OP-530.docx
DOCX document 18 KB Posted
- Solicitation number
- BD-19-1212-MWRA-DITP-130612
- Issued by
- Middlesex County, Cambridge City, Massachusetts
About this file
This is an Advertisement for Bids issued by the Massachusetts Water Resources Authority (MWRA) for electrical improvements at the Prison Point Combined Sewer Overflow (CSO) Facility in Cambridge, Massachusetts. The project scope includes furnishing, installing, connecting, and testing an external generator connection and a new manual transfer switch (MTS) at the facility located at 7 Education Street, Cambridge, MA 02141. Contract documents will be available on the MWRA Supplier Portal on or after Wednesday, June 17, 2026. A mandatory site visit is scheduled for Wednesday, June 24, 2026, at 10:00 a.m., with attendees required to register by contacting Timothy.McAleer@mwra.com by 2:00 p.m. on Tuesday, June 23, 2026. Electronic bids must be submitted through the MWRA Supplier Portal by 2:00 p.m. on Thursday, July 23, 2026, after which bids will be publicly available. No paper bids will be accepted.
The estimated project cost is $280,000.00. Bidders must be classified as electrical contractors and hold current Certificates of Eligibility from the Division of Capital Asset Management and Maintenance (DCAMM), demonstrating appropriate classification and capacity rating to perform the work. An Update Statement must accompany each bid submission. Interested firms must register and join the Plan Holders List through the MWRA Supplier Portal to access contract documents and submit bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS WATER RESOURCES AUTHORITY ADVERTISEMENT FOR BIDS
The Massachusetts Water Resources Authority will receive electronic bids on the MWRA Supplier Portal (www.mwra.com) at the top of homepage) for Prison Point CSO Facility Electrical Improvements, MWRA Contract No. OP-530 until 2:00 p.m., Thursday July 23, 2026, after which the bids will be publicly available.
The contract documents will be posted on the Supplier Portal on or after Wednesday, June 17, 2026. To access the contract documents and submit a bid for this Event, interested firms must register and join the Plan Holders List through the MWRA Supplier Portal. No paper bids will be accepted.
A site visit will be held on Wednesday, June 24, 2026, at 10:00 a.m. at the Prison Point CSO Facility located at 7 Education St. Cambridge, Ma 02141. Attendees must contact Timothy.McAleer@mwra.com by 2:00 p.m. Tuesday, June 23, 2026, to register and to receive site visit instructions.
The work includes: Furnishing, installing, connecting and testing an external generator connection and new manual transfer switch (MTS) at the Prison Point CSO Facility in Cambridge MA.
The estimated project cost is: $280,000.00.
Each bid must be accompanied by a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance (DCAMM) showing that the bidder has the classification and capacity rating to perform the Work and an Update Statement. In order to be eligible to bid, a general bidder must be certified in the following category of work:
ELECTRICAL
MASSACHUSETTS WATER RESOURCES AUTHORITY
Douglas J. Rice, Director Procurement Date: June 13,2026
S/W-149 P no subs Rev. 0 – 10/15
0003-1
File details come from the government source that posted it. Updated .