OH Delaware R100A All Docs Combined.pdf
PDF 6 MB Posted
- Solicitation number
- 57-39041-23-FA
About this file
This is a Request for Lease Proposals (RLP) issued by the U.S. Department of Agriculture (USDA) for office and related space in Delaware, Ohio. The USDA seeks to lease between 4,220 and 4,431 ANSI/BOMA Occupant Area (ABOA) square feet, with a maximum of 5,064 rentable square feet (RSF), within a delineated area of Delaware County. The lease term is 10 years total, with a 5-year firm term and 5-year non-firm term, and the Government retains termination rights with 120 days' notice after the firm term expires. The space must be located in a modern quality building with a stone, marble, brick, or permanent material facade in good or acceptable condition. Required amenities include 31 reserved parking spaces (6 for Government vehicles, 25 for customer use), 24/7 access availability with normal operating hours Monday-Friday 6:00 AM-6:00 PM, and compliance with fire safety, accessibility, seismic, and sustainability standards. The space must be fully serviced with all utilities, janitorial services, and building operating costs included in the rental consideration, and cannot be located in the 1-percent-annual-chance floodplain.
Offers are due by October 26, 2026, at 2:30 PM Eastern time, submitted electronically via email to the Lease Contracting Officer, Heather Schmitt (Heather.Schmitt@usda.gov). The evaluation methodology follows a two-step process: Step 1 involves submittal of pricing (GSA Forms 1217 and 1364), floor plans, and parking plans; Step 2, for the apparent lowest priced offeror only, requires submission of financial commitments, zoning evidence, ownership documentation, proof of signing authority, fire protection and life safety evaluation (GSA Form 12000), Energy Star certification or equivalent documentation, environmental due diligence materials, and CAD floor plans. Award will be made to the lowest priced, technically acceptable, responsive offer based on present value price evaluation at a 5 percent discount rate. The RLP documents include a lease template, Agency Specific Requirements, security requirements (FSL I), USDA facility guidelines, and required federal clauses and forms. No broker commissions are applicable, and the NAICS code is 531120 with small business size standards referenced at SBA.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3a OH Delaware Info and Reference.zip | ZIP file | |
| 3a OH Delaware Proposal Docs.zip | ZIP file | |
| Delaware Revised Delineated Area Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA TEMPLATE R100A (5/25)
USDA
REQUEST
FOR LEASE
PROPOSALS
NO.
57-39041-23-FA
Delaware / OH
Offers due by 10/26/2026
In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 2:30pm Eastern on the date above. See “Receipt of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.
SLAT RLP
TABLE OF CONTENTS
SLAT RLP
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (SLAT) (OCT 2023)
1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)
1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)
1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)
1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)
1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)
1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) INTENTIONALLY DELETED
1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)
1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE
STANDARD (OCT 2023)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)
2.02 FLOOD PLAINS (OCT 2022)
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)
2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023)
SECTION 3 HOW TO OFFER
3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)
3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)
3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)
3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)
3.05 BUILDING TOUR (SLAT) (OCT 2020)
3.06 TENANT IMPROVEMENTS INCLUDED IN OFFER (SLAT) (OCT 2020)
3.07 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)
3.08 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012) INTENTIONALLY DELETED 13
3.09 SECURITY IMPROVEMENTS INCLUDED IN OFFER (OCT 2022) INTENTIONALLY DELETED
SECTION 4 METHOD OF AWARD
4.01 NEGOTIATIONS (SLAT) (OCT 2023)
4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (SLAT) (OCT 2023)
4.03 AWARD BASED ON PRICE (OCT 2023)
4.04 PRESENT VALUE PRICE EVALUATION (OCT 2024)
4.05 AWARD (SLAT) (OCT 2023)
SECTION 5 ADDITIONAL TERMS AND CONDITIONS
5.01 MODIFIED RLP PARAGRAPHS (OCT 2016)
5.02 SWING SPACE - RLP (OCT 2022) INTENTIONALLY DELETED
RLP NO. 57-39041-23-FA, PAGE 1 OF 19 GSA TEMPLATE R100A (10/24)
REQUEST FOR LEASE
PROPOSALS NO. 57-39041-23-FA
August 25, 2026 SLAT RLP GSA TEMPLATE R100A (October 2024)
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (SLAT) (OCT 2023)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” shall apply to the terms of this RLP.
C. Do not attempt to complete the lease template. USDA will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal shall be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).
D. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.
E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., United States Department of Agriculture, USDA, in the entity name that owns and/or leases the Space to USDA.
1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SLAT) (OCT 2020)
A. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization, or adaptive reuse for the Space with modern conveniences. Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.
CITY, STATE DELAWARE, OH
AREA OF CONSIDERATION NORTH: STARTING AT THE INTERSECTION OF RT 257 AND RT 37, RT 37, RT 203, RT
192/HANS-MILLER RD, RT 23/US HWY 23 N, RT 216/HUDSON RD/RT
215/PANHANDLE RD. TURNS INTO RT 215/PANHANDLE RD. TURNS INTO RT 218/CASE
RD., RT 220/HORSESHOE RD., RT 219/KELLY MCMASTER RD., RT 42/US HWY 42, RT
65/CACKLER RD./COUNTY HOME RD., RT 65/COUNTY HOME RD. TURNS INTO RT
521/RT 65/KILBOURNE RD. TURNS INTO RT 521, RT 61, RT 63/ CHAMBERS RD. TURNS
INTO RT 64/LOTT RD. TURNS INTO RT 63/CHAMBERS RD., RT 656, ENDING AT THE
INTERSECTION OF RT 656 AND RT 12/PORTER CENTRAL RD.
EAST: STARTING AT THE INTERSECTION OF RT 656 AND RT 12/PORTER CENTRAL RD.,
RT 12/PORTER CENTRAL RD, RT 52/OLIVE GREEN RD, RT 16/CONDIT RD TURNS INTO
RT 605/DEL COUNTY RD 605, ENDING AT THE INTERSECTION OF RT 605/DEL COUNTY
RD 605 AND RT 37.
SOUTH: STARTING AT THE INTERSECTION OF RT 605/DEL COUNTY RD 605 AND RT
37, FOLLOW RT 37 WEST, RT 19/VANS VALLEY RD, RT 30/SUNBURY RD TURNS INTO
RT 30/COLUMBUS ST. TURNS INTO RT 24/COLUMBUS ST, TURNS INTO RT 24/S OLD
3C RD./COLUMBUS ST, RT 104/DUSTIN RD, RT 35/THREE B’S & K RD, RT
72/CHESHIRE RD, RT 23/COLUMBUS PIKE, HAWTHORN BLVD, RT 9/LIBERTY RD, RT
141/BUNTY STATION RD, RT 5/ S SECTION LINE RD, US HWY 42, ENDING AT THE
INTERSECTION OF RT 42 AND RT 257
WEST: STARTING AT THE INTERSECTION OF RT 42 AND RT 257, FOLLOW RT 257,
ENDING AT THE INTERSECTION OF RT 257 AND RT 37
SPACE TYPE(S) OFFICE AND RELATED SPACE
MINIMUM SQ. FT. (ABOA) 4220 ABOA
MAXIMUM SQ. FT. (ABOA) 4431 ABOA
RLP NO. 57-39041-23-FA, PAGE 2 OF 16 GSA TEMPLATE R100A (4/25)
RENTAL SQ. FT. (RSF) 5064 RSF
RESERVED PARKING SPACES (TOTAL) 31
RESERVED PARKING SPACES (SURFACE) (31) - (6) GOV AND (25) CUSTOMER
RESERVED PARKING SPACES (STRUCTURE) 0
INITIAL FULL TERM 10 YEARS
INITIAL FIRM TERM 5 YEARS
TERMINATION RIGHTS 120 DAYS
ADDITIONAL REQUIREMENTS THE SPACE OFFERED, ITS LOCATION, AND ITS SURROUNDING AREAS MUST BE
COMPATIBLE WITH THE GOVERNMENT’S INTENDED USE.
SPACE WILL NOT BE CONSIDERED WHERE ANY LIVING QUARTERS ARE LOCATED WITHIN
THE BUILDING.
SPACE SHALL NOT BE LOCATED NEAR ESTABLISHMENTS WHOSE PRIMARY OPERATION
IS THE SALE OF ALCOHOLIC BEVERAGES, FIREARMS SOLD/ DISCHARGED, OR WHERE
THERE ARE TENANTS RELATED TO DRUG TREATMENT OR DETENTION FACILITIES.
SUBLEASES ARE NOT ACCEPTABLE.
FIRST FLOOR CONTIGUOUS SPACE PREFERRED. SPACE WITHOUT GROUND FLOOR
ACCESS SHALL BE PROVIDED WITH AN ABAAS COMPLIANT ELEVATOR AND TWO
SEPARATE PATHS OF EGRESS / STAIR CASES OUT OF THE SPACE.
THE GOVERNMENT WILL HAVE ACCESS TO THE SPACE 24-HOURS A DAY, 7-DAYS A
WEEK. NORMAL HOURS OF OPERATION ARE MONDAY THROUGH FRIDAY 6:00 AM – 6:00
PM (EXCLUDING SATURDAYS, SUNDAYS, AND FEDERAL HOLIDAYS).
OFFERED SPACE MUST MEET THE GOVERNMENT’S REQUIREMENTS FOR FIRE SAFETY,
ACCESSIBILITY, SEISMIC, AND SUSTAINABILITY STANDARDS PER THE TERMS OF THE
LEASE.
A FULLY SERVICED LEASE IS REQUIRED. ALL SERVICES, JANITORIAL SERVICES,
UTILITIES SHALL BE PROVIDED AS PART OF THE RENTAL CONSIDERATION.
OFFERED SPACE SHALL NOT BE IN THE 1 PERCENT-ANNUAL CHANCE (100-YEAR) FLOOD
PLAIN.
1.03 NEIGHBORHOOD AND PARKING (SLAT) (OCT 2021)
A. Neighborhood and Parking: Inside City Center. Space shall be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks shall be well maintained. Parking facilities with an adequate availability of parking spaces open to the general public to accommodate employees and visitors shall be located within the immediate vicinity of the Building but generally not exceeding a walkable 1/4 Mile of the employee entrance of the offered Building as determined by the LCO. These parking facilities do not substitute for the required parking under Paragraph 1.02(C).
B. Neighborhood and Parking: Outside City Center. Space shall be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking-to-square-foot ratio available on site shall at least meet current local code requirements, or, in the absence of a local code requirement, onsite parking shall be available at a ratio of one (1) space for every 250 RSF of Space.
C. INTENTIONALLY DELETED
1.04 LIST OF RLP DOCUMENTS (SLAT) (OCT 2023)
A. The following documents are attached to and included as part of this RLP package:
RLP NO. 57-39041-23-FA, PAGE 3 OF 16 GSA TEMPLATE R100A (4/25)
DOCUMENT NAME
NO. OF PAGES
EXHIBIT
Lease No. 57-39041-23-FA (Template L100A) 35 Attachment 1
AGENCY SPECIFIC REQUIREMENTS 20 C
CONCEPT PLAN 1 C-1
USDA LEASE SCOPE OF WORK - INCUMBENT 8 C-2
USDA ADP AND WIRING GUIDELINES VERSION 3.0 11 D
USDA FACILITY SIGNAGE GUIDE 11 E
SECURITY REQUIREMENTS (FSL I) 5 F
GSA 3517A GENERAL CLAUSES 11 G
DOL WAGE RATE 5 H
Proposal to Lease Space (GSA Form 1364) 2 Attachment 2 GSA Form 1217, Lessor's Annual Cost Statement 3 Attachment 3 Tenant Improvement Cost Summary (TICS) Table and TICS Worksheet Excel – many tabs
PDF – 4 pages Attachment 4
GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)
6 Attachment 5
GSA 3516A Solicitation Provisions 8 Attachment 6
1.05 LEASE DESCRIPTION (SLAT) (MAY 2025)
A. Offeror shall examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
A B. The Lease contemplated by this RLP includes:
1. The term of the Lease, and renewal option, if any.
2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.
3. Building Shell standards and requirements.
4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.
5. Security Requirements.
6. A description of all services to be provided by the Lessor.
C. Should the Offeror be awarded the Lease, the terms of the Lease shall be binding upon the Lessor without regard to any statements contained in this RLP.
D. The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, real estate taxes, and security upgrades. Rent shall be based upon a proposed rental rate per Rentable Square Foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor shall be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor shall design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.
After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Agency Specific Requirements.
The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.
E. The security pricing process is described in a separate paragraph.
F. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI alterations, the Government shall withhold TI rent pursuant to Section 1 of the Lease until such time as the TI is completed and accepted by the Government. During the term of the Lease, rent will be adjusted for changes to the Lessor's operating costs and real estate taxes, pursuant to paragraphs set forth in the Lease.
G. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the GSA 3517A, Solicitation Provisions, and will be made part of the Lease.
RLP NO. 57-39041-23-FA, PAGE 4 OF 16 GSA TEMPLATE R100A (4/25)
1.06 AUTHORIZED REPRESENTATIVES (OCT 2020)
With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Lease LCO:
Heather Schmitt 625 Evans City Rd. | Butler, PA 16046 724-482-5288 Heather.Schmitt@usda.gov
1.07 BROKER COMMISSION AND COMMISSION CREDIT (OCT 2020) INTENTIONALLY DELETED
1.08 PRICING OF SECURITY REQUIREMENTS (OCT 2022)
A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space.
C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.
1.09 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).
B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.
RLP NO. 57-39041-23-FA, PAGE 5 OF 16 GSA TEMPLATE R100A (4/25)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (SLAT) (OCT 2020)
In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense.
2.02 FLOOD PLAINS (OCT 2022)
A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.05 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.
B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:
1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;
2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;
3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or
4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.
C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR®
Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or
RLP NO. 57-39041-23-FA, PAGE 6 OF 16 GSA TEMPLATE R100A (4/25)
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System
(BAS)/Monitoring/Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-
OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual HTTPS://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
2.06 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
A. Environmental Due Diligence.
1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.
2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such
RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.
B. National Environmental Policy Act.
1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision-making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.
RLP NO. 57-39041-23-FA, PAGE 7 OF 16 GSA TEMPLATE R100A (4/25)
2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.
3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.
4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government.
5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.
6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement. Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
2.07 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (SMALL) (OCT 2023)
A. The Government is responsible for complying with section 106 of the National Historic Preservation Act of 1966, as amended, 54 U.S.C. §
306108 (Section 106). An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance.
B. If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the GSA’s Qualification Requirements for Preservation Architects. These standards are available at: HTTPS://WWW.GSA.GOV/REAL-ESTATE/HISTORIC-PRESERVATION/.
RLP NO. 57-39041-23-FA, PAGE 8 OF 16 GSA TEMPLATE R100A (4/25)
SECTION 3 HOW TO OFFER
3.01 GENERAL INSTRUCTIONS (SLAT) (OCT 2020)
Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the Government as indicated below. The Government will evaluate the offers received as outlined below and further described in this section.
Step 1: Offer Submittal Offeror shall submit an offer using the instructions in paragraph 3.02 Receipt of Lease Proposals (SLAT) and 3.03 Step 1: Offer Submittal (SLAT).
The LCO will evaluate the offers that are received by the due date identified for submission of offers in this RLP. The LCO may elect to proceed based on initial offers or to conduct negotiations in accordance with paragraph 4.01 Negotiations (SLAT). The Offeror whose offer is identified as the apparent lowest priced offer and is otherwise responsive to the terms identified in the solicitation will proceed to step 2. Proceeding to step 2 does not constitute award of a contract.
Step 2: Due Diligence The Offeror with the apparent lowest priced offer shall be notified by the LCO and requested to submit the information requested in paragraph 3.04 Step 2: Due Diligence - Additional Submittals (SLAT), in addition to signing the Lease form which will be completed with the details of the Offeror’s price submittal. No further discussions will occur between the Government and the apparent lowest priced offeror regarding the Additional Submittals.
Should the Offeror submitting the apparent lowest priced offer fail to complete any of the requirements of the solicitation or, upon further review be found to not meet the requirements of the solicitation during any part of the evaluation process, the LCO will consider other offers received in response to the solicitation.
Building Tour As part of the Government’s due diligence review of the offer, the LCO may notify the Offeror of the date and time for the Government to physically tour the building.
Award Upon completion of the Government’s review of the apparent lowest priced offer’s Due Diligence – Additional Submittals and a determination that the offer meets the requirements of the solicitation, the LCO will counter-sign the Lease document and furnish notification of execution to the Offeror. This execution and notification by the LCO shall constitute award of a contract.
3.02 RECEIPT OF LEASE PROPOSALS (SLAT) (OCT 2024)
Electronic method - Submission through email:
A. Unless otherwise authorized by the LCO, offers may only be submitted electronically to USDA using direct email to the LCO. Email enables
Offerors to electronically offer space for lease to the Federal Government.
B. In order to be considered for award, offers conforming to the requirements of the RLP shall be submitted via email to the LCO’s email address in this RLP no later than October 26, 2026, 2:30pm Eastern.
C. Offerors must submit all documentation identified in this RLP using email. There is no paper-based submission process under this RLP and paper submissions will not be considered, unless otherwise authorized by the LCO.
3.03 STEP 1: OFFER SUBMITTAL (SLAT) (OCT 2023)
Offeror shall provide the following information:
A. Price Offer
1. GSA Form 1217, Lessor’s Annual Cost Statement. Complete all sections of the 1217.
2. GSA Form 1364, Proposal to Lease Space. Complete all sections of the 1364, including, but not limited to:
a. A fully serviced Lease rate (gross rate) per ABOA and RSF, clearly itemizing the total Building shell rental, TI rate, operating costs, and parking (itemizing all costs of parking above base local code requirements or otherwise already included in shell rent).
b. Improvements. All improvements in the base Building, lobbies, common areas, and core areas shall be provided by the
Lessor, at the Lessor’s expense. This Building shell rental rate shall also include, but is not limited to, property financing (exclusive of TIs), insurance, taxes, management, profit, etc., for the Building. The Building shell rental rate shall also
RLP NO. 57-39041-23-FA, PAGE 9 OF 16 GSA TEMPLATE R100A (4/25)
include all basic Building systems and common area buildout, including base Building lobbies, common areas, core areas, etc., exclusive of the ABOA Space offered as required in this RLP.
c. The annual cost per ABOA and rentable square foot (RSF) for the cost of services and utilities for ABOA and RSF, respectively. This equals line 27 of GSA Form 1217, Lessor’s Annual Cost Statement, divided by the Building size (shown on the top of both GSA Form 1364, Proposal to Lease Space, and Form 1217) for ABOA and RSF, respectively.
d. The annual rent to amortize the Tenant Improvements. Such amortization shall be expressed as a cost per ABOA and RSF per year. This shall be all alterations for the Space above the Building shell. Such alterations shall be described and identified in the drawings used to construct the Space. If the Offeror chooses to amortize the TI for a period exceeding the Firm Term of the Lease, the Offeror shall indicate the extended time in the offer. If the Government terminates the Lease after the Firm Term or does not otherwise renew or extend the term beyond the Firm Term, the Government shall not be liable for any unamortized TI costs resulting from an extended amortization period.
e. INTENTIONALLY DELETED
f. A shell rate per ABOA and RSF for that portion of the lease term extending beyond the Firm Term. The rate proposed for this portion of the term shall not reflect any TIs as they will have been fully amortized over the Firm Term.
g. An hourly overtime rate for overtime use of heating and cooling, and, if applicable, Adjustment for Reduced Services. NOTE:
Refer to the Lease document for additional guidance.
h. Adjustment for Vacant Leased Premises. NOTE: Refer to the Lease document for additional guidance.
i. Lessor’s Fees to complete Tenant Improvements. Provide a listing of proposed (i) Lessor’s Project Management fee and
(ii) Lessor’s A/E design costs to prepare construction documents, to complete the Tenant Improvements, if applicable. State the basis for determining each component, (e.g., flat fee, cost per ABOA SF, etc.). State any assumptions used to compute the dollar costs for each fee component.
j. Rent concessions being offered. Indicate either on the GSA Form 1364 Proposal to Lease Space or in separate correspondence.
k. INTENTIONALLY DELETED
l. If the Offeror requests any deviations, all deviations must be documented on Form 1364 in block labeled “Additional
Remarks or Conditions with Respect to this Offer.” If the Offeror requests any deviations, USDA at its sole discretion will make the decision whether to accept the deviation.
3. INTENTIONALLY DELETED
4. INTENTIONALLY DELETED
5. INTENTIONALLY DELETED
6. Tenant Improvement Cost Summary (TICS) Table. Note that the LCO may request additional quotes or supporting documentation during negotiations to help assist with the fair and reasonable price evaluation.
B. Initial Documentation. As part of the Step 1 offer submission process, Offerors must submit the following:
1. Scaled floorplans of the offered Space(s)
2. A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements.
3. Authorization from the ownership entity to submit an offer on the ownership entity’s behalf, if the offeror is not the owner of the
Property.
4. If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the
Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to closing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required.
5. Additional offeror attachments, such as the Acknowledgements of Multiple Representation (if the offeror(s) choose to use their own independent broker for their own representation).
6. Riders, Clarifications to Offer, Exceptions to Offer and other additions, deletions, or changes to the terms of the RLP may not be accepted by the Government and may cause the Offeror to be excluded from further consideration.
7. INTENTIONALLY DELETED
RLP NO. 57-39041-23-FA, PAGE 10 OF 16 GSA TEMPLATE R100A (4/25)
STEP 1: PRICE SUBMITTAL LIST OF DOCUMENTS
Proposal to Lease Space (GSA Form 1364)
Lessor’s Annual Cost Statement (GSA Form 1217)
Tenant Improvement Cost Summary (TICS) Table
Scaled Floorplan showing the offered Space
Parking Plan
Authorization to submit offer on behalf of ownership (if Offeror is not the owner)
Fully executed copy of contract to acquire an interest in the Property (if Offeror is not the owner)
3.04 STEP 2: DUE DILIGENCE - ADDITIONAL SUBMITTALS (SLAT) (OCT 2024)
If identified as the apparent lowest priced Offeror, the LCO will request the following items which shall be submitted in a timely manner as determined by the LCO:
A. Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell, and TI.
Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state:
amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer.
B. Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority. If the current zoning is not in compliance, the Offeror must submit a plan and time schedule outlining how they will obtain all necessary zoning approvals prior to construction and how long the necessary zoning approvals will take.
C. Evidence of ownership or control of Building or site. If the Offeror owns the Property being offered or has a long- term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.
D. Required Proof of Signing Authority: As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease:
1. Corporation. Copy of Articles of Incorporation and bylaws. In addition, a copy of the resolution, signed by the necessary directors of the corporation authorizing the corporate officer who will sign the lease to bind the corporation to the Lease.
2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership and evidence of authority of signatory to bind the partnership if not expressly authorized by the Partnership Agreement.
3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement. Also, evidence of the authority of the signing manager (if company is manager owned) or member (if the company is member managed) to sign, if not expressly authorized by the Articles of Organization and/or Operating Agreement.
4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease.
E. If claiming an historic preference in accordance with the Historic Preference paragraph in RLP Section 2, Eligibility and Preferences for
Award, Offeror must submit one of the following as documentation that the Property is historic or the site of the offered Property is within a Historic District: a letter from the National Park Service stating that the Property is listed in the National Register of Historic Places (NRHP) or eligible for listing, with a date of the listing/decision; a letter from the State Historic Preservation Office stating that the Property is listed in the(NRHP, or on a statewide register, or eligible for inclusion, with a date of the listing/decision; or, the NRHP Identification Number and date of listing available from the NRHP Database found at WWW.NPS.GOV/NR.
F. If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package.
Owners and agents in conflicting interest situations are advised to exercise due diligence with regard to ethics, independent pricing, and Government procurement integrity requirements. In such cases, the Government reserves the right to communicate with the owner directly.
G. The Offeror must submit the Fire Protection and Life Safety (FPLS) Submittal Information in sub-paragraph 1, unless the Building meets either exemption in sub-paragraph 2 or 3 below.
1. FPLS Submittal Information.
a. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).
RLP NO. 57-39041-23-FA, PAGE 11 OF 16 GSA TEMPLATE R100A (4/25)
b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building).
c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).
d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, a report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances must be provided.
2. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to USDA the FPLS Submittal Information listed in sub-paragraph 1 above.
3. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then Offeror is not required to submit to USDA the FPLS Submittal Information in sub-paragraph 1 above.
H. INTENTIONALLY DELETED
I. The architectural plans for modernization if the offered Building is not a modern office Building.
J. A current asbestos management plan or operations and management plan, along with a current reinspection report (performed within the past 5 years), if the offered Building contains asbestos-containing materials.
K. Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs a through e noted below:
1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided.
2. All plans submitted for consideration shall have been generated by a Computer Aided Design (CAD) program which is compatible with the latest release of AutoCAD. The required file extension is .DWG. Plans shall include a proposed corridor pattern for typical floors and/or partial floors. The CAD file showing the offered Space should show the Poly-Line utilized to determine the square footage on a separate and unique layer. All submissions shall be accompanied with a written matrix indicating the layering standard to verify that all information is recoverable. All architectural features of the Space shall be accurately shown.
3. All architectural features of the Space shall be accurately shown. If conversion or renovation of the Building is planned, alterations to meet this RLP shall be indicated.
4. Plans shall reflect corridors in place or the proposed corridor pattern for both a typical full (single tenant) floor and/or partial
(multi-tenant) floor. The corridors in place or proposed corridors shall meet local code requirements for issuance of occupancy permits.
5. USDA will review all plans submitted to determine if an acceptable level of safety is provided. In addition, USDA will review the common corridors in place and/or proposed corridor pattern to determine whether these achieve an acceptable level of safety as well as to verify that the corridors provide public access to all essential Building elements. The Offeror will be advised of any adjustments that are required to the corridors for determining the ABOA Space. The required corridors may or may not be defined by ceiling-high partitions. Actual corridors in the approved layout for the successful Offeror's Space may differ from the corridors used in determining the ABOA square footage for the lease award. Additional egress corridors required by the tenant agency’s design intent drawings will not be deducted from the ABOA square footage that the most efficient corridor pattern would have yielded.
L. A statement as to whether there are existing vending facilities in the offered Building which have exclusive rights in the Building.
M. Information required under paragraph entitled “UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN.”
N. No later than the Lease Award Date, the Offeror must submit to the LCO:
1. The Offeror must have an active registration in the System for Award Management (SAM) via the internet at
HTTPS://WWW.SAM.GOV. Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM. This registration service is free of charge.
2. Energy Star Documentation.
a. Evidence of an Energy Star® label obtained within the 12 months prior to the Lease Award Date, RLP NO. 57-39041-23-FA, PAGE 12 OF 16 GSA TEMPLATE R100A (4/25)
b. Offerors falling under a statutory exception must also indicate prior to the Lease Award Date what cost effective energy efficiency and conservation improvements they are proposing to make.
c. If no cost-effective improvements can be made, the Offeror must demonstrate to the Government using the ENERGY
STAR® Online Tools referenced in the RLP paragraph, entitled “ENERGY INDEPENDENCE AND SECURITY ACT,” why no energy efficiency and conservation improvements are cost effective. This explanation will be subject to review by the LCO. If the explanation is considered unreasonable, the offer may be considered technically unacceptable.
d. If the Offeror is claiming eligibility for additional time to obtain the Energy Star® label per sub-paragraph B of the RLP paragraph entitled “Energy Independence and Security Act,” then the Offeror shall provide such indication with its initial offer and also must provide by the due date for final proposal revisions evidence substantiating their claim for additional time to obtain the Energy Star® label and substantiating their capability of earning the Energy Star®.
O. INTENTIONALLY DELETED
P. If applicable, information required under paragraph entitled “DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT
REQUIREMENTS - RLP.”
Q. If applicable, information required under paragraph entitled “NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS.”
R. INTENTIONALLY DELETED
S. INTENTIONALLY DELETED
STEP 2: DUE DILIGENCE LIST OF DOCUMENTS
Evidence of funds
Evidence of zoning compliance
Evidence of ownership or control of the building
Required proof of signing authority
Evidence of historic preference eligibility (if applicable)
Agent disclosure representation (if applicable)
FPLS submittals as required above
Legal description of property
Architectural Modernization Plan (if applicable)
Asbestos Management Plan (if applicable)
CAD floor plans
Exclusive vending facilities statement
Building Operating Plan (if applicable)
Energy Star documentation (if applicable)
Environmental submittals (if applicable)
NHPA submittals (if applicable)
3.05 BUILDING TOUR (SLAT) (OCT 2020)
As part of its due diligence process, the Government may elect to conduct building tour(s) of any offered Property.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .