OD-M Materials BPA SOW 2.pdf
PDF 97 KB Posted
- Attached to
- OD Materials BPA Federal contract opportunity
- Solicitation number
- W912EP21Q0003
About this file
This document outlines a blanket purchase agreement for heavy and civil construction materials. The U.S. Army Corps of Engineers, Jacksonville District is seeking contractors to provide various project materials, tools, and services for construction projects in Florida and Georgia through multiple-award BPAs. Services will include items like silt fencing, turbidity curtain, concrete, rebar, forms, coatings, lighting, erosion control materials and installation, pipe, aggregate, asphalt, and other building materials. Interested parties were requested to submit capability statements by December 19, 2020 to be considered for future call orders under the BPAs, which will be awarded to small businesses including 8(a), service-disabled veteran-owned, women-owned, and HUBZone firms. Responses should describe relevant past project experience, business category and size, subcontracting plans if needed, and bonding capacity. The BPAs will be used to acquire materials for an indefinite delivery period on an as-needed basis.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
MATERIAL BLANKET PURCHASE AGREEMENT (BPA)
Each Call Order will incorporate a defined list of supplies, delivery schedule, and period of performance
Standards of Basic Services
Unless specified otherwise in a Call Order, all materials to be delivered as scheduled within 5 business days of notification of award. All material will be brought to site in undamaged condition in the specified quantities, type and sizes.
SCOPE OF WORK
The U.S. Army Corps of Engineers, Jacksonville District (USACE) is requesting heavy and civil construction materials purchasing for various locations in the State of Florida and the State of
Georgia in the form of a Blanket Purchase Agreement. The USACE is in need of various project materials, tools and services to perform a variety of projects throughout these locations.
This BPA shall cover all heavy and Civil construction materials, tools and services associated with heavy and Civil construction functions. The Corps may choose to perform any of the work identified in these specifications. A description of the work to be performed will be given in the specifications of each call.
Protection of Government Owed Property, Material, and Work
The contractor shall protect and preserve all government materials, supplies, and equipment while in their possession. The contractor shall comply with all reasonable requests of the Contracting Officer’s Representative
(COR) to enclose or to specially protect such property. If the COR determines that material, equipment, supplies, and work performed are not adequately protected by the contractor, such property may be protected by the government and the cost thereof may be charged to the contractor or deducted from any payment due him. If any damages are made by the contractor to any government owed property, the contractor shall repair at no cost; or the price to fix shall be deducted from the contract price.
Quality Assurance
The Government will evaluate the quality of the Contractor's work through the inspection of the contractor’s performance of each call. If the quality of performance is not acceptable on any call, the contractor shall make necessary deficiencies at no cost; or the price to fix shall be deducted from the call price.
Transportation
Transportation will be addressed on a per call basis.
Possible materials, services and fabricated items, this list is neither inclusive nor exclusive:
o Silt fencing o Turbidity curtain o Floating boom o Safety supplies o Oil spill containment materials o Cast in place Structural Concrete for Civil Works, grout mix, delivery as specified o Formwork materials o Concrete accessories o Concrete reinforcing steel o Concrete finishing products o Concrete Curing products o Metal accessories o Paint o Painting supplies o Coatings o Coating supplies o Electrical safety supplies o Exterior lighting fixtures and supplies o Interior lighting fixtures and supplies o Geotextile material o Geotextile installation tools o Erosion Control materials and tools o Erosion Control installation contractors o Sheet metal piling as specified o Limerock road base material as specified o Topsoil as specified o Sod and Sod installation materials o Concrete storm drain culverts o Concrete storm drainpipe o Corrugated galvanized steel drainpipes o Embankment material as specified o Select fill material as specified o Filter gravel as specified o #57 stone as available o Bedding stone, various sizes, as specified o Rip Rap material, various sizes, as specified o Gangway platforms o Pier construction materials
Delivery
Unless otherwise specified the contractor is responsible for transporting all materials. to the work site.
All material will be delivered securely and protected to avoid damage to materials. Unless specified otherwise, all materials will be unloaded IAW EM 385-1-1 (NOV 14) LHE avoiding injury of personnel and damage to equipment and materials. If required by the manufacture, materials will be protected from direct sunlight, moisture or weather conditions that will adversely affect the quality of the delivered materials in transit to site. All materials will be inspected jointly by the contractor and a government representative.
File details come from the government source that posted it. Updated .