This is a Statement of Work (SOW) for preventative maintenance and emergency services for building automation systems at the National Institute of Standards and Technology (NIST) Gaithersburg campus. The contractor shall provide all labor, supervision, tools, materials, and equipment to maintain the Continuum and I/NET building automation systems across multiple buildings. Services include twice-monthly preventative maintenance visits during normal business hours (7am–5pm, Monday–Thursday, excluding federal holidays), with emergency services available 24/7 on a 40-hour annual basis. The scope encompasses data backup, graphics revisions, programming diagnostics, field panel diagnostics, control loop evaluation and tuning, consultation with NIST personnel, and emergency issue resolution. The contract period consists of a one-year base period (August 1, 2026–July 31, 2027) with four optional one-year renewal periods extending through July 31, 2031. Work locations include Buildings 101, 203, 217, 218, 219, 222, 230, 301, and 318, with maintenance covering multiple servers, controllers, VAV controllers, network controllers, and related equipment across these facilities.
The contractor must submit a Safety Plan for approval within seven business days prior to commencing work and a Quality Control Plan within ten calendar days of award. Planned service dates require submission 30 days in advance, with technician names and citizenship information due at minimum one business day prior (three days if non-U.S. citizen). Monthly preventative maintenance reports and emergency service reports must be submitted within five days of each visit. All contractor personnel require NIST badge access, background investigations commensurate with Low Risk–Tier 1 sensitivity designation, and compliance with HSPD-12 identity verification requirements. A personnel roster identifying all staff with system access must be provided within 14 days of contract effective date. Quality assurance will be conducted through file reviews, physical inspections, and surveillance with a 99% acceptable quality level for report accuracy and compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought-OFPM-TEAM-SS26-15.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/PERFORMANCE WORK STATEMENT
Title: ANDOVER DDC System Maintenance
I. BACKGROUND INFORMATION
The National Institute of Standards and Technology (NIST) is a 576-acer facility consisting of thirty-six (36) mixed use (mainly office and research laboratory) buildings. There are currently four (4) proprietary building automation systems used to control various mechanical equipment that maintain the required environmental conditions on campus. The Andover system (Continuum and I/NE) pertains to this statement of work.
II. PURPOSE
Contractor is to provide all labor, supervision, tools, material, and equipment to provide preventative maintenance and emergency services for the Continuum and I/NET building automation systems specified. Contractor shall maintain systems to ensure systems are in proper operating order.
PLACE OF PERFORMANCE
Maintenance service shall be provided twice a month, and the place of performance shall be at NIST, Gaithersburg Campus. Maintenance service shall be performed during normal business hours (7am – 5 pm Monday through Thursday, excluding Federal Holidays).
PERIOD OF PERFORMANCE
This is a 1-year Base Period contract with four (4) 1-year Option Periods.
Base Year – 8/1/2026 – 7/31/2027 Opt.1 Year – 8/1/2027 – 7/31/2028 Opt.2 Year – 8/1/2028 – 7/31/2029 Opt.3 Year – 8/1/2029 – 7/31/2030 Opt.4 Year – 8/1/2030 – 7/31/2031
III. SPECIFIC REQUIREMENTS
The maintenance service shall cover:
Building 217, 218 and 219. (4 visits per year).
· I/NET 7 Application- 1 server/Host Location; 2Client Locations.
Buildings 203, 301 (Warehouse) and 318 Continuum 1.94. (4 visits per year).
· Continuum 1.94 Application- 1 Server/Host location; 3 laptops
· bCX1-CR Network Controller- 1 each (203), 1 each (301) and 1 each (318)
· b3920 System Controller with Expansion Cards- 4 each (203), 2 each (301), 1 each (318)
· b3804 Local Controller- 1 each (203), 2 each (318)
· b3867 Terminal Controller- 5 each (203), 10 each (301), 7 each (318)
· b3866V VAV Controller- 8 each (301)
· b3865V VAV Controller- 8 each (203), 33 each (318)
· b Link Repeater- 1 each (203), 1 each (318)
· OE-368 Gateway- 1 each (318) Building 101(ACU-C3, Converters), 222, 230 (Compressor/Heat Exchanger) and 301 (Rooftop Units) Continuum 1.74. (4 visits per year).
· Continuum 1.74 Application- 1 Server/host location, 1 Client Location, 2 laptops
· b4920 Network Controller- 1 each (101), 2 each (222), 1 each (245), 1 each (301)
· b3920 System Controller with Expansion Cards- 5 each (222
· b3810 Local Controller- 2 each (101), 1 each (230), 5 each (301)
· b3865V VAV Controller- 95 each (222)
· b-Link Repeater- 2 each (222)
TASKS
Maintenance services shall include the following:
Task 1 – Data Backup
Complete data backup to CD, DVD or flash drive to include trend logs, programming, graphics, and control software must be conducted whenever a software or programming changes is made but no less frequently than monthly.
Task 2 – Graphics Revisions
The contractor shall maintain all graphics at each of the applicable workstations.
Task 3 – Programing Diagnostics
The contractor shall perform diagnostics of programs and make recommendations for change/correction to meet original control performance requirements. After consulting with NIST COR the contractor shall make changes to programming to achieve the performance requirement.
Task 4 – Field Panel Diagnostics
The contractor shall perform diagnostics of all field panels. The contractor shall analyze the results of diagnostics and make recommendations for changes to optimize the building control performance within the functional capabilities for the system any changes required to hardware will be the responsibility of NIST. Changes required to software to resolve issues shall be the responsibility of the contractor.
Task 5 - Control Loop Evaluation and Tuning
The contractor shall evaluate and tune critical control loops to maintain peak efficiency of equipment as the building mechanical systems performance changes over time. NIST DDC personnel shall work with the Contactor to identify the critical control loops on each system.
Task 6 – Consultation
The Contractor shall consult with NIST DDC personnel to identify and resolve problems with hardware and/or software in the applicable automation system. Any changes required to hardware will be the reasonability of NIST. Changes required to software to resolve issues shall be the reasonability of the contractor.
Task 7 – Emergency Service
This shall Include time for Contractor to diagnose and resolve problems identified by NIST. This shall include normal or out of normal hours past 7am – 5pm Monday through Thursday to include Fridays, Saturdays, Sundays and Federal holidays. If necessary, the Contractor shall respond to the site in 24 hours of contact by NIST. Pricing shall be based upon 40 hours of emergency service.
Task 8 Homeland Security Presidential Directive (HSPD)-12
Contractor personnel (including subcontractors) who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M-19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.
Roster
The Contractor must submit a roster by name, position, e-mail address, phone number and responsibility, of all personnel (including subcontractor personnel) working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s).
The Contractor must submit the roster to the COR and/or CO within 14 days of the effective date of this contract. Any revisions to the roster because of staffing changes must be submitted within 14 days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description, and the Government will determine the appropriate suitability level.
Position Sensitivity Designations Requirement
All Contractor (and/or any subcontractor) personnel must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).
The following position sensitivity designation levels apply to this acquisition:
Low Risk – Tier 1
IV. GENERAL REQUIREMENTS
1. General Administration Requirements
a. Technicians shall be required to obtain a NIST badge to access the site. Typically, it takes thirty (30) calendar days to obtain a NIST badge. Contact the COR for paperwork necessary to obtain a NIST Badge.
b. For each service visit, the technician shall report to the COR (or designated alternate) upon arriving and departing the site.
c. User accounts and privileges for those accounts are only to be created or modified by NIST.
d. NIST will create BAS application and operating system accounts, if required, for Contractor technicians required to access system. Contractor shall notify NIST COR of need for account. NIST preference would be for each technician to have their own account, but a company account will be considered with proper justification.
e. Laptops are available for Contractor use on-site but must be requested through the NIST COR. Laptops shall be issued from and returned to NIST DDC Group on the day of service.
f. Only NIST-approved or provided data storage devices shall be used on the systems.
g. Applications must adhere to NIST IT security protocol. NIST will scan the systems at least annually and report any IT security vulnerabilities to Contractor for action. If revisions would cause functionality issues, the contractor must submit a justification in writing to the COR for not implementing changes.
h. Prior to assigning any new IP addresses and device instance numbers, consult with the NIST COR in writing to ensure that the designations conform to NIST protocol.
i. Service must be completed prior to submitting invoices to NIST for payment.
2. Quality Assurance
NIST’s role in quality assurance is to ensure that the Contractor is achieving the quality levels established in the operation and maintenance service contract and focuses on the Contractor’s QC plan. NIST periodically validates the execution of the Contractor’s QCP by reviewing areas such as inspection forms, service request logs, maintenance reports and timeliness of corrective actions.
As a part of the Government’ Quality assurance program, the Government may:
· Review and, if warranted reject any report or other submittals required by Contractor.
· Review performance and service records, including (if applicable, but not limited to) monthly progress reports, BAS data, and any computerized or hard copy records maintained by the Contractor documenting performance under this contract, and require correction of any unsatisfactory conditions noted.
· Determine adequacy of the Contractor’s QCP and document the overall success of this program. The Government may order improvements, if it determines the program is insufficient or ineffective.
· Obtain information and require improvements in service based on such information to the extent such results correlate with deficiencies in Contract requirements.
· Conduct (random and routine) physical inspections of facticity equipment and systems, including programs and files maintained on computers in Contractor’s onsite work areas and require correction of deficiencies noted.
· Perform inspections with Government personnel or independent third-party inspectors.
V. SCHEDULE OF DELIVERABLES
1. Prior to performing any field work, submit to NIST a job specific activity hazard analysis (“Safety Plan”) for review and approval. This will be reviewed by representatives from OFPM COR and Safety. It is anticipated that review of analysis will require seven (7) business days. A notice to Proceed will not be issued until the safety plan has been approved. Services technicians must comply with the approved plan while on site.
2. Quality Control Plan. The Government’s role in quality assurance is to ensure that the Contractor is achieving the quality levels established in the contract and focuses on Contractor’s Quality Control Plan (QCP). The Government periodically validates the execution of the Contractor’s QCP by reviewing such areas as the Contractor’s reports, inspections of equipment and timeliness of corrective actions; refer to the Quality Assurance Surveillance Plan (QASP). The COR will review all submitted reports, against the requirements of the scope of work and the QASP within ten (10) calendar days to verify that performance standards are being met, and quality is satisfactory.
3. Planned service dates shall be submitted for approval to NIST COR a minimum of fourteen (30) days prior to planned date. To allow NIST site resignation, the Contractor shall provide name and citizenship information of service technician to NIST COR a minimum of one (1) business day prior to planned date. If the technician is not a US citizen additional information is needed and that information must be submitted at least three (3) business days prior to planned date.
For each monthly service and emergency service visit, the Contractor shall provide a written reports indicating the date, time, duration, and description of service provided. This report shall be submitted to NIST COR within five (5) days of scheduled visit.
| Deliverable Number |
| Description |
| Format |
| Due Date |
Quantity
| 1. |
| Safety Plan |
| Electronic |
| 7 business days |
| 1 |
| 2. |
| QCP |
| Electronic |
| 10 calendar days after award |
| 1 |
| 3. |
| PM Schedule |
| Electronic |
| 30 days prior to visit |
| 12 |
| 4. |
| PM Report |
| Electronic |
| 5 days after visit |
| 12 |
VI. PAYMENT SCHEDULE
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon receipt and subsequent reviews of a proper invoice.
QUALITY ASSURANCE SURVEILLANCE PLAN
| Required Services (Tasks) |
| Performance Standards |
| Acceptable Quality Levels |
| Methods of Surveillance |
| Incentive (Positive and/or Negative) (Impact on Contractor Payments) |
Submit a PM report of scheduled, completed, and outstanding tasks after each visit.
100% of reports accurately depict status
99%
File reviews, periodic inspections, and random, observations, customer complaints.
Conduct (random and routine) physical inspections of facticity equipment and systems
Contractor is in compliance with QCP when no deficiencies noted
99%
File reviews, periodic inspections, and random, observations, customer complaints