RFQ_NRC-HQ-13-R-04-0011_10.31.2012.pdf

PDF 266 KB Posted

Attached to
High Energy Arcing Fault (HEAF) Testing
Solicitation number
NRC-HQ-13-R-04-0011
Issued by

About this file

Conbine Synopsis Solicitation

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE OF PAGES

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF. RATING

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5A. ISSUED BY 6. DELIVER BY (Date)

5B. FOR INFORMATION CALL: (No collect calls) 7. DELIVERY

NAME TELEPHONE NUMBER FOB DESTINATION (See Schedule)

OTHER

AREA

CODE

NUMBER 9. DESTINATION

a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE ON

OR BEFORE CLOSE OF BUSINESS (Date)

This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(a) (b) (c) (d) (e) (f)

a. 10 CALENDAR DAYS % b. 20 CALENDAR DAYS % c. 30 CALENDAR DAYS % d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO SIGN QUOTATION 15. DATE OF QUOTATION

a. NAME OF QUOTER

b. STREET ADDRESS 16. SIGNER

a. Name (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER

IMPORTANT:

11. SCHEDULE (Include applicable Federal, State and local taxes)

12. DISCOUNT FOR PROMPT PAYMENT

(THIS IS NOT AN ORDER)

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

Previous edition not usable Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

REQUEST FOR QUOTATIONS

1 54 x

NRC-HQ-13-R-04-0011

RES-12-316

N/A U.S. Nuclear Regulatory Commission Div. of Contracts Attn: P.Merriweather 301.492.3614 Mail Stop: TWB-01-B10M Washington, DC 20555

U.S. Nuclear Regulatory Commission

Washington

DC 20555

See CONTINUATION Page

See Attached RFQ.

U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research

STATEMENT OF WORK FOR

NRC-RES HEAF Testing

October 15, 2015

1.0 BACKGROUND

The current state-of-the-art in evaluating the fire effects from a High Energy Arcing Fault (HEAF) event is contained in NUREG/CR-6850 Appendix M and NFPA 805 Frequently Asked Question (FAQ) 35. NUREG/CR-6850 contains a model to evaluate HEAFs in cabinets, and the NFPA 805 FAQ 35 contains a HEAF model for bus ducts. Each of these models is based primarily on a single event that corresponds to the type of failure, and each does not allow adjustments to account for the variables which can influence a HEAF. Further, these events continue to occur, the most recent event in the U.S. occurring in March 2010 and producing two HEAFs, one of which is a different failure mode from that characterized in either NUREG/CR-6850 or the NFPA 805 FAQ. To support improvement of the state-of-the-art in Fire PRA modeling of HEAF events, test data is needed.

HEAFs have the potential to cause extensive damage to the failed electrical component and distribution system along with adjacent equipment and cables within the zone of influence. The significant energy released during the HEAF event can act as an ignition source to other components and developing a mechanistic model based on past events and testing can improve the state of knowledge and provide better characterization of HEAF in the fire PRA and NFPA 805 license amendment request applications.

To better understand the HEAF phenomena, enduring fires, and to develop a mechanistic model, a testing program is envisioned that would provide the required information to progress with model development. All parameters that can reasonably be measured or monitored should be acquired to allow for the widest applicability of the results to enhance fire PRA applications and analysis. For example, there are currently models to estimate flash heat flux levels, by including flux gauge or other types of devices that can measure radiative heat flux. HEAF testing would provide an opportunity to collect this information and allow for comparison to such models or development of new ones, if so required. Therefore, experimental measurements found beneficial to providing a better understanding of the HEAF event should be applied, provided that the measurements within project scope and cost.

2.0 OBJECTIVE

The goal of this program is to perform high power electrical testing on low and medium voltage switchgear (circuit breakers) and distribution buses. The electrical measurements made during the testing, along with the mechanical measurements will allow for development of an enhanced HEAF model for use in fire probabilistic risk assessment. Preliminary flame spread assessment to target samples is also required.

3.0 SCOPE OF WORK

Task 1 – Provide storage, work preparation area, and disposal of tested equipment

The purpose of Task 1 is to provide a workspace where NRC and NRC contractors can set-up and instrument equipment. In addition, this task required storage of the equipment supplied by the NRC or its contractors.

The contractor shall perform the following subtasks to achieve this purpose:

1. Task 1a: Store the equipment to be tested, either within a warehouse that provides protection from the environment (rain, sun, snow, etc.) or provide an outside area where a shipment container can be stored to house the electrical equipment.

2. Task 1b: Provide a preparation work area with electrical utilities for the NRC and NRC contractors to work on and instrument the electrical equipment.

3. Task 1c: Assist NRC and its contractors in moving equipment between storage site, work preparation area, testing area, and disposal area.

4. Task 1d: Dispose of equipment. Damaged equipment shall be disposed and untested equipment shall be prepared for shipment back to one of the NRC selected contractors.

The NRC selected contractor shall be responsible for shipment costs.

Deliverables: Site storage of equipment (1a) 15 days use of preparation work area (1b) Movement of equipment (1c) Disposal of equipment (1d)

Task 2 – HEAF testing of electrical equipment with high voltage power source

The purpose of this task is to provide a high power electrical supply capable of providing three phase ac power of nominal 60 hertz frequency. The voltage levels for each test shall be representative of the rating for the equipment being tested. The nominal operating voltage of equipment being tested will be between 440Vac and 15,000Vac. The high power energy supply shall be capable of providing current capacity in excess of 40kA for 0.5 seconds at 15kV with the capability of providing fault energy to the test device for 2 seconds or more for some tests at a lower current output rating. The high power electrical supply shall also be capable of varying the X/R ratio. Explicit voltage, current, X/R ratio, and fault time will vary by the specific equipment tested. The power supply shall have the capability of selecting the duration of energy discharge and modeling time-current characteristics of interrupting devices.

The testing laboratory shall be capable of allowing for NRC contractors to place instrumentation panels at various locations and distances from the piece of test equipment. A means for the NRC contractor to connect the instrumentation panels to NRC contractor data acquisition system shall also be provided. In addition, the testing area shall allow for combustion of target materials for time duration up to 10 minutes.

1. Task 2a: Provide high voltage power source with the capacity equal to or greater than that specified immediately above and having the capability of varying the power discharge profile.

2. Task 2b: Provide two technicians and a test engineer to perform the high power testing and to ensure the safety of onsite personnel and the laboratories power system.

3. Task 2c: Assist the NRC and its contractors in moving and setting up the equipment for testing.

Deliverable: Provide adequate high power supply – 10 days (non-consecutive) with up to 5 tests per day (2a) Provide test support staff (2b) Provide test set-up assistance (2c)

Task 3 – Documenting the test results

The purpose of this task is to provide a test report documenting the electrical characteristics of the individual tests performed.

1. Task 3a: Provide electronic data files

2. Task 3b: Provide test report documentation, including electrical measurement plots and high power supply system configuration.

Deliverables: Data files in electronic form (3a) Test report to NRC (3b)

4.0 RESEARCH QUALITY

The quality of NRC research programs are assessed each year by the Advisory Committee on Reactor Safeguards. Within the context of their reviews of RES programs, the definition of quality research is based upon several major characteristics:

Results meet the objectives (75% of overall score) Justification of major assumptions (12%) Soundness of technical approach and results (52%) Uncertainties and sensitivities addressed (11%)

Documentation of research results and methods is adequate (25% of overall score) Clarity of presentation (16%) Identification of major assumptions (9%)

It is the responsibility of the contractor to ensure that these quality criteria are adequately addressed throughout the course of the research that is performed. The NRC project manager and technical monitor will review all research products with these criteria in mind.

5.0 TECHNICAL AND OTHER SPECIAL QUALIFICATIONS REQUIRED

A qualified test engineer and two technicians will be required to perform the testing, along with any other associated individuals required to be present during testing by the laboratory. In addition, scientific staff from the National Institute of Standards and Technology (NIST) and/or Sandia National Laboratories (SNL) shall be involved with the test setup, instrumentation and recoding of data. Any effort (costs) associated with NIST and SNL is not covered under this contract.

6.0 REPORTING REQUIREMENTS

NRC Project Managers should: Provide a concise list of reports to be provided, the desired level of contractor management review of reports, and the frequency, content, and distribution of the reports.

Monthly Letter Status Report.

A Monthly Letter Status Report (MLSR) is to be submitted to the NRC Project Manager by the 20th of the month following the month to be reported with copies provided to the following:

Resource Name: RESDRAMLSR.Resource@nrc.gov

The MLSR will identify the title of the project, the job code, the Principal Investigator, the period of performance, the reporting period, summarize each month’s technical progress, list monthly spending, total spending to date, and the remaining funds and will contain information as directed in NRC Management Directive 11.1. Any administrative or technical difficulties which may affect the schedule or costs of the project shall be immediately brought to the attention of the NRC project manager.

7.0 PUBLICATIONS NOTE

RES encourages the publication of the scientific results from RES sponsored programs in refereed scientific and engineering journals as appropriate. If the laboratory proposes to publish in the open literature or present the information at meeting in addition to submitting the required technical reports, approval of the proposed article or presentation should be obtained from the NRC Project Manager. The RES Project Manager shall either approve the material as submitted, approve it subject to NRC suggested revisions, or disapprove it. In any event, the RES Project Manager may disapprove or delay presentation or publication of papers on information that is subject to Commission approval that has not been ruled upon or which has been disapproved. Additional information regarding the publication of NRC sponsored research is contained in NRC Management Directives 3.7, “NUREG Series Publications,” and 3.9, “NRC Staff and Contractor Speeches, Papers, and Journal Articles on Regulatory and Technical Subjects.”

mailto:RESDRAMLSR.Resource@nrc.gov�

If the presentation or paper is in addition to the required technical reports and the RES Project Manager determines that it will benefit the RES project, the Project Manager may authorize payment of travel and publishing costs, if any, from the project funds. If the Project Manager determines that the article or presentation would not benefit the RES project, the costs associated with the preparation, presentation, or publication will be borne by the contractor. For any publication or presentations falling into this category, the NRC reserves the right to require that such presentation or publication will not identify the NRC’s sponsorship of the work.

NEW STANDARDS FOR CONTRACTORS WHO PREPARE NUREG-SERIES MANUSCRIPTS

The U.S. Nuclear Regulatory Commission (NRC) began to capture most of its official records electronically on January 1, 2000. The NRC will capture each final NUREG-series publication in its native application. Therefore, please submit your final manuscript that has been approved by your NRC Project Manager in both electronic and camera-ready copy.

All format guidance, as specified in NUREG-0650, Revision 2, will remain the same with one exception. You will no longer be required to include the NUREG-series designator on the bottom of each page of the manuscript. The NRC will assign this designator when we send the camera-ready copy to the printer and will place the designator on the cover, title page, and spine. The designator for each report will no longer be assigned when the decision to prepare a publication is made. The NRC's Publishing Services Branch will inform the NRC Project Manager for the publication of the assigned designator when the final manuscript is sent to the printer.

For the electronic manuscript, the Contractor shall prepare the text in Microsoft Word, and use any of the following file types for charts, spreadsheets, and the like.

File Types to be Used for NUREG-Series Publications

File Type File Extension

Microsoft®Word® .doc

Microsoft® PowerPoint® .ppt

Microsoft®Excel .xls

Microsoft®Access .mdb

Portable Document Format .pdf

This list is subject to change if new software packages come into common use at NRC or by our licensees or other stakeholders that participate in the electronic submission process. If a portion of your manuscript is from another source and you cannot obtain an acceptable electronic file type for this portion (e.g., an appendix from an old publication), the NRC can, if necessary, create a tagged image file format (file extension.tif) for that portion of your report.

Note that you should continue to submit original photographs, which will be scanned, since digitized photographs do not print well.

If you choose to publish a compact disk (CD) of your publication, place on the CD copies of the manuscript in both (1) a portable document format (PDF); (2) a Microsoft Word file format, and

(3) an Adobe Acrobat Reader, or, alternatively, print instructions for obtaining a free copy of Adobe Acrobat Reader on the back cover insert of the jewel box.

8.0 DELIVERABLES/SCHEDULES AND/OR MILESTONES

Deliverables should be itemized with schedule or milestone due dates included. Due dates or milestones for NRC-required actions should be included. For instance, the contractor will deliver a draft document for review as one milestone, with the due date for NRC’s review and comment on the draft document as a second milestone. As a minimum, monthly letter status reports (MLSRs) and a final report must be included in the list of project deliverables.

MEETINGS AND TRAVEL

None.

NRC-FURNISHED MATERIAL

NRC and its sponsored contractors (National Institute of Standards and Technology [NIST] and/or Sandia National Laboratories [SNL]) shall provide the electrical equipment (switchgear, circuit breakers, bus bars, etc.). In addition, NIST and/or SNL may provide instrumentation and data acquisition equipment to monitor the thermal response of the experiment.

APPROPRIATE USE OF GOVERNMENT FURNISHED INFORMATION TECHNOLOGY

(IT) EQUIPMENT AND/ OR IT SERVICES/ ACCESS (APRIL 2003)

As part of contract performance the NRC may provide the contractor with information technology (IT) equipment and IT services or IT access as identified in the statement of work or subsequently as identified in the project. Government furnished IT equipment, or IT services, or IT access may include but is not limited to computers, copiers, facsimile machines, printers, pagers, software, phones, Internet access and use, and email access and use. The contractor (including the contractor's employees, consultants and subcontractors) shall use the NRC furnished IT equipment, and/or IT provided services, and/or IT access solely to perform the necessary efforts required under the contract. The contractor (including the contractor's employees, consultants and subcontractors) are prohibited from engaging or using the NRC IT equipment and government provided IT services or IT access for any personal use, misuse, abuses or any other unauthorized usage.

The contractor is responsible for monitoring its employees, consultants and subcontractors to ensure that NRC furnished IT equipment and/or IT services, and/or IT access are not being used for personal use, misused or abused.

The NRC reserves the right to withdraw or suspend the use of its government furnished IT equipment, IT services and/ or IT access arising from contractor personal usage, or misuse or abuse; and/or to disallow any payments associated with contractor (including the contractor's employees, consultants and subcontractors) personal usage, misuses or abuses of IT equipment, IT services and/or IT access; and/or to terminate the project arising from violation of this provision.

NRC-HQ-13-R-04-0011

A.1 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (FEB 2012)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition is 541690.

(b) Offerors shall provide a technical and price quote that includes:

TECHNICAL QUOTE:

(1) Discussion of the background, objectives, and work requirements of the Statement of Work (including offeror’s laboratory is ISO 17025 accredited by the American Association of Laboratory Accreditation) as analyzed by the Offeror;

(2) Discussion of proposed methods and techniques for completing each task;

(3) Discussion which supports how each task will be evaluated for full performance and acceptability of work from the offeror’s viewpoint;

(4) Discussion of any anticipated major difficulties and problem areas, along with potential recommended approaches for their resolution;

(5) Discussion of major logistical considerations;

(6) A Management Plan that is simple, easy to read, and clearly and concisely describe project responsibilities and personnel, any proposed subcontracting arrangements, communication and coordination, scheduling of all tasks and subtasks, meetings, and deliverables. All staff needed to conduct the work and produce all required training and deliverables must be identified.

(7) Proposed key personnel and a description of your current personnel resources to include:

(a) Resumes with a description of the experience and capability for all key personnel proposed for your project team. Descriptions shall address such items as the individual's background, education, work experience, and accomplishments. Show the knowledge that key personnel have gained through completed and ongoing efforts that are similar in nature to this effort.

(b) A description of the offerors current personnel resources for this activity, which addresses the offerors capabilities and experience relating to the attached Statement of Work;

(8) Past Performance Information. Provide three past performance references of similar efforts performed by your organization for the last three years. Include a description of the project, project title, contract number, contract amount, client identification including agency or company name, contracting and technical reviewing official, address, telephone number, and e-mail address. Your response must demonstrate that both your organization and proposed key personnel can successfully complete this project.

Page Limitation: The technical quote should not exceed 10 pages, excluding resumes and past performance information.

PRICE QUOTE:

Your price quote shall be a separate volume from your technical quote and must include:

• Identification of the labor category to be utilized for this effort

• A description of the skills and experience of the labor category

• The firm-fixed price hourly rate(s) proposed for the labor category

• The estimated hours proposed for labor category

• Any other proposed associated costs, including but not limited to ODCs and travel, for calculating the total proposed cost for this effort.

• Subcontractor rate information shall also be included, if applicable.

ASSUMPTIONS, CONDITIONS, OR EXCEPTIONS

Offerors must submit, under separate cover, all (if any) assumptions, conditions, or exceptions with any of the terms and conditions of the Statement of Work. If not noted in this section of your quote, it will be assumed that the offeror proposes no assumptions for award, and agrees to comply with all of the terms and conditions as set forth herein. It is not the responsibility of the Government to seek out and identify assumptions, conditions, or exceptions buried within the offeror’s quote.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers.

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.

Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.

(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.

(i) Availability of requirements documents cited in the solicitation.

(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--

GSA Federal Supply Service Specifications Section Suite 8100 470 East L'Enfant Plaza, SW, Washington, DC 20407

Telephone (202) 619-8925 Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (http://assist.daps.dla.mil).

(ii) Quick Search (http://assist.daps.dla.mil/quicksearch).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by?

(i) Using the ASSIST Shopping Wizard (http://assist.daps.dla.mil/wizard);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Data Universal Numbering System (DUNS) Number. (Applies to all offers exceeding $3,000, and offers of $3,000 or less if the solicitation requires the Contractor to be registered in the Central Contractor Registration (CCR) database. The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address. The DUNS +4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. An offeror within the United States may contact Dun and Bradstreet by calling 1-866- 705-5711 or via the internet at http://www.fedgov.dnb.com/webform. An offeror located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The offeror should indicate that it is an offeror for a Government contract when contacting the local Dun and Bradstreet office.

(k) Central Contractor Registration. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the CCR database accessed through https://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.

(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(4) A summary of the rationale for award;

(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

A.2 52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(1) Adequacy of existing infrastructure (Pass/Fail) The contractors’ proposal shall demonstrate that its existing infrastructure meets or exceeds the requirements of the SOW with regard to the electrical characteristic requirements of the high power testing system (voltage, current, time).

The laboratory shall be ISO 17025 accredited by the American Association of Laboratory Accreditation. The proposal will not be evaluated further and will be found to be technically unacceptable if the NRC cannot determine adequacy solely on the basis of the written proposal.

(2) Technical and Management Approach (40 Points) Extent to which the offeror demonstrates a thorough understanding of the required tasks and deliverables described in the SOW and the extent to which the offeror demonstrates a coherent plan to accomplish the requirements within budget, resolve problems, assure quality, and meet schedules. Proposed strengths and weaknesses will also be evaluated.

(3) Personnel Qualifications (25 Points)

The quality and depth of experience of individual personnel in working on similar projects; e.g., similarity in topic, dollar value, workload, duration, and complexity. The quality and depth of how the Project Manager will supervise and coordinate the workforce. Appropriate mix and balance of education and training of any team members.

(3) Past Performance (35 Points) Extent to which the offeror demonstrates satisfactory performance and customer satisfaction on past contracts in the past 3 years which are similar in dollar value, complexity size, and scope to the requirements of stated in the SOW.

The history of high-quality reports and other deliverables, history of staying on schedule and within budget.

(4) Cost/Price

a. The cost/price evaluation will determine whether the proposed cost/pricing for the effort is complete, and reasonable in relation to the solicitation requirements; and proposed cost/pricing must be entirely compatible with the Technical Approach and Management Plan portion of the proposal.

b. Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

c. A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

The Government reserves the right to make an award to other than the lowest cost/priced offeror or to the offeror with the highest technical score if the Contracting Officer determines that to do so would result in the best value to the Government. The Government reserves the right to award a contract without discussions if the Contracting Officer determines that the initial offer(s) is/are providing the Best Value and discussions are not necessary.

A.3 52.216-31 TIME-AND-MATERIALS/LABOR-HOUR PROPOSAL REQUIREMENTS-- COMMERCIAL

ITEM ACQUISITION (FEB 2007)

(a) The Government contemplates award of a Time-and-Materials or Labor-Hour type of contract resulting from this solicitation.

(b) The offeror must specify fixed hourly rates in its offer that include wages, overhead, general and administrative expenses, and profit. The offeror must specify whether the fixed hourly rate for each labor category applies to labor performed by--

(1) The offeror;

(2) Subcontractors; and/or

(3) Divisions, subsidiaries, or affiliates of the offeror under a common control.

A.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS-- COMMERCIAL ITEMS (APR

2012)

An offeror shall complete only paragraph (b) of this provision if the offeror has completed the annual representations and certifications electronically via https://www.acquisition.gov. If an offeror has not completed the annual representations and certifications electronically at the ORCA website, the offeror shall complete only paragraphs (c) through (o) of this provision.

(a) Definitions. As used in this provision--

"Economically disadvantaged women-owned small business (EDWOSB) concern" means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service--

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

"Inverted domestic corporation", as used in this section, means a foreign incorporated entity which is treated as an inverted domestic corporation under 6 U.S.C. 395(b), i.e., a corporation that used to be incorporated in the United States, or used to be a partnership in the United States, but now is incorporated in a foreign country, or is a subsidiary whose parent corporation is incorporated in a foreign country, that meets the criteria specified in 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c). An inverted domestic corporation as herein defined does not meet the definition of an inverted domestic corporation as defined by the Internal Revenue Code at 26 U.S.C. 7874.

"Manufactured end product" means any end product in Federal Supply Classes (FSC) 1000-9999, except--

(1) FSC 5510, Lumber and Related Basic Wood Materials;

(2) Federal Supply Group (FSG) 87, Agricultural Supplies;

(3) FSG 88, Live Animals;

(4) FSG 89, Food and Related Consumables;

(5) FSC 9410, Crude Grades of Plant Materials;

(6) FSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) FSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) FSC 9610, Ores;

(9) FSC 9620, Minerals, Natural and Synthetic; and

(10) FSC 9630, Additive Metal Materials.

"Place of manufacture" means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

"Restricted business operations" means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate-

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

"Sensitive technology"--

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

"Service-disabled veteran-owned small business concern"--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

"Small business concern" means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

"Subsidiary" means an entity in which more than 50 percent of the entity is owned--

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

"Veteran-owned small business concern" means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans;

and

(2) The management and daily business operations of which are controlled by one or more veterans.

"Women-owned business concern" means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.

"Women-owned small business concern" means a small business concern--

(1) That is at least 51 percent owned by one or more women; or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and

(2) Whose management and daily business operations are controlled by one or more women.

"Women-owned small business (WOSB) concern eligible under the WOSB Program" (in accordance with 13 CFR part 127), means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.

(b)(1) Annual Representations and Certifications. Any changes provided by the offeror in paragraph (b)(2) of this provision do not automatically change the representations and certifications posted electronically on the Online Representations and Certifications Application (ORCA) website.

(2) The offeror has completed the annual representations and certifications electronically via the ORCA website accessed through https://www.acquisition.gov. After reviewing the ORCA database information, the offeror verifies by submission of this offer that the representations and certifications currently posted electronically at FAR 52.212-3, Offeror Representations and Certifications--Commercial Items, have been entered or updated in the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201), except for paragraphs .

(c) Offerors must complete the following representations when the resulting contract will be performed in the United States or its outlying areas. Check all that apply.

(1) Small business concern. The offeror represents as part of its offer that it [ ] is, [ ] is not a small business concern.

(2) Veteran-owned small business concern. [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents as part of its offer that it [ ] is, [ ] is not a veteran-owned small business concern.

(3) Service-disabled veteran-owned small business concern. [Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph (c)(2) of this provision.] The offeror represents as part of its offer that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(4) Small disadvantaged business concern. [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents, for general statistical purposes, that it [ ] is, [ ] is not a small disadvantaged business concern as defined in 13 CFR 124.1002.

(5) Women-owned small business concern. [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents that it [ ] is, [ ] is not a women-owned small business concern.

Note: Complete paragraphs (c)(8) and (c)(9) only if this solicitation is expected to exceed the simplified acquisition threshold.

(6) WOSB concern eligible under the WOSB Program. [Complete only if the offeror represented itself as a women-owned small business concern in paragraph (c)(5) of this provision.] The offeror represents that--

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (c)(6)(i) of this provision is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [The offeror shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture:_________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(7) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the offeror represented itself as a WOSB concern eligible under the WOSB Program in (c)(6) of this provision.] The offeror represents that--

(i) It [ ] is, [ ] is not an EDWOSB concern, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (c)(7)(i) of this provision is accurate for each EDWOSB concern participating in the joint venture. [The offeror shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: __________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

Note to paragraphs (c)(8) and (9): Complete paragraphs (c)(8) and (c)(9) only if this solicitation is expected to exceed the simplified acquisition threshold.

(8) Women-owned business concern (other than small business concern). [Complete only if the offeror is a women-owned business concern and did not represent itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents that it [ ] is a women-owned business concern.

(9) Tie bid priority for labor surplus area concerns. If this is an invitation for bid, small business offerors may identify the labor surplus areas in which costs to be incurred on account of manufacturing or production (by offeror or first-tier subcontractors) amount to more than 50 percent of the contract price:

(10) [Complete only if the solicitation contains the clause at FAR 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns, or FAR 52.219-25, Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting, and the offeror desires a benefit based on its disadvantaged status.]

(i) General. The offeror represents that either--

(A) It [ ] is, [ ] is not certified by the Small Business Administration as a small disadvantaged business concern and identified, on the date of this representation, as a certified small disadvantaged business concern in the CCR Dynamic Small Business Search database maintained by the Small Business Administration, and that no material change in disadvantaged ownership and control has occurred since its certification, and, where the concern is owned by one or more individuals claiming disadvantaged status, the net worth of each individual upon whom the certification is based does not exceed $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); or

(B) It [ ] has, [ ] has not submitted a completed application to the Small Business Administration or a Private Certifier to be certified as a small disadvantaged business concern in accordance with 13 CFR 124, Subpart B, and a decision on that application is pending, and that no material change in disadvantaged ownership and control has occurred since its application was submitted.

(ii) [ ] Joint Ventures under the Price Evaluation Adjustment for Small Disadvantaged Business Concerns. The offeror represents, as part of its offer, that it is a joint venture that complies with the requirements in 13 CFR 124.1002(f) and that the representation in paragraph (c)(10)(i) of this provision is accurate for the small disadvantaged business concern that is participating in the joint venture.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .