Amendment 01 to OFC003-11-S-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OFC003-11-S-0005.pdf | ||
| OFC003-11-S-0005 - drawings part 1.pdf | ||
| OFC003-11-S-0005 - drawings part 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 4
0001 Nov 17, 2010 OCF003
USACE, CONTRACTING DIVISION
ATTN: HPO CT-ROOM 184
7400 LEAKE AVE.
NEW ORLEANS, LA 70118-3651
OCF003-11-S-0005
Nov 12, 2010
The purpose of this amendment is as follows:
See Continuation Sheet for revisions to Plans and Specification Sections and answers to submitted questions.
SF 30 CONTINUATION PAGE OCF003‐11‐S‐0005
AMEND 0001
SF 30 CONTINUATION PAGE
Changes to Specification
1. Section 01100, Article 22, 4th sentence, replace “A professional engineer registered in the State of Louisiana with experience in…” to “A professional engineer with experience in…”
2. Section 01100, Article 26, IV. General Requirements, C128.04, Second paragraph on page 01100‐28, 1st sentence, delete the following words “, licensed by the State of Louisiana”
3. Section 01100, Article 26, Add the following to the end of the Article:
V. Noise Control ‐ The contractor shall take reasonable measures to avoid unnecessary noise appropriate for the ambient sound levels in the area during working hours. All construction machinery and vehicles shall be equipped with practical sound muffling devices, and operated in a manner to cause the least noise, consistent with efficient performance of the work.
VI. Dust control – The contractor shall take reasonable measures to prevent unnecessary dust. Surfaces subject to creating dust shall be kept moist with water or by application of chemical dust suppressant. Dusty materials in piles or in transit shall be covered to prevent blowing.
VII. The contractor shall contact the following entities at least three (3) working days prior to beginning of construction around their respective utilities.
A) DEPARTMENT OF PUBLIC WORKS CITY OF NEW ORLEANS
TRAFFIC ENGINEERING: ALLEN YRLE 658‐8040
ENGINEERING/CONSTRUCTION: NGUYEN PHAN 658‐8044
UTILITIES: 658‐6801
MAINTENANCE: MICHAEL NOLAN 658‐8150
B) S & W BOARD OF NEW ORLEANS:
CONSTRUCTION: HADI AMINI 865‐0445
ELECTRICAL ENGINEER 865‐0450
NETWORK ENGINEERING: RON SPOONER 865‐0659
S&WB: 24 HOUR EMERGENCY 529‐2837
C) DEPARTMENT OF PARKS & PARKWAYS
KEITH BLEICHNER (OR)
BOB RICHARDS
658‐3200
D) ENTERGY
ELECTRIC DEPARTMENT: KENNY SPANNERICK ARTEAGE 593‐3419
595‐3701
ELECTRIC DISPATCH CENTER: 1‐800‐368‐3749 (24 HOURS)
GAS DEPARTMENT: KEN SCHINDLER/STEVE WILHELM 595‐3877/3882
GAS DISPATCH CENTER: 504‐670‐3544 (24 HOURS)
THERMAL: ERIC KELLY 952‐8773
E) AT& T (OR) BELL SOUTH LOUISIANA ONE CALL 1‐800‐272‐3020
SF 30 CONTINUATION PAGE OCF003‐11‐S‐0005
F) COX CABLE MITZI MANCUSO/ ED HERRERA 304‐8091/8093
VIII. Traffic Control –
a. Prior to the start of construction, the contractor shall submit to the Department of Public
Works traffic engineer for approval a complete construction signage, traffic maintenance and public safety plan, per section C129 of the general specifications, which at a minimum include the following:
i. A sign inventory ‐ a list of all existing traffic control devices (signs, signals, raised markers, pavement markings, etc.) accurately located on the plans (no direct pay).
ii. A plan for the proposed route on which construction materials and equipment are to be transported to or from the construction site.
iii. A detour plan showing proposed routes for local and transient traffic on which locations of detour traffic control devices and construction zone or work zone traffic control devices are shown. Traffic control device applications and methods shall be in compliance with part 6 of the Manual on Uniform Traffic Control Devices.
b. These plans shall include the name and telephone number of the responsible person in charge of the project and traffic control.
c. The contractor shall submit to the project engineer prior to seeking approval of the City
Traffic Engineer for any traffic related plan change, including removal, relocation or addition of traffic control devices before or during the course of construction.
d. All existing traffic control devices that are in conflict with the construction or work zone traffic control plan shall be covered or removed by the contractor, and the removed devices returned to the City Signal Shop or Sign Shop at 2832 Lafitte Street. All existing devices left in the construction or work zone shall be maintained in good condition by the contractor during the course of construction.
e. All removed traffic control devices shall be restored to their original position and orientation by the contractor prior to the time of final inspection.
4. Change OFC‐03B specification 31 41 16.00 12, Part 2, 2.1, Properties of Sections, Section Modulus in^3/ft of wall, change "75" to "36.1".
5. Change OFC‐03B specification 31 41 16.00 12, Part 2, 2.1.2 Hot Rolled Z‐Type Steel Sheet Piling
ASTM A 572, "...with a minimum material thickness of .335 inches,..." to "...with a minimum material thickness of 0.42 inches,..."
6. Change OFC-03B specification 31 41 16.00 12, Part 2, 2.1.2, Change value of "75" under Substitute Section, Minimum Section Modulus (in3/ ft of wall) to "36.1"
SF 30 CONTINUATION PAGE OCF003‐11‐S‐0005
Questions and Answers
1) OFC‐03B Section 31 41 16.00 12 page 7 and 8, part 2.1 Steel Sheet Piling list PZC‐19 with its properties. The section modulus is listed as 75.2 in3/ft of wall. The actual section mod. of PZC‐19 is
36.1 Is this is a mistake? Which is correct.
See Specification Change No. 2
2) Same spec section part 2.1.2 talks about acceptable alternate sheeting that would be acceptable.
Again it references the section mod. of 75 in3/ft. It also states that a min. thickness of 0.335" is required. The thickness for PZC‐19 is nominal thickness of 0.420" Much thicker than the alternate language. Please clarify
See Specification Change No. 3 and 4
3) Is painting of the PZC‐19 material really required?
Coating of sheet piling will be required as specified.
4) The RFP requires the project to be complete 150 days after NTP. The procurement & delivery period for the 290,000SF + of steel sheetpile is 90 days. There is not enough time to complete the work and the project will go into LD’s unless the time is extended.
We herby request that you issue an amendment to extend the contract completion time to 365 days after NTP??
The period of performance remains unchanged.