NOI - Brand Name Item - Creech DRP Phase 2_(FINAL).pdf
PDF 111 KB Posted
- Solicitation number
- W912PL25S0003
About this file
This document is a Special Notification regarding a Notice of Intent for the Creech Disaster Resiliency Program (DRP) Phase 2 project, Solicitation Number W912PL25S0003. The notification specifies the government's intent to sole source certain brand name equipment and controls, including an energy management control system, utility meters, and a fire alarm control panel. The government cites concerns over system compatibility, warranties, and training costs as the rationale for the brand name requirements. Respondents are asked to provide alternatives that would address these concerns. The notification also includes details on the overall Creech DRP Phase 2 project, which involves the design and construction of an aircraft maintenance facility, aerospace ground equipment storage, and airfield pavements. Responses to this notice are requested within 10 days, by November 29, 2024. This notification is for information and planning purposes only and is not a solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Notification
Intent to Sole Source-Brand Name Only-Inclusion of the “brand name or equal” descriptions identified in the design for an upcoming solicitation W912PL25R0003, for Creech Disaster Resiliency Program (DRP) Phase 2. The portion of the acquisition which includes “brand name or equal” components include: energy management control system, utility meters, and fire alarm control panel. This is NOT a request for proposal.
Description
Creech DRP Phase 2 includes the design and construction of an approximate 79,335 square foot Aircraft Maintenance Facility (AMF) hangar, a 4,429 square foot covered Aerospace Ground Equipment (AGE) storage yard, a 204 square foot hazardous material storage, and 100,167 square feet of airfield pavements to support the DRP mission-sets. Supporting facilities include all supporting utility and site infrastructure to make the facilities complete and usable.
The intent of this announcement is to specify particular brand-name equipment in the design. The notice of intent will cover only the portion of the acquisition which is the brand name or peculiar to one manufacturer. Use of such descriptions in the design is essential to the Government’s requirements, thereby precluding consideration of a product manufactured by another company. A description of the systems is listed below.
i. Energy Management and Control System (JCI Metasys) – The government requires the brand name system for three of the primary facilities so that the system may properly communicate with the existing base wide Energy Management and Control System (EMCS). The system allows the installation to monitor energy use. The base requires this component as part of their Installation Facility Standards (IFS). The standardization of these systems is essential to main coordinated system growth, consistency, and to conduct more efficient training.
ii. Building Utility Meters (Elec – Schneider Electric or Electro Industries Nexus; Water - McCrometer) – The government requires these meters for two of the facilities and their brand name requirement is noted within their IFS. These brands have been evaluated to meet the Air Force’s Automatic Meter Reading System (AMRS) specifications and cybersecurity requirements. The standardization of these components also allows the 432WG Support Squadron to improve their maintenance and serviceability and to conduct
iii. Fire Alarm Control Panel (Monaco) – The government requires one fire alarm control panel under Phase 2. The base has over 92% of their fire alarm control panel inventory under this manufacturer which has a history of proven local and regional support for supply and services. The base requires this component as part of their IFS. The standardization of this system is essential to main coordinated system growth, consistency, and to conduct
a) System Compatibility
A non-integrated system comprised of incompatible parts will result in unacceptable delays in fulfilling the Air Force’s requirements. To maintain proper operations and warranties, the parts used in servicing the equipment should only use approved parts from the manufacturer. A fully integrated system designed to operate and work together optimizes performance. Components from different manufacturers are not always compatible with each other which can lead to challenges during installation and integration. Incompatibilities may result in improper connections, communication failures, or unreliable performance.
b) Warranty It is typical for the work performed on the noted equipment to require a manufacturer certified technician to provide and maintain current warranties. The installation of non-manufacturer parts and the consequent need for certified technicians from multiple manufacturers will result in unacceptable delays and the duplication of maintenance contract costs in fulfilling the Air Force’s requirements.
c) Training The use of non-manufacturer parts which are not consistent with the IFS or current base wide inventory would result in substantial duplication of training costs due to the requirement for equipment manufacturer specific training that addresses the proprietary features and needs of operating and maintaining the systems. An integrated system and standardization of equipment will prevent this additional financial burden.
The information identified above is intended to be descriptive of why it is imperative the Brand Name Only equipment and controls are to be used.
Responses to this announcement should include company name, address, point of contact, phone number, and point of contact e-mail, UEI Number, Cage Code, size of business pursuant to North American Industrial Classification System (NAICS) 236220.
Please answer the following questions:
1) Provide an alternative to using mentioned equipment, with supporting rationale, that would alleviate the Government’s concerns regarding system compatibility.
2) Provide an alternative to using mentioned equipment, with supporting rationale, that would alleviate the Government’s concerns regarding warranties.
3) Provide an alternative to using mentioned equipment, with supporting rationale, that would alleviate the Government’s concerns regarding duplication of training costs.
4) Provide rationale as to how a on non-integrated equipment system will result in a more reliable system (than an integrated system using only aforementioned equipment) to ensure that compatibility and standardization efforts are not impacted.
This notice does not commit the government to contract for any supplies or services. The government will not pay for any information or administrative cost incurred in response to this Special Notice. Information will only be accepted in writing by e-mail to Contract Specialist Dominic Pebenito at Dominic.M.Pebenito@usace.army.mil and RubyAnn Prout at Rubyann.Prout@usace.army.mil. Responses are requested within 10 days of issuance, no later than 29 November 2024.
mailto:Dominic.M.Pebenito@usace.army.mil mailto:Rubyann.Prout@usace.army.mil
DISCLAIMER This Special Notification is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this notice that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this Special Notification
| Special Notification |
| Description |
File details come from the government source that posted it. Updated .