This is a Scope of Work document for the City of Port St. Lucie, Florida, detailing stormwater improvements required at the Northport Utility Site. The project encompasses the design and construction of stormwater management infrastructure to address drainage and water quality concerns at the utility facility. The scope includes site grading, installation of stormwater conveyance systems, retention/detention pond construction or modification, erosion control measures, and compliance with Florida Department of Environmental Protection (FDEP) stormwater regulations. The work requires coordination with existing utility operations and adherence to Port St. Lucie City Code Section 35.07. Specific quantities for materials and linear footage of piping are detailed in the project specifications. The project involves phased implementation with specific milestones for permitting, design approval, and construction completion. Site visits are required for proposers to assess existing conditions and utility conflicts prior to submission.

Pricing shall be submitted on a lump-sum basis for the entire project scope or alternatively as unit prices for identified tasks, with payment terms established upon contract award. The project is funded through the City's stormwater utility fund with specific allocation identified in the capital improvement budget. Environmental permitting costs and any required mitigation measures are the contractor's responsibility unless otherwise specified in the final contract documents. The incumbent contractor information, if applicable, will be provided separately. All work must comply with current Florida Building Code, FDEP requirements, and City of Port St. Lucie engineering standards. Performance bonds and insurance requirements are specified in the contract terms.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/cityofpsl

City of Port St. Lucie

20260256

NORTHPORT UTILITY SITE STORMWATER IMPROVEMENTS

RELEASE DATE: June 30, 2026 RESPONSE DEADLINE: August 4, 2026, 3:00 pm

Please refer to the project timeline in this document for all important deadlines.

Invitation For Bid (IFB) #20260256 Title: Northport Utility Site Stormwater Improvements

Table Of Contents

1. Introduction

2. Scope of Work

3. Instructions to Contractors

4. General Insurance

5. Bonds and/or Letter of Credit, Permits

6. IFB Bid Factors

7. Cost Table

8. Cost/Pricing

9. Evaluation and Award

10. Contract Terms and Conditions

11. List of IFB Documents

12. Vendor Submission Requirements and Attestations

Attachments:

A - Sample Contract.docx

B - Site Clearing - Phase 1 Construction Plans

C - Final Design Technical Specifications

1. Introduction

1.1. Purpose of Procurement

Pursuant to the City of Port St. Lucie Code of Ordinances, Section 35.07, this electronic Invitation for Bid

(“IFB”) is being issued to establish a Contract with one or more qualified Contractors who will provide Northport Utility Site Stormwater Improvements to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB.

A descriptive overview of the City can be found at https://www.cityofpsl.com/discover-us/about-psl .

Please visit the City’s website to familiarize yourself with how our city is structured and operates.

Please contact the Issuing Officer with any questions.

1.2. Overview of the IFB Process

The objective of the IFB is to select one (1) or more qualified Contractor (as defined by Section 1 – “Purpose of Procurement”) to provide the goods and/or services outlined in this IFB to the City. This IFB process will be conducted to gather and evaluate responses from Contractors for potential award.

All qualified Contractors are invited to participate by submitting responses, as further defined below.

After evaluating all Contractor’s responses received prior to the closing date of this IFB and resolution of any Contract exceptions, the preliminary results of the IFB process will be publicly announced, including the names of all participating Contractors and the evaluation results. Subject to the protest process, final Contract award(s) will be publicly announced thereafter.

NOTE TO CONTRACTORS: The general instructions and provisions of this document have been drafted with the expectation that the City may desire to make one award or multiple awards. For example, this document contains phrases such as “contract(s)” and “award(s)”. Please refer to Section 1 – “Purpose of Procurement” and Section 9 – “Evaluation and Award,” for information concerning the number of Contract awards expected.

1.3. Schedule of Events

The Schedule of Events set out herein represents the City’s best estimate of the schedule that will be followed. However, delays to the procurement process may occur, which may necessitate adjustments to the proposed schedule. If a component of this schedule, such as the close date, is delayed, the rest of the schedule may be shifted as appropriate. Any changes to the dates up to the closing date of the IFB will be publicly posted prior to the closing date of this IFB. After the close of the IFB, the City reserves the right to adjust the remainder of the proposed dates, including the dates for evaluation, negotiations, award, and the Contract term, on an as-needed basis, with or without notice.

Release of IFB: June 30, 2026 https://library.municode.com/fl/port_st._lucie/codes/code_of_ordinances?nodeId=TITIIIAD_CH35FIPU_S35.07FOBIPR https://www.cityofpsl.com/discover-us/about-psl

Pre-Proposal Meeting (Non- Mandatory):

July 7, 2026, 11:00am

Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/2 6664501454365?p=IKFULdFo49PHl24 k7H Meeting ID: 266 645 014 543 65 Passcode: eX3sy69X

Need help? | System reference Dial in by phone +1 561-437-3554,,168194755# United States, West Palm Beach Find a local number Phone conference ID: 168 194 755#

Question Submission Deadline: July 14, 2026, 5:00pm

Question Response Deadline: July 21, 2026, 5:00pm

Response Submission Deadline: August 4, 2026, 3:00pm

The City reserves the right to proceed to award without further discussions after receipt of the initial proposals, in which case, evaluation committee reviews, negotiations, and proposal revisions may not be required.

1.4. Official Issuing Officer (Procuring Agent)

India Barr, Procurement Contracting Officer, II

O. 772-344-4055 ibarr@cityofpsl.com

1.5. Definition of Terms

Please review the following terms:

- Contractor(s) – companies desiring to do business with the City (Also called “Bidder,” “Proposer,” or “Offeror.”) https://teams.microsoft.com/meet/26664501454365?p=IKFULdFo49PHl24k7H https://teams.microsoft.com/meet/26664501454365?p=IKFULdFo49PHl24k7H https://teams.microsoft.com/meet/26664501454365?p=IKFULdFo49PHl24k7H

- City of Port St. Lucie (“City”) – the governmental entity identified in “Purpose of Procurement,” of this

IFB.

- Immaterial Deviation – does not give the Contractor a substantial advantage over other Contractors.

- Material Deviation – gives the Contractor a substantial advantage over other Contractors and thereby restricts or prevents competition.

- Procurement Management Division (“PMD”) – the City department that is responsible for the review and possible sourcing of all publicly sourced solicitations.

- Responsible – means the Contractor, whether a company or an individual, has the financial and technical capacity to perform the requirements of the solicitation and subsequent Contract which will assure good faith performance of the Contract.

- Responsive – means the Contractor, whether a company or an individual, has submitted a bid which conforms in all material respects to the requirements set forth in the solicitation.

- Sourcing Platform/Electronic Bidding System - OpenGov.

Any special terms or words which are not identified in this IFB may be identified separately in one or more attachments to the IFB.

1.6. Contract Term

The Initial term of the contract(s) is for two hundred and ten (210) calendar days from the execution date .

In the event that the Contract(s), if any, resulting from the award of this IFB shall terminate or be likely to terminate prior to the making of an award for a new Contract for the identified products and/or services, the City may, with the written consent of the awarded Contractor(s), extend the Contract(s) for such period of time as may be necessary to permit the City’s continued supply of the identified products and/or services. The Contract(s) may be amended in writing from time to time by mutual consent of the parties. Unless this IFB states otherwise, the resulting award of the Contract(s) does not guarantee volume or a commitment of funds.

1.6.1 Hours of Service

The standard hours of work allowed in the City’s rights-of-way are from 7:00 a.m. to sundown Monday through Friday. Any work performed by the Contractor outside of the aforementioned time limit requires special authorization by the City and requires that the Contractor obtain a noise permit from the Port St. Lucie Police Department (PSLPD). All equipment operated at night shall comply with the noise levels established by the City of Port St. Lucie noise ordinance. Any additional costs associated with work outside of the hours of work allowed shall be borne by the Contractor. This shall include, but is not limited to, costs of inspection, testing, police assistance, and construction administration.

All night, Saturday, Sunday, and/or Holiday work must be authorized by the City and requires that the Contractor obtain a noise permit from the PSLPD. All night work within the City’s rights-of-way requires a minimum forty-eight (48) hour prior notice to the City. This clause shall not pertain to crews organized to perform maintenance work on equipment or to operate and maintain special equipment such as dewatering pumps, which may be required to work twenty-four (24) hours per day.

2. Scope of Work

2.1. Scope of Work

Project Overview

The initial phases of the Northport Site redevelopment (Phase 0 & Phase I) include site clearing, demolition of former wastewater treatment facilities, and construction of a new master stormwater system. These improvements will prepare the site for future civil and vertical development.

Later phases (Phase II and beyond) will be procured separately at a future date.

Work Included in Phase 0 & Phase I

A. Clearing & Grubbing

• Clearing and Grubbing of approximately 3.5 acres on the north portion of the Northport site.

• Removal of vegetation, organic material, debris, and unsuitable surface materials.

B. Demolition & Removal

Demolition and removal of all structures and systems associated with the former wastewater treatment plant, including:

• Existing Structures (above-grade and select below-grade)

• Ponds and basins

• Stormwater infrastructure

• Miscellaneous appurtenances related to the abandoned plant

All demolition debris must be removed from the site and disposed of per applicable regulations.

C. Earthwork & Grading

• Earthwork quantities are based on existing topographic survey data.

• Target finished grade elevations: 15.0'–15.5'.

• Target finished floor elevations: 0.5'–1.0' above finished grade.

• Contractor must:

o Verify and adjust elevations as needed.

o Ensure positive drainage to the new stormwater system.

o Coordinate with design team if discrepancies arise.

D. New Master Stormwater System

Construction of the new stormwater system required to support future site development, including:

• Stormwater conveyance piping

• Inlets, manholes, and structures

• Outfalls and discharge points

• Any required SFWMD-compliant features

System must meet South Florida Water Management District (SFWMD) permitting requirements.

Existing Below-Grade Utilities

Utilities to Remain

Certain utilities must remain active and protected throughout construction:

• Force main along the western boundary

• Infrastructure serving the existing in-line sanitary booster pump station

These utilities are clearly labeled “TO REMAIN” on the plans. Contractor must:

• Protect these utilities during all phases of work.

• Coordinate any required temporary support or access.

Utilities to Be Removed

• The site contains extensive abandoned below-grade utilities from its former use.

• All unneeded or abandoned utilities within the project limits should be removed unless labeled

“TO REMAIN.”

• Contractor is responsible for:

o Identifying utilities not marked “TO REMAIN” o Removing them safely o Properly backfilling and compacting excavations

3. Instructions to Contractors

This section contains general business requirements. By submitting a response, the Contractor is certifying its agreement to comply with all the identified requirements of this section and that all costs for complying with these general business requirements are included in the Contractor’s submitted pricing.

By submitting a response to the IFB, the Contractor is acknowledging that the Contractor:

1. Has read the information and instructions, and

2. Agrees to comply with the information and instructions contained herein.

3.1. General Information and Instructions

3.1.1 Familiarity with Laws and Regulations

It is the responsibility of responding Contractors to be familiar with all Federal, State, and local laws, ordinances, rules, and regulations, that may affect the work. Ignorance on the part of the Awarded Contractor will in no way relieve it from Contract responsibility.

3.1.2 Restrictions on Communicating with Staff/ Cone of Silence

From the issue date of this IFB until the time of City Council's approval of the award or the City Manager's approval when proposal amount is below the required formal solicitation threshold (or the IFB is officially canceled), Contractors are not allowed to communicate for any reason with any City staff or elected officials except through the Issuing Officer named herein, during the Bidders'/Offerors’ conference (if any), as defined in this IFB, or as provided by existing work agreement(s). This is commonly known as a Cone of Silence during the procurement process as identified in the City Code of Ordinances, Section 35.13. Prohibited communication includes all contact or interaction, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. The City reserves the right to reject the response of any Contractor violating this provision. Further information on this topic can be found on the Cone of Silence and IFB Communication Document.

3.1.3 Submitting Questions

All questions concerning this IFB must be submitted in writing on the OpenGov Platform during the Question and Answer open period. Please select the Question and Answer tab in the IFB project and click the "Ask Question" option. Once the question has been entered, select the "Submit Question" button. Enter a subject in the Subject field and then type the question in the Question field below.

Once finished, select "Submit." No questions other than written will be accepted. No response other than written will be binding upon the City. All Contractors must submit questions by the deadline identified in the Schedule of Events for submitting questions. Contractors are cautioned that the https://library.municode.com/fl/port_st._lucie/codes/code_of_ordinances?nodeId=TITIIIAD_CH35FIPU_S35.13COSI

City may or may not elect to entertain late questions or questions submitted by any other method than as directed by this section.

3.1.4 Attending Bidders'/Offerors' Conference

The Bidders'/Offerors’ Conference or any other information session (if indicated in the Schedule of Events) will be held at the locations referred to in “Schedule of Events,” of this IFB. Unless indicated otherwise, attendance is not mandatory, although Contractors are strongly encouraged to attend.

However, in the event the conference has been identified as mandatory, then a representative of the Contractor must attend the conference in its entirety to be considered eligible for Contract award.

The Contractor is strongly encouraged to allow ample travel time to ensure arrival in the conference meeting room prior to the beginning of any mandatory conference. The City reserves the right to consider any representative arriving late to be “not in attendance.” Therefore, all Contractors are strongly encouraged to arrive early to allow for unexpected travel contingencies.

3.1.5 The City's Right to Request Additional Information- Contractor's Responsibility

Prior to Contract award, the City must be assured that the selected Contractor has all the resources to successfully perform under the Contract. This includes, but is not limited to, adequate number of personnel with required skills, availability of appropriate equipment in sufficient quantity to meet the on-going needs of the City, financial resources sufficient to complete performance under the Contract, and experience in similar endeavors. If, during the evaluation process, the City is unable to assure itself of the Contractor’s ability to perform, if awarded, the City has the option of requesting from the Contractor any information deemed necessary to determine the Contractor’s responsibility. If such information is required, the Contractor will be notified and will be permitted approximately ten (10) business days to submit the information requested.

3.1.6 Failing to Comply with Submission Instructions

Responses received after the identified due date and time or submitted by any other means than those expressly permitted by the IFB will not be considered. Contractor's response must be complete in all respects, as required in each section of this IFB.

3.1.7 Rejection of Proposals; The City's Right to Waive Immaterial Deviation

The City reserves the right to reject any or all responses, to waive any irregularity or informality in a Contractor’s response, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City. The City reserves the right to waive mandatory requirements, provided that, all the otherwise Responsive proposals failed to meet the mandatory requirements and/or doing so does not otherwise materially affect the procurement of requested commodities and/or services. It is also within the right of the City to reject responses that do not contain all elements and information requested in this IFB. A Contractor’s response will be rejected if the response contains any defect or irregularity and such defect or irregularity constitutes a Material

Deviation from the IFB requirements, which determination will be made by the City in its sole discretion and on a case-by-case basis.

NOTE: The City reserves the right to reject the Bid of any Contractor who has previously failed in the performance of an award, to deliver contracts of a similar nature on time, or who is not in a position to perform properly under this award. This includes the firm, employees, and financial or legal interests. The City will not enter into a contract or conduct business with any firm or any personnel that is listed on the Federal, State, or other local government agencies' Excluded Parties List, Suspended List, or Debarment List. Please see section 287.133, Florida Statutes, for further information regarding business transactions with companies that have been convicted of public entity crimes.

3.1.8 The City's Right to Amend and/or Cancel the IFB

The City reserves the right to amend this IFB. All revisions must be made in writing prior to the IFB closing date and time. If a responding entity discovers any ambiguity, conflict, discrepancy, omission, or other error in the IFB, it shall immediately notify the City of such error in writing and request modification or clarification of the document. Any modification made to this IFB will be issued as an addendum. If a responding entity fails to notify the City prior to the date and time fixed for submission of an error or ambiguity in the IFB known to it, or an error or ambiguity that reasonably should have been known to it, it shall not be entitled to additional time by reason of the error/ambiguity or its late resolution. By submitting a response, the Contractor shall be deemed to have accepted all terms and agreed to all requirements of the IFB (including any revisions/additions made in writing prior to the close of the IFB, whether or not such revision occurred prior to the time the Contractor submitted its response), unless expressly stated otherwise in the Contractor’s response. THEREFORE, EACH CONTRACTOR IS INDIVIDUALLY RESPONSIBLE FOR REVIEWING THE

REVISED IFB AND MAKING ANY NECESSARY OR APPROPRIATE CHANGES AND/OR ADDITIONS TO

THE CONTRACTOR’S RESPONSE PRIOR TO THE CLOSE OF THE IFB. All Notice(s) to Proceed with Negotiations and/or Notice of Intent to Award (NOIAs) will be posted as referenced in Section 9.8 - “Public Award Announcement,” of this document. Finally, the City reserves the right to amend or cancel this IFB at any time.

3.1.9 Assigning of the Contract & Use of Subcontractors

Except as may be expressly agreed to in writing by the City, Contractor shall not assign, sell, transfer, or otherwise dispose of the awarded Contract or any portion thereof, or of the work provided for therein, or of its right, title, or interest therein, to any person, firm, or corporation without the prior written consent of the City.

Each Contractor shall list all subcontractors and the work provided by the suppliers in the area provided on the Bid Reply Sheet. The successful Contractor(s) shall provide a listing of all subcontractors, suppliers, and other persons and organizations (including those who are to furnish the principal items of material and equipment), other than those identified in the Bid Reply, to the City within ten (10) days after the bid opening. Such a list shall be accompanied by an experience statement for each such subcontractor, supplier, person, or organization, if requested by the City.

The City, if after due investigation, has reasonable objection to any proposed subcontractor, supplier, other person or organization, the City may, before the Notice of Intent Award is given, request apparent successful Contractor to submit an acceptable substitute without an increase in Bid price.

If the apparent successful Contractor(s) declines to make any such substitution, the City may award the Contract to the next acceptable Contractor(s) that proposes to use acceptable subcontractors, suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Contractor(s). Any subcontractor, supplier, other person, or organization listed and to whom the City does not make written objection prior to the giving of the Notice of Intent to Award, shall be deemed acceptable to City, subject to revocation of such acceptance after the effective date of the Contract.

No subcontract which Contractor enters into with respect to performance of obligations or work assigned under the Contract shall in any way relieve Contractor of any responsibility, obligation, or liability under the Contract, and for the acts and omissions of all subcontractors, agents, and employees. All restrictions, obligations, and responsibilities of the Contractor under the Contract shall also apply to the subcontractors. Any contract with a subcontractor must also preserve the rights of the City. The City shall have the right to request the removal of a subcontractor from performing work under the Contract at any time, with or without cause.

3.1.10 Proposal of Additional Services

If a Contractor indicates an offer of services in addition to those required by and described in this IFB, these additional services may be added to the original Contract at the sole discretion of the City.

3.1.11 Protest Process

Contractors should familiarize themselves with the procedures set forth in City Code of Ordinances, Section 35.15. By submitting a response to this IFB, the Contractor certifies that it is on notice of Section 35.15, understands the procedures set forth therein, and acknowledges it is bound by the protest process therein.

3.1.12 Costs for Preparing Responses

Each Contractor’s response should be prepared simply and economically, avoiding the use of elaborate promotional materials beyond those sufficient to provide a complete presentation. The cost for developing the response and participating in the procurement process (including the protest process) is the sole responsibility of the Contractor. The City will not provide reimbursement for such costs.

https://library.municode.com/fl/port_st._lucie/codes/code_of_ordinances?nodeId=TITIIIAD_CH35FIPU_S35.15BIPR

3.1.13 Public Access to Procurement Records

Solicitation opportunities will be publicly advertised as required by City ordinances and state and federal laws. Any material that is submitted in response to this IFB, including anything considered by the Contractor to be confidential or a trade secret, will become a public document pursuant to Chapter 119, Florida Statutes. Any claim of confidentiality is waived upon submission, effective after the City’s opening of the proposals pursuant to section 119.07, Florida Statutes. Therefore, the Contractor is hereby cautioned NOT to submit any documents that the Contractor does not want to be made public. The City is allowed to assess a reasonable charge to defray the cost of reproducing documents. A City employee must be present during the time of onsite inspection of documents. PLEASE NOTE: Even though information (financial or other information) submitted by a Contractor may be marked as "confidential," "proprietary," etc., the City will make its own determination regarding what information may or may not be withheld from disclosure. Contractors should review Chapter 119, Florida Statutes for all updates before requesting exceptions from Chapter 119.

3.2. Submittal Instructions

Submittal Instructions to Electronic Bidding System

Listed below are key action items related to this IFB. The Schedule of Events Section identifies the dates and time for these key action items. This portion of the IFB provides high-level instructions regarding the process for reviewing the IFB, preparing a response to the IFB, and submitting a response to the IFB.

3.2.1 IFB Released

The release of the IFB is through the posting of this project in OpenGov, the City's Electronic Bidding System. Each Contractor interested in competing to win a Contract award must complete and submit a response to this IFB in OpenGov. Therefore, each Contractor MUST carefully review the submittal instructions.

3.2.2 IFB Review

The IFB 20260256 consists of the following: this document, entitled “Northport Utility Site Stormwater Improvements,” and any and all information included in the IFB, as posted to OpenGov, including any and all documents provided by the City as attachments to the IFB or links contained within the IFB or its attached documents.

Please carefully review all information, including all documents available as attachments or available through links. Any difficulty accessing or opening provided links or documents should be reported immediately to the Issuing Officer.

3.2.3 Preparing a Response

http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0119/0119.html http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0119/0119ContentsIndex.html&StatuteYear=2019&Title=%2D%3E2019%2D%25http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0119/0119.html%20119

When preparing a response, the Contractor must consider the following instructions:

1. Use the provided Cost Table to prepare your response. Enter your responses directly into the Cost Table. Unless otherwise directed, do not insert “see attached file” (or similar statements) in the worksheet to reference separate documents.

2. Answer each question in sufficient detail for evaluation while using judgment with regards to the length of response.

3. Proofread your response and make sure it is accurate and readily understandable.

4. Label any and all uploaded files using the corresponding section numbers of the IFB as specified by the City.

5. Use caution in creating electronic files to be uploaded. If the City is unable to open an electronic file due to a virus or because the file has become corrupted, the Contractor’s response may be considered incomplete and disqualified from further consideration.

6. Use commonly accepted software programs to create electronic files. The City has the capability of viewing documents submitted in the following formats: Microsoft Office and portable document format file (PDF). Unless the IFB specifically requests the use of another type of software or file format than those listed above, please contact the Issuing Officer, India Barr, prior to utilizing another type of software and/or file format. In the event that the City is unable to open an electronic file because the City does not have ready access to the software utilized by the Contractor, the Contractor’s response will be considered incomplete and disqualified from further consideration.

3.2.4 Reviewing, Revising, or Withdrawing a Submitted Response

After the response has been submitted, the Contractor may view and/or revise its response by logging into OpenGov. Please take note of the following:

A. BID SUBMISSION. All bids shall be submitted by completing and uploading all required documents. All submittals are required to be electronic. No hard copies will be accepted.

o The Cost Worksheet shall be completed through the Cost Table in OpenGov (see Section 7 – Cost Table).

To ensure a complete submission, vendors must follow the requirements outlined in:

o Section 11 – List of IFB Documents, and o Section 12 – Vendor Submission Requirements and Attestations

These sections contain the list of mandatory forms, required uploads, and electronic confirmations, including all City-required documents.

Vendors are responsible for reviewing Sections 11 and 12 in their entirety and ensuring that all required documents, attestations, and forms are properly completed and uploaded in the order specified.

B. REVIEW AND REVISE. Contractors may modify their submittal electronically via the City's Electronic Bidding System at any time prior to the scheduled due date and time for submission. In order to revise, the Contractor must navigate to their submitted response via the City's Electronic Bidding System and then click "Unsubmit Response." At this point, Contractor's response is no longer submitted. Contractor should make the changes required and promptly re-submit its response before the submission date and time.

C. WITHDRAW. Contractors may withdraw their submittal electronically via the Portal at any time prior to the scheduled due date and time for submission. In order to withdraw, the Contractor must navigate to their submitted proposal via the City's Electronic Bidding System and then click "Unsubmit Response". In the event a Contractor desires to withdraw its response after the closing date and time, the Contractor must submit a request in writing to the Issuing Officer.

Add Item

4. General Insurance

The Proposer shall, on a primary basis and at its sole expense, agree to maintain in full force and effect at all times during the life of this Contract, insurance coverage and limits, including endorsements, as described herein. The requirements contained herein, as well as City's review or acceptance of insurance maintained by the Proposer are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Proposer under the Contract.

The parties agree and recognize that it is not the intent of the City of Port St. Lucie that any insurance policy/coverage that it may obtain pursuant to any provision of this Contract will provide insurance coverage to any entity, corporation, business, person, or organization, other than the City of Port St.

Lucie and the City shall not be obligated to provide any insurance coverage other than for the City of Port St. Lucie or extend its immunity pursuant to Section 768.28, Florida Statutes, and as may be amended from time to time, under its self-insured program. Any provision contained herein to the contrary shall be considered void and unenforceable by any party. This provision does not apply to any obligation imposed on any other party to obtain insurance coverage for this project, and/or any obligation to name the City of Port St. Lucie as an additional insured under any other insurance policy or otherwise protect the interests of the City of Port St. Lucie as specified in this Contract.

4.1. Indemnification/Hold Harmless

Proposer agrees to indemnify, defend, and hold harmless, the City, its officers, agents, and employees from, and against any and all claims, actions, liabilities, losses, and expenses including, but not limited to, attorney's fees for personal, economic, or bodily injury, wrongful death, loss of or damage to property, at law or in equity, which may arise or may be alleged to have risen from the negligent acts, errors, omissions or other wrongful conduct of Proposer, agents, laborers, subcontractors or other personnel entity acting under Proposer control in connection with the Proposer's performance of services under the Contract. To that extent, Proposer shall pay any and all such claims and losses and shall pay any and all such costs and judgements which may issue from any lawsuits arising from such claims and losses including wrongful termination or allegations of discrimination or harassment, and shall pay all costs and attorney's fees expended by the City in defense of such claims and losses, including appeals. That the aforesaid hold-harmless agreement by Proposer shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of Proposer or any agent laborers, subcontractors, or employee of Proposer regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. Proposer shall be held responsible for any violation of laws, rules, regulations, or ordinances affecting in any way the conduct of all persons engaged in or the materials or methods used by Proposer on the work. This indemnification shall survive the termination of the Contract.

4.2. Workers’ Compensation Insurance & Employer’s Liability

The Proposer shall agree to procure and maintain Workers' Compensation Insurance & Employers' Liability in accordance with Section 440, Florida Statutes. Employers’ Liability must include limits of at least $100,000.00 each accident, $100,000.00 each disease/ employee, and $500,000.00 each disease/maximum. A Waiver of Subrogation endorsement must be provided. Coverage shall apply on a primary basis. Should scope of work performed by Proposer qualify its employee(s) for benefits under Federal Workers’ Compensation Statute (for example, U.S. Longshore & Harbor Workers Act or Merchant Marine Act), proof of appropriate Federal Act coverage must be provided.

4.3. Commercial General Liability Insurance

The Proposer shall agree to procure and maintain Commercial General Liability insurance, issued under an Occurrence form basis, including Contractual liability, to cover the hold harmless agreement set forth herein, with limits of not less than:

Each occurrence $1,000,000

Personal/advertising injury $1,000,000

Products/completed operations aggregate

$2,000,000

General aggregate $2,000,000

Fire damage $100,000 any 1 fire

Medical expense $10,000 any 1 person

4.4. Additional Insured

An Additional Insured endorsement must be attached to the certificate of insurance and must include coverage for on-going and Completed Operations (should be ISO CG2037 & CG2010) under the General Liability policy. Products & Completed Operations coverage to be provided for a minimum of five (5) years from the date of possession by City or completion of contract. Coverage is to be written on an occurrence form basis. Coverage shall apply on a primary and non-contributory basis. A per project aggregate limit endorsement should be attached. Defense costs are to be in addition to the limit of liability. A waiver of subrogation shall be provided in favor of the City. Coverage for the hazards of explosion, collapse and underground property damage (XCU) must also be included when applicable to the work performed. No exclusion for mold, silica or respirable dust or bodily injury/property damage arising out of heat, smoke, fumes, or hostile fire shall apply. Coverage shall extend to independent contractors and fellow employees. Contractual Liability is to be included.

Coverage is to include a cross liability or severability of interests provision as provided under the standard ISO form separation of insurers clause

Except as to Workers' Compensation and Employers' Liability insurance, Certificates of Insurance and policies shall clearly state that coverage required by the Contract has been endorsed to include the City of Port St. Lucie, a municipality of the State of Florida, its officers, agents and employees as Additional Insured for Commercial General Liability and Business Auto Liability policies. The name for the Additional Insured endorsement issued by the insurer shall read: "City of Port St. Lucie, a municipality of the State of Florida, its officers, employees and agents shall be listed as additional insured and include Northport Utility Site Stormwater Improvements Contract #20260256” Copies of the Additional Insured endorsements shall be attached to the Certificate of Insurance. The policies shall be specifically endorsed to provide thirty (30) days written notice to the City prior to any adverse changes, cancellation, or non-renewal of coverage thereunder. Formal written notice shall be sent to City of Port St. Lucie, 121 SW Port St. Lucie Blvd., Port St. Lucie, FL 34984, Attn: Procurement. In the event that the statutory liability of the City is amended during the term of this Contract to exceed the above limits, the Contractor shall be required, upon thirty (30) days written notice by the City, to provide coverage at least equal to the amended statutory limit of liability of the City. Copies of the Additional Insured endorsement shall be attached to the Certificate of Insurance.

4.5. Business Automobile Liability Insurance

The Proposer shall agree to maintain Business Automobile Liability at a limit of liability not less than $1,000,000.00 each accident covering any auto, owned, non-owned and hired automobiles. In the event the Proposer does not own any automobiles, the Business Auto Liability requirement shall be amended allowing the Proposer to agree to maintain only Hired & Non-Owned Auto Liability. This amended requirement may be satisfied by way of endorsement to the Commercial General Liability, or separate Business Auto Coverage form. Certificate holder must be listed as additional insured. A waiver of subrogation shall be provided. Coverage shall apply on a primary and non-contributory basis.

4.6. Waiver of Subrogation

By entering into this Contract, the Proposer agrees to a Waiver of Subrogation for each required policy.

When required by the insurer, or should a policy condition not permit an Insured to enter into a pre-loss Contract to waive subrogation without an endorsement then the Vendor shall agree to notify the insurer and request the policy be endorsed with a Waiver of Transfer of Rights of Recovery Against Others, or its equivalent. This Waiver of Subrogation requirement shall not apply to any policy where a condition to the policy specifically prohibits such an endorsement, or voids coverage should Proposer enter into such a Contract on a pre-loss basis.

4.7. Deductibles

All deductible amounts shall be paid for and be the responsibility of the Proposer for any and all claims under this Contract. Where an SIR or deductible exceeds $5,000, the City reserves the right, but is not obligated, to review and request a copy of the bidder’s most recent annual report or audited financial statement.

4.8. Compliance

It shall be the responsibility of the Proposer to ensure that all independent contractors and/or subcontractors comply with the same insurance requirements referenced herein. It shall be the responsibility of the Proposer to obtain Certificates of Insurance from all independent contractors and subcontractors listing the City as an Additional Insured without the language “when required by written contract”. If the Proposer, independent contractor and/or subconsultant maintain higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Proposer/independent contractor/subcontractor.

(For Construction Projects Only – Select This Paragraph) It shall be the responsibility of the Proposer to ensure that all independent contractors and/or subcontractors comply with the same insurance requirements as listed herein, including Products & Completed Operations coverage for a minimum of five (5) years from the date of possession by City or completion of contract. It shall be the responsibility of the Proposer to obtain Certificates of Insurance from all contractors and subcontractors listing the City as an Additional Insured, without the language “when required by written contract”. If the Proposer, independent contractor and/or subcontractor maintain higher limits than the minimums listed above, the City requires and shall be entitled to coverage for the higher limits maintained by Proposer/ independent contractor/subcontractor.

The Proposer may satisfy the minimum limits required above for either Commercial General Liability, Business Auto Liability, and Employers’ Liability coverage under Umbrella or Excess Liability. The Umbrella or Excess Liability shall have an Aggregate limit not less than the highest "Each Occurrence" limit for either Commercial General Liability, Business Auto Liability, or Employers’ Liability. When required by the insurer, or when Umbrella or Excess Liability is written on Non-Follow Form, the City shall be endorsed as an "Additional Insured."

The City by and through its Risk Management Department reserves the right, but is not obligated, to review, modify, reject or accept any required policies of insurance, including limits, coverages or endorsements, herein from time to time throughout the term of this Contract. All insurance carriers must have an AM Best rating of at least A:VII or better.

A failure on the part of the Proposer to execute the contract and/or punctually deliver the required insurance certificates and other documentation may be cause for annulment of the award.

4.9. Builder's Risk Insurance

Proposer shall purchase and maintain Builder's Risk insurance in an amount equal to 100% of the completed value of the project including any amendments thereto (without coinsurance). Proposer’s policy shall be written on an “ALL Risk” Builders Risk form that shall cover physical loss or damage to the Work, temporary buildings, construction forms and scaffolding, materials, and equipment in transit or in storage/at temporary locations, and should extend coverage to foundations, excavations, and other underground property. Coverage shall insure against at least the following perils or causes of loss: fire; lightning; windstorm/and hail; theft (including theft of materials, whether or not attached to any structure); vandalism and malicious mischief; flood; earthquake; collapse; and such other perils or causes of loss as may be specifically required. The policy shall include coverage for pollutant cleanup, debris removal, demolition and increased cost of construction, water damage, backup of sewers and drains, testing and startup of building systems (including hot testing), and mold & fungus remediation. The Builders Risk coverage shall include a waiver of subrogation rights endorsement in favor of the City.

The “ALL RISK” Builder’s Risk Insurance must also cover: soft costs, including additional advertising/promotional; additional license and permit fees; additional legal/accounting fees;

insurance premiums, including builder’s risk; and architects’ and engineers’ fees that may be necessary to provide plans and specifications and supervision of work for the repair and/or replacement of property damage caused by a covered peril.

This policy must include insurance for the City of Port St. Lucie, Proposer, Subcontractors, Architect/Engineer, and Consultants for their interest in covered property. The City’s policy will not provide coverage related to this project.

Proposer has the right to purchase coverage or self-insure any exposures not required by these specifications, but shall be held liable for all losses, deductibles, and self-insurance for coverages not required.

Proposer is responsible for all deductibles. including those for windstorms.

4.10. Pollution Insurance

Contractor shall procure and agree to maintain in full force during the term of this Contract, Contractors Pollution Liability Insurance in limits not less than $1,000,000 per occurrence and $2,000,000 aggregate, for any operations relating to the construction, handling, storage, and transportation of hazardous materials and/or waste. Contractors Pollution should be in force for no less than the entire term of the project and two years extended Completed Operations. The City of Port St. Lucie shall be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

4.11. Requirements for Insurance

Within ten (10) business days of award, the awarded Proposer must procure the required insurance and provide the City with an executed Certificate of Insurance. Certificates must reference the contract number and the City as the Additional Insured party, as identified herein. The Proposer’s submitted pricing must include the cost of the required insurance. No contract performance shall occur unless and until the required insurance certificates and endorsements are provided.

5. Bonds and/or Letter of Credit, Permits

5.1. Bid Bond

Each responding Contractor must supply a Bid Bond or Bid Deposit (certified check, cashier’s check, bank money order, bank draft of any national or state bank), in a sum of not less than 5% of the bid total made payable to the City. As a Mandatory Requirement, the Bid Bond or Bid Deposit must be scanned and uploaded as part of the Vendor Submission along with all other required documents, thus showing evidence that a Bid Bond or Bid Deposit was obtained. Responding Contractors must send the Original Bid Bond or Bid Deposit to the City within ten (10) business days after the IFB Due Date as reflected above in the Schedule of Events. The responding Contractor's proposal will be considered non- Responsive if the Bid Bond or Bid Deposit is not received within the specified time frame. Responding Contractors must submit a Bid Bond or Bid Deposit made payable to the City in a sealed envelope to:

India Barr 121 S.W. Port St. Lucie Blvd.

Port St. Lucie, FL 34984 Attn: Procurement Management Division

Bonds must be issued by a Surety authorized to do business in the State of Florida, in order to guarantee that the Contractor will enter into a contract to deliver products and/or related services outlined in this solicitation, strictly within the terms and conditions stated in the Contract.

5.2. Certification

Proposal Certification

By responding to this solicitation, the Contractor understands and agrees to the following:

1. That this electronically submitted proposal constitutes an offer, which, when accepted in writing by the City, and subject to the terms and conditions of such acceptance, will constitute a valid and binding contract between the Contractor and the City; and

2. That the Contractor guarantees and certifies that all items included in the Contractor's response meet or exceed any and all of the solicitation’s identified specifications and requirements, except as expressly stated otherwise in the Contractor's response; and

3. That the response submitted by the Contractor shall be valid and held open for a period of one hundred and twenty (120) days from the final solicitation closing date and that the Contractor’s offer may be held open for a lengthier period subject to the Contractor’s consent; and

4. That the Contractor's response is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. Contractor understands and agrees that collusive bidding is a violation of City ordinance and state and federal laws and can result in fines, prison sentences, and civil damage awards.

5.3. Payment and Performance Bonds

By responding to this solicitation, the Contractor understands and agrees to the following:

1. The Contractor shall furnish an acceptable recorded Performance and Payment Bond complying with the statutory requirements set forth in section 255.05, Florida Statutes, and 2 CFR 200.326 in the amount equal to one hundred percent (100%) of the Contract price. Additionally, upon any Contract price increase, Contractor shall obtain a bond rider to ensure that the Performance and Payment Bond never drops below 100% of the Contract Price. For clarity, this means that if there is any amendment, change order, purchase order, or any other approval for additional funds under the Contract, Contractor shall obtain a bond rider covering 100% of the increase. The bond shall be issued by a Corporate Surety authorized to do business with the State of Florida. The performance bond/letter of credit must be submitted to the City within ten (10) calendar days of the date the Contract is approved by City Council or the City Manager (if within his or her threshold), but in any event, prior to the beginning of any Contract performance by the awarded Contractor. The Performance and Payment Bond shall remain in full force and effect a minimum of one (1) year after the work has been completed and final acceptance of the work is issued by the City.

2. Should the Surety become irresponsible during the time the Contract is in force, the City may require additional and sufficient sureties and the Contractor shall furnish same to the satisfaction of the City within ten (10) calendar days after written notice to do so. In default thereof, the Contractor may be suspended as herein provided.

5.4. Permits

The selected Contractor shall be responsible for obtaining all permits, licenses, certifications, etc., required by federal, state, county, and municipal laws, regulations, codes, and ordinances for the performance of the work required in these specifications and to conform to the requirements of said legislation. Permit fees can be found on the City’s Building Department Website. All permit fees shall be included in the Contract amount and paid by the successful Contractor(s).

https://www.flsenate.gov/laws/statutes/2018/255.05 https://www.cityofpsl.com/government/departments/building

6. IFB Bid Factors

This section contains the detailed technical requirements and related services for this Sourcing Event. The City has determined that it is best to define its own needs, desired operating objectives, and desired operating environment. The City will not tailor these needs to fit particular solutions Contractors may have available; rather, the Contractors shall propose to meet the City’s needs as defined in this IFB. All claims shall be subject to demonstration. Contractors are cautioned that conditional proposals, based upon assumptions, may be deemed non-Responsive.

Unless requested otherwise, all…