About this file

This is a Draft Statement of Work (SOW) for a federal training contract to be awarded by the Food and Drug Administration's (FDA) Office of Inspections and Investigations (OII). The FDA seeks a single contractor to develop and deliver a comprehensive four-course Biomanufacturing Principles and Processes Training Series for FDA investigators, with courses covering Quality Control and Analytical Testing, Upstream Bioprocessing, Downstream Bioprocessing, and Aseptic Processing. The contractor must deliver curricula through a hybrid model combining asynchronous web-based learning via the BTEC Shorts platform, synchronous webinars, and hands-on laboratory training at the contractor's facility. Each course spans five weeks with 32 contact hours (8 online, 24 on-site over three days), accommodates a maximum of 25 students per cohort, and must be completed within 12 months of award. The contract period runs from March 31, 2027, through March 30, 2028 (base year) with four optional one-year extensions and a potential six-month extension through September 2032.

The contractor must complete the first course for enrollment within six months of award, with web-based content delivered within eight months and in-person materials within ten months of contract award. All materials must comply with Section 508 accessibility standards, HTML5 requirements, SCORM conformance, and FDA IT security specifications. Key deliverables include a Program Management Plan within 15 business days of award, monthly status reports, bi-weekly in-progress reviews for the first six months, prototype materials, instructor and participant guides, and all multimedia assets. The expected contract type is Firm-Fixed-Price, with the contractor responsible for all personnel, facilities, materials, and services necessary to perform the work. The contractor must not develop or manufacture FDA-regulated products and must have knowledgeable personnel experienced in biotechnology/pharmaceutical production and adult education. All contractor personnel require FDA security clearance at the Public Trust Position Level 5 prior to beginning work, with the credential processing typically requiring four weeks.

View the file

Other files

File Type Posted
Attachment B - Vendor Feedback Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOOD AND DRUG ADMINISTRATION (FDA)

OFFICE OF INSPECTIONS AND INVESTIGATIONS (OII)

BIOMANUFACTURING PRINCIPLES AND PROCESSES TRAINING SERIES

Contents Background Objective Scope Tasks Deliverables Contract Type Place of Performance Period of Performance Assumptions and Constraints Government Furnished Equipment/Information/Property Authorized Contacts Travel, Materials, and Incidental Services Holidays and Government Closures Government Contacts 508 Standard Requirements Security Requirements Background The Food and Drug Administration (FDA) is responsible for protecting the public health by assuring the safety, efficacy, and security of human and veterinary drugs, biological products, medical devices, our nation's food supply, cosmetics, and products that emit radiation. The FDA is also responsible for advancing the public health by helping to speed innovations that make medicines and foods more effective, safer, and more affordable, and helping the public get the accurate, science-based information they need to use medicines and foods to improve their health.

The U.S. Food and Drug Administration (FDA) Office of Inspections and Investigations (OII) coordinates domestic and foreign inspectional, quality and investigational activities across the field and at headquarters. In addition, OII works closely with other FDA Offices on compliance and enforcement activities and to implement policies related to the Pharmaceutical program.

The Office of Training, Education, and Development’s (OTED) Division of Inspections and Investigations trains field and headquarter investigators and analysts to conduct inspections of biopharmaceutical and pharmaceutical manufacturing processes and practices for compliance with good manufacturing practices (GMP) regulations.

The trainees for the Biomanufacturing Principles and Processes Curriculum will typically have five (5) or more years of agency experience and hold a Bachelor of Science degree. Some will have a background in chemistry, biochemistry, microbiology or engineering.

OTED has created a comprehensive curriculum series to provide investigators with additional biological therapeutic drug training in the following areas:

Product development and manufacturing processes Facility and equipment design Technology transfer Manufacturing processes Analytical Testing Methods Objective OTED requires one individual contractor to deliver an enhanced four-course training curriculum including course material, modules, webinars, and hands-on training, as necessary, to FDA investigators. This will allow FDA inspectors to experience the production of biological therapeutic drug products thereby enabling them to better understand biomanufacturing principles and processes to include facility equipment design, product manufacturing processes, analytical testing methods, and emerging technologies in biomanufacturing. The training will provide investigators with the skills and knowledge to determine areas of highest risk during inspections of biopharmaceutical manufacturing facilities.

Scope OTED seeks a contractor/institution that does not create/produce products that are or will be regulated by the FDA and/or marketed or introduced to the market and thus regulated by FDA.

The contractor shall deliver curricula via distance learning, followed by classroom instruction, coupled with practical experience in the contractor's facility. Course delivery shall consist of asynchronous web-based learning via the BTEC Shorts platform, synchronous web-based webinars, synchronous classroom training, and hands-on/laboratory training. The contractor shall develop and maintain comprehensive instructor and participant guides to accompany the delivery of the synchronous classroom and laboratory training with respect to the manufacture of biological therapeutic drugs.

OII employees will have access to the web from their desktop for asynchronous learning components. OII employees will travel to the contractor's facility for the on-site portion of the training.

Students must complete all four (4) courses within 12 months. Each course allows for a maximum enrollment of 25 students, takes place over a five-week period, and requires 32 contact hours. A total of eight contact hours shall be provided via online instruction for applicable courses. The remaining 24 hours of instructional time take place over three days onsite at the contractor's facility in the fifth and final week of the course.

The entire curriculum must be available for student enrollment by the end of the base year. The first course must be finalized and ready for student enrollment within 6 months from award of contract. The first cohort must complete at least half of the curriculum before the end of the base year of the contract. By the end of the fourth option year, six (6) separate cohorts will have completed the entire curriculum.

Tasks The contractor shall perform each of the following tasks within the parameters outlined in this section. The scope of work section details the overall requirements for delivering the biomanufacturing principles and processes curriculum and developing the accompanying instructor and participant guides for that curriculum.

Task One: Administrative Throughout this Order, the Contractor shall work with the FDA's Contracting Officer Representative (COR), various FDA staffers and the Contracting Officer (CO), to provide technical and/or administrative assistance, review, and support services for the FDA to ensure that the tasks are performed efficiently, accurately, on time, and in compliance with the requirements of this SOW.

The Contractor shall coordinate, as necessary, with the technical POC and the COR to ensure that the tasks are managed consistently in accordance with overall Order requirements.

The Contractor shall ensure timely and accurate submission of invoices that shall track, at a minimum, the hours utilized during each invoice period, total hours (dollars) used to date on the Order and remaining hours and funding under the Order.

The Contractor shall work with the COR, alongside the Technical POC, and other FDA staff to ensure that tasks stay on track and important milestones are met.

Within 10 business days after the effective date of the Order, the Contractor shall participate in a Kick-Off Meeting with the COR and the Technical POC. The kick-off meeting will be held at White Oak Campus – 10903 New Hampshire Ave Silver Spring, MD and/or virtually. The contractor, Project COR, Project Manager, and other identified OTED personnel will attend the kick-off meeting to discuss the Project Management Plan, the courseware review process, instructional design strategies, project schedule, and the roles and responsibilities of all parties involved to ensure all personnel share the same level of understanding with respect to the goals, requirements, and complexities of the project.

The Contractor shall prepare summary meeting minutes, detailing the discussion held, and provide a copy of the minutes to the COR within five (5) business days after the meeting. The meeting will not exceed one day in duration.

The Contractor shall develop and submit a Program Management Plan (PMP) within 15 business days of award. The PMP shall be submitted and updated as required by the COR.

The PMP shall consist of control policies and procedures in accordance with standard industry practices for project administration, execution, and tracking. The Program Management Plan shall include but is not limited to the following:

Identification of milestones where Government information/activity is required and timeline dependencies for subsequent Contractor activities The Contractor's audit management approaches, policies and procedures including suggested project metrics as dictated by their certification body A detailed staffing plan or an organizational chart identifying relationships, authorities, and responsibilities A matrix of all personnel assigned to the program and total aggregate level of effort for all tasks The Contractor's processes for notification to the Government of all Government personnel resources, documentation, or any GFE required for accomplishing this order Risk identification, tracking and mitigation approach The schedule for developing and implementing the curriculum in a "phased-in" approach The contractor shall develop and include in the PMP an Implementation and Evaluation Plan that specifies the process to be used by the contractor to oversee the implementation of the web-based courseware.

If the government enters into option years of the contract, the class schedule shall be gradually adjusted to allow the final class to complete all of the 4-course series in biomanufacturing principles and processes before the contract is finished at the end of the last option year.

The contractor shall implement a process that allows OTED to review and comment on the implementation of the web-based and classroom materials. When the first course is completed, it will be available for student enrollment while the remaining courses are still in their various phases of implementation.

The review and comment capabilities will allow the government to view and comment on the following course elements:

Agenda Classroom handouts Instructional strategies for web-based, classroom, and laboratory instruction Assessment strategy Course evaluation strategy Alpha version of all web-based and classroom materials The Contractor shall create and deliver a Work Breakdown Structure (WBS) within fifteen (15) business days from order award. The WBS shall represent how the Contractor plans to accomplish the entire work scope and be consistent with Government organizations and processes.

The WBS shall serve as the framework for contract planning, budgeting, and reporting of cost/price and schedule status to the Government.

The Contractor shall provide a monthly status report to the OTED COR and Project Manager. The Government shall be given 2 workdays to review the monthly progress reports.

The report shall contain:

A summary of adherence to deliverable schedule Reference to the contract number General summary information about the tasks specified in the Project Management Plan Explanations for any dates or milestones that are not met Other problems of contract interest Any progress report which includes information concerning changes in contract requirements, standards, or specifications does not constitute Government Agreement to those changes. Only by direction of the Contracting Officer can such changes be made.

In-Progress Reviews (IPRs) shall be held for the first year of performance via web conference to review the to-be-implemented course materials, etc. Initially one to two-hour reviews shall be held bi-weekly for the first six months of the project until all the components of the first course are released. In-Progress Reviews shall be held monthly for the remainder of the 6 months.

The IPRs shall be stated in the PMP and shall be included in the project timeline. Each IPR shall be held on a date and time mutually agreeable to the Government and contractor. The IPRs shall last no longer than two hours in duration.

The contractor shall supply knowledgeable IT personnel to define the requirements for accessing the web-based training and to further work with FDA IT once the contract is awarded. OTED will provide the contractor with FDA IT contact information.

The contractor shall work with FDA IT personnel to address security and delivery issues of the web-based components. This consultation shall occur within 3 weeks of award.

Task Two: Course Development and Delivery The instructional areas to be covered in the four courses include, but are not limited to:

Quality Control and Analytical Testing Upstream Bioprocessing Downstream Bioprocessing Aseptic Processing The contractor shall deliver web-based modules, webinars, and classroom training. The contractor shall develop and maintain instructional and participant guides for the curriculum.

The Contractor shall furnish the necessary personnel, materials, services, and facilities to perform the work described herein. Instructors and contractor personnel must be experienced in the development and presentation of adult education. In addition, instructors must possess both academic and workplace experience in biotechnology/pharmaceutical production and development that prepared them for teaching in a university environment.

The contractor shall organize, coordinate, and control all program activities to ensure compliance with the contract requirements and the timely delivery of the required product and services specified herein.

The contractor shall provide the necessary system engineering, design engineering, hardware, software, personnel, supervision, management, materials, services, equipment, facilities, testing, technical, logistics, safety and clerical support necessary to perform the tasks described in this SOW.

The Contractor shall ensure that the developed content functions as designed within the policies and restrictions of the FDA network and FDA issued computers and is free of elements that might be detrimental to the secure operation of the resource operating system, including those listed below:

Malicious code Trojans, worms, logic bombs, and other computer viruses Backdoors Ad-ware, Spy-ware, or web bugs that have the ability to track user behavior Code that permits functions that are beyond the actual publicized intent of application capability Software that will not function properly with the operating system configured securely The alpha version of the web-based courses shall be tested on computers configured to FDA standards and delivered via the FDA network. The vendor shall not develop the courseware to exceed FDA standards or develop the courseware in a way that requires students to view it on computers that exceed the minimum technical requirements.

The contractor shall provide the students with the web address and necessary information for accessing the online components of the curriculum after receiving registrants' names and email address from OTED.

It is the contractor's responsibility to track the attendance of the students attending the classroom component of the curriculum and forward that information to the Project Manager at OTED.

The contractor shall perform an annual review of the curriculum content and ensure that it reflects the current science that is being taught in the areas of biomanufacturing principles and processes. The content review shall also incorporate student feedback.

The contractor shall perform an annual review of the hardware, software, SCORM and Section 508 requirements needed to deliver the curriculum.

After the curriculum is implemented, the contractor shall maintain, revise, and update all electronic and classroom materials. All content revisions and updates shall be coordinated through the OTED Project Manager.

This includes all source and document files used in the planning, design, development, and testing processes of the product to include but not limited to programming source code, branching/mapping files of the product, etc. This does not include pre-existing training materials that were not revised/updated to meet the terms of this contract.

The contractor shall utilize any course materials provided by OTED at time of award to update the course materials to fit its equipment, program, etc. The contractor shall meet with appropriate OTED personnel to clarify any information in provided course materials.

The prototyping phase will include a review of the content, instructional objectives, and development of the instructional strategies for each topic. OTED and the contractor will review the proposed course schedule and agendas and determine if additional topics will be added to the curriculum and existing topics updated or deleted.

The visual design of training materials shall involve the development of templates for the online training materials. The contractor shall submit template designs and prototype content to OTED for approval prior to the final deliverable.

The contractor shall screen capture and print examples of all images and templates to be used in the final courses. The contractor shall review the course materials implemented under the guidance of the course guides with OTED prior to the courses beginning.

For the synchronous web-based component of the curriculum (webinars), the course materials shall describe the following:

Webinar objectives Interface design for the webinar Webinar course outline Sample visual aids Webinar schedule For the classroom component of the curriculum, the information provided shall describe the following:

Course objectives Classroom exercises guides and instructions List of materials to be used For the laboratory component of the classroom curriculum:

Objectives Outline of the instructional activities Hands-on activities Schedule of events All course materials must be compatible with the contractor's facility's equipment and appropriate for an FDA audience. Course materials may be modified to accommodate compatibility.

The contractor shall develop and maintain approved instructor and participant guides to be used for on-site training and all multimedia assets used within them. Instructor and participant guides shall include approved scripts, approved prototype layout and all visuals needed to support them.

The review periods for reviewing the instructor and participant guides shall be 10 business days each.

This includes approved asynchronous web-based course modules delivered via the BTEC Shorts platform and layout for pre-on-site course synchronous webinar.

For each of the web-based course versions (i.e. alpha and beta), the contractor will develop and upload a copy of the courseware onto their server for review by OTED.

Asynchronous Web-Based Component Prototype:

The prototype for the asynchronous web-based component will be a topic from one of the courses. Included in the prototype shall be a demonstration of screen layouts and templates, interface design, instructional strategies, question items, and other major functional components. All features and functions of the final course shall be demonstrated, including transitions, remediation, and feedback.

The contractor shall deliver the courseware prototype via a test website to OTED for review. The website must be accessible to OTED personnel. The date of posting materials on the website shall be considered the date of delivery.

The prototype must follow and demonstrate adherence to Section 508 compliance guidelines. The contractor shall provide 508 test logs for the prototype that verify compliance to Section 508 requirements.

All prototype assets (e.g., graphics, audio files, video files, etc.) shall be delivered with the finished prototype.

Participant Guide Prototype:

A prototype of the participant guide that will be used for the classroom component shall be submitted for review. The prototype will be a topic from one of the courses. Included in the prototype will be a demonstration of page layouts, instructional strategies, instructional graphics/photos, and question items.

The contractor shall make changes to material in the prototypes to reflect the equipment used in the contractor's facilities that is different from past facilities equipment.

Prototypes shall be delivered within 3 months of contract award for web-based content and within 4 months of contract award for face-to-face course materials. OTED will provide feedback within 15 days for web-based prototypes and within 10 days for face-to-face prototypes.

The contractor shall incrementally deliver electronic preliminary modules for each completed lesson and revised content to OTED for review. The schedule for this development and review shall be outlined in the contractor's Project Management Plan.

The modules for the web-based courses shall contain the following instructional screens and descriptions:

Introduction Objectives Screen text (course content) Summary Description of the visuals that will be used Assessment items Description of interactive elements Section 508 instructions Navigation information Programmer instructions Artist instructions Each classroom script must contain the following:

Objectives Content Descriptions of visuals Instructional activities Test items The contractor shall subject all preliminary modules to a copy edit review to ensure proper grammar, punctuation, continuity, and content clarity.

All accompanying assets (e.g., graphics, audio files, video files, etc.) shall be delivered with the finished course.

All assessment questions, answer keys and scoring systems shall be delivered with the finished course.

The contractor shall deliver final courseware materials in a format that may be easily stored and maintained by OTED. Instructions for developing assets and making changes to the courseware for its life cycle maintenance shall be provided in the form of a "Train the Trainer" package.

Web-based content shall be delivered within 8 months of contract award. In-person content shall be delivered within 10 months of contract award.

The contractor shall provide all assets necessary for performance that are not provided by OTED (i.e., photographs, graphics, animation, video, audio, etc.).

The contractor shall ensure compliance with all copyright laws for all assets used. The contractor shall provide release forms for copyrighted materials to OTED for all content not developed by OTED.

Personnel release forms must be obtained for the use of images for personnel who appear in the course materials. Photos or media obtained from the Internet or stock media galleries must be identified by website/software/company, file name, and permission granted.

The contractor shall not assume that media files appearing on FDA sites or other media sources are "owned" by the FDA and are free of copyright restrictions.

HTML Requirements:

The courseware shall conform to HTML5 or the most recent version of HTML on the date the contract is awarded.

Sharable Content Objects (SCOs) will be produced and tagged at the unit, module, lesson, and topic level and all media assets will be tagged to include: video, graphics, animation, and audio when used as or to support content.

Meta-data Tagging:

The contractor shall tag electronic assets and SCOs that are capable of being reused or repurposed. The contractor shall produce the required metadata files for all training products.

Browser and Mobile Data Compatibility:

All web-based components shall be developed to operate with Internet Explorer version 11 and Firefox version 60.0.2, or current browser versions as specified by FDA IT at time of award.

Reusable Learning Objects:

All new courseware developed for this contract shall be structured in the form of Reusable Learning Objects (RLOs). The web-based courses shall include, but are not limited to, the following features:

Report whether the student has completed the topic when "Exit Topic" (or similar text) is activated If a student has not completed the topic upon exiting, the RLO should report bookmarking data to the Learning Management System (LMS) When the student re-enters the RLO, the RLO should query the LMS for the bookmarking data. Upon receipt of the bookmarking data from the LMS, the user shall be directed to the topic and screen he/she last visited before exiting the lesson Training materials and multimedia assets shall be delivered within 11 months of award.

Task Three: Training and Course Delivery Contractor shall annually deliver all four courses in the Biomanufacturing Principles and Processes curriculum.

The contractor shall implement and maintain the BTEC Shorts online learning platform for delivery of asynchronous web-based training components. This platform replaces the previous Moodle LMS delivery system and is designed to offer more efficiency and convenience for online learning.

The contractor shall ensure the BTEC Shorts platform:

Is accessible to FDA employees via their desktop computers Meets all FDA IT security requirements Provides tracking and reporting capabilities for student progress Maintains SCORM conformance Meets Section 508 accessibility requirements There will be no changes to the asynchronous curriculum content for the courses. The only difference is the delivery platform.

OTED will provide the contractor with any pre-existing course materials including web modules, webinars, handouts, slides and any other developed course materials which may be modified to suit the contractor's facility and equipment. The contractor shall write the instructor and participant guides based on the provided course content and/or develop new content as required.

The contractor shall provide practical experience (manufacturing and laboratory environments) that leverages and reinforces the knowledge gained through the web-based training. After the student completes the curriculum, the student should be able to apply the knowledge and skills gained to the inspection of a biopharmaceutical manufacturing facility.

The contractor's laboratory facilities shall include equipment that reflects the current science in the biomanufacturing industry.

The contractor shall post and maintain the web-based components on a web server accessible by the government for the duration of the contract. As course materials are completed, they shall be posted on this site for OTED to review in accordance with the approved schedule.

Web-based components of the course shall be delivered in a synchronous/asynchronous fashion to the student's personal computers.

During the quality assurance process, the contractor shall notify OTED of any bugs or defects in the courseware and updates on when the issues were resolved.

Asynchronous Web-Based Training:

The contractor shall present asynchronous web-based courses for three of the four courses in the curriculum (Upstream Bioprocessing, Downstream Bioprocessing, and QC/Analytical Testing). Each web-based course shall be comprised of multiple modules. The approximate seat time for each module is 2 hours. The estimated seat time for each web-based course is 6-8 hours.

Each module shall be available anytime of the day within a specified calendar period concurrent with course offering dates.

The asynchronous web-based component will be implemented at a Level II interactivity category. Standard navigation controls (e.g., Back, Next, Glossary, Menu, etc.) are not considered interactive elements. Types of interactive elements may include but are not limited to: links that review additional content; animation control buttons, submenu links that branch to additional information, test questions, and "click-and-see" activities. The contractor shall provide additional options as to the types, and location, of interactive activities.

The web-based courseware shall be presented in an open architecture, non-proprietary environment. The courseware shall be HTML-based (e.g., XHTML), shall meet Levels 1 and 2 interactivities, and shall apply the Shareable Content Object Reference Model to ensure that it is (SCORM) conformant. Metadata shall be generated to provide the LMS with additional information about each RLO (topic) and multimedia asset.

OTED will review content, layout, and delivery mechanism for distance learning courses and provide comments to the contractor.

The contractor shall deliver the hierarchy of web-based courses so that the content is divided into logical chunks of information (e.g., course, module, lesson, topic). The contractor shall design the web-based course(s) so that users are not required to view every screen within the topics. Users will also have the option of skipping over screens that contain branching to several sub-topic sections. The curriculum shall be programmed to make the Next button available at all times while within a topic. Students will have the option of selecting individual modules and lessons within each course.

The expectation is that the student shall be able to exit the asynchronous course and upon re-entry be directed to the screen last viewed.

Graphics and photographs of an instructional nature shall be used to clarify complex concepts and to show manufacturing processes. These graphics and photographs should reflect the equipment and processes at the contractor's biotech facility.

The courseware must contain a glossary section.

The help section of the courseware shall provide students with network assistance as well as additional navigational instruction, assistance with the course website, and courseware guidance.

Each module within a course shall include an assessment activity. Students shall be given two opportunities to pass the online tests with an established minimum score. If a student fails to pass after two attempts, the instructor who shall teach the same content for the classroom component shall contact the student to provide coaching, remediation and/or clarification. If the instructor believes the student has grasped the concepts of the module, he/she shall be permitted to attend the classroom component.

Another objective of the online assessments is to assist students with their learning plan by identifying areas of weakness and recommending topics for remediation prior to attending the classroom component. Users shall have the option to not view each lesson within a module, or each topic within a lesson, before taking the assessments. Assessment results shall include feedback for each answer.

Asynchronous web-based training shall be available within a week after the time allotted for completion of the synchronous web-based training module and before the classroom component. Each module shall be available anytime of the day within a specified calendar period concurrent with course offering dates.

Synchronous Web-Based Training/Webinar:

The contractor shall implement and present a synchronous, instructor-led webinar for each course. The synchronous portion of the web-based training shall take place within a week after the time allotted for completion of the asynchronous web-based modules (for applicable courses). This session shall allow participants to discuss course content and ask questions related to the previously-completed asynchronous session in preparation for the face-to-face portion of each unit.

The web-based synchronous (webinar) component of the curriculum will be held one week before the classroom component. The web-based synchronous component shall be offered at several different times during the week to accommodate the work schedules of the participants.

Synchronous web-based training/webinars shall be scheduled as approved by OTED.

Due to potential public health emergencies or other unforeseen circumstances, the FDA and the contractor may request that the portion of this course that is typically conducted in-person at the vendor's facilities be conducted virtually. The vendor should be able to accommodate virtual delivery of the courses – Quality Control/Analytical Testing, Upstream Bioprocessing, Downstream Bioprocessing, and Aseptic Processing – via virtual learning platform if requested or necessary due to the risks of traveling.

This course's on-site portion will take place at one location. The contractor shall have a learning space large enough to teach between 10-25 students per course each year.

The contractor shall develop a comprehensive instructor guide and participant guide to go with the provided curriculum of the synchronous classroom and laboratory training. The contractor shall implement a process that allows OTED to review and comment on the development of the participant and instructor guide.

The contractor shall provide instruction that addresses the manufacturing of biological therapeutic drugs as per the provided curriculum. It is the expectation that the curriculum delivered by the contractor reflects the current knowledge base in the field of biomanufacturing. Contractor shall provide updates to curriculum if current practices are out of date.

The contractor shall change the curriculum to reflect the equipment, materials and specialties of the contractor's facilities.

On-Site Instructor Led Training:

This section identifies the types of content that will be incorporated into the on-site portion of the biomanufacturing principles and processes curriculum. The contractor shall develop a participant guide and instructor guide and implement other training materials such as interactive laboratory activities, handouts, and slide shows.

All materials developed and/or used in the on-site courses shall be made available to participants upon completion of the course (CD, DVD, downloadable from website, etc.). Electronic resource materials include participant guides, video clips, visual aids, photographs technical manuals, graphics, video clips and other miscellaneous classroom resource materials.

OTED will review delivery design for on-site training and provide comments to the contractor.

The contractor shall supply necessary qualified personnel to provide practical, hands-on instructional services in the manufacturing environment.

The classroom component of the curriculum shall contain a final assessment for determining the students' level of mastery of the learning outcomes. Each test item shall utilize an assessment strategy that is appropriate for measuring comprehension of the knowledge/skills needed for each objective. This might necessitate the development of both knowledge-based and performance-based assessments.

If students do not pass the final course assessment, the contractor shall implement a remediation plan to help students obtain the necessary knowledge for meeting the minimum competency requirements. The assessment strategies used for determining the minimum passing scores and student remediation shall be detailed in the document and will be reviewed by OTED for acceptance.

Depending on the course content, the contractor shall provide classroom training coupled with practical manufacturing experience. The practical component of the instruction should provide OII employees with a setting that better prepares them to conduct inspections of biological therapeutic drug manufacturing firms.

The Government will provide funding for student travel, lodging, and meals for the on-site component of the course.

On-site classroom training (instructor-led and training/lab) shall be scheduled as approved by OTED.

Course 1: Upstream Bioprocessing This course shall be delivered in hybrid format consisting of asynchronous web-based training via BTEC Shorts platform, synchronous webinar, and in-person hands-on training. The course shall cover:

Cell culture processes Bioreactor operations Media preparation and optimization Cell line development Upstream process monitoring and control Contamination prevention and detection Scale-up considerations Maximum enrollment: 25 students Duration: 5-week period Contact hours: 32 (8 online, 24 on-site over 3 days) Course 2: Downstream Bioprocessing This course shall be delivered in hybrid format consisting of asynchronous web-based training via BTEC Shorts platform, synchronous webinar, and in-person hands-on training. The course shall cover:

Harvest and clarification Chromatography techniques Filtration processes Viral inactivation and removal Formulation and fill-finish operations Process validation Downstream process optimization Maximum enrollment: 25 students Duration: 5-week period Contact hours: 32 (8 online, 24 on-site over 3 days) Course 3: QC/Analytical Testing This course shall be delivered in hybrid format consisting of asynchronous web-based training via BTEC Shorts platform, synchronous webinar, and in-person hands-on training. The course shall cover:

Analytical method development and validation Quality control testing procedures Endotoxin testing Sterility testing Potency assays Stability testing Regulatory requirements for analytical testing Data integrity and documentation Maximum enrollment: 25 students Duration: 5-week period Contact hours: 32 (8 online, 24 on-site over 3 days) Course 4: Aseptic Processing This course shall be delivered in hybrid format consisting of asynchronous web-based training via BTEC Shorts platform, synchronous webinar, and in-person hands-on training. The course shall cover:

Microbiology Basics (including an iET) Finger Plate Lab Environmental Monitoring Aseptic Processing Preparation Cleanroom Behavior Aseptic Gowning Aseptic Processing Gram Staining Maximum enrollment: 25 students Duration: 5-week period Contact hours: 32 (8 online, 24 on-site over 3 days) The contractor shall be responsible for implementing assessments for the web-based and classroom components of the curriculum.

Assessments for the web-based asynchronous component shall be implemented at the module level and may offer multiple attempts at the correct answer before moving on to the next topic. The questions developed for the assessments will be related directly to the learning outcomes.

Students must obtain the set minimum score (to be determined by the contractor) for each of the web-based modules in order to move forward and attend the instructor-led classroom sessions.

Students must obtain the set minimum score (to be determined by the contractor) for the classroom component in order to receive a certificate of completion.

If students do not pass the course tests, a remediation plan shall be implemented pulling information from the assessments to help students work to comprehend the concepts and information with which they are struggling.

OTED will track student course completion using the attendance records supplied by the contractor.

A schedule of classes, assessment and evaluation strategies for students shall be provided no more than 6 months after award.

Deliverables Format of Deliverables Format: Electronic copies must be in a format compatible with Office 365 and Adobe Acrobat (version 10 or later). Documents will be required to be Section 508 compliant.

Weekly, interim, informal, and working-copy products may be provided by e-mail to the COR.

Final electronic copies of deliverables must be in a format compatible with Office 365 and Adobe Acrobat (version 10 or later).

Final hard copies, if required, shall be typewritten on 8-1/2"x11" white paper. The Contractor shall not use spiral binding or other binding that interferes with photocopying.

Deliverables Submission Procedure The Contractor shall submit all deliverables to the COR, unless otherwise stated. The COR will be responsible for the review of all draft and final deliverables to ensure accuracy, functionality, completeness, professional quality, and overall compliance with the requirements of the task.

The Contractor shall ensure the accuracy and completeness of all deliverables in accordance with referenced policy, regulations, laws, and directives.

Unless specified otherwise, the government shall have ten (10) working days to complete the review and approve the deliverables. If deficiencies are found or areas require modification, the Contractor shall be notified and shall have five (5) calendar days to correct the deficiencies.

Upon re-submission by the Contractor, the government will reapply the same acceptance criteria. If the deliverable does not meet the acceptance criteria a second time, the government may consider the Contractor as having deficient performance with respect to the subject task.

Summary of Deliverables

Task
Deliverable
Quantity/Frequency
Due Date

Reporting, Meetings, Planning

1.1
Kickoff Meeting
One / Once
Within 15 days of award, or at OII's discretion
1.1
Kickoff Meeting Minutes
One / Once
Five (5) business days after kickoff meeting
1.2
Program Management Plan (including Implementation and Evaluation Plan)
One / Once; Updated as required
Within 15 business days (6 weeks) of award
1.3
Work Breakdown Structure
One / Once
Within 15 business days of award
1.4
Monthly Status Report
Monthly
By 5th business day of each month
1.5
In-Progress Reviews (IPR)
Bi-weekly for first 6 months; Monthly thereafter
As scheduled in PMP
1.6
IT Consultation Meeting
One / Once
Within 3 weeks of award
1.6
Course Provision Schedule
One / Once
Within 2 months of contract award

Course Components and Data

2.7
Prototypes - Web-based content (syllabus, prototype of online modules, accompanying course materials, 508 logs)
One set per course
Within 3 months of contract award; OTED will provide feedback within 15 days
2.7
Prototypes - Face-to-face course materials (instructor guide, participant guide, schedule, activities, lecture slides/presentations, activity workbooks)
One set per course
Within 4 months of contract award; OTED will provide feedback within 10 days
2.6
Web-based Course Modules & Webinar Layouts (Alpha and Beta versions)
Per course
Alpha and Beta versions within 6 months; Review period: 10 working days
2.6
Web-based Course Modules & Webinar Layouts (All courses)
Complete set
Within 12 months of contract award
2.5
Instructor and Participant Guides (including approved scripts, approved prototype layout, all visuals)
Per course
Review period: 10 business days each
2.8
Final Content - Web-based
Complete set
Within 8 months of contract award
2.8
Final Content - In-person/Classroom (includes Participant and Instructor Guides)
Complete set
Within 10 months of contract award
2.9
Training Materials and Multimedia Assets (all assets necessary for performance not provided by OTED, release forms for copyrighted materials as needed)
As developed
Within 11 months of award
3.5
Evaluation Data (of all components - web-based and on-site - for all courses completed by students)
Annually
Within 12 months of contract award; then annually

Training and Course Delivery

3.1
BTEC Shorts Platform Implementation
Ongoing
Operational within 6 months of award
3.4
Biomanufacturing Principles and Processes Curriculum - All 4 Courses
4 courses annually
Each course within a 5-week period; 4 courses within 12 months, annually
3.2
Asynchronous Web-Based Training
Per course schedule
Within a week after synchronous web-based training module and before classroom component; available anytime within specified calendar period
3.2
Synchronous Web-Based Training/Webinar
Per course schedule
Scheduled as approved by OTED
3.3
On-site Classroom Training (Instructor-Led and Training/Lab)
Per course schedule
Scheduled as approved by OTED
3.5
Schedule of classes, assessment and evaluation strategies for students
One / Once
No more than 6 months after award

Contract Type The expected contract type is a Firm-Fixed-Price Contract.

Place of Performance The on-site and on-line training shall take place at the Contractor's facilities.

Services shall be provided both on and off-premises. The contractor shall work remotely using FDA furnished property on the FDA network as necessary for coordination and communication.

Period of Performance The period of performance is a base period of twelve (12) months with four (4) additional option periods of twelve (12) months each.

Base Period: 03/31/2027 through 03/30/2028 (12 months) Option Period 1: If exercised, 03/31/2028 through 03/30/2029 (12 months) Option Period 2: If exercised, 03/31/2029 through 03/30/2030 (12 months) Option Period 3: If exercised, 03/31/2030 through 03/30/2031 (12 months) Option Period 4: If exercised, 03/31/2031 through 03/30/2032 (12 months) Potential Extension up to 6 months: If exercised, 03/31/2032 through 09/29/2032 (6 months) The entire curriculum must be available for student enrollment by the end of the base year. The first course must be finalized and ready for student enrollment within 6 months from award of contract. The first cohort must complete at least half of the curriculum before the end of the base year of the contract. By the end of the fourth option year, six (6) separate cohorts will have completed the entire curriculum.

Assumptions and Constraints The Contractor shall follow all terms and conditions referenced in the order.

The Government assumes that unless substantive changes are necessary (e.g., language requiring updates based on new laws and statutes, significant changes in biomanufacturing science or technology, or changes in FDA inspection requirements), deliverables will not require substantial updating for the option years beyond annual curriculum reviews and minor updates.

The Government identified no constraints underlying the overall Order that the Contractor shall consider in developing their technical solution other than those required to meet Federal and FDA statutory and regulatory obligations.

Government Furnished Equipment/Information/Property Government furnished property (materials, equipment, and/or information) may be provided in conjunction with required performance under this contract as determined by mutual agreement between FDA and the Contractor.

OTED may provide existing course materials, including web modules, webinars, handouts, slides, and other developed course materials to assist the contractor in developing updated curriculum.

When the Government provides equipment, then the Contractor shall maintain a detailed inventory accounting system for Government Furnished Property (GFP) following contract award. The inventory accounting system must specify, at a minimum:

Product description (make, model) Government tag number Date of receipt Name of recipient Location of receipt Current location Contract/order number under which the equipment is being used The Contractor shall attach an updated inventory report to each monthly progress report unless otherwise specified by the COR. In either case, the Contractor's inventory listing must be available for Government review within one (1) business day of COR request.

The Contractor shall remain responsible and accountable for all GFP for the duration of the contract and ensure the return of the property upon completion of all work required under this contract.

Property Custodian:

Name: [To be determined] U.S. Food and Drug Administration White Oak Campus 10903 New Hampshire Ave Silver Spring, MD 20993 Phone: [To be determined] Email: [To be determined] Authorized Contacts Contracting Officer/Contract Specialist:

Name: [To be determined by OAGS] Email: [To be determined] Phone: [To be determined] Contracting Officer's Representative (COR):

Name: LCDR Kimberly Hull Title: Training Specialist Office: OTED Address: White Oak Campus – 10903 New Hampshire Ave Silver Spring, MD Email: Kimberly.Hull@fda.hhs.gov Phone: 301-796-4536 Technical Point of Contact: Yaw Daniel Osei Title: Division Director - Division of Inspections and Investigations Office: Office of Training, Education and Development (OTED) Office of Operations Address: U.S. Food and Drug Administration Email: Yaw.Osei@fda.hhs.gov Phone: 240-706-6624 Travel, Materials, and Incidental Services Travel may be required in the performance of this contract. All anticipated travel costs shall be reasonable and coordinated with, approved, and authorized in writing by the COR, prior to commencement of travel.

All contract related travel costs shall be in accordance with FAR 31.205-46 Travel Costs and the Federal Travel Regulation, which addresses permissible costs for transportation, lodging, meals, and incidental expenses, and must be accompanied by a Trip Report that details the purpose for travel, work accomplished, identified issues (if any), remaining work to be performed and overall results.

If any travel arrangements cause additional costs to the contract that exceed those previously negotiated, written approval by the contracting officer (CO) is required, prior to undertaking such travel.

The contractor shall travel using the lower cost mode transportation commensurate with the contract requirements. When necessary to use air travel, the contractor shall use the economy class level or similar accommodations to the extent they are available and commensurate with the contract requirements.

Travel will be incluede in the total FFP price.

The contractor shall not be reimbursed for local travel expenses incurred in direct performance of this contract. Local travel is considered to be part of the fixed price. Local travel to attend meetings within the FDA White Oak campus in Silver Spring, Maryland local commuting vicinity (50 miles radius of the normal place of performance) shall be considered a cost of doing business and shall not be separately reimbursed.

Travel costs to the FDA White Oak campus in Silver Spring, Maryland shall be provided for employees providing services remotely, outside of the FDA White Oak campus, Silver Spring, Maryland local commuting vicinity (50 miles radius of the normal place of performance).

Note: The Government will provide funding for student travel, lodging, and meals for the on-site component of the courses. Contractor travel costs for instructors or support personnel must be included in the fixed price if required.

Holidays and Government Closures The Government generally does not allow billable hours on Federal Holidays.

The Contractor is not required to provide on-site services on the following days that are Federal Holidays or on any other day designated as a Federal holiday, Government closure, or shut-down for the Washington, D.C. area:

New Year's Day Martin Luther King Day President's Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day Note: Inauguration Day is a twelfth federal holiday every four years. If the Period of Performance includes an Inauguration Day, that date will be added as an additional holiday.

The Contractor shall not schedule training during federal holidays or Government closure. As necessary, training scheduled during unexpected Government closures may be rescheduled following coordination with the COR.

The Contractor shall not bill the Government for any training that the Contractor did not perform due to any Government closures.

508 Standard Requirements Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d) requires Federal agencies to purchase information and communication technologies (ICT) that meet specific accessibility standards.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .