Filter Sources Sought Supply NAICS.pdf
PDF 2 MB Posted
- Solicitation number
- NOAA-WAD-SRW-22-03
About this file
This sources sought notice seeks potential vendors to provide aquaculture equipment including drum filters, debris screens, and aeration systems for the Manchester Research Station. The National Oceanic and Atmospheric Administration National Marine Fisheries Service intends to award a contract by December 2023 with an anticipated NAICS code of 221310 Water Supply and Irrigation Systems. Responses are requested by July 20, 2022 and shall include organization information, experience, and compliance with Buy American Act requirements. The equipment specifications include requirements for three drum filters capable of 1500 gallons per minute at 10 micron filtration, three debris screens capable of passing 1500 gallons per minute, and two aeration modules each capable of 1200 gallons per minute.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA/WAD Sources Sought Page 1 of 2
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
ACQUISITION AND GRANTS OFFICE
Western Acquisition Division
SOURCES SOUGHT NOTICE
WATER FILTRATION/DEBRIS SCREEN/AERATION EQUIPMENT
This is a Sources Sought Notice for market research purposes in accordance with Federal Acquisition Regulations (FAR) Part 10 Procedures. This is not a solicitation, nor does it guarantee a solicitation will be issued. Requests for a solicitation will not receive a response. This is not a request for proposals and it does not obligate the government in any manner.
The Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA) National Marine Fisheries Service (NMFS) is seeking potential vendors capable of providing aquaculture equipment to include Drum Filters, Debris Screens, and Aeration Systems for the Manchester Research Station (https://www.fisheries.noaa.gov/about/manchester-research-station-northwest-fisheries-science-center)
Please see attachments for anticipated equipment specifications.
Period of Performance: Award anticipated around September 16, 2022
The Government is especially interested in responses from SBA certified small business concerns that are capable of performing the work described within this notice.
This is a supply purchase. The anticipated NAICS code is 333999, All Other Miscellaneous General Purpose Machinery Manufacturing with a size standard of 500 employees. A previous sources sought incorrectly named the NAICS code as a utility: 221310 Water Supply and Irrigation Systems with a size standard of $30,000,000.00 but that is not applicable.
Response Requirements
Responses to this notice shall be limited to five pages:
1. Organization Information
a. The organization name and address, and a point of contact name, telephone number and e-mail address. The organization point of contact shall have the knowledge and authority to clarify responses with Government representatives.
b. The organization’s DUNS number, CAGE code, and organization/company structure (corporation, LLC, partnership, joint venture, etc.).
c. Written confirmation of the organization’s registration in SAM (www.sam.gov). Offerors should be registered to be considered as a source.
d. The size classification of the organization under the appropriate NAICS code, and if the organization is classified as a small business, HUBZone small business, Service Disabled Veteran Owned small business, Woman-owned small business and/or 8(a) certified small business.
https://www.fisheries.noaa.gov/about/manchester-research-station-northwest-fisheries-science-center https://www.fisheries.noaa.gov/about/manchester-research-station-northwest-fisheries-science-center http://www.sam.gov/
NOAA/WAD Request for Information Page 2 of 2
2. General statement providing the organization’s relevant experience and/or capability to provide the described supplies, including Buy American Act considerations for each item.
Capability statements and other responses shall be submitted to Sarah Waugh at sarah.waugh@noaa.gov no later than 2:00 PM Pacific Time on Wednesday, July 20, 2022 Do not call regarding this sources sought notice. Any questions regarding this notice must be submitted in writing via e-mail to the above e-mail address not later than 2:00 PM Pacific Time on Tuesday, August 23, 2022. An amendment may be posted if necessary, so firms are encouraged to “follow” this announcement for future actions.
This request is not to be construed as a commitment on the part of the Government to award a contract, nor does the Government intend to pay for any information submitted as a result of this request. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of the submission of contractor's information. The Government shall not be liable for or suffer any consequential damages for proprietary information not properly identified. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
Manchester Seawater Equipment Specifications:
General Requirements:
• Equipment shall be shipped and delivered to Manchester Washington. All shipping and delivery costs shall be included in equipment pricing.
• All components (drum filters, debris screens, and aeration system) shall be provided by the same supplier as part of an integrated filtration system. The supplier shall be responsible for designing the equipment to operate together as fully functional filtration system, with the debris screen removing large debris and the drum filter providing fine filtration.
• Submittals:
o Submit general product data, dimensional shop drawings, electrical wiring diagrams, materials of construction for all components including accessories and spare parts o Submit capacity ratings for drum filters and debris screen for the following conditions:
10-micron filtration with 25 mg/l TSS loading 20-micron filtration with 25 mg/l TSS loading o Submit capacity of overflow (filter occluded condition) o Submit capacity of filter tank (when operating with 20- and 30-micron screens) o Submit operating power requirements o Submit Operating Hydraulic profile for the drum filter and debris screen system under:
Normal operation with clean filter screens Normal operation with dirty filter screens Operation under emergency overflow (filter screens occluded) at 1500 gpm and
2500 gpm o Submit drum filter backwash water consumption (gpm) when backwash pump is running o Submit drum filter hot water consumption (gpm) when cleaning with the hot water rinse system o Submit description of drum filter controls and alarms o Submit shipping and operating weights of all equipment
Drum Filters:
• Number of Filters: 3
• Flow @ 10-micron filtration: 1500 gpm (Manufacturer Rating @ 10 micron)
• Screens: 10 microns
• Fluid: Seawater
• Fluid TSS: ` 25 mg/l
• Configuration: Tank Mounted with internal level control pan and emergency overflow weirs
• Hydraulic Capacity of Tank: 2506 gpm
• Hydraulic Capacity of Filter Overflow: 2506 gpm
• Materials of Construction: Plastic and Grade 2205 Duplex Stainless Steel (no exceptions)
• Connectors (nuts, bolts, washers): Grade 2205 Duplex Stainless Steel (no exceptions)
• Backwash Pump: Unit Mounted (skid mounted pumps not allowed)
• Backwash Systems:
o For Normal Operations: Moving Spray-bar (35 gpm max) o Hot Water: Separate Moving Spray-bar (2.2 gpm max)
• Backwash Water Strainer: 2” diameter minimum
• Backwash Strainer Mesh: As recommended by mfr.
• Water Inlet: 16” diameter, flanged end
• Water Outlet: 16” diameter flanged end
• Backwash Outlet: 4” diameter, plane end
• Power: 480V, 3 phase
• Controls:
o Mounting: Unit Mounted o Power Connection: Single Point Power Connection o Surge Protection: Provide lightning protection o Operating Modes:
Continuous Drum Rotation with Intermittent Backwash Timed Backwash and Cleaning Operation Backwash based on upstream water level Hot water cleaning o Alarms:
Horn and Strobe Alarm on High Level Provide dry contact for connection to an alarm dialer
• Spare Parts:
o Extra set of 10-micron screens for two filters o (5) sets of 20-micron screens (sufficient for in installation on five screens) o (1) extra set of backwash nozzles (for one filter) o (1) drum drive motor o (1) backwash pump o (2) backwash strainer baskets o (1) moving spray-bar motor o (1) hot water moving spray-bar motor o (1) drive chain o (1) set of drum seals o (1) set of drive bearings
• Accessories (provided by filter supplier) o Portable water heater for hot water cleaning system (120 V, 20 amp, for use with municipal water). The system shall be capable of providing high pressure water at 122-degree F water to the hot water cleaning system.
o Spreader Bar for removal of drums
• Manufacture Support:
o (3) day start up and training after installation by third party o (1) day follow up visit after installation by third party
Debris Screens:
• The debris screens shall be set up to allow adjustment and fine-tuning by the Government during startup and commissioning to minimize water loss to the dewatering chute. The final product shall be set up to have a water loss of 5 gpm or less per screen when operating at 1200 gpm.
• Number of Debris Screens: 3
• Flow: 1500 gpm
• Screen Slots: 1.75 mm
• Fluid: Seawater with 35 ppt salinity
• Fluid Debris: ` Barnacles, Sea Grass, Muscles, Fish
• Configuration: As indicated on configuration drawings unless approved by engineer.
• Materials of Construction: Grade 2205 Duplex Stainless Steel (no exceptions)
• Connectors (nuts, bolts, washers): Grade 2205 Duplex Stainless Steel (no exceptions)
• Water Inlet: 16” diameter, plane end
• Water Outlet: 16” diameter, plane end
• Drain: 3” diameter, NPT
• Dewatering Chute Drain: 4” diameter, plane end
• Spare parts: (1) extra screen and screen hold downs
• Manufacture Support:
o (3) day start up and training after installation by third party o (1) day follow up visit after installation by third party
Aeration System:
• Number of Aeration Modules: 2
• Rated capacity: 1200 gpm per module
• Hydraulic Capacity: 1500 gpm or greater per module
• Fluid: Seawater
• Water Inlet: (2) 10” Flanges per Aeration Module
• Configuration:
o Maximum footprint dimensions (each module):
Width: 40” Length: 70” Overall Height: 68” o Each Module to have (8) 16” diameter (+/-) aeration columns o Columns shall be removable by a single person for cleaning o Each Module shall include the support framework and distribution piping to the aeration columns
• Materials of Construction:
o Module Frame: Grade 2205 Duplex Stainless Steel (no exceptions) o Aeration Columns: Polyethylene or approved equal o Pipe: Polyethylene, PVC, or Fiberglass
• Connectors (nuts, bolts, washers): Grade 2205 Duplex Stainless Steel (no exceptions)
• Spare parts: (8) Aeration Columns
NOAA/WAD Request for Information Page 2 of 2
2. General statement providing the organization’s relevant experience and/or capability to provide the described supplies, including Buy American Act considerations for each item.
Capability statements and other responses shall be submitted to Sarah Waugh at sarah.waugh@noaa.gov no later than 2:00 PM Pacific Time on Wednesday, July 20, 2022. Do not call regarding this sources sought notice. Any questions regarding this notice must be submitted in writing via e-mail to the above e-mail address not later than 2:00 PM Pacific Time on Wednesday, July 27, 2022. An amendment may be posted if necessary, so firms are encouraged to “follow” this announcement for future actions.
This request is not to be construed as a commitment on the part of the Government to award a contract, nor does the Government intend to pay for any information submitted as a result of this request. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of the submission of contractor's information. The Government shall not be liable for or suffer any consequential damages for proprietary information not properly identified. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
DRAFT1
8 5
(M A
X
2' - 4" (MAX)
3' - 8" (MAX)
6' - 0" (MAX)
M
A X
CL
CL
ABOVE
BELOW
GENERAL NOTES
1. DEBRIS SCREEN STRUCTURE SHALL BE
CONSTRUCTED OF DUPLEX STAINLESS STEEL
2. ALL CONNECTORS (NUTS, BOLTS AND WASHERS)
SHALL BE CONSTRUCTED OF DUPLEX STAINLESS
STEEL
3. ALL GASKET MATERIALS USED SHALL BE SUITABLE
FOR USE WITH SEA WATER.
4. FABRICATION DIMENSIONS NOTED AS “MAX” MAY BE
SMALLER THAN SHOWN.
5. THE MAXIMUM WATER LEVEL NOTED OCCURS IF
FILTER IS CLOGGED AND WATER OVERFLOWS THE
EMERGENCY BYPASS WEIR IN THE FILTER TANK.
THE BASE OF THE DEBRIS SCREEN (ITEM 1) SHALL BE
SET AT A MINIMUM OF 3” ABOVE THE MAXIMUM
WATER LEVEL NOTED.
1. DEBRIS SCREEN. CONFIGURATION AND DESIGN TO
BE PROVIDED BY MANUFACTURER AND SHALL BE
SUITABLE TO PASS UP TO 1500 GPM. DEBRIS
SCREEN SHALL BE REMOVABLE FOR ACCESS FOR
CLEANING COLLECTION SUMP
2. DEWATERING CHUTE. DEWATERING CHUTE SHALL
BE DESIGNED BY MANUFACTURE TO DEWATER ANY
RESIDUAL WATER PASSING WITH DEBRIS. THE
CHUTE SHALL BE ADJUSTABLE FOR FINE TUNING
AND DESIGNED TO DROP DEBRIS INTO COLLECTION
BOX SUPPLIED BY OWNER.
3. 16” INLET WITH PLANE END CONNECTION SUITABLE
FOR CONNECTION TO PIPING WITH A FLEXIBLE
COUPLING. HEIGHT OF INLET PIPE AS DESIGNED BY
MANUFACTURER.
4. 16” OUTLET WITH PLANE END CONNECTION
SUITABLE FOR CONNECTION TO PIPING WITH A
FLEXIBLE COUPLING. OUTLET PIPE HEIGHT SHALL
MATCH ELEVATION OF FILTER INLET.
5. 3” TANK DRAIN WITH NPT CONNECTION
6. 4” DEWATERING CHUTE OUTLET WITH PLANE END
CONNECTION
7. HINGED OR REMOVABLE TOP COVER TO ALLOW
ACCESS FOR CLEANING INLET UPWELL.
8. ADJUSTABLE MOUNTING LEGS WITH PROVISIONS
FOR ANCHORING.
9. CONCRETE EQUIPMENT PAD BY OTHERS, HEIGHT AS
RECOMMENDED BY EQUIPMENT MANUFACTURER.
KEY NOTES
DATE
FIGURE
DEBRIS SCREEN
06/17/22
1/2" = 1'-0"
DEBRIS SCREEN ELEVATION
21/2" = 1'-0"
DEBRIS SCREEN PLAN
6" 12"0" 48"24"
| Filter Sources Sought NOAA-WAD-SRW-22-03.pdf |
| 22_0615_NOAA Seawater Progress_Debris Screen.pdf |
| Sheets |
| A.36 - DEBRIS SCREEN |
File details come from the government source that posted it. Updated .