NRMAC7002100126 SON TowerTrailers 8 RFQ.pdf

PDF 111 KB Posted

Attached to
BRAND NAME OR EQUAL FOR ALUMA TRAILER TOWERS FOR NOAA OAR SPECIAL OPERATIONS & RESEARCH DIVISION AT LAS VEGAS, NV
Solicitation number
NRMAC7002100126MWH
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/05/2020

STATEMENT OF NEED FOR SUPPLIES

PURPOSE:

Four (8) Trailer Towers (10 meters) for weather instrumentation and data collection.

A critical element of the NOAA ARL/SORD mission is to collect meteorological data on and near the Nevada National Security Site (NNSS). These data are required to produce daily weather forecasts and spot forecasts for specific times and locations, conduct daily weather surveillance, generate severe and extreme weather warnings and advisories, and perform emergency response activities. In addition, we collect specialized weather data to support field experiments.

TECHNICAL SPECIFICATIONS: BRAND NAME OR EQUAL

All equipment listed below is required to be ordered from a single vendor as to ensure system compatibility.

Total of Four (8) Trailer Towers

Include shipping costs to POC.

Trailer Tower:

Aluma Tower TM-12/T-DD-35H or Compatible or Better.

Tower Specifications (each tower):

- Operating Temperature: -40o to +120oF

- Designed to TIA-222-G Structural Standards for Antenna Supporting Structures and

Antennas

- Tower Material: American Aircraft Aluminum 6061-T6

- Guyed Capable: Yes

- Number of Sections: 2

- Length of each Section: 17 feet

- Section Overlap Length: 4 feet

- Maximum Height without Mast: 30 feet

- Mast Length: 4 feet

- Maximum Height with Mast: 34 feet

- Nested Height without Mast: 17.5 feet

- Raising System: Manual – Hand Crank

- Worm Gear Winch Drill Adapter capability: Yes

- Worm Gear Winch Drill Adapter: Included

- Retracting System: Gravity

- Lockable Mechanism: Safety Stop

- Multiple Level Locks: every 20 inches

- Multiple Safety Redundancy: Yes

- Maximum Payload (fully deployed): 125 pounds

- Maximum Wind Load (Sail Area, fully deployed): 18 square feet

- Maximum Wind Speed (fully deployed): 70 miles per hour

Trailer Specifications (each trailer):

- Meet or Exceed Department of Transportation’s (DOT) regulations.

- National Association of Trailer Manufacturers (NATM) certified manufacturer.

- Frame Material: American Structural Steel

- Finishing and Corrosion Protection: Hot Dip Galvanized

- Trailer Frame Length: 16 feet maximum

- Trailer Frame Width: 6 feet maximum

- Deck Height: 2 feet, approximate

- Overall Height (with Tower): 9 feet maximum

- Coupler Type: 2 5/16 inch Ball and/or Pintle

- Coupler Height: 18 to 22 inch, 2 inch increments

- Number of Axles: One (1)

- Axle Size: 3,500 pounds

- Axle Type: Galvanized Torsion

- GVWR: less than 3,500 pounds

- Tire Size: 225-75R/15ST

- Tire Load Range: E

- Brakes: 2 Wheel Electric

- Breakaway Kit: Yes

- Weight: approximately 2,200 pounds (including tower and accessories)

- Tongue Weight: approximately 220 pounds

- Tongue Jack: one (1) 5,000 pounds, mechanical

- Leveling System: five (5) 8,000 pounds mechanical jacks

- Outriggers: five (5) pull-out

Maximum Trailer Transport Length (trailer and tower together): 18 feet Warranty: One (1) year from date of shipment.

DELIVERABLE SCHEDULE:

Deliver by 31 January 2021 or sooner.

GOVERNMENT CONTACT:

Walt Schalk Director, NOAA ARL/SORD 232 Energy Way North Las Vegas, NV 89030 702-295-1231

GREEN PROCUREMENT PROGRAM (GPP): does not apply is compliant GPP includes Recovered Materials Products, Biobased Products, Energy Efficient Products, Electronic Product Environmental Assessment Tool Products, Water Efficient Products, Alternative Fuels Vehicles/Alternative Fuels/Hybrids, Non-Ozone Depleting Products, Environmentally-Preferable Products and Services, and Waste Prevention and Recycling.

(If this procurement should fall under the GPP, but is not compliant, a justification is required with concurrence from the Environmental Designee and OCIO designee, if applicable, and approved by the Head of the Contracting Office (HCO).

File details come from the government source that posted it. Updated .