Notice to Offerors Bee Rock SOL Package.pdf
PDF 7 MB Posted
- Attached to
- Slide Repair Bee Rock Federal contract opportunity
- Solicitation number
- 12445123R0020
- Issued by
- Department of Agriculture Forest Service
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 12445123R0020 Project Name: USDA Forest Service Daniel Boone National Forest Repair Bee Rock
NOTICE TO OFFERORS
This solicitation is to serve as a seed project for the Daniel Boone National Forest Road Construction MATOC, North Zone.
Solicitation NO: 12445123R0009
SF-1442 INFORMATION
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in FAR 52.211-10.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds- Construction.
Item 14: NAME AND ADDRESS OF OFFEROR: DUNS and SAM UEI number shall be included in addition to the name and address.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR QUOTE. If amendments are issued, they will be posted to www.beta.sam.gov.
Item 24: SUBMITTING INVOICES: Invoices must be comply with FAR 52.232-5, Payments under Fixed Price Construction Contracts, and submitted electronically using the Invoice Processing Platform (IPP) via www.IPP.gov.
I. PRE-QUOTE INFORMATION
ELECTRONIC QUOTE SUBMISSION. Submit an electronic copy of your proposal package to: charles.cotton@usda.gov with the following documents:
□ SF-1442, Solicitation, Offer & Award, Pages 1 and 2 o Acknowledge any amendments
□ B.1 SCHEDULE OF ITEMS
□ Annual Representations and Certifications (FAR Provision 52.204-8), Representation Regarding Certain o Telecommunications and Video Surveillance Services or Equipment (FAR Provision 52.204-24), and Certification o Regarding Responsibility Matters (FAR Provision 52.209-5). Section K of this solicitation.
□ Contractor Quote Data. This may all be in one PDF. Delineate the volumes with a dividing page
Reference/Description Page Limit VOL I: Technical Approach N/A _ BASE CONTRACT DATA ACCEPTED
N/A _ BASE CONTRACT DATA ACCEPTED
Schedule B
VOL II: Past Performance VOL III: Price
II. Award Intention. The USDA-FS intends to award one (1) task order to the LPTA Best Value proposal.
III. QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4:00 P.M. ON 04/04/2023 Questions can be submitted to charles.cotton@usda.gov.
Submittal Format and Confirmation/Receipt.
Email Subject Line: 12445123R0020_Company Name_Proposal Email: Your quote shall be emailed to :charles.cotton@usda.gov
**DO NOT WAIT TO CONFIRM RECEIPT!**
Site Visit: Meeting point is Bee Rock Campground entrance at 0900 EST 03/30/23. We will complete the Bee Rock Campground site visit then proceed to Lockegge and Big Perry 04/04/2023
04/17/2023 1700 ET
Last day for Questions:
Deadline http://www.beta.sam.gov/ http://www.ipp.gov/ mailto:charles.cotton@usda.gov mailto:charles.cotton@usda.gov
Solicitation No: 12445123R0020 Project Name: USDA Forest Service Daniel Boone National Forest Repair Bee Rock
It is the contractor’s responsibility to ensure their quote is received by the government. Your email with the PDF attached will be deposited in a secure USDA-FS file.
This solicitation and the subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the drawings, specifications, and data attached. Applicable FAR provisions and clauses in this RFQ are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at:
https://www.acquisition.gov/browse/index/far.
It is the responsibility of the offeror to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets are attached to the email solicitation.
Notice of SAMRegistration – offerors must be registered and ACTIVE in the System for Award Management (SAM) prior to submission of a quote in response to this solicitation. Failure to register prior to submission of a quote may require award to the next successful registered offeror. See FAR Subpart 4.1102.
Register online at www.sam.gov. (SAM is an official website of the U.S.
government. There is no cost to use SAM. You can use this site for FREE to register to do business with the U.S. government.).
Representations and Certifications – This solicitation is issued under NAICS 238990 All Other Specialty Trade Contractors. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications. Offerors must certify small business status for NAICS 238220 in SAM. Before submitting a quote, please ensure you have completed annual representations and certifications electronically in SAM at www.sam.gov.
Modifications to quotes - quotes may be modified or withdrawn by electronic commerce (email) if such notice is received prior to the time specified for receipt of quotes. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) data. For all modifications, the Government STRONGLY ENCOURAGES offerors to resubmit the entire quote schedule with a unit price and amount for every quote item, and a Schedule Total Modifications which make the quote ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the quote to be rejected as nonresponsive. Email Address to submit modifications to quotes for this project is charles.cotton@usda.gov.
Vets-4212 Reporting - Offerors must complete the following report, if required. See reporting requirements at: https:// www.dol.gov/agencies/vets/programs/vets4212.
□ My firm had a qualifying Federal Contract in 2020 and has complied with the reporting requirements.
□ My firm did not have a qualifying Federal Contract in 2020 and is therefore exempt from the reporting requirements.
http://www.acquisition.gov/browse/index/far http://www.acquisition.gov/browse/index/far http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/agencies/vets/programs/vets4212
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1089708
USDA-FS CSA EAST 11
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
Charles Cotton
USDA FS EAST CSA 11 Contracting Officer
CHARLES COTTON 859-745-3157
1x 03/10/2023
12445123R0018
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
SOW, Specfication, tech drawing and all other documents included in solicitation package.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
30 120 calendar days and complete it within ________________ ________________ calendar days after receiving
04/17/2023
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA EAST 11
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
CHARLES C. COTTON
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12445123R0018
Task Order Seed Project: This is a Request for Proposal (RFP) which will result in award of a firm-fixed price contract. Award will be made using the provided source selection included in Daniel Boone National Forest Road Construction MATOC Solicitation NO: 12445123R0009. This solicitation is to serve as a seed project for the Daniel Boone National Forest Road Construction MATOC, North Zone.
Daniel Boone National Forest Road Construction MATOC Solicitation NO: 12445123R0009.
Project Title: Repair Slide at Big Perry
NACIS: 237310 Highway, Street, and Bridge Construction $40M
PSC: Y1LB
Task Order: This is a Request for proposal (RFP).
The Government intends to award ONE task order to the lowest technically acceptable bid.
Site Visit will be held 30 March 2023. Meeting point is Bee Rock Campground entrance at 0900 EST. We will complete the Bee Rock Campground site visit then proceed to Lockegge and Big Perry.
Questions are due NLT 1700 EST 4 April 2023.
Period of Performance is 120 days Notice to Proceed This project is on NFSR 977 Big Perry, located adjacent to Interstate 64 eastbound, is a National Forest
System Road (NFSR) in the Cumberland Ranger District of the Daniel Boone National Forest. NFSR 977 Big
Perry is accessed via the intersection with
KY-799 (Big Perry Road) at Milepost 3.35 of
KY-799. This project stabilizes the slope failure located below the road between STA. 15+00 and STA. 17+50 as measured from
STA. 0+00 (intersection of NFSR 977 Big Perry and KY-799 Milepost 3.35). The project is necessary to maintain public access on NFSR 977 to comply with the Highway Safety Act, and correct non-point source soil erosion to comply with the Clean Water Act.
Delivery: 04/17/2023
Delivery Location Code: 531B
USDA FOREST SERVICE
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12445123R0018
MOREHEAD RANGER DSITRICT
2375 801 SOUTH
MOREHEAD KY 40351-9219 US
Period of Performance: 05/19/2023 to 09/16/2023
0001 REPAIR SLIDE NFSR 977 BIG PERRY, FHWA EMERGENCY 1 LS
REPAIR OF FEDERALLY OWNED ROADS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
001 Repair Slide NFSR 623 Bee Rock 1 Mobilization 1 LS 2 Construction Submittals 1 LS 3 Construct Survey & Staking 2 Day 4 Contractor Quality Control 20 Day 5 Public Traffic Control 1 LS 6 Erosion and Sediment Control 1 LS 7 Clearing & Grubbing 2 Day 8 Remove of Existing Structures 3 Day 9 Retaining Wall 1,000.00 SF 10 Road Reconditioning 400.00 LF 11 Repave Road 500 SY 12 Pavement Marking 400 LF 13 Demoblization 1 LS 14 $ -
Sub-Total Overhead
Profit
Repair Slide NFSR 623 Bee Rock
Item Description Total
TOTAL
Statement of Work
This project corrects road settlement issues by constructing a new retaining wall to replace the failing wall. The project is necessary to maintain safe public access to the Bee Rock campground to comply with the Highway Safety Act and correct non-point source soil erosion to comply with the Clean Water Act. The work will remove and replace the failing retaining wall at the site. The final wall type selected will be based on collected geotechnical data. The proposed wall type may be either gabion, mechanically stabilized earth, permanent ground anchor, reinforced concrete, soil nail, reinforced soil slopes, micropiles, or other wall systems. The design and implementation of the selected slide repair, including any proposed alternatives, shall be in accordance with the U.S. Department of Transportation Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, the USDA Forest Service Supplemental Specifications and roadway standards and the AASHTO Guidelines for Geometric Design of Very Low-Volume Local Roads.
The work will extend 250-ft each direction from the midpoint of failure along the centerline. The work on the fill slope (south side) of road will extend 75-ft from the centerline ending at toe of slope.
Roadway asphalt within this area shall be overlaid and any sub-base disturbed shall be reconstructed and asphalt 8-2-1 shall be laid. No work is planned on the cut slope (north side) of the road will extend up slope.
Fill will be imported from commercial rock quarries. Spoils will be hauled off-site and disposed of on private lands outside of the floodplain. Any stockpiling of materials will be done immediately adjacent to the roadway limits (i.e. along the flat shoulders and/or existing roadway).
Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, transportation, and other facilities and services necessary for proper execution and completion of the Work.
Work is identified in the following documents.
FHWA Standard Specifications (FP-14) - Refer to Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects in conjunction with this document. FHWA Standard Specifications (FP-14) at the following website; Standard Specifications (FP-14) | FHWA (dot.gov)
Forest Service Supplemental Specifications (FSSS)
Schedule of Items https://highways.dot.gov/federal-lands/specs
Map of Bee Rock Campground
The Bee Rock Campground features camping units on both sides of the river. The Laurel County side is open all year. The Pulaski County side is open from mid-April through mid-October. An overlook along Bee Rock Trail provides a scenic view of the rocks and cliffs along Rockcastle River.
The Bee Rock Overlook presents a beautiful view of the rocks and cliffs along the Rockcastle River. The cliff known as Bee Rock was once hollow. Folk tales say that there were so many honey bees here that they darkened the skies. When the wild bees invaded local beehives, beekeepers dynamited the cliff and destroyed the hollow Bee Rock. According to local legend, there was so much honey that it flowed down the cliff and into the Rockcastle River.
The campground features Old Sublimity Bridge, a historic structure built by the Civilian Conservation Corps in the late 1930s. The stone used in the abutments was quarried from the adjacent sandstone cliffs. The bridge has been restored for foot travel only.
Campfires are permitted in fire rings only. Make sure fires are out before retiring at night or when leaving your campsite.
London District 761 S. Laurel Rd.
London, KY 40744 606-864-4163 Directions From I-75, take exit 38 (London). Turn west on KY 192; go 18 miles to the bridge over Rockcastle River.
Open Dates The Laurel Co. side is open year round; the Pulaski Co.
side is open from April to October. Call for exact dates.
Parking Parking is available at campsites, boat ramp and overflow parking area.
Fees U.S. Fee Area.
Campsites Laurel side: 9 sites Pulaski side: 19 sites.
Restrooms Accessible vault toilets Trash Bear-resistant dumpsters Water Drinking water is available except during winter months.
Accessibility Some campsites have accessible features.
For more information Guides like this are available at www.fs.usda.gov/dbnf
Put trash in a bear-resistant trash can or other receptacle provided by the Forest Service.
Put food, trash and other odorous items in a bear-resistant container.
Store food and trash in a closed motor vehicle with a solid top or a closed hard-body trailer.
CAUTION: Low lying areas are prone to flooding, so be alert for flooding when driving, camping or crossing streams in this area. Swift currents and undertows can make s wimming and wading very hazardous.
Nearby Trails: Bee Rock Loop Trail #529, Rockcastle Narrows #401, Rockcastle Narrows #401A, Winding Stair Gap #402, Sheltowee Trace #100 Section 25.
Quad: Ano Closest Town: London County: Pulaski and Laurel Latitude: 37.028679 Longitude: -84.321573
Trails are closed to motorized vehicles.
Trails and campground are closed to horses.
Consumption of alcohol and open containers of alcohol are prohibited.
Camping and firebuilding in rock shelters is prohibited.
No climbing or rappelling from cliffs, arches or other rock formations at Bee Rock Overlook.
No wading, swimming or fishing at boat ramp.
U.S. Department of Agriculture | Forest Service Southern Region | Daniel Boone National Forest
Supervisors Office | 1700 Bypass Rd. | Winchester, KY 40391 | 859-745-3100 USDA is an equal opportunity provider, employer and lender.
Map of Project Site
³100 0 10050
Meters
MM White Dec. 14, 2021
Legend BRCG Retaining Wall Project Location BRCG Road (Pulaski County Side) Roads NF System Lands
Photos of Project Site
Pictures of the Bee Rock Campground Road Retaining Wall to be Repaired
Figure 1: Facing west along BRCG road toward Hwy 192. Retaining wall on left.
Figure 2: Overview of retaining wall failure, facing west
Figure 3: Along BRCG road, facing east, failed retaining wall in center of picture
Figure 4: Below the failed retaining wall, facing north (note rails that should be vertical)
"General Decision Number: KY20230107 01/06/2023
Superseded General Decision Number: KY20220107
State: Kentucky
Construction Type: Highway
Counties: Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd, Garrard, Green, Harlan, Hart, Jackson, Johnson, Knott, Knox, Laurel, Lawrence, Lee, Leslie, Letcher, Lincoln, Magoffin, Martin, McCreary, Menifee, Metcalfe, Monroe, Morgan, Owsley, Perry, Pike, Powell, Pulaski, Rockcastle, Russell, Taylor, Wayne, Whitley and Wolfe Counties in Kentucky.
HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,|
| | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023
SUKY2015-047 10/20/2015
Rates Fringes
BOILERMAKER......................$ 24.65 12.94
BRICKLAYER
Bricklayer..................$ 22.90 8.50 Stone Mason.................$ 21.50 8.50
CARPENTER
Carpenter...................$ 24.90 14.50 Piledriver..................$ 24.55 14.50
CEMENT MASON.....................$ 21.25 8.50
ELECTRICIAN
Electrician.................$ 29.36 10.55 Equipment Operator..........$ 26.90 10.31 Groundsman..................$ 17.79 8.51 Lineman.....................$ 30.09 10.94 When workmen are required to work from bosum chairs, trusses, stacks, tanks, scaffolds, catwalks, radio and T.V. towers, structural steel (open, unprotected, unfloored raw steel), and bridges or similar hazardous locations where workmen are subject to fall, except where using JLG's and bucket trucks up to 75 feet: Add 25% to workman's base rate for 50 to 75 feet, and add 50% to workman's base rate for over 75 feet.
IRONWORKER.......................$ 27.56 20.57
LABORER
Group 1.....................$ 21.80 12.36 Group 2.....................$ 22.05 12.36 Group 3.....................$ 22.10 12.36 Group 4.....................$ 22.70 12.36 GROUP 1: Aging and Curing of Concrete (Any Mode or Method), Asbestos Abatement Worker, Asphalt Plant Laborers, Asphalt Laborers, Batch Truck Dumpers, Carpenter Tenders, Cement Mason Tenders, Cleaning of Machines, Concrete Laborers, Demolition Laborers, Dredging Laborers, Drill Tender, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level D, Flagmen, Grade Checkers, All Hand Digging and Hand Back Filling, Highway Marker Placers, Landscaping Laborers, Mesh Handlers and Placers, Puddler, Railroad Laborers, Rip-rap and Grouters, Right of Way Laborers, Sign, Guard Rail and Fence Installers (All Types), Signalmen, Sound Barrier Installer, Storm and Sanitary Sewer Laborers, Swampers, Truck Spotters and Dumpers, Wrecking of Concrete Forms, General Cleanup GROUP 2: Batter Board Men (Sanitary and Storm Sewer), Brickmason Tenders, Mortar Mixer Operator, Scaffold Builders, Burner and Welder, Bushammers, Chain Saw Operator, Concrete Saw Operators, Deckhand Scow Man, Dry Cement Handlers, Environmental Laborers - Nuclear, Radiation, Toxic and Hazardous Waste - Level C, Forklift Operators for Masonry, Form Setters, Green Concrete Cutting, Hand Operated Grouter and Grinder Machine Operator, Jack Hammers, Lead Paint Abatement, Pavement Breakers, Paving Joint Machine, Pipe Layers - Laser Operators (Non-metallic), Plastic Pipe Fusion, Power Driven Georgia Buggy and Wheel Barrow, Power Post Hole Diggers, Precast Manhole Setters, Walk-behind Tampers, Walk-behind Trenchers, Sand Blasters, Concrete Chippers, Surface Grinders, Vibrator Operators, Wagon Drillers GROUP 3: Air Track Driller (All Types), Asphalt Luteman and Rakers, Gunnite Nozzleman, Gunnite Operators and Mixers, Grout Pump Operator, Powderman and Blaster, Side Rail Setters, Rail Paved Ditches, Screw Operators, Tunnel Laborers (Free Air), Water Blasters GROUP 4: Caisson Workers (Free Air), Cement Finishers, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level A and B, miners and Drillers (Free Air), Tunnel Blasters, and Tunnel Mockers (Free Air), Directional and Horizontal Boring, Air Track Drillers (All Types), Powder Man and Blasters, Troxler and Concrete Tester if Laborer is Utilized
PAINTER
All Excluding Bridges.......$ 19.92 9.57 Bridges.....................$ 23.92 10.07
PLUMBER..........................$ 22.52 7.80
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 29.95 14.40 Group 2.....................$ 29.95 14.40 Group 3.....................$ 27.26 14.40 Group 4.....................$ 26.96 14.40 GROUP 1: Auto Patrol, Batcher Plant, Bituminous Paver, Cable- Way, Clamshell, Concrete Mixer (21 cu ft or over), Concrete Pump, Crane, Crusher Plant, Derrick, Derrick Boat, Ditching and Trenching Machine, Dragline, Dredge Engineer, Elevator (regardless of ownership when used for hoisting any building material), Elevating Grader and all types of Loaders, Hoe-type Machine, Hoisting Engine, Locomotive, LeTourneau or Carry-all Scoop, Bulldozer, Mechanic, Orangepeel Bucket, Piledriver, Power Blade, Roller (Bituminous), Roller (Earth), Roller (Rock), Scarifier, Shovel, Tractor Shovel, Truck Crane, Well Point, Winch Truck, Push Dozer, Grout Pump, High Lift, Fork Lift (regardless of lift height), all types of Boom Cats, Multiple Operator, Core Drill, Tow or Push Boat, A-Frame Winch Truck, Concrete Paver, Grade-All, Hoist, Hyster, Material Pump, Pumpcrete, Ross Carrier, Sheepfoot, Sideboom, Throttle- Valve Man, Rotary Drill, Power Generator, Mucking Machine, Rock Spreader attached to Equipment, Scoopmobile, KeCal Loader, Tower Cranes,(French, German and other types), Hydrocrane, Tugger, Backfiller Gurries, Self-propelled Compactor, Self-Contained Hydraulic Percussion Drill GROUP 2: All Air Compressors (200 cu ft/min or greater), Bituminous Mixer, Concrete Mixer (21 cu. ft. or over), Welding Machine, Form Grader, Tractor (50 hp and over), Bull Float, Finish Machine, Outboard Motor Boat, Brakeman, Mechanic Tender, Whirly Oiler, Tract-air, Road Widening Trencher, Articulating Trucks GROUP 3: Greaser on Grease Facilities servicing Heavy Equipment GROUP 4: Bituminous Distributor, Cement Gun, Conveyor, Mud Jack, Paving Joint Machine, Pump, Tamping Machine, Tractor (under 50 hp), Vibrator, Oiler, Air Compressor (under 200 cu ft per minute), Concrete Saw, Burlap and Curing Machine, Hydro Seeder, Power Form Handling Equipment, Deckhand Oiler, Hydraulic Post Driver
SHEET METAL WORKER...............$ 20.40 7.80
TRUCK DRIVER
Driver (3 Tons and Over), Driver (Truck Mounted Rotary Drill)...............$ 23.74 14.50 Driver (3 Tons and Under), Tire Changer and Truck
Mechanic Tender.............$ 23.53 14.50 Driver (Semi-Trailer or Pole Trailer), Driver (Dump Truck, Tandem Axle), Driver of Distributor.......$ 23.40 14.50 Driver on Mixer Trucks (All Types).................$ 23.45 14.50 Driver on Pavement Breakers.$ 23.55 14.50 Driver, Euclid and Other Heavy Earth Moving Equipment and Low Boy.......$ 24.31 14.50 Driver, Winch Truck and A- Frame when used in Transporting Materials......$ 23.30 14.50 Greaser on Greasing Facilities..................$ 24.40 14.50 Truck Mechanic..............$ 23.50 14.50 Truck Tender and Warehouseman................$ 23.20 14.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
| SCH B Bee Rock.pdf |
| Table 1 |
File details come from the government source that posted it. Updated .