19-00154_Statement_of_Work_RFQ.doc
DOC document 45 KB Posted
- Solicitation number
- NRMAD000-19-00154CM2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-00154_SF_18_Quote_Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
NRMAD000-19-00154
Introduction
The Atlantic Oceanographic and Meteorological Laboratory (AOML), located on Virginia Key, Florida is a research facility owned by the National Oceanic and Atmospheric Administration (NOAA). The main building was commissioned in 1973 and consists of roughly 78,000 square feet of office, laboratory, workshop, machinery, and storage space. There is also a 3,000 square foot warehouse and boat storage area behind the main building.
Scope
NOAA is seeking a contractor capable of performing solid waste removal and recycling services at the Atlantic Oceanographic and Meteorological Laboratory, Virginia Key, FL.
Services
a. The contractor shall provide removal services for one 4-cubic-yard container of municipal solid waste, four times per week. Services must be conducted between the hours of 0900-1500, Monday-Friday. (Offices are closed on all Federal Holidays)
b. The contractor shall provide recycling services for no less than one 90-gallon totter of single stream recyclables, one time per week. Services must be conducted between the hours of 0900-1500, Monday-Friday. (Offices are closed on all Federal Holidays)
c. The contractor shall provide removal services for up to one 8-cubic-yard container of cardboard waste, one time per week. Services must be conducted between the hours of 0900-1500, Monday-Friday. (Offices are closed on all Federal Holidays)
d. All containers shall be provided by the contractor.
Place of Performance
4301 Rickenbacker Causeway, Miami, FL 33149-1026 The Service Contract Labor Standards act applies to this procurement for Dade County, FL and is the contractor’s responsibility to be in compliance.
Period of Performance
January 1, 2019 through December 31, 2019 There will be an opportunity for executing four additional option years:
January 1, 2020 through December 31, 2020
January 1, 2021 through December 31, 2021
January 1, 2022 through December 31, 2022
January 1, 2023 through December 31, 2023
Contractor agrees to observe all Federal Holidays, plus any other day off work designated by Federal Statute, Executive Order, or Presidential Proclamation:
New Year’s Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving, Christmas, Memorial Day, Presidents Day, Independence Day & Martin Luther King Day.
File details come from the government source that posted it.