NOI - CPM Development Corp PW1752-26 - OregonBuys.pdf

PDF 232 KB Posted

Attached to
ITB - Salmon Falls Park Improvements
Solicitation number
S-C25102-00015358
Issued by
Marion County, Oregon

About this file

This Notice of Intent to Award is issued by Marion County Finance for Invitation to Bid (ITB) PW1752-26 regarding Salmon Falls Park Improvements, a construction project awarded to CPM Development Corp. The project encompasses various construction activities including mobilization, erosion control, concrete washout facilities, pollution control planning, construction survey work, general excavation, aggregate base installation, commercial asphalt concrete pavement, concrete walks, ADA parking pads, removable bollards, double gates, and pay station foundation and conduit work. The ITB included 13 base line items with quantities ranging from 1 lump sum to 1,490 square feet, plus one alternate item for additional asphalt concrete pavement totaling 450 tons. The final bid submission deadline was January 27, 2026, at 2:00 PM PST. The Notice of Intent to Award was issued on February 2, 2026, with a protest deadline of 5:00 PM Pacific Time on February 9, 2026. The contract is identified as Contract #2026-350 with County Project #105482.

CPM Development Corp submitted the lowest responsive bid with a base total of $91,607.50 and an alternate subtotal of $56,250.00, for a combined contract total of $147,857.50, representing 40.70% below the engineer's estimate. Sixteen construction firms submitted bids for this project, with total bids ranging from CPM Development Corp's low bid of $147,857.50 to Alpha Environmental Services' high bid of $309,670.00. The engineer's estimate totaled $147,857.50, and bid pricing was calculated on a per-unit basis for materials including aggregate base at unit prices ranging from $47.00 to $93.60 per ton, commercial asphalt concrete pavement from $115.00 to $309.00 per ton, and concrete walks from $11.00 to $30.00 per square foot. The solicitation documents do not specify set-asides, disadvantaged enterprise requirements, incumbent vendor information, or explicit budget constraints. Protests must comply with Marion County's Public Contracting Rules, Section 40-0450, and should be directed to Toby Giddings, Marion County Contracts and Procurement Manager, at PO_Contracts@co.marion.or.us.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County Commissioners Chief Administrative Danielle Bethell, Chair Officer Kevin Cameron Jan Fritz Colm Willis

Chief Financial Officer Jeff White

555 Court Street NE, Suite 4247 ▪ P.O. Box 14500 ▪ Salem, OR 97309-5036 ▪ www.co.marion.or.us

Phone: (503) 589-3290 FAX: (503) 373-4379

MARION COUNTY FINANCE

NOTICE OF INTENT TO AWARD

February 2, 2026

RE: Invitation to Bid # PW1752-26 for ITB - Salmon Falls Park Improvements

Dear Offeror:

Marion County is pleased to announce a Notice of Intent to Award for the above-referenced project to Apparent Successful Bidder, CPM Development Corp.

If you wish to protest the County’s Intent to Award, protests must be received by 5:00 PM pacific time February 9, 2026. Late protests will not be considered.

The protest must comply with the terms of Marion County’s Public Contracting Rules, Section 40-0450. Any protest not in compliance will not be considered by the County.

Protests must be directed by email to Toby Giddings, Marion County Contracts and Procurement Manager at PO_Contracts@co.marion.or.us.

Questions relating to the procurement process must be emailed to the Single Point of Contact of the Solicitation.

Thank you to all who submitted offers.

Sincerely, Alicia Jones http://www.co.marion.or.us/ https://www.co.marion.or.us/FIN/Documents/Marion%20County%20Public%20Contracting%20Rules.pdf mailto:PO_Contracts@co.marion.or.us

Item No. Item Description UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

0210-0100 MOBILIZATION 1.00 LS $14,250.00 $14,250.00 $22,000.00 $22,000.00 $10,000.00 $10,000.00 0280-0100 EROSION CONTROL 1.00 LS $2,400.00 $2,400.00 $500.00 $500.00 $2,000.00 $2,000.00 0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS $950.00 $950.00 $400.00 $400.00 $600.00 $600.00 0290-0100 POLLUTION CONTROL PLAN 1.00 LS $250.00 $250.00 $150.00 $150.00 $350.00 $350.00 0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS $2,750.00 $2,750.00 $2,000.00 $2,000.00 $4,350.00 $4,350.00 0330-0150 GENERAL EXCAVATION 1.00 LS $7,000.00 $7,000.00 $8,000.00 $8,000.00 $15,000.00 $15,000.00 0640-0100 AGGREGATE BASE 110.00 TON $49.50 $5,445.00 $50.00 $5,500.00 $80.00 $8,800.00

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON $159.50 $16,747.50 $165.00 $17,325.00 $170.00 $17,850.00

0759-0128 CONCRETE WALKS 500.00 SF $15.00 $7,500.00 $11.00 $5,500.00 $16.00 $8,000.00 0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF $13.50 $20,115.00 $12.00 $17,880.00 $15.00 $22,350.00 0815-0101 REMOVABLE BOLLARDS 4.00 EA $1,000.00 $4,000.00 $1,100.00 $4,400.00 $1,280.00 $5,120.00 1050-0120 30 FOOT DOUBLE GATES 1.00 EA $9,000.00 $9,000.00 $6,000.00 $6,000.00 $5,800.00 $5,800.00 9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS $1,200.00 $1,200.00 $2,500.00 $2,500.00 $2,750.00 $2,750.00

$91,607.50 Base Total: $92,155.00 Base Total: $102,970.00

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

$125.00 $56,250.00 $131.70 $59,265.00 $115.00 $51,750.00

$56,250.00 Alt Total: $59,265.00 $51,750.00

CPM $147,857.50 NSP $151,420.00 Roy Houck $154,720.00 -40.70% -39.27% -37.95% 0.00% 2.41% 4.64%

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

FH

W

A "G ui de lin es on

P re pa rin g En gi ne er 's

Es tim at e, Bi d Re vi ew s a nd

Ev al ua tio n"

BASE SUBTOTAL

CPM Development Corp NORTH SANTIAM PAVING Roy Houck Const. LLC

Item No. Item Description

0210-0100 MOBILIZATION 1.00 LS

0280-0100 EROSION CONTROL 1.00 LS

0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS

0290-0100 POLLUTION CONTROL PLAN 1.00 LS

0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS

0330-0150 GENERAL EXCAVATION 1.00 LS

0640-0100 AGGREGATE BASE 110.00 TON

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON

0759-0128 CONCRETE WALKS 500.00 SF

0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF

0815-0101 REMOVABLE BOLLARDS 4.00 EA

1050-0120 30 FOOT DOUBLE GATES 1.00 EA

9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

BASE SUBTOTAL

UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$11,930.00 $11,930.00 $18,500.00 $18,500.00 $17,000.00 $17,000.00 $1,570.00 $1,570.00 $1,144.00 $1,144.00 $2,000.00 $2,000.00 $450.00 $450.00 $1,248.00 $1,248.00 $550.00 $550.00 $500.00 $500.00 $850.00 $850.00 $500.00 $500.00

$1,800.00 $1,800.00 $3,120.00 $3,120.00 $3,000.00 $3,000.00 $5,975.00 $5,975.00 $11,440.00 $11,440.00 $17,000.00 $17,000.00

$50.00 $5,500.00 $93.60 $10,296.00 $66.00 $7,260.00

$145.00 $15,225.00 $133.50 $14,017.50 $170.00 $17,850.00

$20.00 $10,000.00 $15.60 $7,800.00 $14.00 $7,000.00 $25.00 $37,250.00 $19.80 $29,502.00 $18.00 $26,820.00

$1,650.00 $6,600.00 $1,248.00 $4,992.00 $2,000.00 $8,000.00 $5,000.00 $5,000.00 $9,888.00 $9,888.00 $3,500.00 $3,500.00 $1,500.00 $1,500.00 $3,328.00 $3,328.00 $2,150.00 $2,150.00

Base Total: $103,300.00 Base Total: $116,125.50 Base Total: $112,630.00

$130.00 $58,500.00 $123.50 $55,575.00 $138.00 $62,100.00

$58,500.00 $55,575.00 $62,100.00

Mid Valley $161,800.00 K&E $171,700.50 EMERY $174,730.00 -35.11% -31.14% -29.93% 9.43% 16.13% 18.17%

K&E PAVING, INC. dba H&H PAVING EMERY & SONS CONSTRUCTION INCMid Valley Exc., LLC

0280-0100 EROSION CONTROL 1.00 LS

0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS

0290-0100 POLLUTION CONTROL PLAN 1.00 LS

0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS

0330-0150 GENERAL EXCAVATION 1.00 LS

0640-0100 AGGREGATE BASE 110.00 TON

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON

0759-0128 CONCRETE WALKS 500.00 SF

0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF

0815-0101 REMOVABLE BOLLARDS 4.00 EA

1050-0120 30 FOOT DOUBLE GATES 1.00 EA

9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

BASE SUBTOTAL

UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$19,200.00 $19,200.00 $18,000.00 $18,000.00 $12,000.00 $12,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $200.00 $200.00

$1,000.00 $1,000.00 $500.00 $500.00 $1,250.00 $1,250.00 $7,500.00 $7,500.00 $6,500.00 $6,500.00 $4,500.00 $4,500.00 $1,500.00 $1,500.00 $11,000.00 $11,000.00 $12,500.00 $12,500.00

$54.00 $5,940.00 $70.00 $7,700.00 $47.00 $5,170.00

$180.00 $18,900.00 $255.00 $26,775.00 $175.00 $18,375.00

$12.50 $6,250.00 $13.00 $6,500.00 $21.00 $10,500.00 $12.50 $18,625.00 $14.00 $20,860.00 $28.00 $41,720.00

$2,000.00 $8,000.00 $1,700.00 $6,800.00 $1,700.00 $6,800.00 $3,200.00 $3,200.00 $6,000.00 $6,000.00 $6,995.00 $6,995.00 $1,000.00 $1,000.00 $3,800.00 $3,800.00 $6,985.00 $6,985.00

Base Total: $93,115.00 Base Total: $115,935.00 Base Total: $127,495.00

$190.00 $85,500.00 $142.00 $63,900.00 $146.00 $65,700.00

$85,500.00 $63,900.00 $65,700.00

Wickwire $178,615.00 BROWN $179,835.00 JESSE ROD $193,195.00 -28.37% -27.88% -22.52% 20.80% 21.63% 30.66%

Wickwire Contracting Inc. JESSE RODRIGUEZ CONSTRUCTIONBROWN CONTRACTING CO

0280-0100 EROSION CONTROL 1.00 LS

0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS

0290-0100 POLLUTION CONTROL PLAN 1.00 LS

0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS

0330-0150 GENERAL EXCAVATION 1.00 LS

0640-0100 AGGREGATE BASE 110.00 TON

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON

0759-0128 CONCRETE WALKS 500.00 SF

0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF

0815-0101 REMOVABLE BOLLARDS 4.00 EA

1050-0120 30 FOOT DOUBLE GATES 1.00 EA

9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

BASE SUBTOTAL

UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$20,500.00 $20,500.00 $20,700.00 $20,700.00 $10,000.00 $10,000.00 $4,450.00 $4,450.00 $1,400.00 $1,400.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $250.00 $250.00 $3,500.00 $3,500.00 $150.00 $150.00 $450.00 $450.00 $100.00 $100.00

$4,300.00 $4,300.00 $6,500.00 $6,500.00 $1,000.00 $1,000.00 $27,125.00 $27,125.00 $26,165.00 $26,165.00 $10,000.00 $10,000.00

$78.10 $8,591.00 $75.00 $8,250.00 $100.00 $11,000.00

$160.50 $16,852.50 $250.00 $26,250.00 $250.00 $26,250.00

$11.46 $5,730.00 $14.00 $7,000.00 $25.00 $12,500.00 $15.00 $22,350.00 $16.00 $23,840.00 $25.00 $37,250.00

$1,700.00 $6,800.00 $2,010.00 $8,040.00 $1,500.00 $6,000.00 $9,150.00 $9,150.00 $5,700.00 $5,700.00 $10,000.00 $10,000.00 $2,850.00 $2,850.00 $5,700.00 $5,700.00 $5,000.00 $5,000.00

Base Total: $130,048.50 Base Total: $140,245.00 Base Total: $133,600.00

$150.25 $67,612.50 $150.00 $67,500.00 $175.00 $78,750.00

$67,612.50 $67,500.00 $78,750.00

KNIFE RIVER $197,661.00 Cascade $207,745.00 KNL $212,350.00 -20.73% -16.69% -14.84% 33.68% 40.50% 43.62%

KNIFE RIVER Cascade Civil Corp KNL INDUSTRIES, INC.

0280-0100 EROSION CONTROL 1.00 LS

0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS

0290-0100 POLLUTION CONTROL PLAN 1.00 LS

0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS

0330-0150 GENERAL EXCAVATION 1.00 LS

0640-0100 AGGREGATE BASE 110.00 TON

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON

0759-0128 CONCRETE WALKS 500.00 SF

0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF

0815-0101 REMOVABLE BOLLARDS 4.00 EA

1050-0120 30 FOOT DOUBLE GATES 1.00 EA

9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

BASE SUBTOTAL

UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$12,000.00 $12,000.00 $15,000.00 $15,000.00 $16,069.44 $16,069.44 $5,000.00 $5,000.00 $5,200.00 $5,200.00 $1,444.44 $1,444.44 $1,250.00 $1,250.00 $700.00 $700.00 $451.39 $451.39 $1,000.00 $1,000.00 $700.00 $700.00 $36.11 $36.11 $7,000.00 $7,000.00 $12,000.00 $12,000.00 $5,416.67 $5,416.67

$20,500.00 $20,500.00 $14,500.00 $14,500.00 $24,900.00 $24,900.00 $63.00 $6,930.00 $80.00 $8,800.00 $96.84 $10,652.40

$250.00 $26,250.00 $300.00 $31,500.00 $309.00 $32,445.00

$16.00 $8,000.00 $14.00 $7,000.00 $18.00 $9,000.00 $14.00 $20,860.00 $16.00 $23,840.00 $20.00 $29,800.00

$2,900.00 $11,600.00 $2,000.00 $8,000.00 $1,354.17 $5,416.68 $4,500.00 $4,500.00 $6,500.00 $6,500.00 $3,430.56 $3,430.56 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $10,900.00 $10,900.00

Base Total: $127,890.00 Base Total: $135,740.00 Base Total: $149,962.69

$240.00 $108,000.00 $300.00 $135,000.00 $323.00 $145,350.00

$108,000.00 $135,000.00 $145,350.00

Papaya $235,890.00 Slateco $270,740.00 Dallum $295,312.69 -5.40% 8.58% 18.43% 59.54% 83.11% 99.73%

Slateco LLC DallumBuildCoPapaya Contracting LLC

0280-0100 EROSION CONTROL 1.00 LS

0280-0257 CONCRETE WASHOUT FACILITY 1.00 LS

0290-0100 POLLUTION CONTROL PLAN 1.00 LS

0305-0100 CONSTRUCTION SURVEY WORK 1.00 LS

0330-0150 GENERAL EXCAVATION 1.00 LS

0640-0100 AGGREGATE BASE 110.00 TON

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

105.00 TON

0759-0128 CONCRETE WALKS 500.00 SF

0759-0470 6" CONCRETE ADA PARKING PAD 1490.00 SF

0815-0101 REMOVABLE BOLLARDS 4.00 EA

1050-0120 30 FOOT DOUBLE GATES 1.00 EA

9999-0617 PAY STATION FOUNDATION AND CONDUIT 1.00 LS

0740-0100 COMMERCIAL ASPHALT CONCRETE PAVEMENT

450.00 TON

SALMON FALLS PARK IMPROVEMENTS

BID ANALYSIS

ONEOFFICE CONTRACT #: 2026-350

KEY #: N/A

COUNTY PROJECT #: 105482

CONTRACT TOTALS:

% OVER LOW BID:

QUANTITY

% OF ENGINEER'S ESTIMATE:

ALT SUBTOTAL

BASE SUBTOTAL

UNIT PRICE TOTAL

BID AVERAGE

UNIT PRICE

BID AVERAGE

TOTAL PRICE

$59,500.00 $59,500.00 $19,109.96 $19,109.96 $8,500.00 $8,500.00 $2,507.23 $2,507.23 $2,750.00 $2,750.00 $993.29 $993.29 $6,500.00 $6,500.00 $929.07 $929.07

$12,500.00 $12,500.00 $5,325.78 $5,325.78 $10,000.00 $10,000.00 $13,840.33 $13,840.33

$45.00 $4,950.00 $67.87 $7,465.63

$450.00 $47,250.00 $223.50 $23,467.50

$30.00 $15,000.00 $16.70 $8,352.00 $30.00 $44,700.00 $18.59 $27,694.13

$880.00 $3,520.00 $1,649.48 $6,597.91 $15,000.00 $15,000.00 $6,924.24 $6,924.24 $16,500.00 $16,500.00 $4,560.87 $4,560.87

Base Total: $246,670.00

$140.00 $63,000.00 $173.63 $78,133.50

$63,000.00

Alpha $309,670.00 $205,901.45 24.19% -17.42%

109.44% 39.26%

AVERAGEAlpha Environmental Services, Inc.

NOI - CPM Development Corp PW1752-26
Bid Opening Form - Salmon Falls PW1752-26
ADP461.tmp
BidDetail

File details come from the government source that posted it. Updated .