About this file

This document is a statement of work for maintenance services for two uninterruptible power source (UPS) units at the National Oceanic and Atmospheric Administration's Aviation Weather Center in Kansas City, Missouri. The statement of work requires full service and preventative maintenance support for two Riello Master HP UL 250 kVA UPS units, including emergency service with parts and labor available seven days a week, 24 hours a day and a four-hour response time. It also requires two preventive maintenance inspections per year, one major and one minor. The period of performance for the base year is August 1, 2023 through July 31, 2024, with four optional one-year extensions. The place of performance is 7220 NW 101 Terrace, Room 101 in Kansas City, Missouri. Points of contact are provided for technical and non-technical inquiries.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NW-WX6000-23-00172

PURPOSE:

The National Oceanic and Atmospheric Administration (NOAA) National Centers for Environmental Prediction’s (NCEP’s) Aviation Weather Center (AWC) is in need of full service and preventative maintenance support for its uninterruptable power source

(UPS).

SCOPE OR MISSION:

The mission of the AWC is to deliver consistent, timely and accurate weather information for the world airspace system. The AWC is one of two world area forecast centers; the other is in Exeter, U.K. Migration to a virtual infrastructure enhances overall mission robustness and portability.

BACKGROUND:

AWC requires uninterrupted power during commercial power outages. To support the facility's transition to generator power, the facility has a battery bank UPS system. This system requires yearly maintenance and support by a qualified vendor to ensure operational health.

TECHNICAL SPECIFICATIONS:

The following work is for two UPS units of the following make and model: Riello Master HP UL 250 kVA

• Full Service (Emergency Service Parts & Labor) including:

o As needed o 7 days a week x 24 hours a day Availability o 4-Hour Response Time

• UPS Preventive Maintenance Inspections including:

o 2 Per Year (1 Major, 1 Minor)

PLACE OF PERFORMANCE:

NOAA AWC

7220 NW 101 Terrace, Room 101 Kansas City, MO 61453-2371AWC

PERIOD OF PERFORMANCE:

Base Year: 08/01/2023 – 07/31/2024 Option Year 1: 08/01/2024 – 07/31/2025 Option Year 2: 08/01/2025 – 07/31/2026 Option Year 3: 08/01/2026 – 07/31/2027 Option Year 4: 08/01/2027 – 07/31/2028

GOVERNMENT POINTS OF CONTACT (POC):

TECHNICAL POC: Lee Powell 816.343.8360, lee.powell@noaa.gov

NON-TECHNICAL POC: Pamela Battles (Bouallegue) 816.584.7205, pamela.battles@noaa.gov mailto:lee.powell@noaa.gov mailto:pamela.battles@noaa.gov

File details come from the government source that posted it. Updated .