Northport QASP Security System Repair Maintenance Services.pdf

PDF 222 KB Posted

Attached to
J065--Physical Security Maintenance Contract Northport VAMC
Solicitation number
36C24223Q0169
Issued by

About this file

This document outlines a quality assurance surveillance plan (QASP) for physical security system preventive maintenance and repair services at the Northport Veterans Affairs Medical Center in New York. The solicitation seeks a contractor to provide preventive maintenance and repair for security systems, including submitting management reports, responding to call backs within required timeframes, correcting deficiencies, and meeting other standards of service outlined in the statement of work. Performance will be monitored by a contracting officer's representative through random inspections, periodic independent reviews, and customer feedback to ensure acceptable quality levels are achieved. The contractor must meet stringent performance metrics such as responding to all calls within six months when averaged over a six-month period to avoid negative incentives. Failure to meet standards may also affect performance evaluations and recommendations to exercise option years.

View the file

Other files

File Type Posted
36C24223Q0169 0001.docx DOCX document
Handbook_0730_11_Aug_2000.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE 36C24223Q0169.docx DOCX document
Wage Determination 2015-4157 Rev.20.pdf PDF
36C24223Q0169_1.pdf PDF
LIMITATIONS ON SUBCONTRACTING CERTIFICATION.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Security System Repair/Upgrade Services

TABLE OF CONTENTS

1 INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Contracting Officer’s Representative

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

5.2 Monitoring Forms

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.2 Reporting

6.3 Reviews and Resolution

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the statement of work (SOW) titled Security Systems preventative maintenance and repair services. This plan sets forth the procedures and guidelines VA will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the SOW and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team

(IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The SOW structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by VA to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the Sow are achieved.

Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance

(QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.

The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the COR

Michael Mireider and the contractor. The CO will designate Michael Mireider, COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

2.2 The Contracting Officer’s Representative

The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the SOW and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract and will receive recommendation for exercising options. Failure to meet the required service or performance level will result in low performance ratings and possible recommendation not to exercise option.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

➢ Random monitoring, which shall be performed by the COR/COR designated inspector.

➢ Periodic Inspection – Independent Contractor shall perform the periodic inspection on an annual basis and report findings to CO and COR.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO and/or COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the CO/COR. The CO/COR will accept those customer complaints and investigate and then document by using the Contract Discrepancy Report –CDR

(Attachment 3) which is also attached to the COR designation letter.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary

Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving direct patient care, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at VAMC, Northport, NY, 11768.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results and acceptable quality levels are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms and CDR forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each quarter, the COR will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted quarterly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the

COR and/or CO and/or other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the CO and/or

COR as often as required or per the contractor’s request. The agenda of the reviews may include:

➢ Quarterly performance assessment data and trend analysis

➢ Issues and concerns of both parties

➢ Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

➢ Recommendations for improved efficiency and/or effectiveness

➢ Any other issues arising from the performance monitoring processes

6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.

Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.

Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Required Services

(Tasks)

Performance

Standards

Acceptable

Quality

Levels

Methods of

Surveillance

Incentive

(Positive and/or

Negative)

Certifications-Current

Inspections (timeliness)

Submit management reports as required

Call backs and call back timeliness

Reporting

Corrections of deficiencies

Meet SOW

Meet SOW

Meet SOW

Meet SOW

Meet SOW

100% (no deviation)

98% (slight deviation)

No more than 6 call backs per month when averaged over 6 month period, also response

100% (no deviation)

100% (no deviation)

COR random review

COR random review

COR random review

COR random review

COR random review

Failure affects performance evaluations

Failure affects performance evaluations

Failure affects performance evaluations

Failure affects performance evaluations

Failure affects performance evaluations

ATTACHMENT 2: QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

Contract Discrepancy Report (Attachment 3)

Contract No.

Report No. for this Discrepancy:

Contractor/Manager’s Name: From: (Name of Project Officer)

Dates

Prepared:

Returned by Contractor:

Action Complete:

Discrepancy or Problem:

Signature of Contracting Officer:

To: (Contracting Officer) From: (Contractor)

Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach

Continuation Sheet if Necessary)

Signature of Contractor Representative: Date:

Government Evaluation:

Government Actions:

Close Out

Name Title Signature Date

Contractor Notified

Project Officer

Contracting Officer