This document is Addendum No. 1 for the Albert S. Nader Regional Airport On Airport Obstruction Removal project, issued by the City of Oneonta and funded by the Federal Aviation Administration (FAA) and New York State Department of Transportation (NYSDOT). The project involves removing obstructions at the Runway 6 and Runway 24 ends, with a base bid covering the Runway 6 end and an add alternate for the Runway 24 end. The scope includes clearing 4 acres and 0.30 acres in wetlands, tree topping, seeding 5 acres, and mulching 22,280 square yards. The work is to be completed within 75 calendar days between November 1 and March 31, with temporary erosion control measures and wetland crossing mats to be used. Bids are due by 2:00 pm on May 2, 2024, at the City of Oneonta Purchasing Office, with a pre-bid meeting held on April 17, 2024.
The contract requires a 5% bid bond, performance and payment bonds, and a maintenance bond. There are specific DBE participation requirements of 2.15%, with EEO goals of 1.2% for minorities and 6.9% for women. Prevailing wage rates at both federal and state levels must be observed, and there is a Buy American requirement. The project is structured as a single prime contract with the City of Oneonta, with McFarland Johnson serving as the engineering firm. The total project includes items such as sediment filter logs, construction entrance/exit, wetland crossing mats, mobilization, engineer's field office, maintenance and protection of traffic, project survey and stakeout, and various clearing and vegetation management activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Invitation for Bids -Airport Obstruction Removal (003).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
to
CONTRACT DOCUMENTS
for
ALBERT S. NADER REGIONAL AIRPORT
ONEONTA, NEW YORK
ON AIRPORT OBSTRUCTION REMOVAL
FAA AIP 3-36-0092-029-2023
APRIL 25, 2024
On Airport Obstruction Removal Albert S. Nader Regional Airport -2- Addendum 01
ALBERT S. NADER REGIONAL AIRPORT
ONEONTA, NEW YORK
TABLE OF CONTENTS
1. Instructions
2. Pre-Bid Meeting Minutes
3. Contractor Questions
4. Attachments
Pre-Bid Meeting Minutes
Base Bid Tabs
Albert S. Nader Regional Airport -3- Addendum 01
1. INSTRUCTIONS
TO ALL HOLDERS OF CONTRACT DOCUMENTS
Your attention is directed to the following interpretations of, changes and additions to the Contract Documents for the project, “ON AIRPORT OBSTRUCTION REMOVAL” at the Albert S. Nader Regional Airport in Oneonta, New York.
This Addendum constitutes part of the Contract Documents. Should conflicts occur between the Specifications or Drawings with items in the Addendum, the Addendum shall govern. Bidders shall examine carefully all items and determine for themselves what sub-bidders are affected, and notify all bidders or sub-bidders of clarifications, interpretations, or revisions affecting their work. Work described in this Addendum shall be in accordance with specifications for like items unless stated otherwise
Please indicate receipt of this addendum (including date) on sheet P-5 of your Proposal.
Albert S. Nader Regional Airport -4- Addendum 01
2. PRE-BID MEETING MINUTES
2.1 See attached pre-bid meeting minutes.
Albert S. Nader Regional Airport -5- Addendum 01
3. CONTRACTOR QUESTIONS:
Question: Will Switchsoxx be acceptable in lieu of Sediment Filter Log?
Answer: Substitutions must we listed on the NYSDOT Approved Materials List.
https://www.dot.ny.gov/divisions/engineering/technical-services/technical-services-repository/alme/pages/sediment_log-1.html
Question: Is the field office a required item, there is no item no. for payment listed.
Answer: Replace the Base Bid Tabs with the attached.
Question: Will stumping and grubbing occur immediately after clearing, or will it be completed in the spring?
Answer: Stump Griding may occur at any time, there is no restriction.
Question: Will seeding and mulching occur during the 75-day contract in the winter months?
Answer: A stop work period is acceptable. If the contractor feels the seeding and mulching should occur at a later date, the 75 calendar days will be stopped and will restart for seeding and mulching.
Question: Does the sediment filter log have to be removed within the 75-day contract, or will it be removed after vegetation is established?
Answer: Erosion and Sediment control can not be removed until the seeding and mulching has occurred. See answer above regarding potential stop work period.
Question: Can chips and mulch be utilized or left on site?
Answer: Yes, wood chips may be used on-site and spread in upland areas as mulch.
Question: Also, in Appendix C, erosion & sediment control plans, obstruction removal notes #2 it states: NO GRUBBING OR STUMPS OR ROOTS MAY OCCUR. TREE STUMPS SHALL BE LEFT IN PLACE AND GRINDED DOWN TO MATCH EXISTING GRADE. Is this just referring to the wetland clearing?
Answer: No, this is for all clearing within this contract.
Question: There are two styles of temporary wetland crossing mats shown on EC-03 for item C-102-50. Please advise which you would like us to use.
Answer: Either option is acceptable.
Question: Can photos be provided of the site for those that could not attend the pre-bid meeting?
Answer: The site may be visited prior to bidding. Access can be coordinated through the Airport Attendant, Mike Stevens, 607-435-9960.
Albert S. Nader Regional Airport -6- Addendum 01
4. ATTACHMENTS:
Pre-Bid Meeting Minutes
Base Bid Tabs
END OF ADDENDUM No. 1
Albert S. Nader Regional Airport Addendum 01
Attachments
ALBERT S. NADER
REGIONAL AIRPORT
ON AIRPORT OBSTRUCTION REMOVAL
PRE-BID MEETING
10:00 am
APRIL 17, 2024
Introduction
▪ Sign In Sheet
▪ Owner:
▪ City of Oneonta
▪ Funding Agency:
▪ Federal Aviation Administration (FAA) - A.I.P. NO. 3-36-0092-029-2023 (DESIGN)
▪ New York State Department of Transportation (NYSDOT) - PIN 9904.58
▪ Engineer:
▪ McFarland Johnson
▪ Turner Bradford, tbradford@mjinc.com , 518-582-9380
▪ Contract:
▪ Single Prime Contract with the City of Oneonta
Scope of Work
▪ Page Turn Review
Scope of Work
▪ Maintenance and Protection of Traffic
▪ Active Airfield
▪ Review Sheet CS-01 and Appendix A
▪ Survey
▪ Delineate / property boundary & work area
▪ Erosion and Sediment Control
▪ Review Sheet EC-01 through 03
▪ SWPPP – Appendix C
▪ Tree Clearing
▪ Base Bid – RW 6 End
▪ Wetlands not to be impacted
▪ Wetland mats, no ground disturbance
▪ Area of clearing
▪ Area of topping
▪ Add Alternate 1 – RW 24 End
▪ Wetlands not to be impacted
▪ Wetland mats, no ground disturbance
▪ Area of clearing
▪ Tree clearing / stump grinding
▪ All work to be from 11/1 through 3/31
▪ 75 Calendar Days – Base Bid and Add Alternate 1
Contract Requirements
▪ General Provisions
▪ Bonding and Insurance
▪ Bid Bond (5%), Performance and Payment Bond, Maintenance Bond
▪ Prevailing Wage Rates – Special Provisions SP-2
▪ Federal Prevailing Wage
▪ State Prevailing Wage
▪ Buy American Requirement
▪ DBE Requirements
▪ 2.15% DBE Participation
▪ EEO Requirements
▪ Minority 1.2%
▪ Women 6.9%
▪ Standard Clauses for NYS Contracts – Special Provisions SP-5
▪ FAA General Provisions
Schedule
▪ Bids will be received up until 2:00 pm on Thursday, May 2, 2024
▪ City of Oneonta, Purchasing Office, 258 Main Street, Oneonta, NY 13820
• Questions:
• Turner Bradford, tbradford@mjinc.com, and
• Kerriann Harrington kharrington@oneonta.ny.us.
• The deadline for submitting questions is April 21, 2024.
mailto:tbradford@mjinc.com mailto:kharrington@oneonta.ny.us
City of Albert S. Nader Regional Airport
Oneonta Project Pre-Bid Meeting 4/17/2024
On Airport Obstruction Removal
Name, Title, and Company Mailing Address Phone / Fax / Email
John Farney 7610 Yousey Road Phone: 315-783-1161
Croghan, NY 13327 Fax:
Farney Tree & Excavation Email: farneytree_exec@yahoo.com
Jim Bruner 1 Grove St Ste 206 Phone: 585-485-0032
General Superintendent Pittsford, NY 14534 Fax:
Tristate Clearing & Tree Service Email: jbruner@tristatects.com
Hunter Bruner 1 Grove St Ste 206 Phone: 585-485-0032
Pittsford, NY 14534 Fax:
Tristate Clearing & Tree Service Email: hbruner@tristatects.com
Shane G. Slingerland Phone:
Fax:
SGS Development Email: sgslingerland@gmail.com
Tim Byler 745 Martin Hill Rd Phone: 607-222-7754
Harpursville, NY 13787 Fax:
Byler Excavating Email: tim@bylerexcavating.com
Phone:
Fax:
Email:
Phone:
Fax:
Email:
Phone:
Fax:
Email:
Addendum 01 P-6 MJ/18428.10
BASE BID TABS
ITEM NO.
ESTIMATED
QUANTITY
ITEM DESCRIPTION WITH UNIT BID
PRICE WRITTEN IN WORDS
UNIT PRICE AMOUNT
Dollars Cents Dollars Cents
C-102-17 3,200
LF
Sediment Filter Log-Temporary for the unit price per Linear Foot of:
_______________________ dollars
And ___________________ cents
C-102-44
EA
Construction Entrance/Exit-
Temporary for the unit price per
Each of:
C-102-50
LS
Wetland Crossing Mats for the unit price per Lump Sum of:
C-105-1
LS
Mobilization for the unit price per
Lump Sum of:
Addendum 01 P-7 MJ/18428.10
ESTIMATED
QUANTITY
ITEM DESCRIPTION WITH UNIT BID
PRICE WRITTEN IN WORDS
UNIT PRICE AMOUNT
Dollars Cents Dollars Cents
C-105-2
LS
Engineer’s Field Office for the unit price per Lump Sum of:
M-102-1
LS
Maintenance and Protection of
Traffic for the unit price per Lump
Sum of:
M-150-1
LS
Project Survey and Stakeout for the unit price per Lump Sum of:
P-151-1
AC
Clearing for the unit price per Acre of:
P-151-2 0.30
AC
Clearing in Wetlands for the unit price per Acre of:
Addendum 01 P-8 MJ/18428.10
ESTIMATED
QUANTITY
ITEM DESCRIPTION WITH UNIT BID
PRICE WRITTEN IN WORDS
UNIT PRICE AMOUNT
Dollars Cents Dollars Cents
P-151-3
AC
Tree Topping for the unit price per
Acre of:
T-901-1
AC
Seeding for the unit price per Acre of:
T-908-1 22,280
SY
Mulching for the unit price per
Square Yard of: