Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AE_SOW_040315_Amendment2.doc | DOC document | |
| PresolicitationNoticeWithTableAttachments_Amendment2.docx | DOCX document | |
| Questions Answers_Amendment2.docx | DOCX document | |
| PresolicitationNoticeWithTableAttachments_Amendment1.docx | DOCX document | |
| PresolicitationNoticeWithTableAttachments.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(CORs are required to complete responses to each section in paragraph form, unless otherwise specified.)
C.1 Title of Project
Architectural and engineering (A&E) services to the United States Nuclear Regulatory Commission (NRC) to support NRC’s long-term housing strategy and NRC’s restoration and refurbishment activities.
C.2 Introduction
In achieving our mission NRC adheres to the principles of good regulation, independence, openness, efficiency, clarity, and reliability. The agency puts these principles into practice with effective, realistic, and timely regulatory actions, consistent with our organizational values and our open, collaborative work environment. The NRC's goal is to provide flexible workspace that is compliant with Federal security guidelines and allows NRC to comply with Executive Orders 13514-Federal Leadership in Environmental, Energy, and Economic Performance and 13423-Greening of the Government through Efficient Energy Management and Title IV of PL110-140 of the "Energy Independence and Security Act of 2007", and all other successor federal "green" legislation, Executive Orders and regulations.
In accordance with the current federal space utilization guidelines, the NRC is developing a long-term housing strategy for its headquarters location. The current housing strategy will consolidate NRC headquarters at the White Flint Complex (WFC) into three adjacent buildings in Rockville, Maryland located at: (1) One White Flint North (OWFN), 11555 Rockville Pike, Rockville, MD 20850, (2) Two White Flint North (TWFN), 11545 Rockville Pike, Rockville, MD 20850, and (3) Three White Flint North (3WFN), 11601 Landsdown Street, North Bethesda, MD 20850. These consolidation efforts will greatly enhance the ability of the staff to communicate and collaborate, and they will allow the NRC to more effectively and efficiently accomplish its mission.
The NRC is also embarking on several restoration and refurbishment activities (also referred to as interior up-keep projects) at the WFC.
C.3 Objective
The objective of this contract is for the contractor to perform various design tasks to support NRC’s long-term housing strategy and NRC’s restoration and refurbishment activities. The contractor shall perform A&E, space planning, and interior design services for the long-term housing strategy and interior up-keep projects at NRC headquarters. The contractor shall develop test fits, space plans, design intent drawings (DIDs), construction drawings (CDs), construction cost estimates, and detailed specifications to facilitate demolition, repairs, alterations, and construction for projects as specified by the NRC. The contractor shall perform all design, design management, and construction administration services necessary to complete all specified design and construction projects.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform design services defined in this SOW, except for those items specified as Government-furnished services. The contractor shall perform to the standards listed in this contract.
C.4 Type of Contract Contemplated
The contract type contemplated for this requirement is: Indefinite Delivery Indefinite Quantity (IDIQ). Task orders under this contract will be issued on a Fixed Price and/or Time-and-Materials basis.
C.5 Scope of Work
The contractor shall provide all resources necessary to accomplish the tasks and deliverables described in this Statement of Work (SOW). The contractor shall provide designs that comply with environmental laws, regulations, and Executive Orders, including regulations requiring minimum energy and water efficiency compliance. Under this contract, the NRC Contracting Officer (CO) will issue individual Task Orders (TO) specifying the requirements, schedule, performance standards, and deliverables for each project. The Contracting Officer's Representative (COR) will be responsible for overseeing the contractor's satisfactory completion of the requirements of the contract. The COR for each individual task order will be responsible for overseeing the contractor's satisfactory completion of the requirements of that task order. The contractor shall furnish all labor, materials, equipment, transportation, supervision, etc. to satisfy all NRC requirements specified in the contract and TO.
The design services to be performed under this contract may include, but are not limited to: 1) conducting engineer-led field surveys, graphical surveys, and analysis of existing work space and planned work space; 2) preparing engineering studies; 3) creating coordination reports of recommended actions and/or design packages; 4) developing program of requirements, cost estimates, specifications, test fits, space plans, audio-visual plans, design intent drawings (DID's), and construction documents (CD's), 5) providing project management, 6) providing construction administration, and 7) obtaining permits.
Upon request for the TO proposal, the contractor shall provide a detailed price proposal and project schedule. The price proposal shall include all labor, materials, and subcontractor breakdown for various design support tasks. Tasks may include, but are not limited to:
· Architectural, engineering, and interior design services.
· Project management (PM) services.
· Development of DIDs and/or CDs for various construction projects to be performed at the WFC.
· Production of drawings and other documentation containing sufficient detail of design intent for use (1) by furniture installers to replace existing systems furniture; (2) to replace ceiling tile; (3) to replace carpet; and (4) to construct drywall enclosed offices, refinish walls, and replace millwork and cabinetry.
· Development of furniture, furnishings, and equipment specifications, documented in printed and electronic formats. Coordination with the COR in obtaining plan approval by the customer agency and sub-components.
C.6 Services/Deliverables
General
The contractor shall have the following minimum qualifications, which will be required to perform similar work under this contract:
A. Knowledge and experience preparing: interior designs, structural design, mechanical design, electrical design, plumbing design, fire protection and Life Safety systems design, audio visual communication systems design, cost estimating, construction scheduling and project management.
B. Knowledge of and experience with using different types of design and construction methods and materials and be responsive to changes in direction due to Agency requests. All tasks will require disciplined engineering skills for performance of the required work.
C. Knowledge of and experience with developing complete design packages and provide studies, surveys, reports, environmental requirements, environmental certificates of compliance as directed for new material, and recycling certificates for removed materials.
D. Experience supporting concurrent projects of varying sizes. Specialize in and have extensive experience in multi-level high rise office building renovation and/or new construction.
E. Experience in different types of wall/ceiling/floor construction, furniture layout, HVAC, plumbing, building control systems, specialized systems, electrical systems, grounding, and lighting.
F. Knowledge of and experience with preparing facility re-stack plans and schedules for large relocation of personnel, furniture, and equipment, including plan development for sequenced moves, implementation and coordination.
The contractor shall perform the following services under this contract:
A. Respond to changes that impact multiple facilities and require a variety of changes to the local infrastructure. Potential changes include, but are not limited to, reconfiguration of workspaces, systems furniture layout, electrical distribution, lighting distribution, telecommunications, fire suppression, heating and cooling, and cost estimates.
B. Produce drawings and other documentation that contain sufficient detail of design intent for use (1) by furniture installers to replace existing systems furniture; (2) to replace ceiling tile; (3) to replace carpet; and (4) to construct drywall enclosed offices, refinish walls, and replace millwork and cabinetry.
C. Within 10 business days of the conclusion of the project, provide 1) two compact discs with as-built CAD drawings formatted in AutoCAD drawing format (.dwg) Version 2010 or later and PDF; 2) one set of as-built drawings in half-size hard copy; 3) two sets of as-built drawings in full-size hard copy; and 4) copies of furniture, furnishings, and equipment specifications in printed and electronic formats, unless otherwise instructed in the TO.
D. Provide architectural drawings to be used for permits as specified in each TO. Submit the drawings to the Montgomery County permitting office (or appropriate jurisdiction) and walk the drawings through the entire process (all inspections and final approvals).
E. Prepare a schedule using Microsoft Project software and sequence or phase construction plans to minimize the number of personnel moves required for new space occupation and to minimize the impact on employees.
F. Provide assistance in the review and management of project and construction schedules utilizing critical path methods with related analyses and the Microsoft Project software.
G. Review contractor submittals, coordination of value engineering and Leadership in Energy and Environmental Design (LEED) related services. (See http://www.usgbc.org/). Contractors will be required to follow LEED principles. The TO will specify if the project is seeking a LEED Silver or Gold certification.
H. Provide a copy of all equipment operation manuals, warranties, and other related documentation for ongoing facility maintenance work to NRC upon completion of each project.
I. Specify, in the construction design specifications, use of the maximum practicable amount of recovered materials consistent with the performance requirements, availability, price reasonableness, and cost-effectiveness.
J. Consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable in developing the construction design specifications.
Quality Control and Construction Administration at the Work Site A. It shall be the responsibility of the contractor to inspect the site, determine the quantity of work involved, and compare the specifications with the work to be done. The contractor shall verify all information shown on the drawings.
B. When directed by the COR, the contractor may be required to inspect the quality of the construction work to ensure that the scope of services requested in the contract is being accomplished in the manner as described in the SOW for each individual TO.
Space Programming - Program of Requirements (POR) Tasks A. The contractor shall provide evaluation of overall office space and furniture requirements, existing inventory, space standards, the function office environment, work flow, and special space or electrical/data requirements.
B. Tasks/deliverables under space programming and work space development task that the contractor shall provide include but are not limited to the following:
1. Provide recommendations for design and finishes for new or refurbished space and furniture.
2. Prepare and present space briefings and finish boards.
3. Provide color coded alternative allocation plans evaluating future downsizing, expansion, or revision requirements.
4. Provide drawings to scale which show, in outline form, workstations, private offices, support areas, special areas, and circulation patterns.
5. Provide as-built drawings 10 business days after the completion of construction.
6. Submit two sets of full size drawings in hard copy, one half size set in hard copy, and two compact discs containing digital files formatted in AutoCAD Version 2010 or later, and Adobe PDF to the COR.
Design Intent Drawings (DIDs) and Construction Drawings (CDs) A.
The contractor shall develop Architectural designs to include the following:
1. Architectural demolition documents consisting of demolition floor plans, demolition reflected ceiling plan, and demolition device plans.
2. Architectural specifications and drawings for the area of work specified by the COR.
3. Drawings related to construction documents such as space plans, partition plans, finish plans, elevation plans, section plans, reflected ceiling plans, and detailed drawings when specified.
B. Deliverables under the DIDs and CDs include, but are not limited to, the following:
One (1) DID and 3 revisions One (1) Demolition Submission One (1) 40% CD Submission One (1) 75% CD Submission One (1) 95% CD Submission One (1) Final CD Submission Deliverables and submission dates will be specified in individual task orders. Unless otherwise specified in the TO, with each submission the contractor shall submit to the COR 1) two full-size drawings in hard copy, 2) one half-size drawing in hard copy, and 3) two compact discs containing digital files in AutoCAD Version 2010 or later drawing format (.dwg), and Adobe PDF.
Mechanical Design A. The contractor shall prepare mechanical design to include the following:
1. Investigation/documentation of problems with base building systems.
2. Load calculation in the areas of work only.
3. Indication of the airflow quantity required to meet the load in the area of work.
4. Relocation of existing diffusers as required by new tenant partitions.
5. Redistribution of base building air quantities as available.
6. Solutions to other mechanical problems as required.
7. Design to replace existing Variable Air Volume (VAV) boxes with new electronic digital control boxes. Boxes shall be either cooling only or parallel fan powered VAV's with electric heat as needed. Boxes shall have variable speed fan controls for each parallel box.
8. Design control scheme for floor air handlers to include new temperature sensors, variable frequency drives on fan motors and electronic damper actuators.
B. Deliverables under the mechanical design task include, but are not limited to the following:
One (1) DID and 2 revisions One (1) Demolition Submission One (1) 40% CD Submission One (1) 75% CD Submission One (1) 95% CD Submission One (1) Final CD Submission Deliverables and submission dates will be specified in individual task orders. Unless otherwise specified in the TO, with each submission the contractor shall submit to the COR 1) two full-size drawings in hard copy, 2) one half-size drawing in hard copy, and 3) two compact discs containing digital files in AutoCAD Version 2010 or later drawing format (.dwg), and Adobe PDF.
Plumbing Design A. The contractor shall prepare plumbing design to include the following:
1. Designing pantry sinks, toilets, and shower facilities.
2. Designing special plumbing systems.
3. Designing process plumbing systems.
4. Investigating/documenting problems with base building systems.
5. Plumbing size, routing, and slope designs to meet space requirements.
B. Deliverables under the plumbing design task will include, but are not limited to the following:
One (1) DID and 2 revisions One (1) Demolition Submission One (1) 40% CD Submission One (1) 75% Construction Document (CD) Submission One (1) 95% CD Submission One (1) Final CD Submission Deliverables and submission dates will be specified in individual task orders. Unless otherwise specified in the TO, with each submission the contractor shall submit to the COR 1) two full-size drawings in hard copy, 2) one half-size drawing in hard copy, and 3) two compact discs containing digital files in AutoCAD Version 2010 or later drawing format (.dwg), and Adobe PDF.
Electrical Design
A. The contractor shall prepare electrical design to include the following:
1. Reflected ceiling plans to meet IECC (International Energy Conservation Code) requirements. This will include occupancy sensor layout.
2. Lighting design for non-standard or decorative systems other than specifically listed above.
3. Lighting layout.
4. Lighting calculations.
5. Uninterruptible power source (UPS) system design.
6. Designing special electrical systems.
7. Investigating/documenting problems with base building systems.
8. Solutions to other electrical problems as required.
9. Circuiting building standard tenant lighting, including exit and white lights, based on reflected ceiling plan provided by the contractor's architect.
10. Circuiting power systems based on power plan provided by the contractor's architect.
11. Indicating telephone/data receptacles for use by the tenant's communication vendor or contractor's architect.
12. Adapting existing fire alarm systems to accommodate the revised tenant partitions within the capabilities of the existing system.
B. Deliverables under the electrical design task include, but are not limited to the following:
One (1) DID and 2 revisions One (1) Demolition Submission One (1) 40% CD Submission One (1) 75% CD Submission One (1) 95% CD Submission One (1) Final CD Submission
Deliverables and submission dates will be specified in individual task orders. Unless otherwise specified in the TO, with each submission the contractor shall submit to the COR 1) two full-size drawings in hard copy, 2) one half-size drawing in hard copy, and 3) two compact discs containing digital files in AutoCAD Version 2010 or later drawing format (.dwg), and Adobe PDF.
Fire Suppression Design A. The contractor shall prepare fire suppression design to include the following:
1. Designing fire suppression systems.
2. Investigating/documenting problems with base building systems.
3. Designing water service entrance.
4. Review of the floor plan to determine adequacy of existing fire standpipe coverage.
5. Modify existing wet-pipe sprinkler system to accommodate the new tenant partitions or other considerations.
B. Deliverables under the fire suppression design task include, but are not limited to the following:
One (1) DID and 2 revisions One (1) Demolition Submission One (1) 40% CD Submission
One (1) 75% CD Submission One (1) 95% CD Submission One (1) Final CD Submission Deliverables and submission dates will be specified in individual task orders. Unless otherwise specified in the TO, with each submission the contractor shall submit to the COR 1) two full-size drawings in hard copy, 2) one half-size drawing in hard copy, and 3) two compact discs containing digital files in AutoCAD Version 2010 or later drawing format (.dwg), and Adobe PDF.
Schedule and Work Plan A. Upon approval of designs by NRC, the contractor shall provide an estimated construction schedule for planning purposes prior to NRC acquisition of a construction contractor.
Meetings
A. The NRC COR will schedule a kick-off meeting at NRC at the start of each TO. At this meeting, the contractor shall be prepared to brief the COR on responsibilities and personnel assignments for the project.
B. The contractor shall ensure that non-NRC participants at the meeting are familiar with the project and are authorized to conduct matters relating to their work.
C. As designated by the COR for each meeting, the contractor shall ensure the following roles are represented at each meeting:
1. Architect
2. Key Design consultants
3. Key subcontractors
4. Other trades related to each TO
D. The contractor shall record significant discussions, agreements, and open items needing closure for each meeting. No later than three business days after each meeting, the Contractor shall distribute minutes of the meeting to the COR, each party present at the meeting, and to other concerned parties designated by the COR.
C.7 Key Personnel Labor Categories
Primary Key Personnel
Primary Key Personnel include Principal Architect, Architect, Interior Designer and Project Manager. Primary Key Personnel are subject to the requirements of 2052.215-70 Key Personnel (JAN 1993).
Principal Architect
1. Principal Architect’s duties include, but are not limited to the following:
A. Provides program management of all tasks, including productivity and management methods to monitor and assure high quality and on time deliverables as well as performance within the project budget.
B. Analyzes information design and construction documentation.
C. Presents plans to clients.
2. Principal Architect shall have:
A. Professional licensure;
B. A minimum of seven years continuous experience in architecture;
C. A National Council of Architectural Registration Boards (NCARB) certificate;
D. A professional degree from a school accredited by the National Architectural Accrediting Board (NAAB); and
E. An active LEED accreditation.
Architect
1. Architect duties include, but are not limited to, the following:
A. Prepare architectural drawings and specifications to assure plans comply with local and International Building codes and other applicable local code requirements.
B. Prepare architectural demolition documents consisting of demolition floor plans, demolition reflected ceiling plan, and demolition device plans.
C. Prepare drawings related to construction documents such as space plans, partition plans, finish plans, elevation plans, section plans, reflected ceiling plans, and detailed drawings when specified.
D. Present plans to stakeholders.
E. Analyze information design and construction documentation.
F. Provide Computer Aided design (CAD) space plans.
G. Provide stamped hard copies of drawings to the NRC and General Contractor.
2. Architects shall have:
A. Professional licensure;
B. A minimum of seven years continuous experience in architecture;
C. An NCARB certificate; and
D. A professional degree from a school accredited by NAAB.
Interior Designer
1. Interior Designer duties include, but are not limited to, the following:
A. Specifies finishes and develops finish boards.
B. Develops program of requirements (POR).
C. Develops test-fits and space plans with furniture blocks included.
D. Create an interior design specification package for the COR.
E. Provide comprehensive support services for the design, reconfiguration, relocation, and increasing or downsizing of office spaces and similar facilities.
F. Prepare coordination drawings where careful coordination is needed for installation of products and materials fabricated by separate entities, and prepare coordination drawings where limited space availability necessitates maximum utilization of the space for efficient installation of different components. The drawings shall:
1. Show the relationship of components shown on separate shop drawings.
2. Indicate required installation sequences.
3. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.
4. Show equipment and system installations in mechanical and electrical rooms and spaces where two or more entities will provide the work and separate shop drawings are insufficient to show coordination.
5. Indicate required installation sequences.
6. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.
2. Interior Designers shall have a National Council of Interior Design Qualifications (NCIDQ) certification and demonstrate a minimum of five (5) years continuous experience in the interior design of facilities.
Project Manager
1. Project Manager’s duties include, but are not limited to the following:
A. Manage and report hours and dollars expended for each task by individual for the subject month and to date, including providing centralized administrative support, documentation, and related functions.
B. Provide monthly reports to the COR outlining project activities including funds approved for each task.
C. Provide advice and service to clients and customers on designated phases of projects.
D. Provide comprehensive support services for the design, reconfiguration, relocation, and increasing or downsizing of office spaces and similar facilities.
E. Coordinate construction operations that depend on each other for proper installation, connection or operation.
F. Prepare and distribute memoranda to each party involved, outlining special procedures required for coordination. Notices, reports, specifications, and meeting minutes shall be a part of the memoranda.
G. Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and promote orderly progress of the task order. Administrative procedures include but are not limited to the following:
1. Preparation of schedules.
2. Delivery and processing of submittals.
3. Progress meetings.
4. Task order closeout activities.
2. Project Managers shall have either 1) a Project Manager Professional (PMP) certification and a minimum of three years continuous experience in project management, or 2) a minimum of five years continuous experience in project management.
Secondary Key Personnel Secondary Key Personnel include Audio and Visual Designer, Mechanical Engineer, Structural Engineer, Civil Engineer and Electrical Engineer. Secondary Key Personnel are not subject to the requirements of 2052.215-70 Key Personnel (JAN 1993).
Audio and Visual Designer: Audio and Visual Designer shall have a minimum of three years continuous experience in audiovisual design.
Mechanical Engineer: Mechanical Engineer shall have professional licensure and a minimum of three years continuous experience in mechanical engineering.
Structural Engineer: Structural Engineer shall have professional licensure and a minimum of three years continuous experience in structural engineering.
Civil Engineer: Civil Engineer shall have professional licensure and a minimum of three years continuous experience in civil engineering.
Electrical Engineer: Electrical Engineer shall have professional licensure and a minimum of three years continuous experience in electrical engineering.
C.8 Other Direct Costs Travel will not be a reimbursable expense under this contract.
C.9 Estimated Materials Required Materials provided by the Contractor under this contract may include but are not limited to: full-size drawings, half-size drawings, design boards, submittal logs, permits, and shipping/delivery.
C.10 Reporting Requirements
A technical progress report and financial status report shall be provided by the contractor on the 28th of each month. This report will be used by the Government to assess the adequacy of the resources proposed by the contractor to accomplish the work contained in this SOW and provide status of contractor progress in achieving tasks and producing deliverables. The report shall include contract/order summary information, work completed during the specified period, milestone schedule information, problem resolution, and staff hour summary.
C.11 Access to Government Property and Facilities
The contractor is permitted full access to the Government's WFC facilities as required to perform the work. [Insert facility name/description and location, if applicable.] C.12 Place of Performance
The work to be performed under this contract will be primarily performed at the contractor’s facility C.13 Hours of Operation
The contractor is responsible for conducting business, between the hours of 8:00 am – 5:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
C.14 Physical Security
The contractor shall be responsible for safeguarding all Government property in its care, custody and control. At the close of each work period, Government facilities, equipment, and materials shall be secured.
C.15 Post-award Orientation (kickoff) or Periodic Progress Meetings
The contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5.
The CO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
Progress Meetings - The contractor may be required to meet with the COR and CO at the beginning of contract/task order performance. Meetings will be scheduled as needed thereafter. The contractor may request meetings whenever a discrepancy exists and no mutual resolution is apparent.
C.16 General – Contractor Personnel Contractor Employees
The contractor shall not employ persons for work on this contract if such individual is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Contractor personnel attending meetings, answering phones, and working in other situations where their status is not obvious are required to identify themselves as such to avoid creating the impression that they are Government officials.
C. 17 Data Rights
The NRC shall have unlimited rights to and ownership of all deliverables provided under this contract/order, including reports, recommendations, briefings, work plans and all other deliverables. All documents and materials, to include the source codes of any software, produced under this contract/order are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written authorization from the CO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. The definition of “unlimited rights” is contained in Federal Acquisition Regulation (FAR) 27.401, “Definitions.” FAR clause at FAR 52.227-14, “Rights in Data-General,” is hereby incorporated by reference and made a part of this contract/order.
C.18 Phase In/Phase Out Period:
To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board, during the sixty (60) day phase in/ phase out periods. During this phase, the contractor shall become familiar with the full scope of services in order to begin on the contract/task order start date.
ATTACHMENT A
STANDARD DEFINITIONS & ACRONYMS
This section includes all appropriate terms and phrases for this SOW. The definition must be clear and concise, not ambiguous. Carefully consider each definition because they will be binding for the duration of this contract, unless modified. In addition, include a complete listing of all acronyms and words or phrases they represent.
DEFINITIONS:
Definitions should be carefully considered by the Government. Explain any special terms or phrases used in the SOW.
CONTRACT LINE ITEM NUMBER (CLIN). CLINs are used to identify, organize and track work requirements throughout the project life cycle. They provide a unit price or lump sum price for each contract deliverable or set of deliverables.
CONTRACT SPECIALIST - A person who assists the contracting officer with day-to-day procurement functions. At the NRC, this person handles pre-award, post-award and close-out activities.
CONTRACTOR - A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
CONTRACTING OFFICER (CO) – A person with delegated authority to enter into, administer, and terminate Government contracts. Note: This is the only individual who can legally bind the Government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR) - An employee of the Government delegated by the CO to administer the contract. Such appointment shall be in writing (i.e., Delegation and Appointment Memorandum) and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DELIVERABLE - Something required by the Government under the contract to be produced or achieved by the contractor.
GOVERNMENT PROPERTY - All property owned or leased to the Government or acquired by the contractor under the terms of the contract where the Government retails title (i.e., contractor-acquired equipment).
KEY PERSONNEL - Contractor personnel expected to play a key role in the performance and success of the contract. Key personnel are generally evaluated as part of the Source Evaluation Panel (SEP) proposal review process. Key Personnel are listed in the SOW.
NONPERSONAL SERVICES CONTRACT - A contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
PERSONAL SERVICE CONTRACT - Is characterized by the employer-employee relationship it creates between the Government and the contractor’s personnel. The Government is normally required to obtain its employees by direct hire under competitive appointment or other procedures required by the civil service laws. Obtaining personal services by contract, rather than by direct hire, circumvents those laws unless Congress has specifically authorized acquisition of the services by contract.
PHYSICAL SECURITY - Actions that prevent the loss or damage of Government property.
SUBCONTRACTOR - One that enters into a contract with a prime contractor in performance of the Government contract. However, the Government does not have privity of contract with the subcontractor and therefore does not directly interact with the subcontractor(s).
WORK DAY - Hours of Operation. The number of normal hours per day that the contractor will provide services in accordance with the contract, is eight.
WORK WEEK. Monday through Friday, unless otherwise specified in the contract.
ACRONYMS:
Define any acronyms the Government uses for this initiative; give both the acronym and the words represented by the acronym.
CFR
Code of Federal Regulations
CLIN
Contract Line Item Number
COR
Contracting Officer’s Representative
COTS
Commercial-Off-the-Shelf
DSS
Defense Security Service
FAR
Federal Acquisition Regulation
FTR
Federal Travel Regulation
HIPAA
Health Insurance Portability and Accountability Act of 1996
NRCAR
U.S. Nuclear Regulatory Commission Acquisition Regulation
OCI
Organizational Conflict of Interest
ODC
Other Direct Costs
PIPO
Phase In/Phase Out
POC
Point of Contact