Notice ID 70Z03023QCLEV0011 - Statement of Work.pdf
PDF 72 KB Posted
- Attached to
- Not listed
- Solicitation number
- 70Z03023QCLEV0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice ID 70Z03023QCLEV0011 - PIC001.jpg | JPG image | |
| Notice ID 70Z03023QCLEV0011 - PIC004.jpg | JPG image | |
| Notice ID 70Z03023QCLEV0011 - PIC003.jpg | JPG image | |
| Notice ID 70Z03023QCLEV0011 - PIC006.jpg | JPG image | |
| Notice ID 70Z03023QCLEV0011 - PIC002.jpg | JPG image | |
| Notice ID 70Z03023QCLEV0011 - PIC005.jpg | JPG image | |
| 70Z03023QCLEV0011A0001 - SF30.pdf | ||
| Notice ID 70Z03023QCLEV0011 - Provisions and Clauses.pdf | ||
| Wage Determination - Oswego County NY.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Coast Guard Station Oswego Notice ID 70Z03023QCLEV0011
Updated 05/09/2023 Page 1/3
STATEMENT OF WORK (SOW)
FOR
Station Oswego Female Wet Head Rebuild
1.0 GENERAL
1.1 BACKGROUND
The female wethead was an add on built sometime in the last 20 years. Design was poor and there are no windows, poor ventilation, and a subpar design.
1.2 SCOPE
Vendor should completely gut the area and rebuild with windows, adequate ventilation, redesign the layout so direct visibility into the space is not achieved by opening the door and an adequate changing area is provided.
1.3 OBJECTIVE
The awarded contractor gut the area and rebuild with modern fixtures. The vendor will furnish, install, and service equipment listed below:
The vendor will replace the shower with new, potentally installing a second and make any repairs as needed. Vendor will replace the toilet and enclosure with new. Vendor will inspect floor drains and install traps if needed. Vendor will insure all plumbing is in good working order free of cracks rust not needing replaced. If plumbing is found to be in poor condition replace as needed. Vendor will replace all flooring with new. Vendor will install high privacy opening windows to facilitate fresh air when weather permits. Vendor will install a heating system to reduce moister in the space. Vendor will install adeadquate ventilation system.
The vendor will provide dumpster and remove all debris. Any obstructions will be removed and replaced to original condition.
The vendor will also furnish any additional items that maybe needed to complete this project.
1.4 APPLICABLE DOCUMENTS
See three pictures in solicitation package.
2.0 SPECIFIC REQUIREMENTS/TASKS
Please see 1.3 Objective
3.0 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this
SOW.
3.1 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s file://///hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc
Updated 05/09/2023 Page 2/3
Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
3.2 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.3 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.
Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed June 15, 2023.
4.1 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities with frequent visits to the United States Coast Guard at USCG Station Oswego 1 Lake Street Oswego, NY 13126 Telephone—315-343-1551 POC: MK1 Jason Muller
4.2 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1530 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.3 TRAVEL
Contractor travel shall not be required for this requirement.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government shall provide power and water to the Contractor in support of this contract.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.
Updated 05/09/2023 Page 3/3
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
7.2 The Contractor shall have 30 business days to make corrections and redeliver.
File details come from the government source that posted it. Updated .