OK FLAP CLE 10(1) Lake Thunderbird Access 100 Percent Plans 2 15 23.pdf
PDF 31 MB Posted
- Attached to
- OK FLAP CLE 10(1), Lake Thunderbird Access Federal contract opportunity
- Solicitation number
- 6982AF23B000010
About this file
This federal contract opportunity is for rehabilitation work on road segments and a parking area at Lake Thunderbird State Park in Oklahoma. The Department of Transportation Federal Highway Administration is seeking bids for full depth reclamation and asphalt overlay of 0.91 miles of two road segments and one parking area at the park under solicitation number 6982AF23B000010. The project involves improving existing roads and a parking area that experience wear through regular use and require resurfacing and structural repair work to restore them for continued vehicular traffic.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary Sched and Opt. OK FLAP CLE 10(1), Lake Thunderbird Access.pdf | ||
| 6982AF23B000010 Questions and Answers 04 04 2023.pdf | ||
| Interested Vendors List 04 04 2023.pdf | ||
| INTERESTED VENDORS LIST 03 20 2023.pdf | ||
| 6982AF23B000010 Questions and Answers 03 20 2023.pdf | ||
| OK FLAP CLE 10(1) Lake Thunderbird Access 100 Percent Pavement Report.pdf | ||
| Lake Thunderbird Utility Plans 8-75.pdf | ||
| FP-14_Eng.pdf | ||
| 6982AF23B000010 IFB OK FLAP 10(1) Lake Thunderbird Access .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/15/23 for:
jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:2
P
M
N o v e m b e r
S h e e t
F .0
C
F L H
D
O K
F L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
Y M
C
L E
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A2
UTILITY SYMBOLS
SIGN SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
GUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
N
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
GUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
:4
N o v e m b e r
S h e e t
F .0
C
F L H
D
O K
F L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t P ro d u c ti o n \S
Y M
(G R
C A
)F T
N P
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
A3
STATE PROJECT
NO.
SHEET
D A
T E
T
IM
E
D
G N
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SURVEY CONTROL
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A4
101+90.41
110+45.08
139+60.71
200+21.12
204+85.55
208+60.93 n/a* n/a* n/a* n/a* n/a*
-51.44
-38.62
54.98
23.00
50.72
-35.63 n/a* n/a* n/a* n/a* n/a*
*See notes
5. Point 2010 - This point is located along Breakwater Drive. This Option was removed from the project Options.
This point is located along Breakwater Drive. This Option was removed from the project Options.4. Point 2009 -
3. Point 2008 - This point is located along Breakwater Drive. This Option was removed from the project Options.
2. Point 2004 - This point is located at the Turkey Pass Parking Lot, inside island 1. See sheet D1.
1. Point 2003 - This point is located at the Turkey Pass Parking Lot, 51.55' south of the existing stop sign. See sheet D1.
NOTES:
VICINITY MAP
35 miles
To Oklahoma City, OK
H W
Y.
D a m
R d
T h u n d e r b ir d
E Lindsey St.
C h a p a rr a l R d . C o u n tr y w o o d E s ta te s th A v e S
E
F is c h e r D r
Y u cca R d n d A v e S
E
C ha pa rr al R d.
th A v e S
E1 th A v e S
E th A v e S
E n d A v e S
E
A r e a
R o a d
A r e a R o a d
Calypso Cove Ave
C a ly p s o C o v e A v e
B re a k w a te r
D r
Clear Bay Avenue
See site map, sheet A6
Clear Bay Avenue
Schedule A
See site map, sheet A6
Turkey Pass Parking Area
Schedule A
See site map, sheet A7
Area 2 Road
Option X
Staging Area
Scale in Feet
500' 1000'01000' 2000'
136th Ave SE
See site map, sheet A7
Cutting Culvert Location
Area 2 Road
Option X
Park boundary
Turkey Pass Campground
:4
S e p te m b e r
V a c in it y
F
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\1 S it e M a p s \S
T E
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
A5
Station 100+38
CLEAR BAY AVENUE
OK FLAP CLE 10(1)
Begin Schedule A
Turkey Pass Parking Area
OK FLAP CLE 10(1)
Schedule A
Equine Pullout
SCHEDULE A
SITE MAP
Turkey Pass Campground
Station 139+30
Clear Bay Avenue
OK FLAP CLE 10(1)
End Schedule A
800'400'0
Scale in Feet
Lake Thunderbird pay station
Clear Bay trails trailhead
MP 0.92
Cleaning culvert in place
OK FLAP CLE 10(1)
Schedule A
H W
Y
A r e a
R o a d
Park boundary
C lear B ay A ven u e
:4
A
S e p te m b e r
S c h e d u le
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\1 S it e M a p s \S
T E
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
A6
Station 200+00
Area 2 Road
OK FLAP CLE 10(1)
Begin Option X
Station 208+81
Area 2 Road
OK FLAP CLE 10(1)
End Option X
OPTION X
SITE MAP
800'400'0
Scale in Feet
Turkey Pass Parking Area
Calypso Cove Marina
Turkey Pass Campground
Critter Alley Campground
MP 0.15
Removal of pipe culvert (cut culvert), see Sheet F1
Clean culvert in place
Area 2 Road
OK FLAP CLE 10(1)
Option X
A r e a
R o a d
A r e a
R o a d
C a ly p s o C o v e A v e
Calypso Cove Ave
B re a k w a te r
D r
C lear B ay A ve
Park boundary
200+00
201+00
202+00
203+00
204+00
205+00
206+00
+00
8+00
:3 e p te m b e r
O p ti o n s
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\1 S it e M a p s \S
T E
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
A7 roadway aggregate
STA 100+38 to STA 103+57
SCHEDULE A
MAINLINE TYPICAL SECTION 1
existing ground
Approximate
2%2%
Tack coat between lifts
Construction Limits
6.0'
Shldr 0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 7" shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime coat, method 1 placed in two lifts
4" Asphalt concrete Pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ. both sides)
See sheet A13 for safety
1:4 1:4
STA 132+00 to STA 139+30
STA 127+80 to STA 128+80
STA 110+30 to STA 127+00
STA 103+57 to STA 105+48
SCHEDULE A
MAINLINE TYPICAL SECTION 2
ground existing
Approximate
Tack coat between lifts
Construction Limits
0.5'
Shldr
0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 7" shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime coat, method 1 placed in two lifts
4" Asphalt concrete pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ. both sides)
See sheet A13 for safety
1:4 1:4 for pullout tie in
See cross sections
0.0'-5.0'
Curve widening
See T13 for centerline striping details
See A8 for curve widening details
0.0'-3.0'
Curve widening
NO SCALE
PAVEMENT SECTION
CLEAR BAY AVENUE
Fog seal
Tack coat
Prime coat
8-inch depth with cement, Full depth reclamation pavement
2" Asphalt concrete nominal maximum aggregate size.
1. ODOT Type S5 should have a 3/8-inch
Notes:
pavement
2" Asphalt concrete
See T13 for centerline striping details
See A8 for curve widening details
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
Varies
7"
Varies
7"
7"
7"
:2
F e b r u a r y
T y p ic a l s e c ti o n s B
IR
D
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\T Y
P
C L
E
(1 d g n
TYPICAL SECTIONS
MAINLINE
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A9
STA 128+80 to STA 129+30
STA 127+00 to STA 127+80
STA 105+48 to STA 110+30
SCHEDULE A
MAINLINE TYPICAL SECTION 3
existing
Approximate
Tack coat between lifts
Construction Limits
0.5'
Shldr
0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 7" shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime coat, method 1 placed in two lifts
4" Asphalt concrete pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ. both sides)
See sheet A13 for safety
1:4
1:4 1:
and plan and profiles
See cross sections
Ditch depth varies
STA 129+30 to STA 132+00
SCHEDULE A
MAINLINE TYPICAL SECTION 4
Approximate
Tack coat between lifts
Construction Limits
0.5'
Shldr
0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 7" shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime coat, method 1 placed in two lifts
4" Asphalt concrete pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ.both sides)
See sheet A13 for safety
1:4 1:4 1:
and plan and profiles
See cross sections
Ditch depth varies
1:3
See cross sections
Ditch depth varies
0.0'-3.0'
Curve widening
NO SCALE
See T13 for centerline striping details
See A8 for curve widening details
See T13 for centerline striping details
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
Varies
7"
7"
Varies
7"
7"
:2
F e b r u a r y
T y p ic a l s e c ti o n s B
IR
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \T
Y P
C
L E
(1 d g n
TYPICAL SECTIONS
MAINLINE
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A10
STA 200+30 to STA 205+90
OPTION X
MAINLINE TYPICAL SECTION 5
Match existingMatch existing
Tack coat between lifts
Construction Limits
0.5'
Shldr
0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 6" shouldering up.
Place over the shoulder after
Windrow conserved topsoil. Prime coat, method 1 placed in two lifts
3.5" Asphalt concrete pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ. both sides)
See sheet A13 for safety
1:4
1:4
1:
1:50
MAINLINE TYPICAL SECTION 6
Match existingMatch existing existing
Approximate
Tack coat between lifts
Construction Limits
0.5'
Shldr
0.5'
Shldr
Existing asphalt pavement (depth varies) past proposed edge of asphalt (typ. both sides)
Extend full depth reclamation 6" shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime Coat placed in two lifts
3.5" Asphalt concrete pavement, Fog Seal
10.5' Typical
Traveled way
10.5' Typical
Traveled way
8-inch depth
Full depth reclamation with cement, edge detail (typ. both sides)
See sheet A13 for safety
1:4 1:4
STA 205+90 to STA 208+81
OPTION X
NO SCALE
ground existing
Approximate nominal maximum aggregate size.
1. ODOT Type S5 should have a 3/8-inch
Notes:
PAVEMENT SECTION
AREA 2 ROAD
Fog seal
Tack coat
Prime coat
8-inch depth with cement, Full depth reclamation pavement
2" Asphalt concrete pavement
1.5" Asphalt concrete
See T13 for centerline striping details
See T13 for centerline striping details
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
30'
Maximum construction limit offset
6"
Varies
6"
6.0'
6"
Varies
6"
:2
F e b r u a r y
T y p ic a l
S e c ti o n s B
IR
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \T
Y P
C
L E
(1 d g n
TYPICAL SECTIONS
MAINLINE
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A11
SCHEDULE A
TURKEY PASS PARKING LOT SECTION
existing ground
ApproximateMatch existing shouldering up.
Place over the shoulder after
Windrow conserved topsoil.
Prime coat, method 1 placed in two lifts
3.5" Asphalt concrete pavement, Parking lot
8-inch depth
Full depth reclamation with cement, edge detail (typ.both sides)
See sheet A13 for safety
1:4
Construction Limits nominal maximum aggregate size.
1. ODOT Type S5 should have a 3/8-inch
Notes:
PAVEMENT SECTION
TURKEY PASS PARKING LOT
Fog seal
Tack coat
Prime coat
8-inch depth with cement, Full depth reclamation pavement
2" Asphalt concrete pavement
1.5" Asphalt concrete
6"
Varies
:2
F e b r u a r y
T y p ic a l
S e c ti o n s D
IN
O
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \T
Y P
C
L E
(1 d g n
TYPICAL SECTION
PARKING LOT
TURKEY PASS
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A12
PROFILE
NO SCALE
Existing pavement existing asphalt
Saw cut
Tack Coat
TYPICAL TRANSVERSE TRANSITION DETAIL
CONNECTION DETAILS
M a tc h e x is ti n g
Asphalt concrete pavement
Finished pavement
Tack coat
TYPICAL CONCRETE CURB CONNECTION DETAIL
SECTION
Finished pavement
(see typical sections)
Concrete Pavement
Asphalt
8-inch depth
Full depth reclamation with cement, SAFETY EDGE DETAIL pavement
Edge of proposed existing ground
Approximate
Full depth reclamation with cement, 8-inch depth
First lift of asphalt
Second lift of asphalt
Existing edge of asphalt
Method 2 (see note)
Roadway Aggregate, material and supplemental
Shoulder up with windrowed specified in typical sections proposed pavement as wider than top edge of
Construct pulverized base
8-inch depth to back face of curb
Extend full depth reclamation with cement, Parking Area
Existing edge of asphalt
1:4 necessary for drainage and appearance.
Then place topsoil on slope. Shape and compact according to Subsection 204.1 as
Windrow existing topsoil to toe of slope, shoulder up with roadway aggregate, method 2.
NOTE:
PROFILE
Existing pavement existing asphalt
Saw cut
Tack Coat
TYPICAL PULLOUT TRANSITION DETAIL
M a tc h e x is ti n g
Finished pavement
(see typical sections)
Concrete Pavement
Asphalt
8-inch depth
Full depth reclamation with cement, Varies
±3.5%
PROFILE
Tack Coat
TYPICAL ASPHALT CURB CONNECTION DETAIL
Finished pavement
(see typical sections)
Concrete Pavement
Asphalt
8-inch depth
Full depth reclamation with cement, Existing asphalt curb
Existing pavement
Match existing
Parking Area
8-inch depth
Full depth reclamation with cement, D e p th v a r ie s
F
D R ty p
F
D R ty p
D e p th v a r ie s
F
D R ty p
F
D R ty p
D e p th v a r ie s
F
D R ty p
:1
N o v e m b e r
C o n n e c ti o n s D e ta il s B
IR
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\T Y
P
C L
E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A13 b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k e d
NOTE:
Paved length
NO SCALE
(1:6 desirable)
1:4 or flatter base edge
Aggregate
FDR base with 8-inch roadway aggregate base.
paved. Where the existing approach is unpaved, substitute thicknesses and foreslopes when existing approach is
Refer to mainline typical sections for structural section
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
base edge
Aggregate b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k e
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
3.
1.
6.
2.
6.
2.
6.
7.
Typical culvert location edge subgrade
Normal
Aggregate base edge R
R1 with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±3.5%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
Variable
V a ria b le
A s
B
A
B
M a in li
Mainline
±3.5%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li
(optional) design grade
Typical maximum
A
A B
B
SECTION A-A
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
ROAD SECTIONS
TYPICAL APPROACH
widths greater than 15 feet.
Apply the normal crown (2%) to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft) W
WIDTH
MIN.
(ft) R
RADIUS
MIN.
N/A
4' (typ.)
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing grade ±10% Typical maximum
VPI
VPC
90°
Total length
WW
Variable
W
Variable
3' minimum
16'x
20' desired 15' min.
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
:3
N o v e m b e r
T y p ic a l S e c ti o n s A p p ro a c h
R o a
.0
C
F L H
D
O K
F L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t P ro d u c ti o n \T
Y P
C
L E
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
A14
Transition Taper, T1 Length, L Transition Taper, T2
Normal Shoulder
W id th
W
NO SCALE
Normal Shoulder
MATCH EXISTING PULLOUT PLAN
Mainline Mainline pullout area
Match existing irregularRadius
TYPICAL PARALLEL PULLOUT PLAN
Existing Slope
Variable ground Existing
See Detail B
1:4 3.
Width Shown in Table Above
W
Mainline Shoulder
Normal Limit of
PAVED PULLOUT TYPICAL SECTION
Varies 4.
Asphalt concrete pavement
DETAIL B
1:4 3.
See Typ. Sec.
material aggregate
8" roadway
Section aggregate, see Typical
Shoulder up with roadway pavement edge (safety edge)
Construct 30°
Notes:
See Typ. Sec.
base material
8" roadway aggregate
See Typ. Sec.
concrete pavement
4" asphalt
5.
4.
3.
2.
1.
Pullout surfacing and earthwork quantities are included in mainline quantities.
See the mainline cross sections for cross slope.
as necessary, but not steeper than 1:2, to stay on the existing bench.
Construct a 1:4 foreslope unless otherwise directed by the CO. Steepen the foreslopes lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts. Apply tack coat to the first
Dimensions shown are approximate and may be varied by the CO.
30°
8"
:0 a y
U
S
S u r_ ft
.0
C
F L
H D
C
O F
T F
S
(1
T ri c k e l
P a rk
R o a d
\D ra w in g s \D
G N
\4
S h e e t
P ro d u c ti o n
\S ta n d a rd
D e ta il s \T
Y P
S
C H
-A
O P
T -W
P u ll o u ts .d g n
TYPICAL SECTIONS
PULLOUT
STATE PROJECT
NUMBER
SHEET
CO
LAKE THUNDERBIRD ACCESS
A15
Sheet and Description
B6 B7 B8-B11 B12-B13 B14
Surfacing
Summaries
Approach Roads &
Turnout
Summaries
Miscellaneous
Summaries
Signing and
Pavement
Markings
Summaries
Temporary Traffic
Control
Summaries
Allowances Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-3000 SURVEY AND STAKING, PARKING
AREA LPSM All ALL
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 3 3
A0080 15225-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING CONTROL MILE 0.737 0.737
A0100 15236-2000 SURVEY CONTROL, GRADE
FINISHING MILE 0.737 0.737
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0140 15401-0000 CONTRACTOR TESTING LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0200 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A0220 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0240 20301-2000 REMOVAL OF PIPE END SECTION EACH 1 1
A0260 20301-2400 REMOVAL OF SIGN EACH 8 8
A0280 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 1,592 78 1,670
A0300 20302-2310 REMOVAL OF CABLE LINE
(Traffic Detector) LNFT 30 30
A0320 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 3 3
A0340 20401-0000 ROADWAY EXCAVATION CUYD 578 22 600
A0360 20402-0000 SUBEXCAVATION CUYD 10 10
A0380 20425-1000 DITCH, EXCAVATION LNFT 1,120 40 1,160
A0400 25701-0400 CONTRACTOR FURNISHED
REINFORCED CONCRETE RETAINING
WALL DESIGN LPSM ALL
A0420 25801-0000 REINFORCED CONCRETE RETAINING
WALL SQFT 260 260
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 200 227 23 450
A0460 30502-0800 FULL DEPTH RECLAMATION WITH
CEMENT, 8-INCH DEPTH SQYD 10,270 8,181 919 19,370
A0480 30510-0000 CEMENTITIOUS MATERIAL TON 175 139 16 330 Used 4% of Full Depth Reclamation tonnage for estimating purposes
A0500 40301-0000 ASPHALT CONCRETE PAVEMENT TON 2,195 1,678 107 3,980
A0520 40601-0000 FOG SEAL TON 6.1 5.4 11.5
A0540 41101-1000 PRIME COAT, METHOD 1 TON 8.6 7.2 0.7 16.5
A0560 41105-0000 BLOTTER TON 5 5
A0580 41201-0000 TACK COAT TON 4.1 3.6 0.3 8.0
h tt p s
/d ja n d a -m y .s h a re p o in t.
c o m
/p e rs o n a l/ c o n o r_ m c a rd le d ja n d a c o m
/D o c u m e n ts
/D e s k to p /N e w
T b ir d s u m m a ry b ro k e n .x ls m
]S h e t
MileStone: 100%
Date Completed: 02/15/23
Report Date: 02/15/23
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -F e b -2
:5
A
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated
Quantities
STATE PROJECT
B1OK
SHEET
NUMBER
FLAP CLE 10(1)
LAKE THUNDERBIRD ACCESS
Surfacing
Summaries
Approach Roads &
Turnout
Summaries
Miscellaneous
Summaries
Signing and
Pavement
Markings
Summaries
Temporary
Traffic Control
Summaries
Allowances Bid
Schedule
A0600 50101-0800 MINOR CONCRETE PAVEMENT,
REINFORCED, 8-INCH DEPTH SQYD 89 89
A0620 60201-0600 18-INCH PIPE CULVERT LNFT 28 2 30
A0640 60201-0800 24-INCH PIPE CULVERT LNFT 36 2 38
A0660 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 3 3
A0680 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 2 2
A0700 60704-0000 CLEANING CULVERT IN PLACE EACH 4 4
A0720 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 1,573 27 1,600
A0740 60915-1000 WHEELSTOP, CONCRETE EACH 8 8
A0760 61401-0000 LEAN CONCRETE BACKFILL CUYD 4 4
A0780 61501-0100 SIDEWALK, CONCRETE SQYD 148 2 150
A0800 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 29 1 30
A0820 61509-0000 DETECTABLE WARNING PANELS SQYD 7 3 10
A0840 61801-0000 CONCRETE BARRIER LNFT 88 2 90
A0860 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 80
A0880 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 80
A0900 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 80
A0920 62201-1300 BULLDOZER, 160HP MINIMUM
FLYWHEEL POWER HOUR 80
A0940 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 80
A0960 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 80
A0980 62301-0000 GENERAL LABOR HOUR 100
A1000 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 10
A1020 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 10
A1040 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 5,458 242 5,700
A1060 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.12 0.06 1.18
A1080 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.12 0.06 1.18
A1100 62520-0000 FERTILIZER ACRE 1.12 0.06 1.18
A1120 63301-0000 SIGN SYSTEM EACH 14 14
Remarks and/or Determination of Estimated Quantity
-F e b -2
:5
A
M
MileStone: 100%
Date Completed: 02/15/23
Report Date: 02/15/23 h tt p s
/d ja n d a -m y .s h a re p o in t.
c o m
/p e rs o n a l/ c o n o r_ m c a rd le d ja n d a c o m
/D o c u m e n ts
/D e s k to p /N e w
T b ir d s u m m a ry b ro k e n .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
B2OK
SHEET
NUMBER
FLAP CLE 10(1)
Surfacing
Summaries
Approach Roads &
Turnout
Summaries
Miscellaneous
Summaries
Signing and
Pavement
Markings
Summaries
Temporary Traffic
Control
Summaries
Allowances Bid
Schedule
A1140 63308-1000 OBJECT MARKER, TYPE 1 EACH 6 6
A1160 63316-1000 REMOVE AND RESET SIGN EACH 3 3
A1180 63401-0450 PAVEMENT MARKINGS, TYPE B,
DOTTED LNFT 788 788
A1200 63402-0300 PAVEMENT MARKINGS, TYPE B,
SOLID MILE 4.456 0.044 4.500
A1220 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 52 52
A1240 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1260 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 20 20
A1280 63502-1400 TEMPORARY TRAFFIC CONTROL,
VERTICAL PANEL EACH 10 10
A1300 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 20 20
A1320 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A1340 63503-0300 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 LNFT 24 24
A1360 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 367 367
A1380 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 0.737 0.737
A1400 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 1,000 1,000
A1420 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 400 400
A1440 63602-6020 SYSTEM INSTALLATION, TRAFFIC
DETECTOR WIRE LOOP EACH 1 1
A1460 63701-0000 FIELD OFFICE EACH 1
A1480 64604-1000 FIXTURE, HANDRAIL LNFT 230 10 240
-F e b -2
:5
A
M
MileStone: 100%
Date Completed: 02/15/23
Report Date: 02/15/23 h tt p s
/d ja n d a -m y .s h a re p o in t.
c o m
/p e rs o n a l/ c o n o r_ m c a rd le d ja n d a c o m
/D o c u m e n ts
/D e s k to p /N e w
T b ir d s u m m a ry b ro k e n .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Remarks and/or Determination of Estimated Quantity
B3OK
SHEET
NUMBER
FLAP CLE 10(1)
Surfacing
Summaries
Approach Roads &
Turnout
Summaries
Miscellaneous
Summaries
Signing and
Pavement
Markings
Summaries
Temporary Traffic
Control
Summaries
Allowances Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15225-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING CONTROL MILE 0.161 0.161
X0060 15236-2000 SURVEY CONTROL, GRADE
FINISHING MILE 0.161 0.161
X0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0100 15401-0000 CONTRACTOR TESTING LPSM ALL
X0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0140 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0160 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
X0180 20301-1900 REMOVAL OF PIPE CULVERT (CUT
CULVERT) EACH 1 1
X0200 20301-2400 REMOVAL OF SIGN EACH 1 1
X0220 20401-0000 ROADWAY EXCAVATION CUYD 73 7 80
X0240 20402-0000 SUBEXCAVATION CUYD 737 73 810
X0260 20425-1000 DITCH, EXCAVATION LNFT 590 30 620
X0280 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 35 1 36
X0300 30502-0800 FULL DEPTH RECLAMATION WITH
CEMENT, 8-INCH DEPTH SQYD 2,175 82 113 2,370
X0320 30510-0000 CEMENTITIOUS MATERIAL TON 37 1 2 40 Used 4% of Full Depth Reclamation tonnage for estimating purposes
X0340 40301-0000 ASPHALT CONCRETE PAVEMENT TON 405 16 9 430
X0360 40601-0000 FOG SEAL TON 1.3 0.1 1.4
X0380 41101-1000 PRIME COAT, METHOD 1 TON 1.8 0.1 0.1 2.0
X0400 41105-0000 BLOTTER TON 2 2
X0420 41201-0000 TACK COAT TON 0.9 0.1 1.0
X0440 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1
X0460 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 20
X0480 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 20
X0500 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
X0520 62201-1300 BULLDOZER, 160HP MINIMUM
FLYWHEEL POWER HOUR 20
X0540 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
X0560 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
-F e b -2
:5
A
M
MileStone: 100%
Date Completed: 02/15/23
Report Date: 02/15/23 h tt p s
/d ja n d a -m y .s h a re p o in t.
c o m
/p e rs o n a l/ c o n o r_ m c a rd le d ja n d a c o m
/D o c u m e n ts
/D e s k to p /N e w
T b ir d s u m m a ry b ro k e n .x ls m
]S h e e t
(4
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
B4OK
SHEET
NUMBER
FLAP CLE 10(1)
Surfacing
Summaries
Approach Roads &
Turnout
Summaries
Miscellaneous
Summaries
Signing and
Pavement
Markings
Summaries
Temporary Traffic
Control
Summaries
Allowances Bid
Schedule
X0580 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 10
X0600 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 10
X0620 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 1,636 14 1,650
X0640 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.34 0.01 0.35
X0660 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.34 0.01 0.35
X0680 62520-0000 FERTILIZER ACRE 0.34 0.01 0.35
X0700 63301-0000 SIGN SYSTEM EACH 1 1
X0720 63402-0300 PAVEMENT MARKINGS, TYPE B,
SOLID MILE 0.849 0.001 0.850
X0740 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
X0760 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 20 20
X0780 63502-1400 TEMPORARY TRAFFIC CONTROL,
VERTICAL PANEL EACH 10 10
X0800 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 20 20
X0820 63503-0300 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 LNFT 24 24
X0840 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 367 367
X0860 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 0.161 0.161
X0880 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 210 210
X0900 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 80 80
-F e b -2
:5
A
M
MileStone: 100%
Date Completed: 02/15/23
Report Date: 02/15/23 h tt p s
/d ja n d a -m y .s h a re p o in t.
c o m
/p e rs o n a l/ c o n o r_ m c a rd le d ja n d a c o m
/D o c u m e n ts
/D e s k to p /N e w
T b ir d s u m m a ry b ro k e n .x ls m
]S h e e t
(5
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
B5OK
SHEET
NUMBER
FLAP CLE 10(1)
SUMMARIES
SURFACING
Sheet 1 of 9
Aggregate base ......................... 139 lbs/cuft
Hot asphalt concrete pavement ... 145 lbs/cuft
Fog seal ................................... 0.15 gal/yd2 (240 gal/ton)
Tack Coat ................................. 0.1 gal/yd2 (240 gal/ton)
Prime Coat ............................... 0.2 gal/yd2 (240 gal/ton)
:5
F e b r u a r y
M is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B6
AND TURNOUTS
APPROACH ROADS
Sheet 2 of 9
Aggregate base ......................... 139 lbs/cuft
Hot asphalt concrete pavement ... 145 lbs/cuft
Fog seal ................................... 0.15 gal/yd2 (240 gal/ton)
Tack Coat ................................. 0.1 gal/yd2 (240 gal/ton)
Prime Coat ............................... 0.2 gal/yd2 (240 gal/ton)
These quantities are added into the surfacing summary.
NOTE:
:5
F e b r u a r y
M is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B7
MISCELLANEOUS
Sheet 3 of 9
:2 o v e m b e r
M is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B8
Sheet 4 of 9
(see note 1)
1. Shouldering material quantity includes material remaining for shouldering work. It was calculated using volumes adjusted for shrink/swell.
NOTE:
:4
N o v e m b e r
M is c e ll a n o u s S u m m a r y
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B9
Sheet 5 of 9
:0
N o v e m b e r
M is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B10
Sheet 6 of 9
:5
N o v e m b e r
M is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B11
SIGNING
Sheet 7 of 9 is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B12
PAVEMENT MARKINGS
Sheet 8 of 9 is c e ll a n o u s S u m m a r
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B13
CONTROL
TEMPORARY TRAFFIC
Sheet 9 of 9
*Utilize the temporary traffic controls from Schedule A for Option X
:5 o v e m b e r
M is c e ll a n o u s S u m m a r y
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L
A K
E T
H U
N D
E R
B
IR
D D
E S
IG
N
\D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \S
U M
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
FLAP CLE 10(1)
B14
Y T I
L I
T U D
E I
R U
G
I
N R
A W
JB
T
T P
T
JB
T G P S
T P
JB
W F
JB
W F
JB
JB
W V
W F
JB
G P S
200'100'0
Scale in Feet
1132.89EL
match existing
Begin pavement improvements, 100+38 pullout, match existing
FDR and pave existing wire loop
Install traffic detector
Removal of cable line
100+40 approach improvements through
See Z2 for drainage
105+93 excavation, Rt
Begin ditch
105+48 excavation, Rt
End ditch
110+30
Construction limits
Stop ahead
Sign system, Removal of sign
106+58
Speed limit 25 MPH
Sign system, Removal of sign
106+70
101+73.34
103+73.56
110+50.14
113+17.24 typ.
Construction limits, Bottom of ditch, Rt
Proposed 24-inch pipe culvert
Begin curve widening
101+52 Lt End curve widening
103+24 Lt widening
Begin curve
103+57 Rt
End curve widening
106+05 Rt
STA 106+34.53 STA 110+22.76
STA 106+07.32
N40°00'41"W
N °4
8'
"W
'187.24L =
'97.89T =
'260.00R =
(RT)41°15'46"Δ =
104+85.11PI
'112.06L = '58.79T = '150.00R =
(LT)42°48'17"Δ =
102+40.92PI
.1
PT
.2
PC
.4
.0
P
1,150
1,140
1,130
1,120
1,110
98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00
1,110
1,120
1,130
1,140
1,150
45'
:5
N o v e m b e r
C le a r
B a y
C le a r
B a y S h e t]
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \P
N P
(C
B A
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
C1 matchline at existing asphalt Tie into existing road limits, typ.
Construction existing pullout, match for pay station Limits of paving
Revegetate staging area improvements Begin pavement 100+38 raised 0.33' above existing grade Approximate proposed grade
Existing grade existing curb Protect
PLAN AND PROFILE
CLEAR BAY AVENUE
MAINLINE
improvements See Z1 for drainage 105+48
A
A
A
H W
Y
1.000%
0.350%
2.54 0%
ELEV 1132.37
OFF 23.57'
ELEV 1133.84
OFF 19.45'
ELEV 1135.08
OFF 18.61'
areas near existing underground water and sanitary sewer.
anecdotal information from the Park. Work with caution in utilities is based on as-builts with limited information and services were not surveyed. The location of each of those The underground water and underground sanitary sewer
NOTE:
T
T P
T P
F P
T P
T
JB
200'100'0
Scale in Feet match existing
FDR and pave existing approach, improvements
See Z3 for drainage
115+74 excavation, Rt
Begin ditch
127+00 excavation, Rt
End ditch
127+80
-0.797% ditch, Rt
Bottom of
Protect existing pipe culvert
STA 127+00.00
STA 127+80.00
N41°33'12"W
'95.08L =
'47.57T =
'1,000.00R =
(LT)05°26'51"Δ =
127+45.74PI
PC
1,140
1,130
1,120
1,110
1,100
113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00
1,100
1,110
1,120
1,130
1,140
:5
N o v e m b e r
C le a r B a y
C le a r
B a y -1
S h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \P
N P
(C
B A
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
C2 raised 0.33' above existing grade Approximate proposed grade
Existing grade limits, typ.
Construction
PLAN AND PROFILE
CLEAR BAY AVENUE
MAINLINE
shift is 5.6' Max alignment shift, Rt Begin alignment 126+05 alignment shift, Rt Begin vertical 125+00
-0.797%
A
A
-2.769%
108'VC
K = 55
SSD = 1381'
.1
ELEV 1119.80
OFF 15.00'
ELEV 1119.14
OFF 15.07'
areas near existing underground water and sanitary sewer.
anecdotal information from the Park. Work with caution in utilities is based on as-builts with limited information and services were not surveyed. The location of each of those The underground water and underground sanitary sewer
PS
200'100'0
Scale in Feet
1110.77EL
End ditch excavation, Rt
132+00 excavation, Lt
Begin ditch
129+30 tie into existing ditch
Grade shoulder to drain around corner, away from road
Grade existing shoulder to drain
137+00 to 137+60 Lt
Begin ditch excavation, Rt
128+80 excavation, Lt
End ditch
132+00 limits, typ.
Construction
Existing grade
Bottom of ditch, Lt
Bottom of ditch, Rt
Proposed 18" pipe culvert extension
Speed limit 25 MPH
Sign system, Removal of sign
130+01
End alignment shift, Rt
136+45
STA 128+79.45
STA 132+00.00
STA 132+00.00
STA 129+30.00
N47°00'03"W
N69°0 6'07
"W
N73° 40'
27" W
N50°50'08"W
'159.44L =
'80.79T =
'400.00R =
(RT)22°50'19"Δ =
137+53.02PI
'231.44L = '117.18T = '600.00R =
(LT)22°06'04"Δ =
131+14.33PI
'59.85L = '29.94T = '750.00R =
(LT)04°34'20"Δ =
136+09.01PI
.6
.0
.9
P
E
1,130
1,120
1,110
1,100
1,090
128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00
1,090
1,100
1,110
1,120
1,130
1,090
1,100
1,110
1,120
1,130
45'
:5
N o v e m b e r
C le a r B a y
C le a r
B a y -2
S h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \P
N P
(C
B A
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK LAKE THUNDERBIRD ACCESS
C3 limits, typ.
Construction raised 0.33' above existing grade Approximate proposed grade match existing improvements, End pavement 139+30
Grade ditches to tie into culvert inlet See sheet Z4 for drainage improvements 128+77
PLAN AND PROFILE
CLEAR BAY AVENUE
MAINLINE
End alignment shift, Rt 136+45 Match existing
139+30
117' VC
K = 80
SSD = INF'
28' VC
K = 49
SSD = 592' 107' VC
K = 50
SSD = 207'
219' VC
K = 85
SSD = 581'
.9
.3
.5
+0.661% +0.092% -2.057%
+0.658%
.5
1.000% 0.500%
0.822%
ELEV 1116.97
OFF 15.94'
ELEV 1118.12
OFF -24.00'
ELEV 1120.28
OFF -15.61'
ELEV 1119.92
OFF 16.81'
areas near existing underground water and sanitary sewer.
anecdotal information from the Park. Work with caution in utilities is based on as-builts with limited information and services were not surveyed. The location of each of those The underground water and underground sanitary sewer
S
G P S
G P S
G P S
G P S
G P S
200'100'0
Scale in Feet
Begin ditch excavation Rt
200+00 match existing improvements, End pavement
208+81 of pavement, typ.
Proposed edge transition realignment
Begin roadway
201+78 transition realignment
End roadway
202+68 surface width.
2' depth, 11' Lt
End subexcavation, subexcavation, Lt
End daylighting
206+52 transition
Roadway realignment
205+18 to 205+39
PLAN AND PROFILE
AREA 2 ROAD
OPTION X
approach, match existing
FDR and pave existing
2' depth, 11' Rt
Begin subexcavation, 201+60
2' depth, 11' Rt
End subexcavation, 204+38 tie into existing centerline
End roadway realignment, 206+62
End ditch excavation, Rt
205+90 daylighting limits, typ.
Proposed subexcavation check dam details
Refer to sheet E2 for dams along ditch, typ.
Install riprap check A match existing improvements, Begin pavement
200+30 raised 0.29' above existing grade
Approximate proposed grade match existing improvements, Begin pavement
200+30 realignment
Begin roadway
201+76
Proposed grade realignment
End roadway
206+62
Existing grade raised 0.29' above existing grade
Approximate proposed grade match existing improvements, End pavement
208+81 grade to proposed grade
Transition from existing grade to proposed grade
Transition from existing a minium grade of 0.5% using slope taper of 1:8 and
Tie ditch into existing grade
+3.93 8%
+2.200%
+5.9 85%
+7.0
25' VC
K = 14
SSD = 202'
145' VC
K = 38
SSD = 233' 70' VC
K = 63
SSD = INF'
130' VC
K = 32
SSD = 145'
.8
.1
.8
.7 width, daylight Lt
2' depth, 11' Lt surface
Begin subexcavtion, 201+60 road profile grades
Grades match proposed
Bottom of ditch, Rt
L = 80.69
T = 40.35
R = 2,400.00
Δ = 01°55'34" (RT)
PI 201+84.55
L = 59.87' T = 29.94' R = 2,400.00
Δ = 01°25'45" (LT)
PI 202+59.52
L = 230.68' T = 117.23' R = 525.00'
Δ = 25°10'30" (LT)
PI 207+30.25
Stop sign Sign system, Removal of sign 206+40
STA 200+00.00
STA 200+16.81
STA 205+60.00
STA 205+90.00
ELEV match existing
OFF 21.01'
ELEV match existing
OFF 21.01'
ELEV 1071.63
OFF 21.01'
ELEV 1098.67
OFF 21.01'
underground water and sanitary sewer.
the Park. Work with caution in areas near existing limited information and anecdotal information from each of those utilities is based on as-builts with sewer services were not surveyed. The location of The underground water and underground sanitary
NOTE:
.5
.4
T 2
.0
.8
PT
.0
P
.2
P
E
200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00
1,050 1,050
1,060 1,060
1,070 1,070
1,080 1,080
1,090 1,090
1,100 1,100
1,110 1,110
1,120 1,120
1,130 1,130
209+00199+00
45'
45'
:4
N o v e m b e r
B
L
A re a
S h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \P
N P
(A
R E
A
C
L E
(1 d g n
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
C4
GPS
JB
GPS
JB
JB
100'50'0
Scale in Feet either side of sidewalk.
Install fixture, handrail retaining wall.
End reinforced concrete concrete
End accessibility ramp, concrete
Begin 5' wide sidewalk, tie into existing sidewalk
End 5' wide sidewalk, concrete, reinforced, 8-inch depth
Minor concrete pavement, detectable warning panels
Install 31.5'X2'
Removal of curb, asphalt, around island 2 under proposed sidewalk
Removal of curb, asphalt, 12-inch depth along sidewalk
Begin curb, concrete
FDR and paving
Proposed limits of
7. See Sheets T21-T23 for handrail details
6. See Sheet T14 for stall dimensions
5. See Sheet T12 for concrete barrier details warning panel details
4. See Sheet T11 for wheelchair ramp and detectable
3. See Sheet T10 for sidewalk, concrete details
2. See Sheet T9 for wheelstop, concrete details
1. See Sheet T8 for curb, concrete details
NOTE:
2% landing
2% landing
8% ramp
2% landing
2% landing
8% ramp
8% ramp
End 5% sidewalk run grades to existing grades
Begin matching sidewalk
16' concrete
Removal of sidewalk, FDR and paving
Proposed limits of of asphalt
Existing edge
Install curb, concrete 12-inch depth around island 2
End 6.5' ADA landing
Begin accessibility ramp, concrete
Begin 6.5' ADA landing concrete barrier
Install 87.5' of
12-inch depth along sidewalk
End curb, concrete
Island 1
Island 2
Graded ditch, see Sheet D5
Wheelstop, concrete, typ.
ADA parking stall, typ. Standard parking stall, typ.
Trailer parking stall, typ.
Begin curb, concrete 12-inch depth
Begin removal of curb, asphalt
End curb, concrete 12-inch depth
End removal of curb, asphalt
Protect existing concrete pad
Protect existing concrete pad
Begin curb, concrete 12-inch depth
Begin removal of curb, asphalt
End curb, concrete 12-inch depth
End removal of curb, asphalt work limits in this area equipment beyond the defined
No work or storage of
NOTE:
handrail both sides of sidewalk.
retaining wall. Install fixture, Begin reinforced concrete
Begin 5% sidewalk run grades to existing grades
End matching sidewalk
:0
N o v e m b e r
C a ll o u t s h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\P R
K
(T P
P A
C
L E
(1 d g n
LAYOUT
PARKING LOT
TURKEY PASS
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
D1
GPS
JB
GPS
JB
JB
A
B
R1
D
E
F
G
J
K
R4
MN
O
PQ
RS
R5
T
U
R6
V
W
X Y
Z
R2
R3
H
I
L
AA
R7
AB R8
AC
AD
C
Sheet 1 of 2
120'60'0
Scale in Feet
Transition from existing grades to proposed 3.5" grade raise.
Approximate transition area.
asphalt transition, typ.
Approximate limits of
:1
N o v e m b e r
O v e r a ll g r a d in g s h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\P R
K
(T P
P A
C
L E
(1 d g n
GRADING SHEET
TURKEY PASS PARKING LOT
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
D2
GPS
JB
GPS
JB
JB
AE
AF
R9
AG
AH
AI
R10
AJ
R11
AK AL
AM AN
R12
AO
AP
R13
AQ
AR
R14
AS
AT
AU
AV
AW
AX
AY
AZ
BA BB
BC
R15
R16
Sheet 2 of 2
120'60'0
Scale in Feet
*See Sheets D5-D6 for island elevations asphalt transition, typ.
Approximate limits of
Transition from existing grades to proposed 3.5" grade raise.
Approximate transition area.
DITCH TYPICAL SECTION
Existing ground
See parking lot typical section
Proposed parking lot section
Ditch profile
Varies (max 1:4) Varies (max 1:4)
:1
O c to b e r
O v e r a ll g r a d in g s h e e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\P R
K
(T P
P A
C
L E
(1 d g n
GRADING SHEET
TURKEY PASS PARKING LOT
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
D3
GPS
JB
GPS
JB
JB
A
B
C D
EF
G
H
I
J
K
L
M
N
O
P
Q R
T
U V
S
W
X
Y
AA
Z
AB
AD
AC
AF
AE
AG
AH
AJ AI
80'40'0
Scale in Feet
:0
N o v e m b e r
S id e w a lk
G r a d in g S h e
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n
\P R
K
(T P
P A
C
L E
(1 d g n
SIDEWALK GRADING SHEET
PARKING LOT
TURKEY PASS
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
D4
-8.000%
-8.000%
-8.000% -8.000%-2.000%
-2.000%
-2.000%
Scale in Feet
40'20'0
1045'
Top back of reinforced concrete retaining wall
Fixture, handrail
Concrete barrier sections
PLAN
PROFILE
Proposed grade (top of wall)
Existing grade
Proposed top of sidewalk wall, measure 4" above the proposed asphalt.
1. Profile depicted is located on the top back of retaining
Notes:
S17°13'12"W
'9.68L =
'6.26T =
'6.00R =
(LT)92°26'42"Δ =
0+06.26PI
N18°36'04"E
N20 °0
3' "W
'62.09L = '32.20T = '95.00R =
(LT)37°27'00"Δ =
0+84.41PI
.3
.0
P
1+ .6
POE
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30
1,040 1,040
1,050 1,050
1,060 1,060
1,070 1,070
-4.995% -5.362% -7.000% -10.238%
.0
.3
.8
' VC10 10' VC ' VC5
,0
.7
,0
.0
:4
N o v e m b e r
U n n a m e d
P la n -2
R e t
W a ll
S h e e t]
F
.0
C
F L
H D
O
K F
L A
P C
L E
(1
L A
K E
T H
U N
D E
R B
IR
D
D E
S
IG
N \D ra w in g s \D
G N
\5 S h e e t
P ro d u c ti o n \P
N P
(T
P P
A
C L
E
(1 d g n
TOP BACK ALIGNMENT
RETAINING WALL
TURKEY PASS PARKING LOT
STATE PROJECT
NUMBER
SHEET
OK
LAKE THUNDERBIRD ACCESS
D7
204-A
1.
conditions encountered at time of construction.
Extent of patch to be determined by the CO based on
2.
4.
SUBEXCAVATION DETAIL
NO SCALE
item. See Section 204.
All items shown within the pay limits are included in the pay
714.03. Utilize Type 2 as specified in Table 714-6.
Install stabilization geogrid layer according to Subsection
5.
prior to chemically treating.
FDR material to limits specified in plans for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .