NRC-HQ-60-17-R-0007_-_A0002.pdf
PDF 177 KB Posted
- Attached to
- High Energy Arcing Fault 2 - Support
- Solicitation number
- NRC-HQ-60-17-R-0007-HEAF2
About this file
Amendment 2 - form 30 and continuation pages
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NRC-HQ-60-17-R-0007_-_A0003.pdf | ||
| NRC-HQ-60-17-R-0007_-_A0001.pdf | ||
| NRC-HQ-60-17-R-0007.pdf | ||
| Attachment_1_-_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
NRC-HQ-60-17-R-0007
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCHQ
WASHINGTON DC 20555-0001
MAIL STOP TWFN-8E06M
ACQUISITION MANAGEMENT DIVISION
US NRC - HQ
08/11/2017000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/11/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment (amendment 2) is to A) respond to questions received from potential offerors; B) modify Sections B.2 and B.4 of the solicitation; and C) extend the proposal due date from 4:30PM, EST on 8/25/2017 to 4:30PM on 8/29/2017.
LIST OF CHANGES:
Bids due date : 25-AUG-17 changed to 29-AUG-17
See attached pages for specific details regarding this amendment.
Period of Performance: 09/30/2017 to 09/29/2020
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
RICHARD W. ROBINSON
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
NRC-HQ-60-17-R-0007
A00002
Specific Changes are as Follows:
A. The following question was received prior to the proposal due date (NRC response in italics):
“Would it be possible to receive more information on the materials required for this project?
Depending on footage and amperage the cost for CLIN items 0004 – 0010 could be substantial.”
The exact testing parameters have not yet been defined and as such the NRC does not have exact specifications. However the NRC would need the equipment to be identical for each line item. For the medium voltage switchgear, 2 vertical breaker sections per switchgear would be needed at a minimum and 3-4 would be ideal. The bus rating of 1,200 Amps continuous should be fine for the medium voltage switchgear. A withstand rating of at least 60kA would be desirable.
Additionally, due to the fact the NRC is unable to provide more specific details regarding the equipment, offerors are instructed to use a not-to-exceed, plug-in value of $226,000.00 total for line-items 0004 – 0010.
B. Sections B.2 and B.4 of the solicitation are revised as follows:
“B.2 CONSIDERATION AND OBLIGATION-TIME-AND-MATERIALS CONTRACT
(a) The ceiling price to the Government for full performance under this contract is [TO BE
DETERMINED].
(b) The contract includes: (1) direct labor hours at specified fixed hourly rates, inclusive of wages, fringe, overhead, general and administrative expenses, and profit, totaling $[TO BE DETERMINED]; and (2) cost of materials totaling $226,000 (NOT-TO-EXCEED).
(c) The amount presently obligated by the Government with respect to this contract is $[TO BE
DETERMINED].
(d) It is estimated that the amount currently obligated will cover performance through [TO BE
DETERMINED].
(e) This is an incrementally-funded contract and FAR 52.232-22 – “Limitation of Funds” applies.”
“B.4 COST/PRICE SCHEDULE
Base Period: Date of Award – 24 Months from Date of Award
TIME AND MATERIALS CLINS
CLIN DESCRIPTION EST
HOURS
LABOR RATE TOTAL
0001 Project Engineer 0002 Electrician/Technician 0003 Test Engineer
SUBTOTAL
CLIN DESCRIPTION EST QTY UNIT PRICE TOTAL
0004 Medium Voltage (4kV)
Nonsegregated Phase Bus Ducts
0005 Medium Voltage (4kV) Copper Nonsegregated Phase Bus Bars
0006 Medium Voltage (4kV) Aluminum Nonsegregated Phase Bus Bars
0007 Low Voltage Switchgear Load Center (480V) w/ Copper Bus
0008 Medium Voltage Switchgear (4kV) w/ Copper Bus
0009 Aluminum Bus for Low Voltage Switchgear Load Center (480V)
0010 Aluminum Bus for Medium Voltage Switchgear (4kV)
SUBTOTAL NOT-TO-EXCEED $226,000.00
TOTAL (TIME AND MATERIAL CLINS)
FIXED PRICE CLINS
CLIN DESCRIPTION FIRM-FIXED PRICE TOTAL
0011 Equipment Storage and Staging Facility
TOTAL
TOTAL PRICE (BASE PERIOD): $____________________________
Option Period 1: 24 – 36 Months from Date of Award
TIME AND MATERIALS CLINS
CLIN DESCRIPTION EST
HOURS
LABOR RATE TOTAL
1001 Project Engineer 1002 Electrician 1003 Test Engineer
TOTAL
FIXED PRICE CLINS
CLIN DESCRIPTION FIRM-FIXED PRICE TOTAL
1011 Equipment Storage and Staging Facility
TOTAL
TOTAL PRICE (OPTION PERIOD): $____________________________
GRAND TOTAL (BASE AND ALL OPTIONS: $____________________________”
C. The proposal due date has been extended from 4:30 PM, EST on Friday August 25, 2017 to 4:30 PM, EST on Tuesday August 29, 2017.
All other terms and conditions stated in the solicitation remain unchanged. All offerors must submit a signed copy of this amendment with their proposal, verifying receipt of the amendment information.
If there are any additional questions or concerns regarding this solicitation, please forward those to the attention of the Contracting Officer at richard.robinsonii@nrc.gov.