Statement of Work for Propeller In-Service Component Engineering Investigations

Approved By:__________________________________
Title:PMA-231 Propulsion and Power IPT Lead
Dated:16 June 2020

N00019-19-G-0007, N0004219XXXXXX

I

Table of Contents

1.0SCOPE1
2.0APPLICABLE DOCUMENTS1
3.0REQUIREMENTS1
3.1Investigations1
3.2JDRS Usage2

3.3 Return of EI Exhibit ………………………………………………………………………………………. 2

3.4 Enterprise-wide Contractor Manpower Reporting Application (ECMRA) ……..……………………….. 2

4.0 ACRONYMS 3

SCOPE

This Statement of Work (SOW) defines the requirements and basic tasks needed to perform Engineering Investigations (EIs) on NP2000 and 54H60 EPCS propeller system components. The contract shall be structured to provide multi-year support of engineering investigations. The scope of work to be performed includes, but is not limited to "as-received" functional checks to verify the reported discrepancy; disassembly of units to identify failures; documentation of original or previous build dimension records to those taken during disassembly; detailed physical, metallurgical and electrical examination, as necessary, to verify suspect components meet design requirements.

EIs are typically requested when:

1) Safety is involved. This includes EI requests prepared in conjunction with aircraft mishaps and when unsafe conditions exist.

2) Additional technical or engineering information is required to complete an aircraft mishap investigation.

3) Aircraft readiness is seriously impaired due to poor material reliability (including Support Equipment).

4) A component is rejected after all authorized repairs are attempted.

5) Environmental issues force material or process changes conflicting with existing publications or Technical Directives.

6) Directed by higher authority.

Note: EIs are requested, authorized, and documented utilizing the Joint Discrepancy Reporting Program (JDRS) https://jdrs.mil/. Final reporting for engineering investigations remains under the cognizance of the Naval Air Systems Command Propeller Fleet Support Team (hereafter, Prop-FST) located at Cherry Point, North Carolina.

APPLICABLE DOCUMENTS

None.

REQUIREMENTS

3.1 Investigations

3.1.1 The Contractor’s system matter expert(s) (SMEs) and the cognizant Navy engineer(s) shall document a plan of investigation for each EI.

3.1.2 Once the plan of investigation documented, the Contracting Officer's Representative (COR) will validate contract number and anticipated cost are included in the exam plan.

3.1.3 The Contractor shall utilize all applicable technical drawings and associated build and test specifications/specialized test plans relevant to the unit under investigation.

3.1.4 The Contractor shall annotate in the Commercial Asset Visibility (CAV) system receipt of EI exhibit(s), and place exhibit(s) within the military crib located in building one, storage of exhibit(s) in the military crib shall not exceed 45 days. The Contractor shall contact the Propeller FST or COR in the event an exhibit(s) exceed 45 days for disposition.

3.1.5 The Contractor shall commence the investigation upon receipt of the exhibit and receipt of the Record control number (RCN).

3.1.6 The portions of each EI that the Contractor is responsible for shall be completed within 90 days from receipt of each authorization and exhibit.

3.1.7 Contractor/Propeller-FST meetings shall be held to discuss findings or to jointly perform investigations as required.

3.1.8 The Contractor shall track all expenditures for each EI. Details shall include but not be limited to materials (lab/shop), and labor costs including labor-hour breakdown by labor category (mechanic, engineering, mat lab etc.) and deliver to the cognizant Navy Engineer. (CDRL A001).

3.2 JDRS Usage

3.2.1 The Contractor shall maintain access to and utilize the JDRS website for all EIs. The Contractor shall fill the Customer Service Activity role in JDRS. This involves reporting receipt of exhibits and acknowledgement of disposition instructions.

3.2.2 The Contractor shall document negotiated plans of investigation in JDRS as the “Exam Plan”. Propeller-FST is responsible for input of approved plan into JDRS.

3.2.3 The Contractor shall deliver detailed physical examination reports, metallurgical reports, photographs, test sheets, build records, etc. to the cognizant Navy Engineer when the investigation is complete. (CDRL A002).

3.3 Return of EI Exhibit

3.3.1 Upon completion of the Contractor’s investigation, the Propeller FST will submit disposition instructions in JDRS. The Contractor shall comply with instructions to disposition exhibit.

3.3.2 The Contractor shall not turn an EI exhibit back into supply without disposition instructions or other guidance provided by the Propeller FST.

3.4 Enterprise-wide Contractor Manpower Reporting Application (ECMRA)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for NAWCAD via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.

4.0 ACRONYMS

CAV Commercial Asset Visibility

COR Contracting Officer’s Representative

EI Engineering Investigation

JDRS Joint Discrepancy Reporting Program

PROP-FST Propeller Fleet Support Team

SOW Statement of Work

SMEs System Matter Expert(s)

RCN Record Control Number image1.emf