Northside_Park_Bid_Sheets.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Northside Park Site Improvements
Solicitation number
RFP #27032
Issued by
Greenville County, South Carolina

About this file

This is a bid sheet for Northside Park Site Improvements project located at 101 West Darby Road, Taylors, SC 29687, issued by the County of Greenville, South Carolina. The project encompasses two phases of park renovations plus one alternate phase, with Phase 1 addressing the east side of the park and Phase 2 addressing the west side. The scope of work includes demolition of existing structures and pavement, site improvements such as concrete and asphalt paving, installation of site furnishings and amenities, grading and utility work, landscaping, and stormwater management. Phase 1 demolition includes removal of 1,319 square feet of concrete pavement, 11,664 square feet of asphalt pavement, 368 linear feet of chain link fence, 11 trees, curbing, and various fixtures. Phase 1 site work includes installation of handrails, receptacles, tables, drinking fountains, approximately 2,282 square yards of mill and overlay asphalt paving, 16,660 square feet of recreation court paving, 6,889 square feet of concrete sidewalk, and placement of chain link fencing, handicap signage, and a 27-by-40-foot pavilion shade structure. Phase 2 demolition encompasses 3,961 square feet of concrete pavement, 6,662 square feet of asphalt pavement, and 1,627 linear feet of chain link fence removal. Phase 2 site work includes 6,130 square yards of mill and overlay asphalt paving, 10,607 square feet of concrete walkway, 2,980 linear feet of concrete curb and gutter, and various site furnishings. The Alternate Phase addresses resurfacing of the waterpark parking lot at 4,365 square yards of mill and overlay asphalt paving with pavement markings. Both phases include grading, fine grading, landscaping with trees, shrubs, groundcover, sod installation, and mulch placement.

The bid sheet provides quantities and units of measure for all line items but does not include completed unit costs, total costs, or subtotal pricing information, indicating this is a blank bid form for contractor completion. No response date, due date, site visit requirements, bidder's meeting information, or award date is specified in this document. The document does not address contract term, renewal options, pricing terms, set-asides, incumbent contractor status, funding sources, or budget amounts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PH 1

ITEM QTY UNIT UNIT COST TOTAL

A. OVERALL PROJECT COSTS
1Mobilization, administration, staking, traffic control1LS
2Erosion control1LS
SUBTOTAL:
B. DEMOLITION
1Existing concrete pavement to be sawcut and removed1319SF
2Existing asphalt pavement to be sawcut and removed11664SF
3Existing curb and gutter to be removed51.2LF
4Existing tree to be removed11EA
5Existing chain link fence to be removed; including all gates, posts & footings368LF
6Existing concrete extruded curb to be removed855LF
7Existing drinking fountain to be removed including entire masonry base1EA
8Existing handicap parking sign to be removed1EA
9Existing concrete wheelstop to be removed2EA
10Existing bench to be removed1EA
11Manual removal of existing curb by pond10LF
12Removal of tree stumps6EA
13Removal of gravel at shelter drive1847SF
14Removal of gate post at entrance2EA
15Remove existing sand volleyball court & all related nets, poles, borders1LS
SUBTOTAL:
C. SITE WORK
1Stair/Ramp Handrail220LF
2Square Receptacle by UltraSite; model #TRSQ-32; Green recycled plastic slats &lid4EA
3Extra Heavy-Duty Rectangular Table by UltraSite; Model #238-UltraCoat;8' length; surface mount; Black seat & frame color; perforated pattern+6EA
4Hamilton Bench with Back by UltraSite;6' length; black color; surface mount0EA
5Bi-Level Outdoor Drinking Fountain with Water Bottle Filling Station by Murdock; Model #GYQ85; color: Textured Fairway Green1EA
6Asphalt paving; mill & overlay existing2282SY
7Asphalt recreation court (includes paving and paving)16660SF
8Recreation court netting8EA
9Asphalt paving; standard duty2500SY
10Tennis court resurfacing24000SF
Sidewalk lollipop loop
11Concrete walk6889SF
12Heavy-duty concrete paving642SF
13Concrete Curb and gutter2301LF
14Rolled concrete curb10LF
156" concrete curb0LF
16Concrete wheel stop; 6' long0EA
17Detectable Warning Plates; Cast-In-Place93SF
18Painted pavement marking; 4" solid white line1000LF
19Painted pavement marking; 8" wide crosswalk striping110LF
20Painted pavement marking; 4" solid blue line261LF
21Chain link fence; 4' black vinyl235LF
22Chain link fence; 10' black vinyl588LF
236" Schedule 40 PVC sleeve132LF
24Handicap parking and raised crosswalk sign7EA
25Painted handicap symbol3EA
26Tree protection fencing149LF
2727'x40' Pavilion Shade Structure1LS
SUBTOTAL:
D. GRADING & UTILITIES
1Grading (cut/fill)833CY
2Fine grading7468SY
36" Schedule 40 PVC sleeve132LF
4Water meters etc., adjust to final grades1EA
5Riprap80TONS
6Storm drain pipe556LF
7Storm drain inlet5EA
SUBTOTAL:
E. LANDSCAPING
1Tree10EA
2Shrub6EA
3Groundcover645EA
4Sod26627SF
5Mulch100CY
SUBTOTAL:

TOTAL (PHASE 1)

&"Times New Roman,Bold"&14Bid Sheet Northside Park Improvements Phase 1 - East Side of Park

PH 2

ITEM QTY UNIT UNIT COST TOTAL

A. OVERALL PROJECT COSTS
1Mobilization, administration, staking, traffic control1LS
2Erosion control1LS
SUBTOTAL:
B. DEMOLITION
1Existing concrete pavement to be sawcut and removed3961SF
2Existing asphalt pavement to be sawcut and removed6662SF
3Existing curb and gutter to be removed0LF
4Existing tree to be removed2EA
5Existing chain link fence to be removed; including all gates, posts & footings1627LF
6Existing concrete extruded curb to be removed1940LF
7Existing drinking fountain to be removed including entire masonry base2EA
8Existing handicap parking sign to be removed3EA
9Existing concrete wheelstop to be removed4EA
10Existing bench to be removed3EA
11Removal of tree stumps1EA
12Remove existing sand volleyball court & all related nets, poles, borders0LS
SUBTOTAL:
C. SITE WORK
1Stair/Ramp Handrail96LF
2Square Receptacle by UltraSite; model #TRSQ-32; Green recycled plastic slats &lid4EA
3Extra Heavy-Duty Rectangular Table by UltraSite; Model #238-UltraCoat;8' length; surface mount; Black seat & frame color; perforated pattern+2EA
4Hamilton Bench with Back by UltraSite;6' length; black color; surface mount2EA
5Wall Mounted Bottle Filler with Angled Bi-Level Drinking Fountain by Murdock; model GYE25-R; Green color; install per manufacturer's instructions1EA
6Asphalt paving; mill & overlay existing6130SY
7Asphalt recreation court0SF
8Asphalt paving; standard duty431SY
9Concrete walk10607SF
10Heavy-duty concrete paving0SF
11Concrete Curb and gutter2980LF
12Rolled concrete curb62.4LF
136" concrete curb33.4LF
14Concrete wheel stop; 6' long8EA
15Detectable Warning Plates; Cast-In-Place150SF
16Painted pavement marking; 4" solid white line3788LF
17Painted pavement marking; 8" wide crosswalk striping71.1LF
18Painted pavement marking; 4" solid blue line632LF
19Chain link fence; 5'1736LF
20Chain link fence; 10' black vinyl0LF
216" Schedule 40 PVC sleeve0LF
22Handicap parking and raised crosswalk sign8EA
23Painted handicap symbol8EA
24Tree protection fencing685LF
25Shade Structure0LS
26Level Spreader poured concrete536LF
SUBTOTAL:
D. GRADING & UTILITIES
1Grading (cut/fill)63CY
2Fine grading7740SY
36" Schedule 40 PVC sleeve0LF
4Water meters etc., adjust to final grades1EA
5Storm drain pipe0LF
6Storm drain inlet0EA
SUBTOTAL:
E. LANDSCAPING
1Tree6EA
2Shrub0EA
3Groundcover0EA
4Sod35414SF
5Mulch0CY
SUBTOTAL:

TOTAL (PHASE 2)

&"Times New Roman,Bold"&14&K000000Bid Sheet

Phase 2 - West Side of Park&11 &12&U

ALT

ITEM QTY UNIT UNIT COST TOTAL

ALTERNATE 1 (RESURFACING IN WATER PARK PARKING LOT)
1Mobilization, administration, staking, traffic control1LS
2Erosion control1LS
3Asphalt repaving in waterpark lot; mill & overlay existing4365.3333333333SY
4Painted pavement marking; 4" solid white line1025LF
5Painted pavement marking; 4" solid blue line139LF
SUBTOTAL:
TOTAL (Alt. 1)

&"Times New Roman,Bold"&14Bid Sheet

Alternate Phase - Waterpark Parking Lot