This work plan document establishes the scope of work for the Village of Medina's downtown wayfinding signage installation project under the NY Forward initiative (RFA number 24-DRINYF-37, Contract number C1003037). The project involves implementing a comprehensive system of directional, informational, and interpretive signage to guide visitors to key downtown locations. The Village of Medina, led by Mayor Deborah L. Padoleski with primary contact Jada Burgess (Village Clerk), will serve as the contractor responsible for project administration and execution. The work plan encompasses five primary tasks: consultant selection through compliant procurement procedures; preparation of draft and final wayfinding signage designs including directional signs, gateway signs, interpretive signs, and information kiosks; obtaining required permits and approvals from applicable federal, state, and local agencies; and fabrication and installation of signage with photographic documentation. The contract requires submission of all products in specified electronic and paper formats, including PDF documents at 300 dpi resolution and original software files for designs and drawings.
The contractor must maintain compliance with General Municipal Law procurement requirements, with written certification from the municipal attorney, chief legal officer, or financial administrator. Licensed professional engineers, architects, or landscape architects registered in New York State are required for preparation and certification of final designs and construction documents, as well as construction supervision. Additional contractual obligations include semi-annual project status reports due June 30 and December 31, submission of Form D for Minority and Women-Owned Business Enterprise (MWBE) utilization, recording MWBE payments through the New York State Contract System, and completion of a Final Project Summary Report upon project conclusion. The Department will review and approve all subcontracts, draft and final products, and design or preconstruction documents before construction commencement. The contractor assumes responsibility for all project activities, coordination with local government and the public, securing necessary permits, environmental reviews, and ensuring all materials acknowledge the Department's contributions and include the contract number.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MedinaNYF_WayfindingProjectProfile.pdf | ||
| NY Forward Wayfinding Signage RFP.doc | DOC document | |
| Non Collusive Bidding Certificate.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK PLAN COVER SHEET
Name of Recipient: Medina (V)
Title of Project: Install Downtown Wayfinding Signage
RFA number 24-DRINYF-37
Contract number: C1003037
OPD Project Manager: Samantha Aldrich
OPD Supervisor: Amanda Smith
OPD Admin: Amanda Jochum
Recipient CEO:
Name: Deborah L. Padoleski
Title: Mayor
Phone number: 585-798-0710
Email address: dlpadoleski@villagemedina.org
Recipient Primary Contact:
Name: Jada Burgess
Title: Village Clerk
Affiliation: Village of Medina
Phone number: 585-798-0710
Email address: jburgess@villagemedina.org
Recipient Secondary Contact:
Name:
Title:
Contract Number: C1003037 Page 1 of 4, Attachment C - Work Plan
Affiliation:
Phone number:
Email address:
D&C Single CTV
ATTACHMENT C - WORK PLAN
Install Downtown Wayfinding Signage
1. Project Description
The Village of Medina will advance the Medina NY Forward through the following project:
Install Downtown Wayfinding Signage
Implement a system of directional, informational, and interpretive signage to direct visitors to key locations and destinations throughout downtown.
2. Required Products
The Contractor must submit to the Department all required products, clearly labeled with the NYS
Comptroller's contract number as indicated on the Face Page of this Contract and where applicable, the related task number from this Work Plan.
Unless otherwise specified in the Work Plan tasks, the Contractor shall submit products in the following formats:
• Draft products: one electronic copy of each product must be submitted in Adobe® Acrobat® Portable
Document Format (PDF), created using 300 dpi scanning resolution and Microsoft Word, if applicable.
• Final products: one electronic copy of each product must be submitted in PDF, created using 300 dpi scanning resolution and Microsoft Word, if applicable. In addition, one paper copy of each final product
(including reports, designs, maps, drawings, and plans) must be submitted.
• Electronic data for all Geographic Information System-based mapping products must be submitted in either ArcGIS format, or similar product acceptable to the Department, and comply with the requirements for Contract GIS Products. Formal metadata must be provided with all digital GIS data which includes, at minimum, a file summary/abstract, intended use, data, source data, and author information.
Page 2 of 4, Attachment C - Work Plan
• Electronic data for all designs, drawings, and plans must be submitted in the original software that they were created (such as CAD format or other similar product acceptable to the Department), as well as in
JPG format.
• Photographs and images must be submitted in JPG format with a minimum resolution of 300 dpi and must be dated and captioned with the location and a brief description of the activity being documented and include any associated metadata (including the photo’s GPS location where available).
3. Compliance with Procurement Requirements
The municipal attorney, chief legal officer or financial administrator of the municipality shall certify in writing to the Department that applicable provisions of General Municipal Law were fully complied with.
4. Install Downtown Wayfinding Signage
Task 1.1 Consultant Selection and Compliance with Procurement Requirements
In consultation with the Department, the Contractor shall retain professional services through the locally approved procurement process per General Municipal Law. The municipal attorney, chief legal officer or financial administrator of the municipality shall certify in writing to the Department that applicable provisions of General Municipal Law were fully complied with.
For preparation/certification of final designs and construction documents, and for supervision of construction, a licensed professional engineer, architect or landscape architect licensed to practice in New
York State is required.
The Contractor shall prepare the draft subcontract(s) to conduct project work with the selected consultant(s).
The subcontract(s) shall contain a detailed work plan with adequate opportunity for review at appropriate stages of product completion, a payment schedule with payments tied to receipt of products, and project costs.
The Contractor shall submit the draft subcontract(s) to the Department for review of the subcontract work plan for alignment with the appropriate tasks of the work plan as set forth in this contract. The Contractor shall incorporate the Department’s comments on the subcontract work plan, or scope of services, prior to execution of the final subcontract(s). The Contractor remains responsible for the legal sufficiency of the subcontract in accordance with the requirements in the Master Grant Contract and Attachment A-1.
Products: Consultant(s) selected and approved by the Department. Written certification of compliance with procurement procedures. Draft and final, executed consultant subcontracts.
Task 1.2 Draft Design of Wayfinding Signage
The Contractor shall prepare, or cause to be prepared, a draft plan for locating signage, draft designs of a series of wayfinding elements such as directional signs, gateway signs, interpretive signs, and information kiosks, consistent with the Strategic Investment Plan. The draft design shall be provided to the Department and the public for review for review. Comments from the Department and the public must be addressed to the satisfaction of the Department in subsequent revisions of the products and the final design.
Page 3 of 4, Attachment C - Work Plan
Products: Draft designs and supporting materials.
Task 1.3 Final Design of Wayfinding Signage
Based upon the approved draft designs, the Contractor shall prepare, or cause to be prepared, a plan for locating signage, final designs of a series of wayfinding elements such as directional signs, gateway signs, interpretive signs, and information kiosks. The final designs shall be provided to the Department for review at least two weeks prior to the due date for comments. Department comments must be addressed to the satisfaction of the Department.
Products: Final designs and supporting materials.
Task 1.4 Obtain Permits or Agreements for the Installation of Signage
The Contractor or its consultant(s) shall prepare the necessary applications or municipal agreements and obtain the required permits or approvals from the appropriate federal, state, and local agencies for the installation of signage, as necessary.
Product: Required permits and approvals for the installation of signage.
Task 1.5 Fabrication and Installation of Signage
Based upon the approved designs, the Contractor or its consultant(s) will fabricate and install wayfinding signage such as directional signs, gateway signs, interpretive signs, and information kiosks. The Contractor or is consultant(s) shall provide photo-documentation of the installed signage within the downtown revitalization area.
Products: Photo-documentation of installed wayfinding signage and information kiosks.
Task 2.1 MWBE Reporting
Comply with MWBE Reporting Requirements by completing the following actions:
• Submit Form D - MWBE Utilization Plan to indicate any state-certified MWBE firms selected to work on this contract. Form D must be updated and submitted to the Department whenever changes to the selected MWBE firms occur (addition or removal).
• Record payments to MWBE subcontractors using DOS funds through the New York State Contract
System (NYSCS).
Technical assistance for use of the NYSCS system can be obtained through the NYSCS website at https://ny.newnycontracts.com by clicking on the “Contact Us & Support” link.
Products: Ongoing reporting through NYSCS during the life of the contract.
Task 2.2 Project Status Reports https://ny.newnycontracts.com/
Page 4 of 4, Attachment C - Work Plan
The Contractor shall submit project status reports semi-annually (every June 30 and December 31) on the form provided, including a description of the work accomplished, the status of all tasks in this work plan, schedule of completion of remaining tasks, and an explanation of any problems encountered.
Products: Completed project status reports submitted to DOS during the life of the contract.
Task 2.3 Final Project Summary Report
The Contractor or its consultant(s) shall work with the Department project manager to complete the Final
Project Summary Report. Final payment shall not be authorized until this report has been completed and filed with project deliverables.
Products: Completed Final Project Summary Report submitted to DOS.
5. Project Responsibilities
The Contractor shall administer the grant, execute a contract with the Department, and ensure the completion of work in accordance with the approved Work Plan and budget.
The Contractor:
• will be responsible for conducting all project work in conformance with the Work Plan included in the executed contract with the Department.
• will be responsible for all project activities including drafting request for proposals and managing subcontracts with consultants and subconsultants.
• will certify to the Department that the procurement record for project consultants and subcontractors complies with the applicable provisions of General Municipal Law.
• will receive approval from the Department for any and all consultant subcontracts before beginning project work.
• will be responsible for submission of all products and payment requests.
• will be responsible for coordinating participation and soliciting comments from local government personnel, project volunteers, and the public.
• will keep the Department informed of all important meetings for the duration of this contract.
• will receive approval from the Department before purchase of any equipment.
• will secure all necessary permits and perform all required environmental reviews.
• will ensure that all materials printed, constructed, and/or produced acknowledge the contributions of the
Department to the project.
• will ensure that all products prepared as a part of this contract shall include the NYS Comptroller's contract number as indicated on the Face Page of this contract.
• will ensure the project objectives are being achieved.
• will ensure that comments received from the Department, or other advisory group, are satisfactorily responded to and reflected in subsequent work.
• will recognize that payments made to consultants or subcontractors covering work carried out or products produced prior to receiving approval from the Department will not be reimbursed unless and until the Department finds the work or products to be acceptable.
Page 5 of 4, Attachment C - Work Plan
• will participate, if requested by the Department, in a training session or sessions focused on developing and implementing revitalization strategies. The purpose of the training session(s) is to build knowledge and provide support to community leaders to advance revitalization efforts and complete priority projects.
The Department:
• will review and approve or disapprove of subcontracts between the Contractor and consultant(s) and any other subcontractor(s).
• will participate in initial project kick-off meeting and subsequent meetings that are important to the project.
• will review all draft and final products and provide comments as necessary to meet the objectives.
• must approve or disapprove any and all design, site plan, and preconstruction documents before construction may begin.
Page 1 of 1, Attachment C - Work Plan
| Install Downtown Wayfinding Signage |
| 2. Required Products |
| 3. Compliance with Procurement Requirements |
| Task 1.1 Consultant Selection and Compliance with Procurement Requirements |
| Task 1.2 Draft Design of Wayfinding Signage |
| Task 1.3 Final Design of Wayfinding Signage |
| Task 1.4 Obtain Permits or Agreements for the Installation of Signage |
| Task 1.5 Fabrication and Installation of Signage |
| Task 2.1 MWBE Reporting |
| Task 2.2 Project Status Reports |
| Task 2.3 Final Project Summary Report |
| 5. Project Responsibilities |