Official Synopsis LSRR_Final.docx

DOCX document 14 KB Posted

Attached to
Line Striping and Rubber Removal Construction Service Federal contract opportunity
Solicitation number
FA448423R0006
Issued by
Department of the Air Force Air Mobility Command

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Official Synopsis of Maintenance and Repair, Construction Services at Joint Base MDL, NJ (JB MDL) This document serves as an official Synopsis of the Governments intent to solicit and award a Single-Award, Indefinite Delivery Indefinite Quantity (IDIQ), Firm-Fixed Price (FFP) Contract as a total set-aside to a Woman Owned Small Business (WOSB) contractor IAW with the evaluation criteria. See below for a detailed description of the acquisition. This synopsis is being posted in accordance with FAR 5.207(a).

(1) Action Code: NA

(2) Posting date of Synopsis: o/a 9 February 2023. Posting of official solicitation: o/a 1 March 2023.

(3) Year: 2023

(4) Contracting Office ZIP Code: 08641

(5) Product or Service Code: Z2BD

(6) Contracting Office Address: 2402 Vandenberg Ave., Joint Base MDL, NJ, 08641.

(7) Subject: Airfield Line Striping and Rubber Removal (LSRR).

(8) Proposed Solicitation Number: FA448423R0006.

(9) Closing Response Date: o/a 24 February 2023.

(10) Contact Point or Contracting Officer: Jake Camacho; reachable at jake.camacho@us.af.mil and Ms. Dana Wright, reachable at dana.wrigjht.6@us.af.mil

(11) Contract Award and Solicitation Number: No award number presently; solicitation number is FA448423R0006.

(12) Contract Award Dollar Amount: NA

(13) Intended Award of Line Item Number(s): CLIN 0001 – CLIN 0014 of the base year and possible follow on option years as applicable.

(14) Contract Award Date: Anticipated contract award date is o/a 15 July 2023.

(15) Contractor: NA

(16) Description: The Contractor shall provide all supervision, management, quality control, labor, tools, equipment, appliances, transportation, supplies and materials and perform all work necessary to apply markings on all airfield pavements located on JB MDL. The scope of work shall also include runway rubber removal, friction testing, and paint removal. The physical work site parameters encompass all airfield pavement areas to include but not limited to runways, taxiways, parking aprons, streets, and parking lots. This scope of work does not include areas outside the airfield areas.

(17) Place of Contract Performance: Joint Base McGuire-Dix-Lakehurst

(18) Set-aside Status: Total WOSB Set-Aside.

File details come from the government source that posted it. Updated .