This is a concept plan document prepared by Advanced Water Engineering for the Ventura County Watershed Protection District and Ventura County Public Works depicting the proposed Stormwater to Sewer Diversion Project at Ocho Rios Way. The document includes a process flow diagram, vicinity map, and engineering specifications for the Upper Malibu Creek Watershed Feasibility Study. The proposed system utilizes a 36-inch reinforced concrete pipe (RCP) stormwater collection system with multiple proposed infrastructure components including trash collection manholes, valve vaults, stormwater collection manholes, sewer manholes, and wet wells. The design diverts dry weather stormwater flow from Ocho Rios Way and surrounding areas in the Ventura County portion of the Upper Malibu Creek Watershed to the existing sewer main for conveyance to the Tapia Water Reclamation Facility (TWRF) for treatment. The project involves coordination between Ventura County Public Works, the Las Virgenes Municipal Water District (LVMWD), and the Triunfo Water and Sanitation District (TWSD) through the Las Virgenes-Triunfo Joint Powers Authority. The document was prepared by Duncan Lee and dated August 2022.

No specific pricing terms, contract award dates, response deadlines, site visit schedules, or bidder conference information is contained within this concept plan document. The file serves as a technical planning tool and design reference for the proposed stormwater diversion infrastructure rather than a procurement notice or contract award document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM

1050 1050

TUSCANY DRIVE PROCESS FLOW DIAGRAM PROFILE

GX.X

PROCESS FLOW DIAGRAM FOR TUSCANY DRIVE

STORM DRAIN DIVERSION PLAN

VICINITY MAP

N.T.S.

PROJECT AREA

LEGEND:

FLOW METER

ELECTRIC ACTUATED PLUG VALVE

PROPOSED PIPELINE

FM

SHEET OF

PROJECT ENGINEER DATE

REVISIONS

DESCRIPTIONDATE

D R

A F

T E

R D

E S

I G

N E

R C

H E

C K

E R

SPEC PCA

D A

T E

L A

S T

S

V

E D

F

I L E

N

M

E xx

INITIALS

PROJ ID

NO.

VENTURA COUNTY WATERSHED PROTECTION DISTRICT

VENTURA COUNTY PUBLIC WORKS

UPPER MALIBU CREEK WATERSHED

FEASIBILITY STUDY

17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708

P: (714) 481-7300 | www.pacewater.com

Advanced Water Engineering

CONCEPT PLANS WITHIN VENTURA COUNTY

DWG NO.

DUNCAN LEE 08/2022

PROPOSED

TRASH

COLLECTION

MANHOLE

PROPOSED

VALVE

VAULT

PROPOSED

STORMWATER

COLLECTION

MANHOLE

PROPOSED

SEWER

MANHOLE

PROPOSED

WET WELL

DIVERT

FLOW TO

EXISTING

SEWER MAIN

DISCHARGED

TO

STORMWATER

COLLECTION

SYSTEM

36" RCP

STORMWATER

COLLECTION

SYSTEM

L i n d e r o

C a n y n

R d

Ventu ra

F wy

Thousand Oaks Blvd

K a n a n

R d

G r e y c k d

Conifer St

S u n n y c r e s t

D r

O c h i s

W a y

Attachment A

File details come from the government source that posted it. Updated .