NooksackRiverOverflowCulvertERPermanentRepairSpecs Vol 1.pdf
PDF 13 MB Posted
- Solicitation number
- XE3780, FA Proj 2C01006-4
- Issued by
- Whatcom County, Washington
About this file
This document is the Special Provisions and General Requirements (Volume 1 of 2) for a state transportation construction contract issued by the Washington State Department of Transportation (WSDOT) for SR 544 Nooksack River Overflow Culvert Emergency Repair in Whatcom County. The project involves relocating buried utilities, removing an existing 135-foot arch culvert (No. 544/9c), constructing a new bridge south of the existing Nooksack River Bridge (No. 544/10), performing partial replacement of the bridge's south approach slab and adjacent sidewalk and traffic barrier, installing new utilities and drainage, constructing scour countermeasures, and restoring the area with landscaping and other associated work. The contract includes 145 bid items and is planned for 300 working days of construction. The bid opening date is December 2, 2026, with bids to be publicly opened and read after 11:00:59 A.M. Pacific Time. Bidders must submit a Bidder Questionnaire form (WSDOT Form #272-30) and comply with surety registration requirements with the Washington State Insurance Commissioner.
The contract is federally funded under 2027 Standard Specifications for Road, Bridge, and Municipal Construction and incorporates multiple permits including a Hydraulic Project Approval, NPDES Section 402, Water Quality Certification, and Section 404 authorization from the U.S. Army Corps of Engineers. The contract establishes an 18% federal small business enterprise (SBE) participation goal. Prevailing wage requirements apply, with federal rates established under U.S. Department of Labor General Decision No. WA20260001 and Washington State rates applicable to all construction activities. The contract mandates 15% or greater apprentice utilization based on project labor hours and includes specific affirmative action and nondiscrimination requirements per 41 CFR Part 60. Buy America requirements apply to all iron, steel products, manufactured products, and construction materials, with minor foreign material exceptions limited to $2,500 or one-tenth of one percent of total contract cost, whichever is greater. Environmental commitments include compliance with wetland protections, a 300-foot mixing zone for turbidity standards, work-window restrictions (July 15 through September 30 below the Ordinary High Water Line), and restrictions on equipment staging within 200 feet of wetlands or surface waters. The project is located in Whatcom County, Washington, with coordination required with other WSDOT projects on SR 546 scheduled for summer 2028 construction.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Construction of:
F.A.PROJECT NO. 2C01006-4
VOLUME 1 OF 2
SR 544
NOOKSACK RIVER OVERFLOW CULVERT
ER PERMANENT REPAIR
26A012 A
CONTENTS 1
INTRODUCTION--------------------------------------------------------------------------------------- 1 7
SPECIAL PROVISIONS 8
DIVISION 1 9
GENERAL REQUIREMENTS 10
DESCRIPTION OF WORK -------------------------------------------------------------------------- 1 11
BID PROCEDURES AND CONDITIONS -------------------------------------------------------- 2 12
Examination of Plans, Specifications and Site of Work ------------------------------------ 2 13
General ------------------------------------------------------------------------------------------------ 2 14
Preparation of Proposal ---------------------------------------------------------------------------- 2 15
Bid Deposit -------------------------------------------------------------------------------------------- 3 16
Public Opening of Proposals --------------------------------------------------------------------- 3 17
Date Of Opening Bids ------------------------------------------------------------------------------ 3 18
Irregular Proposals ---------------------------------------------------------------------------------- 3 19
SCOPE OF THE WORK ----------------------------------------------------------------------------- 4 20
Coordination of Contract Documents, Plans, Special Provisions, Specifications, and 21 Addenda -------------------------------------------------------------------------------------------- 4 22
Procedure, Protest, and Dispute by the Contractor ----------------------------------------- 5 23
CONTROL OF WORK -------------------------------------------------------------------------------- 6 24
Conformity with and Deviations from Plans and Stakes ----------------------------------- 6 25
Contractor Surveying - Structure ---------------------------------------------------------------- 6 26
Contractor Surveying - Roadway ---------------------------------------------------------------- 9 27
Cooperation with Other Contractors ---------------------------------------------------------- 12 28
Other Contracts Or Other Work ---------------------------------------------------------------- 12 29
Speed Safety Camera System Vendor ------------------------------------------------------- 12 30
CONTROL OF MATERIAL------------------------------------------------------------------------- 13 31
Buy America Requirements --------------------------------------------------------------------- 13 32
LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ----------------------- 18 33
Laws To Be Observed ---------------------------------------------------------------------------- 18 34
PAGE
ER PERMANENT REPAIR
26A012 B
Unmanned Aircraft Systems (UAS) ----------------------------------------------------------- 19 1
Environmental Regulations --------------------------------------------------------------------- 19 2
Environmental Commitments ------------------------------------------------------------------- 19 3
Payment --------------------------------------------------------------------------------------------- 20 4
State Department of Fish And Wildlife -------------------------------------------------------- 20 5
State Department of Ecology ------------------------------------------------------------------- 20 6
Air Quality ------------------------------------------------------------------------------------------- 21 7
Asbestos Containing Material ------------------------------------------------------------------ 21 8
U.S. Army Corps of Engineers -------------------------------------------------------------------- 21 9
U.S. Fish and Wildlife Service and National Marine Fisheries Service ----------------- 22 10
Permits And Licenses ---------------------------------------------------------------------------- 23 11
Load Limits ------------------------------------------------------------------------------------------ 23 12
Wages ------------------------------------------------------------------------------------------------ 24 13
General ---------------------------------------------------------------------------------------------- 24 14
Apprentices ----------------------------------------------------------------------------------------- 24 15
Apprentice Utilization ----------------------------------------------------------------------------- 24 16
Requirements For Nondiscrimination --------------------------------------------------------- 26 17
Federal Small Business Enterprise Participation ------------------------------------------ 34 18
Federal Agency Inspection ---------------------------------------------------------------------- 42 19
Required Federal Aid Provisions -------------------------------------------------------------- 42 20
Protection And Restoration Of Property ------------------------------------------------------ 43 21
Vegetation Protection and Restoration ------------------------------------------------------- 43 22
Utilities and Similar Facilities ------------------------------------------------------------------- 43 23
PROSECUTION AND PROGRESS ------------------------------------------------------------- 44 24
Subcontracting ------------------------------------------------------------------------------------- 44 25
Subcontractor Approval -------------------------------------------------------------------------- 45 26
Submittal of Executed Subcontracts ---------------------------------------------------------- 46 27
Progress Schedule -------------------------------------------------------------------------------- 46 28
General Requirements --------------------------------------------------------------------------- 46 29
Type B Progress Schedules -------------------------------------------------------------------- 46 30
Time For Completion ----------------------------------------------------------------------------- 46 31
Liquidated Damages ------------------------------------------------------------------------------ 46 32
MEASUREMENT AND PAYMENT --------------------------------------------------------------- 47 33
Weighing Equipment ----------------------------------------------------------------------------- 47 34
ER PERMANENT REPAIR
26A012 C
General Requirements for Weighing Equipment ------------------------------------------- 47 1
Electronic Delivery Management System (E-Ticketing) ---------------------------------- 47 2
Payment --------------------------------------------------------------------------------------------- 48 3
Scope of Payment--------------------------------------------------------------------------------- 49 4
Fuel Cost Adjustment ----------------------------------------------------------------------------- 49 5
Steel Cost Adjustment ---------------------------------------------------------------------------- 51 6
Payment For Material On Hand ---------------------------------------------------------------- 53 7
Payments-------------------------------------------------------------------------------------------- 53 8
Retainage ------------------------------------------------------------------------------------------- 53 9
DIVISION 2 10
TEMPORARY FEATURES 11
Public Convenience and Safety ---------------------------------------------------------------- 54 12
Construction Requirements --------------------------------------------------------------------- 54 13
Construction Under Traffic ---------------------------------------------------------------------- 54 14
Temporary Traffic Control ------------------------------------------------------------------------ 57 15
Construction Requirements --------------------------------------------------------------------- 57 16
Pedestrian Traffic Control ----------------------------------------------------------------------- 57 17
Traffic Control Management -------------------------------------------------------------------- 57 18
Traffic Safety Drums ------------------------------------------------------------------------------ 59 19
Payment --------------------------------------------------------------------------------------------- 62 20
Reinstating Unit Items With Lump Sum Traffic Control ----------------------------------- 63 21
DIVISION 3 22
EARTHWORK 23
Clearing, Grubbing, and Roadside Cleanup ------------------------------------------------ 63 24
Construction Requirements --------------------------------------------------------------------- 63 25
Clearing ---------------------------------------------------------------------------------------------- 63 26
Payment --------------------------------------------------------------------------------------------- 64 27
Removal of Structures and Obstructions ---------------------------------------------------- 64 28
Description ------------------------------------------------------------------------------------------ 64 29
Construction Requirements --------------------------------------------------------------------- 65 30
Removal and Disposal of Asbestos Material ------------------------------------------------ 66 31
Removal of Bridges, Box Culverts, and Other Drainage Structures ------------------- 67 32
Requirements for Closing Bridge to Traffic Prior to Beginning Removal ------------- 67 33
Bridge and Structure Removal ----------------------------------------------------------------- 69 34
ER PERMANENT REPAIR
26A012 D
Removal of Pavement, Sidewalks, Curbs, and Gutters ---------------------------------- 69 1
Vacant ------------------------------------------------------------------------------------------------ 70 2
Payment --------------------------------------------------------------------------------------------- 70 3
Roadway Excavation and Embankment ----------------------------------------------------- 71 4
Construction Requirements --------------------------------------------------------------------- 71 5
EARTHWORK ---------------------------------------------------------------------------------------- 72 6
Description ------------------------------------------------------------------------------------------ 72 7
Materials --------------------------------------------------------------------------------------------- 72 8
Construction Requirements --------------------------------------------------------------------- 72 9
Summary of Quantities --------------------------------------------------------------------------- 72 10
Payment --------------------------------------------------------------------------------------------- 73 11
Structure Excavation ----------------------------------------------------------------------------- 74 12
Construction Requirements --------------------------------------------------------------------- 74 13
Construction Requirements, Structure Excavation, Class A ---------------------------- 74 14
Excavation Using Open Pits – Extra Excavation ------------------------------------------- 74 15
Shoring and Cofferdams ------------------------------------------------------------------------- 74 16
Measurement --------------------------------------------------------------------------------------- 75 17
Payment --------------------------------------------------------------------------------------------- 75 18
DIVISION 5 19
SURFACE TREATMENTS AND PAVEMENTS 20
HOT MIX ASPHALT --------------------------------------------------------------------------------- 76 21
Materials --------------------------------------------------------------------------------------------- 76 22
Mix Design – Obtaining Project Approval ---------------------------------------------------- 76 23
ESAL's -------------------------------------------------------------------------------------------------- 76 24
HMA Tolerances, Specification Limits and Adjustments ------------------------------------ 76 25
Equipment ------------------------------------------------------------------------------------------- 76 26
HMA Compaction Acceptance -------------------------------------------------------------------- 77 27
Payment --------------------------------------------------------------------------------------------- 77 28
Asphalt Cost Price Adjustment ----------------------------------------------------------------- 77 29
DIVISION 6 30
STRUCTURES 31
GENERAL REQUIREMENTS FOR STRUCTURES ---------------------------------------- 78 32
Work Access and Temporary Structures ----------------------------------------------------- 78 33
CONCRETE STRUCTURES ---------------------------------------------------------------------- 82 34
ER PERMANENT REPAIR
26A012 E
Materials --------------------------------------------------------------------------------------------- 82 1
Epoxy Bonding Agent For Surfaces And For Steel Reinforcing Bar Dowels -------- 82 2
Bridge Supported Utilities ----------------------------------------------------------------------- 82 3
Construction Requirements --------------------------------------------------------------------- 83 4
Bridge Supported Utilities ----------------------------------------------------------------------- 84 5
Proportioning Materials -------------------------------------------------------------------------- 87 6
Bridge Decks and Bridge Approach Slabs -------------------------------------------------- 87 7
Curing Concrete ----------------------------------------------------------------------------------- 89 8
Finishing Concrete Surfaces-------------------------------------------------------------------- 89 9
Bridge Bearings ------------------------------------------------------------------------------------ 90 10
Reinforcement ------------------------------------------------------------------------------------- 90 11
Placing and Fastening --------------------------------------------------------------------------- 90 12
Drilling Holes for, and Setting, Steel Reinforcing Bar Dowels -------------------------- 90 13
Measurement --------------------------------------------------------------------------------------- 90 14
Summary of Quantities for Superstructure and Bridge Deck --------------------------- 91 15
Payment --------------------------------------------------------------------------------------------- 91 16
Bridge and Structures Minor Items ------------------------------------------------------------ 91 17
Bridge Supported Utilities ----------------------------------------------------------------------- 92 18
BRIDGE RAILINGS --------------------------------------------------------------------------------- 92 19
Materials --------------------------------------------------------------------------------------------- 92 20
CONCRETE BARRIER ----------------------------------------------------------------------------- 93 21
Construction Requirements --------------------------------------------------------------------- 94 22
Temporary Barrier --------------------------------------------------------------------------------- 94 23
Payment --------------------------------------------------------------------------------------------- 94 24
SHAFTS------------------------------------------------------------------------------------------------ 94 25
Materials --------------------------------------------------------------------------------------------- 94 26
Access Tubes and Caps ------------------------------------------------------------------------- 94 27
Construction Requirements --------------------------------------------------------------------- 95 28
Pre-Loading Shafts ------------------------------------------------------------------------------- 95 29
Quality Assurance --------------------------------------------------------------------------------- 96 30
Shaft Excavation ---------------------------------------------------------------------------------- 96 31
Contractor Furnished Accessories for Nondestructive QA Testing -------------------- 97 32
Measurement --------------------------------------------------------------------------------------- 97 33
Payment --------------------------------------------------------------------------------------------- 98 34
ER PERMANENT REPAIR
26A012 F
SAND DRAINS --------------------------------------------------------------------------------------- 98 1
Description ------------------------------------------------------------------------------------------ 98 2
Materials --------------------------------------------------------------------------------------------- 99 3
Construction Requirements --------------------------------------------------------------------- 99 4
Payment -------------------------------------------------------------------------------------------- 100 5
DIVISION 7 6
DRAINAGE STRUCTURES, STORM SEWERS, SANITARY 7
SEWERS, WATER MAINS, AND CONDUITS 8
STORM SEWERS ---------------------------------------------------------------------------------- 101 9
Removal of Obstructions ----------------------------------------------------------------------- 101 10
WATER MAINS -------------------------------------------------------------------------------------- 101 11
Materials -------------------------------------------------------------------------------------------- 102 12
Construction Requirements -------------------------------------------------------------------- 102 13
Payment -------------------------------------------------------------------------------------------- 102 14
SANITARY SEWERS ------------------------------------------------------------------------------ 103 15
Description ----------------------------------------------------------------------------------------- 103 16
Materials -------------------------------------------------------------------------------------------- 103 17
Measurement -------------------------------------------------------------------------------------- 103 18
Payment -------------------------------------------------------------------------------------------- 103 19
AGGREGATES FOR STREAMS, RIVERS AND WATERBODIES --------------------- 104 20
AGGREGATES FOR STREAMS, RIVERS AND WATERBODIES --------------------- 105 21
DIVISION 8 22
MISCELLANEOUS CONSTRUCTION 23
ROADSIDE RESTORATION --------------------------------------------------------------------- 106 24
Materials -------------------------------------------------------------------------------------------- 106 25
Construction Requirements -------------------------------------------------------------------- 109 26
Weed and Pest Control ------------------------------------------------------------------------- 110 27
Topsoil ---------------------------------------------------------------------------------------------- 110 28
Roadside Seeding, Lawn and Planting Area Preparation ------------------------------- 111 29
Planting --------------------------------------------------------------------------------------------- 111 30
Mulch ------------------------------------------------------------------------------------------------ 111 31
Bioengineering ------------------------------------------------------------------------------------ 112 32
Wet Native Seed ---------------------------------------------------------------------------------- 113 33
BANK PROTECTION ------------------------------------------------------------------------------ 114 34
ER PERMANENT REPAIR
26A012 G
Materials -------------------------------------------------------------------------------------------- 114 1
Components of Coir Bank Protection -------------------------------------------------------- 114 2
Measurement -------------------------------------------------------------------------------------- 116 3
Payment -------------------------------------------------------------------------------------------- 117 4
CHAIN LINK, WIRE, AND CABLE FENCE --------------------------------------------------- 117 5
Materials -------------------------------------------------------------------------------------------- 117 6
Coated Chain Link Fence ---------------------------------------------------------------------- 117 7
Payment -------------------------------------------------------------------------------------------- 118 8
PERMANENT SIGNING -------------------------------------------------------------------------- 118 9
Materials -------------------------------------------------------------------------------------------- 118 10
Manufacturers for Steel Roadside Sign Supports ---------------------------------------- 119 11
ROCK AND GRAVITY BLOCK WALL AND GABION CRIBBING ----------------------- 119 12
Materials -------------------------------------------------------------------------------------------- 119 13
Construction Requirements -------------------------------------------------------------------- 120 14
Gravity Block Wall -------------------------------------------------------------------------------- 120 15
Streams, Rivers, and Waterbodies ----------------------------------------------------------- 121 16
Construction Requirements -------------------------------------------------------------------- 121 17
Streambed Aggregates ------------------------------------------------------------------------- 121 18
Blending of Streambed Aggregates ---------------------------------------------------------- 121 19
Removal of Obstructions ----------------------------------------------------------------------- 121 20
ENVIRONMENTAL COMPLIANCE ------------------------------------------------------------- 122 21
Construction Requirements -------------------------------------------------------------------- 122 22
Payment -------------------------------------------------------------------------------------------- 123 23
DIVISION 9 24
MATERIALS 25
APPENDICES --------------------------------------------------------------------------------------- 124 26
ER PERMANENT REPAIR
26A012 1
INTRODUCTION 1
This Contract shall be constructed in accordance with the 2027 Standard Specifications for 3 Road, Bridge, and Municipal Construction. 4
SPECIAL PROVISIONS 6
Several types of Special Provisions are included in this contract; General, Region, and Project 8 Specific. Special Provisions types are differentiated as follows: 9
(date) General Special Provision 11 (Region1 date) Region Special Provision 12 (******) Project Specific Special Provision 13
General Special Provisions are designated with the date they were last updated and include 15 standardized language that is used on applicable projects within Washington State. The only 16 difference since the specified date from one project to another is the inclusion of variable 17 project data, inserted as a “fill-in”. 18 Region Special Provisions are designated with the Region or Division abbreviation followed 20 by the date they were last updated and include standardized language that is used on 21 applicable projects within the designated Region or Division. The only difference since the 22 date specified from one project to another is the inclusion of variable project data, inserted as 23 a “fill-in”. Region and Division designations are as follows: 24
Region1 26 ER Eastern Region 27 NCR North Central Region 28 NWR Northwest Region 29 OR Olympic Region 30 SCR South Central Region 31 SWR Southwest Region 32 WSF Washington State Ferries Division 33
Project Specific Special Provisions are designated with six asterisks instead of a date. 35 These are provisions that normally appear only in the contract for which they were developed. 36
Division 1 38
General Requirements 39
DESCRIPTION OF WORK 41
(March 13, 1995) 43 This Contract provides for the improvement of *** SR 544 in Whatcom County by relocating 44 buried utilities, removing the existing 135-foot long arch culvert No. 544/9c, construct a new 45 bridge south of the existing Nooksack River Bridge No. 544/10, perform partial replacement 46 of the existing Nooksack River Bridge No. 544/10 south approach slab adjacent sidewalk and 47 traffic barrier to accommodate and install a roadway bypass, install new utilities and drainage, 48 construct scour countermeasures, and restore the area with landscaping *** and other work, 49 all in accordance with the attached Contract Plans, these Contract Provisions, and the 50 Standard Specifications. 51
ER PERMANENT REPAIR
26A012 2
Bid Procedures and Conditions 1
Examination of Plans, Specifications and Site of Work 3
General 5
Section 1-02.4(1) is supplemented with the following: 7
(September 3, 2019) 9 The Reference Information for this project is available for review by the bidder at the 10 following location: 11
*** https://ftp.wsdot.wa.gov/contracts/, organized by Contract Number and 13 Project Title, in the Reference Information subfolder, and is made available for 14 informational purposes only. *** 15
The Reference Information includes the following: 17
*** 19
• As Built Plans SR 544 Nooksack River Bridges 544/9 & 10 20
• Electronic Design Data 21 *** 22
Preparation of Proposal 24 Section 1-02.6 is supplemented with the following: 26
(October 5, 2026) 28
Bidder Questionnaire 29 The Bidder shall submit with their Bid a Bidder Questionnaire form (WSDOT Form #272-30 022). This shall be filled out for each firm who submitted a bid or quote in attempt to 31 participate in the project whether they were successful or not and include the following 32 information: 33
1. Firm name; 35
2. Firm address including ZIP code; 37
3. Firm’s status as a DBE or non-DBE; 39
4. NAICS code applicable to each scope of work the firm sought to perform in its 41 bid; 42
5. Age of the firm; and 44
6. The annual gross receipts of the firm. The Bidder may obtain this information by 46 asking each firm to indicate into what gross receipts bracket they fit (less than 47 $1 million; $1-3 million; $3-6 million; $6-10 million; $10-20 million; $20-30.72 48 million; or greater than $30.72 million) rather than requesting an exact figure 49 from the firm. 50 https://ftp.wsdot.wa.gov/contracts/
ER PERMANENT REPAIR
26A012 3
This form shall be received at the same location and no later than the time required for 1 the delivery of the Proposal. This form is meant to provide the Contracting Agency with 2 the above information so reasonable care shall be taken to complete the form as 3 accurately as possible, and the questionnaire shall be corrected by the Bidder if requested 4 by the Contracting Agency. 5
Bid Deposit 7 The last sentence of the first paragraph of Section 1-02.7 is revised to read: 9
(October 5, 2026) 11 The Surety shall: (1) be registered with the Washington State Insurance Commissioner, 12 and (2) be listed as an active company under the “Surety” coverage type within the 13 database published by the Office of the Insurance Commissioner at 14 https://fortress.wa.gov/oic/consumertoolkit/Search.aspx. 15
Public Opening of Proposals 17 Section 1-02.12 is supplemented with the following: 19
(August 3, 2015) 21
Date of Opening Bids 22 The bid opening date for this project is *** December 2, 2026 ***. Bids received will be 23 publicly opened and read after 11:00:59 A. M. Pacific Time on this date. 24
Irregular Proposals 26 (October 5, 2026) 28 Item n, under Item 1 in Section 1-02.13, is deleted. 29
Scope of the Work 31
Coordination of Contract Documents, Plans, Special Provisions, 33
Specifications, and Addenda 34 Section 1-04.2 is supplemented with the following: 36
(November 20, 2023) 38
Document Control 39 This specification applies to project documentation and correspondence that occurs after 40 execution of the Contract. The Contractor shall submit all project documentation and 41 correspondence for this Contract in electronic format utilizing the WSDOT Unifier system. 42 Documents that are received by means other than the WSDOT Unifier system will be 43 rejected, except as allowed by this special provision or specifically approved by the 44 Engineer. 45 The Engineer may reject documents that are deemed unsuitable. This includes 47 documents that are illegible, unreadable, locked, etc. Forms that require further 48 information from WSDOT must be unlocked. 49
ER PERMANENT REPAIR
26A012 4
The Contractor shall submit to the Contracting Agency a Unifier Access Request Form 1 (WSDOT Form 134-092) to WSDOT e-Construction Support (e-2 ConstructionSupport@wsdot.wa.gov) designating all individuals requiring access to 3 WSDOT Unifier no later than 5 days following Contract Award. Training for WSDOT 4 Unifier will be provided by WSDOT at no cost to the Contractor. Throughout the life of the 5 Project, all changes to the Contractor’s personnel who require access to the WSDOT 6 Unifier system shall be submitted on a Unifier Access Request Form. 7 All signed documents shall be in PDF format and will require an electronic signature. An 9 electronic signature is defined as a symbol, or process attached to or logically associated 10 with a record and executed or adopted by a person with the intent to sign the record. All 11 signed documents shall be in PDF format. 12 WSDOT has provided an application to be used to apply electronic signatures to the 14 following documents: 15
Change Orders that are not Minor Change Orders 17 421-009 Release – Retained Percentage (Except Landscaping) 18 134-146 Final Contract Voucher Certificate 19
When the Contract specifies that documentation is to be submitted through other web-21 based systems, such as the Diversity Management and Compliance System, or email 22 addresses, the Contractor shall utilize those systems and email addresses accordingly. 23 Before a Completion Date will be established by the Contracting Agency, all contractor 25 active tasks in Unifier shall be closed out or acknowledged. 26 All costs for submitting project documentation electronically shall be included in the 28 Contract prices for the Bid items of Work involved. 29
Procedure, Protest, and Dispute by the Contractor 31 Section 1-04.5 is supplemented with the following: 33
(March 9, 2026) 35
Project Partnering 36 The Engineer and the Contractor’s Project Manager (PM) will plan and host a Project 37 Partnering workshop as soon as practical after Contract execution. The objective of this 38 Partnering workshop is to promote open lines of communication and teamwork between 39 the Contracting Agency and Contractor staff for the effective completion of the work, and 40 to the standard of quality that will be a source of pride to both the Contracting Agency and 41 the Contractor. Commitments made by both parties shall be memorialized in a Project 42 Partnering Agreement at the conclusion of the Partnering workshop. The Partnering 43 agreement will not affect the terms of the Contract. It is intended only to establish an 44 environment of cooperation and mutual understanding between the parties. 45 The planning and execution of the Partnering process is intended to be a collaborative 47 effort between the Engineer and the PM. The length of the partnering workshop should 48 be commensurate with the size and complexity of the project, and familiarity of the parties. 49 For simple projects an expanded pre-construction meeting may suffice. The partnering 50 workshop may be facilitated by the Engineer, the Engineer and PM, or a mutually 51 agreeable Partnering Facilitator (PF). Selection of a PF, dates and location of the 52 mailto:e-ConstructionSupport@wsdot.wa.gov mailto:e-ConstructionSupport@wsdot.wa.gov
ER PERMANENT REPAIR
26A012 5 workshops, materials needed for the workshop, frequency and location for follow up 1 meetings, and estimated cost associated with this effort should be discussed and agreed 2 to prior to moving forward with the Partnering process. 3 An initial 1 day (or half day) facilitated Project Partnering workshop is recommended to 5 initiate the partnering agreement. 6 The cost to retain the services of a Partnering Facilitator (if mutually selected as the PF), 8 locate and rent a neutral location to hold the workshop (if held offsite), and any additional 9 materials needed to host the workshop, will be paid by the Contractor. The Partnering 10 Field Guide is available as a resource to the Engineer and PM to assist in the planning of 11 the Partnering session(s) at the following link: 12 https://wsdot.wa.gov/publications/fulltext/construction/WSDOTProjects-Partnering-14 FieldGuide.pdf 15
The Contracting Agency will reimburse invoice cost for the Contractor provided Partnering 17 Facilitator, facilities and materials at a rate of 50% under the Bid item, “Project Partnering”. 18 After the initial Partnering workshop, quarterly follow-up meetings on projects with over 20 120 working days shall be scheduled to evaluate how the Partnering process is working, 21 acknowledge successes and opportunities for improvement. 22 When the Project Engineer and Contractor’s Project Manager have determined 24 recognition is warranted, the cost for meals and awards for recognition of project 25 partnering success shall be borne by each party. Expenses shall be divided such that 26 each party pays for their pro rata share of the expenses based on the number of people 27 receiving the meal or award. Reimbursement for expenses initially paid by one party will 28 be made to the other party under the Bid item, “Project Partnering”. 29
Payment 31 “Project Partnering”, by calculation. 32 “Project Partnering” will be calculated and paid for as described above. 33
Control of Work 35
Conformity with and Deviations from Plans and Stakes 37 Section 1-05.4 is supplemented with the following: 39
(September 3, 2024) 41
Contractor Surveying - Structure 42 The Contracting Agency has provided primary survey control in the Plans. 43 The Contractor shall be responsible for setting, maintaining, and resetting all alignment 45 stakes, slope stakes, and grades necessary for the construction of bridges, noise walls, 46 retaining walls, buried structures, and marine structures. Except for the survey control 47 data to be furnished by the Contracting Agency, calculations, surveying, and measuring 48 required for setting and maintaining the necessary lines and grades shall be the 49 Contractor's responsibility. 50 https://wsdot.wa.gov/publications/fulltext/construction/WSDOTProjects-Partnering-FieldGuide.pdf https://wsdot.wa.gov/publications/fulltext/construction/WSDOTProjects-Partnering-FieldGuide.pdf
ER PERMANENT REPAIR
26A012 6
The Contractor shall inform the Engineer when monuments are discovered that were not 1 identified in the Plans and construction activity may disturb or damage the monuments. 2 All monuments noted on the plans “DO NOT DISTURB” shall be protected throughout the 3 length of the project or be replaced at the Contractor’s expense. 4 Detailed survey records shall be maintained, including a description of the work 6 performed on each shift, the methods utilized, and the control points used. The record 7 shall be adequate to allow the survey to be reproduced. A copy of each day's record shall 8 be provided to the Engineer within three working days after the end of the shift. 9 The meaning of words and terms used in this provision shall be as listed in "Definitions of 11 Surveying and Associated Terms" current edition, published by the American Congress 12 on Surveying and Mapping and the American Society of Civil Engineers. 13 The survey work by the Contractor shall include but not be limited to the following: 15
1. Verify the primary horizontal and vertical control furnished by the Contracting 17 Agency and expand into secondary control by adding stakes and hubs as well 18 as additional survey control needed for the project. Provide descriptions of 19 secondary control to the Contracting Agency. The description shall include 20 coordinates and elevations of all secondary control points. 21
2. Establish, by placing hubs and/or marked stakes, the location with offsets of 23 foundation shafts and piles. 24
3. Establish offsets to footing centerline of bearing for structure excavation. 26
4. Establish offsets to footing centerline of bearing for footing forms. 28
5. Establish wing wall, retaining wall, noise wall, and buried structure horizontal 30 alignment. 31
6. Establish retaining wall top of wall profile grade. 33
7. Establish buried structure profile grade. 35
8. Establish elevation benchmarks for all substructure formwork. 37
9. Check elevations at top of footing concrete line inside footing formwork 39 immediately prior to concrete placement. 40
10. Check column location and pier centerline of bearing at top of footing 42 immediately prior to concrete placement. 43
11. Establish location and plumbness of column forms, and monitor column 45 plumbness during concrete placement. 46
12. Establish pier cap and crossbeam top and bottom elevations and centerline of 48 bearing. 49
13. Check pier cap and crossbeam top and bottom elevations and centerline of 51 bearing prior to and during concrete placement. 52
ER PERMANENT REPAIR
26A012 7
14. Establish grout pad locations and elevations. 2
15. Establish structure bearing locations and elevations, including locations of 4 anchor bolt assemblies. 5
16. Establish box girder bottom slab grades and locations. 7
17. Establish girder and/or web wall profiles and locations. 9
18. Establish diaphragm locations and centerline of bearing. 11
19. Establish roadway slab alignment, grades and provide dimensions from top of 13 girder to top of roadway slab. Set elevations for deck paving machine rails. 14
20. Establish traffic barrier and curb profile. 16
21. Profile all girders prior to the placement of any deadload or construction live load 18 that may affect the girder's profile. 19
22. Establish locations for marine structures including fixed and floating berthing 21 structures, vehicle and pedestrian foundations and spans, and marine-based 22 buildings. 23
The Contractor shall provide the Contracting Agency copies of any calculations and 25 staking data when requested by the Engineer. 26 The Contractor shall submit the computed elevations at the top of bridge decks as a Type 28 2 Working Drawing. To compute top of bridge deck elevations, elevations shall be taken 29 at the tenth points along the centerline of each girder web from center-to-center of 30 bearing. For girders exceeding 100 feet in length, the elevations shall be taken at 31 equivalent intervals not to exceed 10 feet. 32
The Contractor shall ensure a surveying accuracy within the following tolerances: 34
Vertical Horizontal 36
1. Stationing on structures 0.02 feet 37
2. Alignment on structures 0.02 feet 38
3. Superstructure elevations 0.01 feet 39 variation from 40 plan elevation 41
4. Substructure 0.02 feet 42 variation from 43 Plan grades. 44 Buried structures shall be within the tolerances described in Section 6-20.3. 46
The Contracting Agency may spot-check the Contractor's surveying. These spot-checks 48 will not change the requirements for normal checking by the Contractor. 49
ER PERMANENT REPAIR
26A012 8
When staking the following items, the Contractor shall perform independent checks from 1 different secondary control to ensure that the points staked for these items are within the 2 specified survey accuracy tolerances: 3
Piles 5 Shafts 6 Footings 7 Columns 8
The Contractor shall calculate coordinates for the points associated with piles, shafts, 10 footings and columns. The Contracting Agency will verify these coordinates prior to 11 issuing approval to the Contractor for commencing with the survey work. The Contracting 12 Agency will require up to seven calendar days from the date the data is received to issuing 13 approval. 14 Contract work to be performed using contractor-provided stakes shall not begin until the 16 stakes are approved by the Contracting Agency. Such approval shall not relieve the 17 Contractor of responsibility for the accuracy of the stakes. 18
Payment 20 Payment will be made for the following bid item when included in the proposal: 21
"Structure Surveying", lump sum. 23
The lump sum contract price for "Structure Surveying" shall be full pay for all labor, 25 equipment, materials, and supervision utilized to perform the Work specified, including 26 any resurveying, checking, correction of errors, replacement of missing or damaged 27 stakes, and coordination efforts. 28
(January 13, 2021) 30
Contractor Surveying - Roadway 31 The Contracting Agency has provided primary survey control in the Plans. 32 The Contractor shall be responsible for setting, maintaining, and resetting all alignment 34 stakes, slope stakes, and grades necessary for the construction of the roadbed, drainage, 35 surfacing, paving, channelization and pavement marking, illumination and signals, 36 guardrails and barriers, and signing. Except for the survey control data to be furnished 37 by the Contracting Agency, calculations, surveying, and measuring required for setting 38 and maintaining the necessary lines and grades shall be the Contractor's responsibility. 39 The Contractor shall inform the Engineer when monuments are discovered that were not 41 identified in the Plans and construction activity may disturb or damage the monuments. 42 All monuments noted on the plans “DO NOT DISTURB” shall be protected throughout the 43 length of the project or be replaced at the Contractors expense. 44 Detailed survey records shall be maintained, including a description of the work 46 performed on each shift, the methods utilized, and the control points used. The record 47 shall be adequate to allow the survey to be reproduced. A copy of each day's record shall 48 be provided to the Engineer within three working days after the end of the shift. 49
ER PERMANENT REPAIR
26A012 9
The meaning of words and terms used in this provision shall be as listed in "Definitions of 1 Surveying and Associated Terms" current edition, published by the American Congress 2 on Surveying and Mapping and the American Society of Civil Engineers. 3 The survey work shall include but not be limited to the following: 5
1. Verify the primary horizontal and vertical control furnished by the Contracting 7 Agency, and expand into secondary control by adding stakes and hubs as well 8 as additional survey control needed for the project. Provide descriptions of 9 secondary control to the Contracting Agency. The description shall include 10 coordinates and elevations of all secondary control points. 11
2. Establish, the centerlines of all alignments, by placing hubs, stakes, or marks on 13 centerline or on offsets to centerline at all curve points (PCs, PTs, and PIs) and 14 at points on the alignments spaced no further than 50 feet. 15
3. Establish clearing limits, placing stakes at all angle points and at intermediate 17 points not more than 50 feet apart. The clearing and grubbing limits shall be 5 18 feet beyond the toe of a fill and 10 feet beyond the top of a cut unless otherwise 19 shown in the Plans. 20
4. Establish grading limits, placing slope stakes at centerline increments not more 22 than 50 feet apart. Establish offset reference to all slope stakes. If Global 23 Positioning Satellite (GPS) Machine Controls are used to provide grade control, 24 then slope stakes may be omitted at the discretion of the Contractor 25
5. Establish the horizontal and vertical location of all drainage features, placing 27 offset stakes to all drainage structures and to pipes at a horizontal interval not 28 greater than 25 feet. 29
6. Establish roadbed and surfacing elevations by placing stakes at the top of 31 subgrade and at the top of each course of surfacing. Subgrade and surfacing 32 stakes shall be set at horizontal intervals not greater than 50 feet in tangent 33 sections, 25 feet in curve sections with a radius less than 300 feet, and at 10-34 foot intervals in intersection radii with a radius less than 10 feet. Transversely, 35 stakes shall be placed at all locations where the roadway slope changes and at 36 additional points such that the transverse spacing of stakes is not more than 12 37 feet. If GPS Machine Controls are used to provide grade control, then roadbed 38 and surfacing stakes may be omitted at the discretion of the Contractor. 39
7. Establish intermediate elevation benchmarks as needed to check work 41 throughout the project. 42
8. Provide references for paving pins at 25-foot intervals or provide simultaneous 44 surveying to establish location and elevation of paving pins as they are being 45 placed. 46
9. For all other types of construction included in this provision, (including but not 48 limited to channelization and pavement marking, illumination and signals, 49 guardrails and barriers, and signing) provide staking and layout as necessary to 50 adequately locate, construct, and check the specific construction activity. 51
ER PERMANENT REPAIR
26A012 10
10. Contractor shall determine if changes are needed to the profiles or roadway 1 sections shown in the Contract Plans in order to achieve proper smoothness 2 and drainage where matching into existing features, such as a smooth transition 3 from new pavement to existing pavement. The Contractor shall submit these 4 changes to the Engineer for review and approval 10 days prior to the beginning 5 of work. 6
The Contractor shall provide the Contracting Agency copies of any calculations and 8 staking data when requested by the Engineer. 9 The Contractor shall ensure a surveying accuracy within the following tolerances: 11
Vertical Horizontal 13
Slope stakes 0.10 feet 0.10 feet 14 Subgrade grade stakes set 15
0.04 feet below grade 0.01 feet 0.5 feet 16 (parallel to alignment) 17
0.1 feet 18 (normal to alignment) 19
Stationing on roadway N/A 0.1 feet 21
Alignment on roadway N/A 0.04 feet 22
Surfacing grade stakes 0.01 feet 0.5 feet 23 (parallel to alignment) 24
0.1 feet 25 (normal to alignment) 26 Roadway paving pins for 28 surfacing or paving 0.01 feet 0.2 feet 29 (parallel to alignment) 30
0.1 feet 31 (normal to alignment) 32
The Contracting Agency may spot-check the Contractor's surveying. These spot-checks 34 will not change the requirements for normal checking by the Contractor. 35 When staking roadway alignment and stationing, the Contractor shall perform 37 independent checks from different secondary control to ensure that the points staked are 38 within the specified survey accuracy tolerances. 39 The Contractor shall calculate coordinates for the alignment. The Contracting Agency will 41 verify these coordinates prior to issuing approval to the Contractor for commencing with 42 the work. The Contracting Agency will require up to seven calendar days from the date 43 the data is received. 44 Contract work to be performed using contractor-provided stakes shall not begin until the 46 stakes are approved by the Contracting Agency. Such approval shall not relieve the 47 Contractor of responsibility for the accuracy of the stakes. 48
Stakes shall be marked in accordance with Standard Plan A10.10. When stakes are 50 needed that are not described in the Plans, then those stakes shall be marked, at no 51 additional cost to the Contracting Agency as ordered by the Engineer. 52
ER PERMANENT REPAIR
26A012 11
Payment 2 Payment will be made for the following bid item when included in the proposal: 3
"Roadway Surveying", lump sum. 5
The lump sum contract price for "Roadway Surveying" shall be full pay for all labor, 7 equipment, materials, and supervision utilized to perform the Work specified, including 8 any resurveying, checking, correction of errors, replacement of missing or damaged 9 stakes, and coordination efforts. 10
Final Acceptance 12 The second paragraph of Section 1-05.12 is revised to read: 14
(October 5, 2026) 16 The Contractor agrees that neither Completion nor final acceptance shall relieve the 17 Contractor of the responsibility to indemnify, defend, and protect the Contracting Agency 18 against all claims or losses (i) which may fall within the obligations of Section 1-07.14 19 herein, or (ii) resulting from the failure of the Contractor or subcontractors to pay all 20 laborers, mechanics, subcontractors, material persons, or others who provides labor, 21 supplies, or provisions for carrying out the Work or for payments required for 22 unemployment compensation under Title 50 RCW or for industrial insurance and medical 23 aid required under Title 51 RCW. To the extent applicable, the Contractor shall also 24 continue to satisfy any and all requirements of Section 1-07.18 which involve obligations 25 beyond final acceptance. 26
Cooperation with Other Contractors 28 Section 1-05.14 is supplemented with the following: 30
(March 13, 1995) 32
Other Contracts Or Other Work 33 It is anticipated that the following work adjacent to or within the limits of this project will 34 be performed by others during the course of this project and will require coordination of 35 the work: 36
*** WSDOT project SR 546 Unnamed Tributary to Fishtrap Creek - Fish Passage 38 SR 546, MP 1.40 to MP 2.10 39 Construction Summer 2028 40 Contact Roger Weiss, P.E. 360-788-7416 41 WSDOT project SR 546 / SR 539 to Fishtrap Creek - Paving 43 SR 546, MP 0.03 to MP 2.45 44 Construction Summer 2028 45 Contact Roger Weiss, P.E. 360-788-7416 46 *** 47
(March 20, 2025) 49
Speed Safety Camera System Vendor 50 Coordination with a vendor managed by the Contracting Agency to provide portable 51 Speed Safety Camera Systems (SSCS) when workers are present within the work zone 52
ER PERMANENT REPAIR
26A012 12 may be required. If a SSCS is used on this Contract, the SSCS vendor’s field personnel 1 will need to enter the temporary traffic control zone to place and remove required signage 2 and equipment to implement the automated speed enforcement. The SSCS vendor may 3 document the work zone traffic control setup provided by the Contractor to confirm 4 workers are present prior to commencing operations with the SSCS. 5 The Engineer will set up a coordination meeting between the Contractor’s designated 7 traffic control manager, traffic control supervisor, the Contracting Agency, and the SSCS 8 vendor’s field personnel a minimum of 5 working days prior to the first anticipated 9 implementation date of the SSCS. At a minimum, coordination will include the following: 10
1. The anticipated date and time the SSCS vendor will be on site. 12
2. The expected work area location and temporary traffic control or staged traffic 14 plan that will be in place when the vendor will be on site, including the location(s) 15 of any Contractor-provided Radar Speed Display Sign (RSDS) if included in the 16 project. 17
3. Location…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .