This is a bid package document from the City of Pullman, Washington for a civil construction project involving water main installation. The project, identified as Contract #25-03, consists of constructing approximately 1,125 linear feet of 8-inch diameter C900 PVC water main along NW Terre View Drive in Pullman, Washington, in the vicinity of N. Grand Avenue, NW Dillon Street, and NW Brandon Drive. Work includes furnishing and installing three new fire hydrant assemblies and one air relief valve, completing seven water service reconnections from the new main to existing water meters, disinfecting and testing the new waterline, and connecting to the existing water main with associated disconnecting and decommissioning of the existing waterline. Additional work includes removing and replacing hot mix asphalt pavement, concrete curb and gutter, and concrete sidewalk, as well as roadway and landscape restoration, pavement markings, erosion and sediment control, trench safety, traffic control, and other associated items. The bid opening is scheduled for December 4, 2026 at 10:00 AM with no extension or change recorded. Plans and specifications are available online.

The project has an estimated budget range between an unspecified low estimate and $588,500. The document indicates that bids are open and no specific set-asides are identified. No information regarding site visits, bidder conferences, award dates, contract term, renewal options, funding sources, or incumbent contractor details is provided in this bid package document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Primary Contact

Documents

Project Actions

Status: Open Bid Bid Time: 10:00 AM Status: Open Bid Street: City: Pullman County: Whitman Zip Code: 99163

Project Type: Civil Construction

Bid Packages: No

Estimate Low: Estimate High: $588,500 Contract#/Ref: 25-03 Published Date:

Plan Status: Online Spec Status: Online

Description:

This project consists of constructing approximately 1,125 linear feet of 8-inch diameter C900 PVC water main along NW Terre View Drive in Pullman, Washington in the vicinity of N. Grand Avenue, NW Dillon Street, and NW Brandon Drive. Additional waterline installation activities include furnishing and installing three new fire hydrant assemblies and one air relief valve, completing seven water service reconnections from the new main to existing water meters, disinfecting and testing of new waterline, and subsequent connections to existing water main with associated disconnecting and decommissioning of existing waterline. Other related work includes removing and replacing hot mix asphalt pavement, concrete curb and gutter, and concrete sidewalk; roadway and landscape restoration; pavement markings;

erosion and sediment control; trench safety; traffic control; and other associated items.

Bid Date Information

Bid Date Bid Time Extended Bid Date Change

12/04/2026 10:00 AM No No

Project Contacts

City of Pullman

Compliant with ADA WCAG 2.1 Level AA

DEC

NW TERRE VIEW DRIVE 8-INCH WATER MAIN

Location: Pullman Whitman WA 99163 When: 10:00 AM https://login.onlineplanservice.com/projectgrid?mode=biddingprojects https://login.onlineplanservice.com/projectgrid?mode=biddingprojects

File details come from the government source that posted it. Updated .