Old Town Commercial Facade Improvement Program Project at 16825 D Street (CA Rt 66 Museum).pdf

PDF 608 KB Posted

Attached to
Old Town Commercial Facade Improvement Program Project at 16825 D Street (CA Rt 66 Museum)
Solicitation number
MS27-020
Issued by
San Bernardino County, California

About this file

This Request for Bids (MS27-020) is issued by the City of Victorville, California, for the Old Town Commercial Facade Improvement Construction Project at 16825 D Street (CA Route 66 Museum). The project involves facade improvements including demolition of existing signage and plaster accents, stucco patching and repairs, power washing, exterior painting, and fabrication and installation of new signs and accent lighting. The work is located at a single site in the Old Town Area of Victorville. A mandatory pre-bid meeting and job walk is scheduled for November 18, 2026, at 9:00 am PST at 14343 Civic Drive, Victorville, followed by a site visit at 16825 D Street. Prospective bidders must be represented by a duly authorized agent at this meeting, or their bids will be rejected as non-responsive. The deadline for submitting questions is November 25, 2026, at 2:00 pm PST, and sealed bids must be submitted electronically via the City's eProcurement Portal by December 9, 2026, at 3:00 pm PST. Bids will be publicly opened and read aloud immediately following the submission deadline via a virtual Zoom meeting. The successful contractor must complete all work within 60 calendar days from the Notice to Proceed, with liquidated damages assessed at $100.00 per calendar day for delays exceeding this period. Contract award is anticipated within 45 calendar days of the bid opening date.

This project is funded entirely by HUD Community Development Block Grant (CDBG) Program funds, with the City reimbursing the contractor upon inspection approval and completion of work. The higher of either California State Prevailing Wage or Federal Davis-Bacon Wage rates applies to all contractors and subcontractors. Each bid must be accompanied by a bid guaranty of 10 percent of the total bid price, submitted as either a certified cashier's check or bid bond, with the original document mailed within 48 hours of the bid submission deadline. The successful bidder must possess a valid California Contractor's License (B, C-10, or C-45) and register with the California Department of Industrial Relations (DIR) prior to contract award. Contractors must perform at least 20 percent of the contract work with their own forces, with specialty items permitted to be subcontracted. Bidders are required to comply with Build America, Buy America Act (BABA) requirements, ensuring all covered materials are produced in the United States. Additional requirements include submission of valid CARB Certificates of Reported Compliance for Advanced Clean Fleets and off-road diesel vehicles, electronic certified payroll reporting, construction waste recycling plan compliance (65 percent diversion from landfill), and comprehensive insurance coverage including $2,000,000 commercial general liability per occurrence and $4,000,000 aggregate. The City reserves the right to reject any or all bids and to waive immaterial irregularities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BIDS

MS27-020

OLD TOWN COMMERCIAL FACADE IMPROVEMENT PROGRAM

PROJECT AT 16825 D STREET (CA RT 66 MUSEUM)

City of Victorville

14343 Civic Drive

Victorville, CA 92392

RELEASE DATE: November 4, 2026

DEADLINE FOR QUESTIONS: November 25, 2026

RESPONSE DEADLINE: December 9, 2026, 3:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

Request for Bids #MS27-020 Title: OLD TOWN COMMERCIAL FACADE IMPROVEMENT PROGRAM PROJECT AT 16825 D STREET (CA RT 66

MUSEUM)

https://secure.procurenow.com/portal/victorvilleca https://secure.procurenow.com/portal/%7bproject.government.code%7d

City of Victorville

REQUEST FOR BIDS

OLD TOWN COMMERCIAL FACADE IMPROVEMENT PROGRAM PROJECT

AT 16825 D STREET (CA RT 66 MUSEUM)

I. INTRODUCTION

II. NOTICE INVITING BIDS

III. INSTRUCTIONS TO BIDDERS

IV. SCOPE OF WORK

V. PRICING PROPOSAL

VI. BID PROPOSAL FORMS

Attachments:

A - CITY- CONSTRUCTION AGMT FEDERAL PW BABA 08.07.26

B - Davis-Bacon-and-Labor-Standards-Agency-and-Contractor-Guide

D - HUD 4010 UPDATED 2023

E - 4720

F - Federal Project-_WEEKLY_FORMS

G - Updated_WH347 -WEEKLY CERTIFIED PAYROLL FORM

H - Construction_Demolition_Waste_Recycling_Plan_

I - Updated_DASForm140-142_6.2024

J - ADMN26-00060 - Approval Letter with Conditions of Approval v2 TR Designs

K - 26-045 Route 66 CIPs_Museum_Final Plans_26-0604-sm

L - Davis Bacon Wages 10.20.26

M - Guaranty MS27-020

N - Payment Bond MS27-020

O - Performance Bond MS27-020

1. INTRODUCTION

1.1. Summary

PROJECT NAME:

Old Town Commercial Facade Improvement Construction Project at 16825 D Street (CA Route 66 Museum)

1.2. Background

The City of Victorville ("City") is currently offering the Old Town Commercial Facade Improvement

Program ("Program") to assist qualified commercial Property Owners to enhance the appearance of their storefronts in the Old Town Area. The objective of the Program is to facilitate commercial revitalization, stimulate private investment, preserve, and beautify commercial corridors and improve the visual aesthetics of commercial building facades. The Program is intended to assist projects that promote retail activities, create an attractive environment, encourage neighborhood character and architectural design, use quality materials, and incorporate good design concepts.

The Property Owners of the building located at 16825 D Street submitted an application and supporting documentation to participate in the Program and were deemed eligible to participate. Funding is provided by HUD Community Development Block Grant ("CDBG") Program funds with payment of construction tasks made by the City of Victorville upon inspection approval.

1.3. Contact Information

Project Contact:

Liliana Collins

Housing Specialist as CDBG Administrator

14343 Civic Dr

Victorville, CA 92392

Email: lcollins@victorvilleca.gov

Phone: (760) 243-6312

Procurement Contact:

Megan Seidler

Finance Specialist

14343 Civic Drive

Victorville, CA 92392

Email: mseidler@victorvilleca.gov

Phone: (760) 955-5082 Ext: 55082

Department:

City Manager's Office mailto:lcollins@victorvilleca.gov tel:(760)243-6312 mailto:mseidler@victorvilleca.gov tel:(760)955-5082;ext=55082

1.4. Timeline

Release Project Date November 4, 2026

Pre-Proposal Meeting (Mandatory) November 18, 2026, 9:00am

14343 Civic Dr., Victorville CA 92392, Conference

Room A.

Question Submission Deadline November 25, 2026, 2:00pm

Proposal Submission Deadline December 9, 2026, 3:00pm

Bids will be publicly opened and read aloud by the

City Clerk at a virtual meeting, which will be livestreamed via Zoom, "https://victorvilleca-gov.zoom.us/j/84198359981" immediately following the specified bid closing time.

Interested parties may visit Victorville City Hall, Conference Room A, to observe the bid opening via

Zoom.

https://victorvilleca-gov.zoom.us/j/84198359981 https://victorvilleca-gov.zoom.us/j/84198359981

2. NOTICE INVITING BIDS

2.1. SUMMARY:

The City of Victorville ("City") is currently offering the Old Town Commercial Facade Improvement

Program ("Program") to assist qualified commercial Property Owners to enhance the appearance of their storefronts in the Old Town Area. The objective of the Program is to facilitate commercial revitalization, stimulate private investment, preserve, and beautify commercial corridors and improve the visual aesthetics of commercial building facades. The Program is intended to assist projects that promote retail activities, create an attractive environment, encourage neighborhood character and architectural design, use quality materials, and incorporate good design concepts.

2.2. BID SUBMISSION:

The City of Victorville (“City”) will accept sealed bids for the above-referenced Project via the City's eProcurement Portal until 3:00 pm PST on Wednesday, December 9, 2026, at which time the bids will be publicly opened and the bids received will be available for viewing.

Contract Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal.

Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda.

2.3. BID GUARANTY AND BONDS:

Each bid shall be accompanied by a certified cashier’s check, or bid bond, in the amount of 10 percent

(10%) of the total bid price, payable to City of Victorville, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price from the date of the bid opening.

Please scan and upload a copy of your bid bond/cashier's check as part of your bid submission. In addition, Bidders are required to either HAND DELIVER or MAIL the original bid guarantee and must be “POSTMARKED” within (48) forty-eight hours after the bid submission due date.

The bid guarantee must be mailed to the following address:

City of Victorville

14343 Civic Drive

Victorville, CA 92392

Attn: Finance Dept./Purchasing Division

Please have the Bidder Name, Project Number and Title listed clearly on the outside of the envelope.

2.4. DIR REGISTRATION;COMPLIANCE MONITORING:

Pursuant to Labor Code Section 1771.1, the City may not accept a Bid Proposal from or enter into a

Contract with any Bidder, without proof that the Bidder and its prospective subcontractors are registered with the DIR to perform public work pursuant to Labor Code Section 1725.5, subject to limited legal exceptions. This project is subject to compliance monitoring and enforcement by the DIR and the submission of electronic certified payroll records to the California Labor Commissioner in the manner set forth in Labor Code Section 1771.4.

Exceptions to the registration requirement:

The contractor registration requirement does not apply to contractors working solely on public works projects awarded prior to April 1, 2015. Some exceptions allow contractors to bid on federally funded projects or submit joint venture bids without first being registered, as long as the contractors that are parties to the joint venture and the joint venture are registered at the time the contract is awarded.

Contractors who work exclusively on small public works projects are not required to register as a public works contractor or file electronic certified payroll reports for those projects. Contractors are still required to maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner’s

Office upon request. Additionally, awarding agencies are not required to submit the notice of contract award through DIR Public Works website services on projects that fall within the small project exemption.

The small project exemption applies for all public works projects that do not exceed:

• $25,000 for new construction, alteration, installation, demolition or repair

• $15,000 for maintenance

2.5. FEDERAL FUNDING:

This is funded by Community Development Block Grant (CDBG). The higher of either State Prevailing

Hourly Wages or Federal Wage Determination shall apply to and be paid by all contractors and subcontractors performing work on this Project.

2.6. MANDATORY PRE-BID MEETING & JOB WALK

A MANDATORY pre-bid meeting and job walk has been scheduled for all prospective bidders. The meeting will be held on Wednesday, November 18, 2026, at 9:00 am PST at 14343 Civic Dr., Victorville, CA 92392, Conference Room A. Mandatory Site Job walk to follow at 16825 D. Street, Victorville CA

92392. Prospective bidders are encouraged to address questions, problems, and other issues regarding this project. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

A bid received from a Contractor who is not represented by a duly authorized agent at the pre-bid meeting and job walk shall be considered non-responsive and rejected from further contract award consideration. The participant agrees that they are attending the job walk and assumes responsibility for their safety.

2.7. IN-USE OFF-ROAD DIESEL-FUELED FLEET CERTIFICATE OF REPORTED

COMPLIANCE:

Valid CARB Certificates of Reported Compliance as described in California Code of Regulations, Title 13, Section 2449(n) for fleets of vehicles subject to 13 CCR section 2449 are required for this Project.

3. INSTRUCTIONS TO BIDDERS

3.1. BID SUBMISSION

The City's eProcurement Portal Clock is the official timekeeper for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as a poor internet connection. The City of Victorville strongly recommends completing your response well ahead of the deadline. Bidders take full responsibility for the City's receipt of its bid.

Project Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal.

Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda.

3.2. SUBMISSION DOCUMENTS:

All portions of the proposal forms contained in Section 6 Bid Proposal Form - Submission Certification checklist contained in this bid package must be completed to include signed addenda (if any) before the bid is submitted. Failure to do so may result in the bid being rejected as non-responsive.

3.3. CONTRACT DOCUMENTS:

Bidders may download the Contract Documents associated with this Project from the City's eProcurement

Portal. Those registered will be included in a plan holders (followers) list and may receive notices such as delta revisions to the plans or addenda.

3.4. PROJECT QUESTIONS AND ADDENDA:

Bidders shall submit all inquiries regarding this bid via the City’s e-Procurement Portal, located at https://procurement.opengov.com/portal/victorvilleca. Please note the advertised deadline for submitting inquiries is on Wednesday, November 25, 2026, at 2:00 pm PST. All answers to inquiries will be posted on the City’s e-Procurement Portal. As a registered bidder, you will also receive addenda notifications to your email by clicking “Follow” on this project.

Oral explanation or instructions given before the award of a Contract will not be binding. Any information given a prospective Bidder concerning solicitation will be furnished promptly to all prospective Bidders as an addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders.

PLEASE NOTE: Oral explanation or instructions, or written explanations given by personnel other that purchasing staff are not valid and will not be binding.

3.5. BEGINNING OF WORK AND TIME OF COMPLETION

The Contractor shall begin work by the date specified in the City's Notice to Proceed informing him/her that the contract has been awarded and shall diligently prosecute the work so that all the work shall be completed before the expiration of 60 Days CALENDAR DAYS, including the specified starting date.

https://procurement.opengov.com/portal/victorvilleca

3.6. LIQUIDATED DAMAGES

The Contractor shall pay the City the sum of $100.00 per day for each and every calendar day delay in finishing the work as outlined in the Scope in excess of the Sixty (60) CALENDAR DAYS specified below as

Liquidated Damages. The City withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work.

3.7. CONTRACTOR'S LICENSE

The successful bidder and/or specified subcontractor(s) must possess a valid California Contractor’s

License B, C-10 or C-45, at the time of the award of this contract, to complete the work as described. The

Contractor and/or subcontractor shall obtain all required permits and licenses prior to commencing work and shall submit the work in progress to periodic inspection by the appropriate Inspector of the City and shall honor all correction notices issued by same. All contacts, regarding inspections, shall be made to the appropriate department within the City.

3.8. ELECTRONIC CERTIFIED PAYROLL REPORTING (eCPR)

Contractors and subcontractors on all public works projects awarded on or after April 1, 2015, must use this system to furnish certified payroll records (CPRs) to the Labor Commissioner. Contractors and subcontractors who have been submitting PDF copies of their CPRs for earlier projects must also begin using the new system. For more information, please go to www.services.dir.ca.gov/pw. A copy of proof of payroll submission is required with each invoice to the City of Victorville along with copies of Certified Payrolls.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations

(DIR).

3.9. APPRENTICES ON PUBLIC WORKS

The Contractor shall comply with all applicable provisions of Section 1777.5 and 1777.6 of the California Labor

Code relating to employment of apprentices on public works projects. Prior to commencing work on a contract for public works, contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public works. Contractor and subcontractor shall provide and keep accurate payroll records and shall be available for inspection by the Labor Standards Enforcement (full texts of these codes are available at http://www.leginfo.legislature.ca.gov/ ).

3.10. EXAMINATION OF THE PROJECT SITE AND CONTRACT DOCUMENTS:

Prior to submitting a Bid, Bidder shall visit the Project Site and analyze the contents of the solicitation and

Contract Documents in their entirety to satisfy itself that it has the abilities and resources to complete the

Work. Prospective bidders are encouraged to address questions, problems, and other issues regarding this Project. The Bidder agrees that if it is awarded the Contract, no claim will be made against the City based on ignorance or misunderstanding of the provisions of the Contract Documents, the nature and amount of the Work, and/or the physical or climatic conditions of the Project Site.

3.11. BID PROPOSAL FORMS:

The Bid Proposal forms are included of this bid package and must be completed in the manner specified therein and signed in blue or black ink before they are sealed and submitted. Bids are required for the entire Work. The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item in the Bid Schedule included in Section 6 Bid Proposal Forms, are to be included in the cost of the related line item(s) and no additional compensation shall be due to Contractor for the https://www.services.dir.ca.gov/pw http://www.leginfo.legislature.ca.gov/ performance of the Work. The amount of the bid for comparison purposes will be the sum of all the subtotals of each of the Pricing Proposal in Section 5 (the “Total Base Bid”). The Bid Proposal Documents must be fully completed without interlineations, alterations, or erasures. Alteration of the proposal forms is prohibited. Any necessary corrections must be clear and legible and must be initialed by the Bidder or its authorized representative. Additional instructions accompany Bid Proposal forms in Section 6. Failure to properly complete the Bid Proposal forms may result in rejection of the Bid as nonresponsive.

3.12. RETURN OF BID GUARANTY:

The Bid Guaranties accompanying the Bid Proposals of the first, second and third lowest responsive and responsible bidders will be retained by the City until a Contract has been fully executed or all bids have been rejected. Thereafter, those Bid Guaranties, except bidder’s bonds and any guaranties which have been forfeited, will be returned to the respective bidders whose bids they accompanied. The Bid

Guaranties submitted by all other unsuccessful bidders will be returned upon the City’s determination of the first, second, and third lowest responsive and responsible bidders.

3.13. WITHDRAWAL OF BIDS:

Any Bid may be withdrawn by the Bidder at any time prior to the bid opening date and time specified in the Notice of Inviting Bids, as such may be extended by City-issued addenda. Bids may be withdrawn via the City's eProcurement Portal. A Bid withdrawal does not prejudice the right of the Bidder to resubmit a

Bid prior to the bid opening date and time.

3.14. RELIEF OF BIDDERS:

Pursuant to the provisions of Public Contract Code Sections 5100 to 5110, a Bidder may be relieved of its

Bid by the City for mistake. If the Bidder claims a mistake was made in the bid presented, the Bidder shall give the City written notice within five (5) Business Days after the date of opening of the Bids of the alleged mistake, which notice specifies in detail how the mistake occurred. Should the City determine that a

Bidder mistake occurred, the Bidder shall be relieved from its bid and shall not forfeit its bid security.

Pursuant to Section 5105 of the Public Contract Code, a Bidder who claims a mistake shall be prohibited from participating in further bidding on the Project for which the mistake was claimed.

3.15. SUBCONTRACTING

In accordance with the provisions of Sections 4100 through 4113, inclusive, of the California Public Contract

Code (“Subletting and Subcontracting Fair Practices Act”), each Bidder shall submit with his/her/its Bid

Proposal on the List of Subcontractors form included in Section 6 Bid Proposal Forms of the Project Documents:

the name and location of place of business, and Contractor’s License Number of each proposed subcontractor who will perform work or labor or render service to the principal Contractor in an amount in excess of one-half of one percent (0.5%) of the principal Contractor's bid (or in the case of the construction of streets, highways and bridges, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000), whichever is greater); and shall state the portion (type) and percentage of the total contract work which will be done by each such subcontractor. If no subcontractor is listed for a portion of the work, then the Contractor is required to perform that portion with his own forces.

The List of Subcontractors form must be completed in its entirety and submitted as part of Bidder’s Bid

Proposal, together with all other Required Bid Documents and Proposal Forms. If there are no subcontractors, the form shall be submitted with “None” stated thereon.

The Contractor shall perform with its own organization contract work amounting to not less than twenty percent (20%) of the total original contract price. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the amount of work required to be performed by the Contractor’s own organization.

1. “Its own organization” shall be construed to include only workers employed and paid directly by the prime contractor and equipment owned or rented by the prime Contractor, with or without operators. Such term does not include employees or equipment of a subcontractor, assignee, or agent of the prime contractor.

2. “Specialty Items” shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid on the contract as a whole and in general are to be limited to minor components of the overall contract.

3.16. AWARD OF CONTRACT

The City reserves the right to reject any or all Bid Proposals and waive any immaterial irregularities or informalities in any Bid Proposal or in the bidding. The award of a construction contract, if one is to be awarded, shall be made within Forty-five (45) calendar days of the date specified for publicly opening Bid

Proposals, unless otherwise specified herein. Award of a construction contract, if an award is made, shall be to the lowest responsible bidder whose Bid Proposal conforms to the Contract Documents. For the purposes of evaluating the lowest Bid Proposal price and selecting the lowest bidder, the lowest Bid Proposal price shall be the lowest total of the summation of all individual line items on the Bid Proposal Forms.

The Bidder’s signature on the Bid Proposal Forms shall constitute a commitment on the part of the Bidder to furnish the equipment, materials, supplies, and labor required to perform the contemplated work, for the amount set forth on the Bid Proposal Price Schedules contained therein, and in accordance with all the required provisions of the Contract Documents. The Bidder to whom the contract is awarded shall be notified in writing upon approval of the award by the City Council.

3.17. EXECUTION OF CONTRACT:

A construction Contract shall be signed by the successful Bidder and returned, together with the contract bonds (Faithful Performance and Payment Bond), proof of required insurance coverage and endorsements, and a copy of the Bidder’s City of Victorville Business License within ten (10) Business Days after the Bidder has received the Contract for execution.

3.18. FAILURE TO EXECUTE CONTRACT:

Following award, the failure of the lowest responsive and responsible Bidder, the second lowest responsive and responsible Bidder, or the third lowest responsive and responsible Bidder to timely execute the Contract, and provide the items set forth of these Instructions to Bidders, shall result in the forfeiture of such Bidder’s Bid Proposal guaranty. The successful bidder may file with the City a written notice, signed by the bidder or the bidder’s authorized representative, specifying that the bidder will refuse to execute the Contract if it is presented. The filing of this notice shall have the same force and effect as the failure of the bidder to execute the Contract and furnish acceptable bonds, proof of insurance coverage and endorsements, and a City business license within the time hereinbefore prescribed.

3.19. EVALUATION OF BID PROPOSAL

City reserves the right to reject any or all bids and waive any immaterial irregularities or informalities in any bid or in the bidding. Award of a contract, if any, shall be made to the lowest responsible bidder whose Bid complies with the specified requirements.

3.20. PROHIBITED CONFLICT OF INTEREST

Contractor, its officers, employees, subcontractors, and/or agents may not have, maintain, or acquire a prohibited conflict of interest in relation to the Project or any contract awarded thereunder, in violation of any

City ordinance or requirement, or in violation of any applicable law, including without limitation: California

Government Code Section 1090 et seq.; California Government Code Section 81000 et seq. (the Political Reform

Act); or the regulations of the Fair Political Practices Commission (FPPC) in Division 2 of Title 2 of the California

Code of Regulations.

If Contractor is a “Consultant” as that term is defined in Section 18700.3 of Title 2 of the California Code of

Regulations, or when otherwise directed by the City, Contractor will disclose its financial interests as required by the City’s Conflict of Interest Code by completing and filing a Statement of Economic Interests (FPPC Form

700) with the Victorville City Clerk’s office.

No member, officer, or employee of the City engaged in the selection, award, or administration of a contract for this Project shall have any prohibited conflict of interest, whether real or apparent, in any contract awarded hereunder or in the proceeds thereof.

3.21. AFFIRMATIVE ACTION

The City hereby notifies all bidders that it will affirmatively ensure that, in any Contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration of award.

3.22. INSURANCE

COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY INSURANCE

Contractor shall procure and maintain at its own expense, during the term of this Agreement, commercial general liability insurance, of not less than Two Million Dollars ($2,000,000) per occurrence, and Four Million

Dollars ($4,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by the Contractor or its officers, employees, servants, volunteers, and agents and independent contractors.

Contractor shall further procure and maintain, at its own expense, during the Term of this Agreement, commercial vehicle liability insurance covering personal injury and property damage, of not less than Two

Million Dollars ($2,000,000) Combined Single Limit, covering any vehicle(s) utilized by Contractor or its officers, employees, servants, volunteers, or agents and independent contractors in performing the services required by this Agreement.

PROFESSIONAL LIABILITY

Professional Liability Insurance or Errors and Omissions insurance as appropriate to Contractor’s profession shall be required and written on a policy form specifically designed to provide coverage for and protect against the negligent acts, errors and omissions of the Contractor in the performance of the services required by this Agreement. A minimum limit of $2,000,000 per claim and in the aggregate must be provided.

POLLUTION LIABILITY

Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions applicable to the work being performed, with a limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.

ADDITIONAL INSURED

Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation coverage, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers, and agents and independent contractors, including, without limitation, the City Attorney, are named as Additional Insureds.

WAIVER OF SUBROGATION RIGHTS

Contractor shall require the carriers of all required insurance policies to waive all rights of subrogation against the City and its officers, volunteers, employees, contractors, and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.

PROOF OF INSURANCE COVERAGE; REQUIRED PRIOR TO COMMENCEMENT OF SERVICES

a. Contractor shall secure from a good and responsible company or companies authorized to do insurance business in the State of California the policies of insurance required by this Agreement and furnish to the City

Clerk certificates of said insurance at least one (1) day prior to the commencement of any services to be performed under this Agreement.

b. The certificates of insurance shall bear an endorsement whereby it is provided that, in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of non-payment, ten (10) days’ advance written notice shall be given.

c. The certificates of insurance shall bear an endorsement whereby it is provided that the respective insurance policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.

d. The certificates of insurance shall indicate that the respective insurance policy will be maintained throughout the Term of this Agreement.

e. The commercial general liability and vehicle liability policies shall be endorsed to contain the following provision: “For any claims related to this contract, the Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.”

3.23. CLAIMS AND DISPUTE RESOLUTION

Except for such claims as defined in and covered by California Public Contract Code Section 9204 (“Section

9204”), which are subject to the procedures set out in therein (the full text of Section 9204 is set forth below), any dispute arising out of or relating to the provisions of any construction Contract awarded for this Project, or the breach thereof, shall be settled in the manner set forth in the executed Contract, or if not specified therein, by the following process:

A. Each Party shall designate a senior management or executive level representative to negotiate any dispute.

B. The representatives shall attempt, through good faith negotiations, to resolve the dispute by any means within their authority.

C. If the issue remains unresolved after ten (10) days of good faith negotiations, the Parties shall attempt to resolve the disagreement by negotiation between the legal counsel for each Party. If the above process fails, the Parties may mutually agree to engage in non-binding mediation or arbitration in which the Parties equally share the costs of any mediator or arbitrator, or may proceed with suit or other remedies, subject to the provisions of paragraph (5) below and other applicable provisions and laws.

D. The alternative dispute resolution process set forth herein is a material condition of any Contract entered into for the Project and must be exhausted as an administrative remedy prior to either Party initiating legal action.

E. Compliance with Victorville Municipal Code Section 2.24.020 and the provisions of the Government

Claims Act (Government Code section 810 et seq.) is also required prior to initiating suit against the

City.

California Public Contract Code Section 9204.

(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.

(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.

(c) For purposes of this section:

(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:

(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.

(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.

(C) Payment of an amount that is disputed by the public entity.

(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section

7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.

(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of

California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.

(B) “Public entity” shall not include the following:

(i) The Department of Water Resources as to any project under the jurisdiction of that department.

(ii) The Department of Transportation as to any project under the jurisdiction of that department.

(iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.

(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.

(v) The Military Department as to any project under the jurisdiction of that department.

(vi) The Department of General Services as to all other projects.

(vii) The High-Speed Rail Authority.

(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section

7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.

(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.

(B) The claimant shall furnish reasonable documentation to support the claim.

(C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.

(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph

(3) shall apply.

(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.

(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.

(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.

(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.

(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.

(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.

(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that

(1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

(g) This section applies to contracts entered into on or after January 1, 2017.

(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes or extends that date.

3.24. INDEMNIFICATION

a. Notwithstanding the limits of any insurance and to the fullest extent permitted by law, Contractor shall indemnify the City, its elected or appointed officials, officers, agents, volunteers and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (hereinafter

"Claims or Liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or in connection with the performance of the Work, operations, or activities of Contractor, its agents, employees, Subcontractors, or invitees on the Project, or arising or alleged to arise from the acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's performance of or failure to perform any term, provision, covenant or condition of this Contract, but excluding such Claims or Liabilities or portion of such Claims or Liabilities arising or alleged to arise from the active negligence, sole negligence, or willful misconduct of the City, its elected or appointed officials, officers, agents, volunteers, or employees, and in connection therewith:

(1) Contractor will defend any action or actions filed in connection with any of said Claims or

Liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;

(2) Contractor will promptly pay any judgment rendered against the City, its elected or appointed officials, officers, agents, volunteers, or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor's (or its agents', employees', Subcontractors' or invitees') performance of or failure to perform such Work, operations or activities hereunder; and Contractor agrees to save and hold the City, its elected or appointed officials, officers, agents, volunteers and employees harmless therefrom;

(3) In the event the City, its elected or appointed officials, officers, agents, volunteers, or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising or alleged to arise out of or in connection with the performance of or failure to perform the Work, operation, or activities of Contractor hereunder, Contractor shall pay to the City, its elected or appointed officials, officers, agents ,volunteers, or employees, any and all costs and expenses incurred by the City, its elected or appointed officers, officials, agents, volunteers, or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees for counsel acceptable to City;

(4) Contractor's duty to defend, indemnify, and hold harmless as set out in this Section shall include any claims, liabilities, obligations, losses, demands, actions, penalties, suits, costs, expenses or damages or injury to persons or property arising or alleged to arise from, in connection with, as a consequence of, or pursuant to any state or federal law or regulation regarding hazardous substances, including but not limited to, the Federal Insecticide, Fungicide and Rodenticide Act

("FIFRA"), Comprehensive Environmental Response, Compensation and Liability Act of 1980

("CERCLA"), Resource Conservation and Recovery Act of 1976 ("RCRA"), the Hazardous and Solid

Waste Amendments of 1984, the Hazardous Material Transportation Act, the Toxic Substances

Control Act, the Clean Air Act, the Clean Water Act, the California Hazardous Substance Account

Act, the California Hazardous Waste Control Law or the Porter-Cologne Water Quality Control Act, as any of those statutes may be amended from time to time.

b. City will timely notify Contractor upon receipt of any third-party claim relating to the Contract, as required by Public Contract Code § 9201. The Contractor's indemnification and defense obligations pursuant to this Section shall survive the termination of this Contract. Contractor shall require the same indemnification provisions provided for herein from all Subcontractors.

3.25. TERMINATION OR SUSPENSION

a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.

b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.

3.26. TERMINATION FOR DEFAULT

In the event either party fails to perform its obligations hereunder, the non-defaulting party shall provide the defaulting party written notice of such default. The defaulting party shall have ten (10) calendar days to cure the default; provided that, if the default is not reasonably susceptible to being cured within said ten (10) calendar days, the defaulting party shall have a reasonable time to cure the default, not to exceed a maximum of thirty (30) calendar days, so long as the defaulting party commences to cure such default within ten (10) calendar days of service of such notice and diligently prosecutes the cure to completion; provided further that if the default is an immediate danger to the health, safety and general welfare, the defaulting party shall take such immediate action as may be necessary. Notwithstanding the foregoing, the non-defaulting party may, in its sole and absolute discretion, grant a longer cure period. Should the defaulting party fail to cure the default within the time period provided in this Section, the non-defaulting party shall have the right, in addition to any other rights the non-defaulting party may have at law or in equity, to terminate this Contract. Compliance with the provisions of this Section shall be a condition precedent to bringing any legal action, and such compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured.

3.27. OWNERSHIP OF DOCUMENTS

All drawings, specifications, reports, records, documents and other materials prepared by Contractor, its employees, subcontractors and agents in the performance of this Contract shall be the property of the City and shall be delivered to the City upon request of the Economic Development Administrator or her designee or upon the termination of this Contract, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by the City of its full rights of ownership of the documents and materials hereunder. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to the City of any documents or materials prepared by them, and in the event, Contractor fails to secure such assignment, Contractor shall indemnify the City for all damages resulting there from.

3.28. PREVAILING WAGE

Payment of State Wages Required when Higher. Payment of State prevailing wage rates, when higher than Federal Davis-Bacon prevailing rates, are required whenever federally funded or assisted projects are controlled or carried out by California awarding bodies of any sort. The City of Victorville is considered a California awarding body. Therefore, the higher of State Prevailing Wage and Federal Davis-Bacon Wage rates shall apply to and be paid by all Contractors and subcontractors performing work on this Project.

Federal – The general Federal prevailing rate of wages, as determined by the Secretary of Labor are included as part of the attachments of the Contract Documents (General Federal Wage

Decision); provided, that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates.

The General Federal Wage Decision that is in effect on the date of the bid opening, as long as the

Contract is awarded within ninety (90) days of said date, locks in that Federal Wage Decision for the entire duration of the Project. If the contract is not awarded within such ninety (90) day period, the date of the execution of the Contract would be the date used in determining the applicable

Federal Wage Decision.

Revisions to the General Federal Wage Decision, up to fourteen…