Northside_Park_Bid_Sheets.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Northside Park Site Improvements
- Solicitation number
- RFP #27032
- Issued by
- Greenville County, South Carolina
About this file
This is a bid sheet for Northside Park Site Improvements project located at 101 West Darby Road, Taylors, SC 29687, issued by the County of Greenville, South Carolina. The project encompasses two phases of park renovations plus one alternate phase, with Phase 1 addressing the east side of the park and Phase 2 addressing the west side. The scope of work includes demolition of existing structures and pavement, site improvements such as concrete and asphalt paving, installation of site furnishings and amenities, grading and utility work, landscaping, and stormwater management. Phase 1 demolition includes removal of 1,319 square feet of concrete pavement, 11,664 square feet of asphalt pavement, 368 linear feet of chain link fence, 11 trees, curbing, and various fixtures. Phase 1 site work includes installation of handrails, receptacles, tables, drinking fountains, approximately 2,282 square yards of mill and overlay asphalt paving, 16,660 square feet of recreation court paving, 6,889 square feet of concrete sidewalk, and placement of chain link fencing, handicap signage, and a 27-by-40-foot pavilion shade structure. Phase 2 demolition encompasses 3,961 square feet of concrete pavement, 6,662 square feet of asphalt pavement, and 1,627 linear feet of chain link fence removal. Phase 2 site work includes 6,130 square yards of mill and overlay asphalt paving, 10,607 square feet of concrete walkway, 2,980 linear feet of concrete curb and gutter, and various site furnishings. The Alternate Phase addresses resurfacing of the waterpark parking lot at 4,365 square yards of mill and overlay asphalt paving with pavement markings. Both phases include grading, fine grading, landscaping with trees, shrubs, groundcover, sod installation, and mulch placement.
The bid sheet provides quantities and units of measure for all line items but does not include completed unit costs, total costs, or subtotal pricing information, indicating this is a blank bid form for contractor completion. No response date, due date, site visit requirements, bidder's meeting information, or award date is specified in this document. The document does not address contract term, renewal options, pricing terms, set-asides, incumbent contractor status, funding sources, or budget amounts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PH 1
ITEM QTY UNIT UNIT COST TOTAL
| A. OVERALL PROJECT COSTS | ||||
| 1 | Mobilization, administration, staking, traffic control | 1 | LS | |
| 2 | Erosion control | 1 | LS | |
| SUBTOTAL: |
| B. DEMOLITION | ||||
| 1 | Existing concrete pavement to be sawcut and removed | 1319 | SF | |
| 2 | Existing asphalt pavement to be sawcut and removed | 11664 | SF | |
| 3 | Existing curb and gutter to be removed | 51.2 | LF | |
| 4 | Existing tree to be removed | 11 | EA | |
| 5 | Existing chain link fence to be removed; including all gates, posts & footings | 368 | LF | |
| 6 | Existing concrete extruded curb to be removed | 855 | LF | |
| 7 | Existing drinking fountain to be removed including entire masonry base | 1 | EA | |
| 8 | Existing handicap parking sign to be removed | 1 | EA | |
| 9 | Existing concrete wheelstop to be removed | 2 | EA | |
| 10 | Existing bench to be removed | 1 | EA | |
| 11 | Manual removal of existing curb by pond | 10 | LF | |
| 12 | Removal of tree stumps | 6 | EA | |
| 13 | Removal of gravel at shelter drive | 1847 | SF | |
| 14 | Removal of gate post at entrance | 2 | EA | |
| 15 | Remove existing sand volleyball court & all related nets, poles, borders | 1 | LS | |
| SUBTOTAL: |
| C. SITE WORK | ||||
| 1 | Stair/Ramp Handrail | 220 | LF | |
| 2 | Square Receptacle by UltraSite; model #TRSQ-32; Green recycled plastic slats &lid | 4 | EA | |
| 3 | Extra Heavy-Duty Rectangular Table by UltraSite; Model #238-UltraCoat;8' length; surface mount; Black seat & frame color; perforated pattern+ | 6 | EA | |
| 4 | Hamilton Bench with Back by UltraSite;6' length; black color; surface mount | 0 | EA | |
| 5 | Bi-Level Outdoor Drinking Fountain with Water Bottle Filling Station by Murdock; Model #GYQ85; color: Textured Fairway Green | 1 | EA | |
| 6 | Asphalt paving; mill & overlay existing | 2282 | SY | |
| 7 | Asphalt recreation court (includes paving and paving) | 16660 | SF | |
| 8 | Recreation court netting | 8 | EA | |
| 9 | Asphalt paving; standard duty | 2500 | SY | |
| 10 | Tennis court resurfacing | 24000 | SF | |
| Sidewalk lollipop loop | ||||
| 11 | Concrete walk | 6889 | SF | |
| 12 | Heavy-duty concrete paving | 642 | SF | |
| 13 | Concrete Curb and gutter | 2301 | LF | |
| 14 | Rolled concrete curb | 10 | LF | |
| 15 | 6" concrete curb | 0 | LF | |
| 16 | Concrete wheel stop; 6' long | 0 | EA | |
| 17 | Detectable Warning Plates; Cast-In-Place | 93 | SF | |
| 18 | Painted pavement marking; 4" solid white line | 1000 | LF | |
| 19 | Painted pavement marking; 8" wide crosswalk striping | 110 | LF | |
| 20 | Painted pavement marking; 4" solid blue line | 261 | LF | |
| 21 | Chain link fence; 4' black vinyl | 235 | LF | |
| 22 | Chain link fence; 10' black vinyl | 588 | LF | |
| 23 | 6" Schedule 40 PVC sleeve | 132 | LF | |
| 24 | Handicap parking and raised crosswalk sign | 7 | EA | |
| 25 | Painted handicap symbol | 3 | EA | |
| 26 | Tree protection fencing | 149 | LF | |
| 27 | 27'x40' Pavilion Shade Structure | 1 | LS | |
| SUBTOTAL: |
| D. GRADING & UTILITIES | ||||
| 1 | Grading (cut/fill) | 833 | CY | |
| 2 | Fine grading | 7468 | SY | |
| 3 | 6" Schedule 40 PVC sleeve | 132 | LF | |
| 4 | Water meters etc., adjust to final grades | 1 | EA | |
| 5 | Riprap | 80 | TONS | |
| 6 | Storm drain pipe | 556 | LF | |
| 7 | Storm drain inlet | 5 | EA | |
| SUBTOTAL: |
| E. LANDSCAPING | ||||
| 1 | Tree | 10 | EA | |
| 2 | Shrub | 6 | EA | |
| 3 | Groundcover | 645 | EA | |
| 4 | Sod | 26627 | SF | |
| 5 | Mulch | 100 | CY | |
| SUBTOTAL: |
TOTAL (PHASE 1)
&"Times New Roman,Bold"&14Bid Sheet Northside Park Improvements Phase 1 - East Side of Park
PH 2
ITEM QTY UNIT UNIT COST TOTAL
| A. OVERALL PROJECT COSTS | ||||
| 1 | Mobilization, administration, staking, traffic control | 1 | LS | |
| 2 | Erosion control | 1 | LS | |
| SUBTOTAL: |
| B. DEMOLITION | ||||
| 1 | Existing concrete pavement to be sawcut and removed | 3961 | SF | |
| 2 | Existing asphalt pavement to be sawcut and removed | 6662 | SF | |
| 3 | Existing curb and gutter to be removed | 0 | LF | |
| 4 | Existing tree to be removed | 2 | EA | |
| 5 | Existing chain link fence to be removed; including all gates, posts & footings | 1627 | LF | |
| 6 | Existing concrete extruded curb to be removed | 1940 | LF | |
| 7 | Existing drinking fountain to be removed including entire masonry base | 2 | EA | |
| 8 | Existing handicap parking sign to be removed | 3 | EA | |
| 9 | Existing concrete wheelstop to be removed | 4 | EA | |
| 10 | Existing bench to be removed | 3 | EA | |
| 11 | Removal of tree stumps | 1 | EA | |
| 12 | Remove existing sand volleyball court & all related nets, poles, borders | 0 | LS | |
| SUBTOTAL: |
| C. SITE WORK | ||||
| 1 | Stair/Ramp Handrail | 96 | LF | |
| 2 | Square Receptacle by UltraSite; model #TRSQ-32; Green recycled plastic slats &lid | 4 | EA | |
| 3 | Extra Heavy-Duty Rectangular Table by UltraSite; Model #238-UltraCoat;8' length; surface mount; Black seat & frame color; perforated pattern+ | 2 | EA | |
| 4 | Hamilton Bench with Back by UltraSite;6' length; black color; surface mount | 2 | EA | |
| 5 | Wall Mounted Bottle Filler with Angled Bi-Level Drinking Fountain by Murdock; model GYE25-R; Green color; install per manufacturer's instructions | 1 | EA | |
| 6 | Asphalt paving; mill & overlay existing | 6130 | SY | |
| 7 | Asphalt recreation court | 0 | SF | |
| 8 | Asphalt paving; standard duty | 431 | SY | |
| 9 | Concrete walk | 10607 | SF | |
| 10 | Heavy-duty concrete paving | 0 | SF | |
| 11 | Concrete Curb and gutter | 2980 | LF | |
| 12 | Rolled concrete curb | 62.4 | LF | |
| 13 | 6" concrete curb | 33.4 | LF | |
| 14 | Concrete wheel stop; 6' long | 8 | EA | |
| 15 | Detectable Warning Plates; Cast-In-Place | 150 | SF | |
| 16 | Painted pavement marking; 4" solid white line | 3788 | LF | |
| 17 | Painted pavement marking; 8" wide crosswalk striping | 71.1 | LF | |
| 18 | Painted pavement marking; 4" solid blue line | 632 | LF | |
| 19 | Chain link fence; 5' | 1736 | LF | |
| 20 | Chain link fence; 10' black vinyl | 0 | LF | |
| 21 | 6" Schedule 40 PVC sleeve | 0 | LF | |
| 22 | Handicap parking and raised crosswalk sign | 8 | EA | |
| 23 | Painted handicap symbol | 8 | EA | |
| 24 | Tree protection fencing | 685 | LF | |
| 25 | Shade Structure | 0 | LS | |
| 26 | Level Spreader poured concrete | 536 | LF | |
| SUBTOTAL: |
| D. GRADING & UTILITIES | ||||
| 1 | Grading (cut/fill) | 63 | CY | |
| 2 | Fine grading | 7740 | SY | |
| 3 | 6" Schedule 40 PVC sleeve | 0 | LF | |
| 4 | Water meters etc., adjust to final grades | 1 | EA | |
| 5 | Storm drain pipe | 0 | LF | |
| 6 | Storm drain inlet | 0 | EA | |
| SUBTOTAL: |
| E. LANDSCAPING | ||||
| 1 | Tree | 6 | EA | |
| 2 | Shrub | 0 | EA | |
| 3 | Groundcover | 0 | EA | |
| 4 | Sod | 35414 | SF | |
| 5 | Mulch | 0 | CY | |
| SUBTOTAL: |
TOTAL (PHASE 2)
&"Times New Roman,Bold"&14&K000000Bid Sheet
Phase 2 - West Side of Park&11 &12&U
ALT
ITEM QTY UNIT UNIT COST TOTAL
| ALTERNATE 1 (RESURFACING IN WATER PARK PARKING LOT) | ||||
| 1 | Mobilization, administration, staking, traffic control | 1 | LS | |
| 2 | Erosion control | 1 | LS | |
| 3 | Asphalt repaving in waterpark lot; mill & overlay existing | 4365.3333333333 | SY | |
| 4 | Painted pavement marking; 4" solid white line | 1025 | LF | |
| 5 | Painted pavement marking; 4" solid blue line | 139 | LF | |
| SUBTOTAL: | ||||
| TOTAL (Alt. 1) |
&"Times New Roman,Bold"&14Bid Sheet
Alternate Phase - Waterpark Parking Lot