Ocho_Rios_Map.pdf
PDF 1 MB Posted
- Solicitation number
- CI 5600
- Issued by
- Ventura County, California
About this file
This is a concept plan document prepared by Advanced Water Engineering for the Ventura County Watershed Protection District and Ventura County Public Works depicting the proposed Stormwater to Sewer Diversion Project at Ocho Rios Way. The document includes a process flow diagram, vicinity map, and engineering specifications for the Upper Malibu Creek Watershed Feasibility Study. The proposed system utilizes a 36-inch reinforced concrete pipe (RCP) stormwater collection system with multiple proposed infrastructure components including trash collection manholes, valve vaults, stormwater collection manholes, sewer manholes, and wet wells. The design diverts dry weather stormwater flow from Ocho Rios Way and surrounding areas in the Ventura County portion of the Upper Malibu Creek Watershed to the existing sewer main for conveyance to the Tapia Water Reclamation Facility (TWRF) for treatment. The project involves coordination between Ventura County Public Works, the Las Virgenes Municipal Water District (LVMWD), and the Triunfo Water and Sanitation District (TWSD) through the Las Virgenes-Triunfo Joint Powers Authority. The document was prepared by Duncan Lee and dated August 2022.
No specific pricing terms, contract award dates, response deadlines, site visit schedules, or bidder conference information is contained within this concept plan document. The file serves as a technical planning tool and design reference for the proposed stormwater diversion infrastructure rather than a procurement notice or contract award document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FM
1050 1050
TUSCANY DRIVE PROCESS FLOW DIAGRAM PROFILE
GX.X
PROCESS FLOW DIAGRAM FOR TUSCANY DRIVE
STORM DRAIN DIVERSION PLAN
VICINITY MAP
N.T.S.
PROJECT AREA
LEGEND:
FLOW METER
ELECTRIC ACTUATED PLUG VALVE
PROPOSED PIPELINE
FM
SHEET OF
PROJECT ENGINEER DATE
REVISIONS
DESCRIPTIONDATE
D R
A F
T E
R D
E S
I G
N E
R C
H E
C K
E R
SPEC PCA
D A
T E
L A
S T
S
V
E D
F
I L E
N
M
E xx
INITIALS
PROJ ID
NO.
VENTURA COUNTY WATERSHED PROTECTION DISTRICT
VENTURA COUNTY PUBLIC WORKS
UPPER MALIBU CREEK WATERSHED
FEASIBILITY STUDY
17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708
P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
CONCEPT PLANS WITHIN VENTURA COUNTY
DWG NO.
DUNCAN LEE 08/2022
PROPOSED
TRASH
COLLECTION
MANHOLE
PROPOSED
VALVE
VAULT
PROPOSED
STORMWATER
COLLECTION
MANHOLE
PROPOSED
SEWER
MANHOLE
PROPOSED
WET WELL
DIVERT
FLOW TO
EXISTING
SEWER MAIN
DISCHARGED
TO
STORMWATER
COLLECTION
SYSTEM
36" RCP
STORMWATER
COLLECTION
SYSTEM
L i n d e r o
C a n y n
R d
Ventu ra
F wy
Thousand Oaks Blvd
K a n a n
R d
G r e y c k d
Conifer St
S u n n y c r e s t
D r
O c h i s
W a y
Attachment A
File details come from the government source that posted it. Updated .