This document is a Scope of Work for Lube Tank System Upgrades at the North Cambridge Facility, detailing a comprehensive facility infrastructure improvement project. The scope includes concrete pad construction for storage tank installation, electronic tank gauging system implementation, and lubrication tank and fluid dispensing unit upgrades. Specific requirements include installing one 500-gallon split compartment waste oil/coolant tank, two 275-gallon Roth tanks for coolant and power steering fluid, one 275-gallon Roth tank for windshield washer fluid, and associated equipment such as pneumatic pumps, hose reels, piping, and electronic monitoring systems with Pneumercator TMS 4000 sensors and probes.

The project involves extensive technical work including concrete mat construction with steel reinforcement, installation of galvanized steel bollards, epoxy floor coating, remote fill cabinet installation, waste fluid collection troughs, signage, and comprehensive electrical and pneumatic connections. Additional requirements include providing prevailing wage labor, necessary equipment and tools, high lift services, decals, labels, and product identification signage. The scope demonstrates a detailed approach to upgrading fluid storage, dispensing, and monitoring infrastructure with specific technical specifications for each component of the system.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Cambridge Facility- Lube Tank System Upgrades

Scope:

Concrete Pad as footing for 1 storage tank install with remote fill box

• Provide machinery, labor, and materials to form, pour, and finish one 10 foot by 10 foot by 1-foot-thick concrete AST mat reinforced with #4 steel rebar tied one foot on center both ways

• 4 foot by 4 foot by 8-inch-thick concrete remote fill mat reinforced with 6 gauge welded wire mesh.

• Provide and install four 6-inch galvanized steel bollards, 2 in front of the tank mat and 2 in front of the remote fill mat.

Electronic Tank Gauging System

Supply and install new Pneumercator TMS 4000 sensors and probes to 3 (275g) Roth Tanks with 2” openings and a (500g) split compartment Highland Tank.

Lubrication tank installations and fluid dispensing units.

• Supply and install one new double wall steel 500-gallon split 250/250 gallon above ground tank for waste oil and waste coolant with all tank top equipment including pneumatic overfill shut off devices.

• Clean, prep, and epoxy coat the concrete floor and one foot up on the wall in the basement tank room. The room is approximately 10’ x 8’.

• Supply and install two 275-gallon double wall Roth above ground tanks in the basement for coolant and power steering fluid with pneumatic fireball pumps.

• Supply and install one double remote fill cabinet on remote fill concrete mat.

• Provide and install supply piping from basement tanks up and into remote fill box and vent piping outside to exterior wall.

• Supply and install one 275-gallon double wall Roth above ground tank for windshield washer fluid at far end of bay #4 with pneumatic fireball pump, hose, and nozzle.

• Provide and install two waste fluid collection troughs with dual diaphragm pneumatic pumps and suction hoses.

• Provide and install waste coolant and waste oil signage at the collection site.

• Provide and install piping from two waste fluid troughs out of building, overhead on a piping bridge and down into two compartment waste fluid tank.

• Provide and install two new hose reels on column between bay #3 and bay #4.

• Demo existing low melting point piping from basement tank room to hose reel columns.

• Provide and install 3/4-inch steel piping from basement tanks to two existing hose reels located on column between bay #1 and bay #2 and to new hose reels located between bay #3 and bay #4.

• Provide air lines and connections to all 5 product pumps.

• Provide 5 Pneumercator TMS 4000 product probes and product specific floats to all 5 tanks.

• Provide and install one Pneumercator TMS 4000 interstitial sensor in waste fluid tank.

• Provide and install one Pneumercator over fill alarm and reset switch either inside the remote fill box or in a separate enclosed box at the remote fill area.

• Provide all electrical for all Pneumercator equipment.

• Provide high lift for all the above scope of work.

• Provide and install all necessary decals, labels, and product identification signage for all tanks.

• Provide all prevailing wage labor, equipment, and tools for the above scope of work.