2019 Marine Education and Training Mini Grant Program
TABLE OF CONTENTS
I. Funding Opportunity Description 3
A. Program Objective 3 B. Program Priorities 3 C. Program Authority 4
II. Award Information 4 A. Funding Availability 4 B. Project/Award Period 5 C. Type of Funding Instrument 5
III. Eligibility Information 5 A. Eligible Applicants 5 B. Cost Sharing or Matching Requirement 5 C. Other Criteria that Affect Eligibility 5
IV. Application and Submission Information 5 A. Address to Request Application Package 6 B. Content and Form of Application 6 C. Unique Entity Identifier and System for Award Management (SAM) 10 D. Submission Dates and Times 10 E. Intergovernmental Review 11 F. Funding Restrictions 11 G. Other Submission Requirements 11
V. Application Review Information 13 A. Evaluation Criteria 13 B. Review and Selection Process 14 C. Selection Factors 15 D. Anticipated Announcement and Award Dates 16
VI. Award Administration Information 16 A. Award Notices 16 B. Administrative and National Policy Requirements 17 C. Reporting 20
VII. Agency Contacts 22 VIII. Other Information 22
Federal Funding Opportunity Page 1 of 22
ANNOUNCEMENT OF FEDERAL FUNDING OPPORTUNITY
EXECUTIVE SUMMARY
Federal Agency Name(s): National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Department of Commerce
Funding Opportunity Title: 2019 Marine Education and Training Mini Grant Program
Announcement Type: Initial
Funding Opportunity Number: NOAA-NMFS-PIRO-2019-2005950
Catalog of Federal Domestic Assistance (CFDA) Number: 11.452, Unallied Industry Projects
Dates: Proposals must be received by http://www.Grants.gov, postmarked, or provided to a delivery service by 5:00 p.m., Hawaii Standard Time, on April 7, 2019. Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable. Postmarked applications received more than 7 business days following the closing date will not be accepted.
No facsimile or electronic mail applications will be accepted.
When developing your application submission timeline, please keep in mind that you are encouraged to apply through the www.grants.gov website. This electronic submission system is relatively complex for first time users and involves several preliminary registrations to be completed before your application can be submitted. If you have already used the grants.gov website, the required registrations may have already been completed. Please allow sufficient time for the application to be submitted electronically and for possible computer delays. Please note:
Validation or rejection of your application by Grants.gov may take up to 2 business days after submission. Please consider this process in developing your submission timeline. Applications not adhering to postmark or submission deadlines will be rejected and returned to the sender without further consideration.
Funding Opportunity Description: The National Marine Fisheries Service (hereinafter, “NMFS”) is soliciting competitive applications for the fiscal year 2019 Pacific Islands Region Marine Education and Training (MET) Mini-Grant Program. Projects are being solicited to improve communication, education, and training on marine resource issues throughout the region and increase scientific education for marine-related professions among coastal community residents, including indigenous Pacific islanders, Native Hawaiians and other underrepresented groups in the region.
Federal Funding Opportunity Page 2 of 22
FULL ANNOUNCEMENT TEXT
I. Funding Opportunity Description
A. Program Objective
NOAA/NMFS is soliciting competitive proposals for grants and cooperative agreements that will increase the sustainability, viability, and visibility of fishing and marine resource issues and communities in the Pacific Islands Region (PIR). Projects should prepare communities for employment in marine related professions; increase seafood and fishing safety, marketing, or management; or increase the sustainability of fishing practices through technology improvements or data collection. All projects must be developed with and identify beneficial and appropriate partnerships. These partnerships may include various government agencies (at all levels), non-governmental community organizations (NGO’s), traditional and local knowledge practitioners, researchers, or industry. All projects must include partnerships that contribute to the success of the project and build on, or expand relationships in the fishing and marine community.
B. Program Priorities
All projects, regardless of priority, must leverage and develop effective partnerships.
These partnerships may include: government agencies (island, local, state, or federal), non-governmental community organizations (NGO’s), local and traditional knowledge practitioners, researchers, academic institutions, and industry. The partnerships should contribute to the success of the project and build on, or expand relationships in the fishing and marine community. In addition, projects may leverage NOAA's existing partnership efforts including: Habitat Blueprint priority areas, Sentinel Sites, other previous funded MET projects, and coral reef conservation programs that target sites of high risk from major threats. Projects are also encouraged to be placed-based and community-driven, as appropriate.
Note that MET projects must include non-federal matching funds (See section III B. Cost Sharing or Matching Requirements for additional information), and in-kind support from partner organizations and non-federal agencies count towards this requirement. Projects must improve communication, education, and training on marine resource issues throughout the region and increase scientific education for marine-related professions among coastal community residents. Projects must fall into one or more of the following priorities, which are listed in no particular rank order of preference (i.e., no one factor carrying a higher priority than any another). If a project meets more than one of the listed priorities, the applicant should list first the priority that most closely reflects the objectives of the proposed project. Other priorities addressed in proposals should then be listed as applicable.
Federal Funding Opportunity Page 3 of 22
1. Marine Science and Technology: Education and training projects that are focused on preparing community residents for employment in marine related professions, including marine resource conservation and management, marine science, marine technology, and maritime operations.
2. Fisheries and Seafood-related Training: Projects addressing fishery observation, seafood safety and seafood marketing, focused on increasing the involvement of coastal community residents in fishing, fishery management, and seafood-related operations.
3. Outreach: Projects to educate and inform consumers about the quality and sustainability of wild fish or fish products farmed through responsible aquaculture in Hawaii; Projects that promote community education and outreach related to safe fishing and boating practices.
4. Technology: Projects that, with the fishing industry, not only identify methods and technologies that will improve the data collection, quality, and reporting, but also increase the sustainability of fishing practices, and ultimately transfer such methods and technologies among fisheries sectors and to other nations in the Western, Northern and Central Pacific.
5. Local and Traditional Knowledge: Projects that enhance science-based management of fishery resources of the region though local and traditional knowledge, including Pacific Islander and Native Hawaiian knowledge.
C. Program Authority
16 U.S.C. 1855(j)
II. Award Information
A. Funding Availability
Total funding available under this notice is anticipated to be approximately $150,000.
Approximately 10-15 awards are anticipated to be granted for FY 2019 under this competition. Actual funding availability for this program is contingent upon FY 2019 Federal appropriations. Proposals in excess of $15,000 are unlikely to be funded. Award amounts will be determined by the proposals and available funds. There is no limit on the number of applications that can be submitted by the same applicant; however, multiple applications submitted by the same applicant must clearly identify different projects. If an application for a financial assistance award is selected for funding, NOAA/NMFS has no obligation to provide any additional funding in connection with that award in subsequent years. Notwithstanding verbal or written assurance that may have been received, pre-award
Federal Funding Opportunity Page 4 of 22 costs are not allowed under the award unless approved by the NOAA Grants Officer.
B. Project/Award Period
The project period is recommended to be 12 months in duration. October 1, 2019 is the earliest recommended start date to be used on proposals, unless otherwise directed by the NOAA Program Officer. If an application is selected for initial funding, NOAA/NMFS has no obligation to provide additional funding in connection with that award in subsequent years.
C. Type of Funding Instrument
NOAA/NMFS will fund the projects under this competition as grants and/or cooperative agreements. The government will be substantially involved in the management and/or operation of the program if a project is funded through a cooperative agreement. This substantial involvement may include but is not limited to partnering in collaborative efforts and/or alignment of activities to meet program priorities. Substantial involvement may also include assisting in the development of educational materials.
III. Eligibility Information
A. Eligible Applicants
Eligible applicants are individuals, institutions of higher education, nonprofits, commercial organizations, state, local and Indian tribal governments. Federal agencies and their employees, as well as Federal instrumentalities (including employees and members) are not eligible to apply. Eligible applicants are limited to projects conducted within the Western Pacific Regional Fishery Management areas.
B. Cost Sharing or Matching Requirement
All applications and funded projects must provide matching contributions of at least 50% of the federal share (2:1 ratio of federal to non-federal). For example, if a project is requesting $15,000 in federal funds, $7,500 in non-federal funds must be provided by the applicant. Non-federal share may be provided as cash or in-kind contributions from the applicant or key program partners.
C. Other Criteria that Affect Eligibility
None.
IV. Application and Submission Information
Federal Funding Opportunity Page 5 of 22
A. Address to Request Application Package
The standard application package, consisting of the standard forms, i.e., SF-424, SF- 424A, SF-424B, SF-LLL, and the CD-511, is available at http://www.grants.gov. If an applicant has problems accessing or downloading the application forms from Grants.gov, contact Grants.gov Customer Support at 1-800-518-4726 or support@Grants.gov.
If you do not have internet access, an application package may be received by contacting:
Penny Larin, NOAA Federal Program Officer, Pacific Islands Regional Office, 1845 Wasp Blvd, Building 176, Honolulu, HI 96818, Phone: (808) 725-5057.
B. Content and Form of Application
Application Format: All application materials should be submitted in Adobe PDF or a common word processing format, and when printed out should meet all format requirements.
All pages must be double-spaced, at least 12-point font, and printable on 8.5-inch x 11-inch paper with 1-inch margins. Any PDF or other attachments that are included in an electronic application must meet the above format requirement when printed out. Failure to follow these requirements will result in the rejection of the application.
A complete standard NOAA grant application package is required in accordance with the guidelines in this document. Applications that are not complete on the closing date of this announcement will not be reviewed. Your application must contain all required forms; if these forms are not signed via the www.Grants.gov application process, they MUST be signed in ink. Paper applications without inked signatures on their forms will be considered incomplete and will not be reviewed.
Each application must include:
• Federal application forms, including:
• SF-424
• SF-424A, Budget Information, Non-construction Programs must be completed, and also include all matching funds.
• SF-424B, Assurances, Non-construction Programs must be completed for each submitted non-construction application.
• CD-511, Certification Regarding Lobbying
• SF-LLL, Disclosure of Lobbying Activities (if applicable).
• Title Page (described below, limit 1 page)
• Project Summary (described below, limit 1 page)
• Narrative Project Description (described below, limit 10 pages)
• Budget Justification (described below, limit 2 pages). Provide justifications (in narrative format) for all budget items in sufficient detail to enable the reviewers to evaluate the
Federal Funding Opportunity Page 6 of 22 appropriateness of the funding requested. The budget justification should be broken out and detailed using the same budget categories as noted on the SF-424A budget form.
• NEPA Questionnaire. The NOAA National Environmental Policy Act (NEPA) questionnaire must be completed for each application. For more information on this requirement, see section "B. Administrative and National Policy Requirements" and https://www.nepa.noaa.gov/docs/NOAA-Grants-Questionnaire-final.pdf. This questionnaire does not count towards any page limits.
• Data Sharing or Management Plan (up to 2 pages, if the project collects environmental data). Note that due to the nature of programmatic priorities for MET, we do not anticipate applications that will be collecting environmental data.
• Attachments (limit 15 pages): Other supporting documentation and relevant attachments the applicant deems important to the overall understanding and evaluation of the proposed project (combined into one PDF document). All combined attachments must be no longer than 15 pages. Attachment information can include: charts, graphs, maps, photographs, and other pictorial presentations; abbreviated CVs or resumes of key personnel; letters of collaboration; an indirect cost rate agreement; permit information; or any other supporting information.
Content Requirements:
1. Title Page (Proposal Cover Sheet, limit 1 page)
(a) Project title
(b) Principal Investigator (or Project Manager) and Financial Representative with complete contact information (address, fax, email, and phone number)
(c) Any co-investigators (or Co-managers) with contact information
(d) Start and end dates of proposed project
(e) Identification of programmatic priority applicable to the project (Priority 1, 2, 3, 4, or 5)
(f) Funding type request (grant or cooperative agreement)
(g) Total cost of the project, including federal and non-federal funding requested
2. Project Summary (limit 1 page): This one page project summary should be a high level description of the project written for the general public audience. The summary may be posted on our website if the project is funded. The summary should tell the story of what the proposed project will do (project goals and objectives); how the project will be conducted (project activities and timelines, project geographic area, number of participants, etc); and expected outcomes and benefits of the proposed project.
3. Project Narrative (limit 10 pages). This section will be a detailed description of the project goals, objectives, and activities; performance measures for the period of the proposed work
Federal Funding Opportunity Page 7 of 22 and the expected results or outcomes; information that demonstrates the need for the project;
descriptions of methodologies and time-lines for all phases of work; and, if applicable, the relationship to other ongoing work, or work planned, anticipated, or underway through Federal Assistance or other means. The project description should be a clear statement of all work to be undertaken and must include the information listed below.
(a) Project goals and objectives: This section should very briefly state the project goal, and how this goal will address the problem or opportunity the project intends to address. The project objectives should directly support the larger program goals. The objectives should be simple, understandable, and as specific and quantitative as possible. Objects should also be attainable within the time, money and human resources available.
(b) Project activities and plans: This section is the technical or scientific plan of activities that are to be accomplished during the project. The project activities should directly support the already identified objectives. This description should include detailed descriptions of the specific plan and/or methods that will be employed. Each discrete action or component activity of the project should be described in detail. If any activities occur in the marine environment, (e.g., not in a classroom), indicate if any permits are required, and if they have been obtained. Any activities in the marine environment should also include best management practices to prevent or minimize negative impacts to the environment.
(c) Milestone Schedule. This section should display timelines for each of the major tasks, activities, or objectives. It should include target milestones for important intermediate and final products, and key project outcomes.
(d) Benefits or results expected: This section should describe how the project will increase the sustainability, viability, and visibility of fishing and marine resource issues and communities in the Pacific Islands Region (PIR). Clearly identify the outcomes, results, and benefits of the project. Describe how these expected outcomes, results, or products will be applied and/or made available to any appropriate user groups. This section should also include information on how you will measure success of the project.
(e) Need for Government financial assistance: This section should demonstrate the need for government financial assistance. List all other sources of funding that are or have been sought for the project.
(f) Federal, State and local government activities: List any plans or activities (Federal, State, or local government activities) this project would affect and describe the relationship between the proposed project and those plans or activities.
(g) Project management: Describe how the project will be organized and managed and who will be responsible for carrying out project activities. The lead organization/individual and person listed as the technical contact should be identified as the Project Manager (PM) or Principal Investigator (PI). Use of sub-contractors or volunteer staff time to complete project activities and oversight of those individuals should be discussed. The PM/PI is responsible for all technical oversight and implementation of the approved work plan as delineated in the
Federal Funding Opportunity Page 8 of 22 proposal. One PM or PI must be designated on each project, but the PM/PI may or may not be the applicant. However, if the applicant is not the PM/PI, there must be an explanation of the relationship between the applicant and PM/PI (e.g., applicant will be responsible for managing the grant funds and the PM will be responsible for completing the project milestones on time and within budget, etc.). Project participants or organizations that will have a significant role in conducting the project should be listed as Co-investigators or Co- Managers. Organizations or individuals that support the project, for example, researchers contributing data or materials, should be referred to as Cooperators. Copies of the PM's or PI's and all Co-investigator's/Co-Manager's current resumes or curricula vitae must be included within the appendices. Resumes or curricula vitae for Cooperators are also encouraged.
4. Budget Justification (not to exceed 2 pages in length). Each application must include clear and concise budget information covering total project costs, both on the required Federal forms and in a detailed budget narrative. It is vital that all of the budget information include both the non-federal (matching funds) and the federal funds requested.
(a) Applications must include OMB standard form 424A, "Budget information - Non Construction Programs." All instructions should be read before completing the form, and the amounts per category and total amounts indicated on the form should correspond with amounts indicated in the budget narrative and justification. This form should include both the federal and non-federal (matching funds) in separate lines/columns.
(b) The budget narrative/justification should include a sheet/table of costs as well as a written justification that supports the table. This should be a maximum of 2-pages. The table should be a detailed list of costs per category. The justification should describe and justify the listed costs. The costs should be broken out in both the corresponding Federal and non- Federal share (direct and indirect cost). If in-kind contributions are included, describe briefly the basis for estimating the value of these contributions. The NOAA Grant Management Budget Narrative guidance can be found on their website: https://go.usa.gov/xPjNf.
(c) If an applicant has not previously established an indirect cost rate with a Federal agency they may choose to negotiate a rate with the Department of Commerce or use the de minimis indirect cost rate of 10% of MTDC (as allowable under 2 C.F.R. §200.414). If the de minimis rate is used, this should be stated within the budget narrative and justification.
The negotiation and approval of a rate is subject to the procedures required by NOAA and the Department of Commerce Standard Terms and Conditions Section B.06. The NOAA contact for indirect or facilities and administrative costs is:
Lamar Revis, Grants Officer NOAA Grants Management Division 1325 East West Highway 9th Floor Silver Spring, Maryland 20910 lamar.revis@noaa.gov
5. Data Management Plan: This announcement is not seeking proposals that generate
Federal Funding Opportunity Page 9 of 22 environmental data. Therefore, a Data Management Plan is not required as part of the Proposal.
6. Appendices (maximum 15 pages): Abbreviated curricula vitae or resumes of the PM and any Co-Managers should be included with the application. Additional material that is necessary or useful to the description of the project may also be provided (e.g., letters of collaboration, tables or visual materials). Letters of collaboration which document partners or community community involvement are strongly recommended.
C. Unique Entity Identifier and System for Award Management (SAM)
To enable the use of a universal identifier and to enhance the quality of information available to the public as required by the Federal Funding Accountability and Transparency Act, 31 U.S.C. 6101 note, to the extent applicable, any proposal awarded in response to this announcement will be required to use the System for Award Management (SAM), which may be accessed online at https://www.sam.gov/portal/public/SAM/. Applicants are also required to use the Dun and Bradstreet Universal Numbering System, as identified in OMB guidance published at 2 CFR Part 25, which may be accessed at https://www.ecfr.gov/cgi-bin/text-idx?SID=35be46d4aad32de8a6573d14609aa19b&mc=true&node=pt2.1.25&rgn=div5.?
D. Submission Dates and Times
Proposals must be received by http://www.Grants.gov, postmarked, or provided to a delivery service by 5:00 p.m., Hawaii Standard Time, on April 7, 2019. Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable.
Postmarked applications received more than 7 business days following the closing date will not be accepted. No facsimile or electronic mail applications will be accepted.
When developing your application submission timeline, please keep in mind that you are encouraged to apply through the www.grants.gov website. This electronic submission system is relatively complex for first time users and involves several preliminary registrations to be completed before your application can be submitted. If you have already used the grants.gov website, the required registrations may have already been completed.
Please allow sufficient time for the application to be submitted electronically and for possible computer delays. Please note: validation or rejection of your application by Grants.gov may take up to 2 business days after submission. Please consider this process in developing your submission timeline. Applications not adhering to postmark or submission deadlines will be rejected without further consideration.
Federal Funding Opportunity Page 10 of 22
E. Intergovernmental Review
Applications submitted by state and local governments are subject to the provisions of Executive Order 12372, "Intergovernmental Review of Federal Programs." Any applicant submitting an application for funding is required to complete item 19 on SF-424 regarding clearance by the State Single Point of Contact (SPOC) established as a result of EO 12372.
F. Funding Restrictions
NOAA will not consider expenses associated with fees, fund-raising activities, travel for activities not directly related to project implementation, travel or salaries for Federal employees, or profit as allowable costs in the proposed budget. The total costs of a project consist of all allowable costs incurred in accomplishing project activities during the project period. Project costs can only include support for activities conducted between the effective start date and end date of the award, and cannot include activities undertaken either before or after the agreed upon dates. Applicants will not be reimbursed for time expended or costs incurred in developing a project or in preparing an application, or in any discussions or negotiations with the agency prior to the award. Such expenditures may not be considered as part of the applicant's cost share or matching contribution.
G. Other Submission Requirements
Full Applications should be submitted through www.grants.gov. If you do not have Internet access, an application package may submitted to Penny Larin, Federal Programs Officer, NOAA/NMFS/PIRO; 1845 Wasp Blvd., Building 176, Honolulu, Hawaii, 96818.
Registration Process
1. Required registrations: You must complete and maintain the following registrations to be eligible to submit an application using the Grants.Gov website. All registrations must be completed prior to the application being submitted. Registration can take between 3 days to 4 weeks or more, and applicants should begin the registration process as soon as possible.
(a) Grants.Gov: The first step in submitting an application online is to complete a onetime registration process. Individuals wishing to submit a grant application, using Grants.Gov, are required to complete this one time registration process. Neither a Data Universal Number System (DUNS) number nor the System for Award Management (SAM) registration is necessary for Individual Registration.
(b) Dun and Bradstreet Universal Numbering System (DUNS) - All Applicant Organizations (optional for Individual Applicants) must be issued a DUNS number. A DUNS number is a unique nine-digit identification number provided by Dun and Bradstreet.
It will be used as the Universal Identifier when applying for Federal awards or cooperative agreements. You may request a DUNS number by calling 1-866-705-5711 (toll free) or
Federal Funding Opportunity Page 11 of 22 through the Internet at http://fedgov.dnb.com/webform.
Your DUNS Number assignment is free.
(c) System for Award Management (SAM) – All Applicant Organizations (optional for Individual Applicants) must complete and maintain an active registration. New registrations take an average of fourteen (14) business days. The renewal process may require as much time as the initial registration. SAM registration includes the assignment of a Commercial and Government Entity (CAGE) Code for domestic organizations which have not already been assigned a CAGE Code. To register, go to: http://www.SAM.gov.
Registration is free.
You must renew and re-validate your entity’s registration at least every 12 months from the date you last certified to and submitted the registration in SAM - and sooner, if your entity’s information changes. The email address provided for the primary point of contact will receive a message alerting that designee to the entity’s/entities’ renewal requirements at 60 days, 30 days and 15 days prior to expiration. If you do not renew your registration, it will expire. You must have an active SAM registration in order to be eligible to receive contract awards or payments, submit assistance award applications via Grants.gov, or receive certain payments from some federal government agencies.
2. Only authorized the individual(s) will be able to submit the application, and the system may need time to process a submitted application. After you electronically submit your application, you will receive from Grants.gov an automatic acknowledgment of receipt that contains a Grants.gov tracking number. (This notification indicates receipt by Grants.gov only, not receipt by NOAA.) Applications submitted through Grants.gov will be accompanied by THREE automated responses (the first confirming receipt; the second confirming there are no errors with an application submission; and the third validating the application has been forwarded to NOAA for further processing). You should save and print the proof of submission. If all notifications are not received, applicants should follow up with both the Grants.gov help desk and the NOAA Pacific Islands Regional Office, Federal Programs Office staff to confirm NOAA receipt of the complete submission. You must obtain a Grants.gov support number.
3. Federal employees are not allowed to assist in the preparation of an application or proposal, except that these individuals may provide you with information on program goals, funding priorities, application procedures, and completion of application forms. Because this is a competitive program, Federal employees will not provide assistance in conceptualizing, developing, or structuring proposals, or write letters of support for an application or proposal.
Federal Funding Opportunity Page 12 of 22
V. Application Review Information
A. Evaluation Criteria
Reviewers will assign scores to applications ranging from 0-100 points based on the following five standard NOAA evaluation criteria. The maximum score for each criterion is indicated in parentheses. Each criterion also includes the factors that the reviewers will consider to determine how well an application meets the criterion. We encourage applicants to make explicit connections to the evaluation criterion and factors in their applications.
Written comments are required to justify provided scores in each section of the review.
Applications that best address these criteria will be most competitive.
1. Importance and/or Relevance and Applicability of Proposed Project to the Program Goals (25 points). This criterion ascertains whether there is intrinsic value in the proposed work and/or relevance to NOAA, Federal, regional, state, or local activities.
Does the proposal adequately describe its relevance to a MET Program Priority in section B?
Will the project improve communication, education, and training on marine resource issues throughout the region? Will the project increase scientific education for marine-related professions among coastal community residents? Does the project include or showcase valuable and appropriate partnerships? Does the project increase the sustainability, viability, and visibility of fishing and marine resource issues and communities in the Pacific Islands Region (PIR).
2. Technical/Scientific Merit (20 points). This criterion assesses whether the approach is technically sound and/or innovative, if the methods are appropriate, and whether there are clear project goals and objectives.
Proposals should provide a clear definition of the project design, strengths and/or weaknesses and the means that are to be employed for securing productive results. Are the conceptual framework, design, methods, and analyses adequately developed, well integrated, and appropriate to the aims of the project? Are the objectives in the proposal clearly defined and focused, realistic and can be reached within the proposed project period? Does the applicant acknowledge potential problem areas and consider ways to resolve the issues or implement alternative tactics? Does the project challenge existing paradigms or develop new methodologies or technologies? Is sufficient detail provided in the proposal about the methods proposed for monitoring and evaluating the success of the project, and are they appropriate? Does the project demonstrate support, cooperation and/or collaboration with the fishing industry?
3. Overall Qualifications of the Applicants (15 points). This criterion ascertains whether the applicant possesses the necessary education, experience, facilities, and administrative
Federal Funding Opportunity Page 13 of 22 resources to accomplish the project.
Does the applicant have the capacity/knowledge to conduct the scope and scale of the proposed work, as indicated by the qualifications and past experience of the project leaders and/or partners that show adequate administrative capability and experience in successfully completing similar projects? Are the institutional support, equipment and other physical resources available to the investigators adequate for the proposed project? Does the proposal include resumes of the Principal Investigator(s)? In cases where subcontracts are proposed for carrying out specific tasks, are the quality/appropriateness of the personnel, facilities and procedures (laboratory methods, work plan and or quality oversight procedures) adequate?
4. Project Costs (15 points). This criterion evaluates the budget to determine if it is realistic and commensurate with the project needs and time-frame. This includes reviewing the reasonableness of the costs associated with the required tasks to be performed, and the overall relationship with the cost effectiveness for successfully completing the project.
Is the proposed budget cost-effective and realistic based on the applicant’s stated objectives, time frame, and amount of overall project budget already secured from other sources? Is the proposed budget sufficiently detailed, with appropriate budget breakdown and justification of costs by object class? Does the project include the required non-federal matching funds?
5. Outreach and Education (25 points). This criterion assesses whether the project provides a focused and effective education and outreach strategy regarding NOAA's mission to protect the Nation's natural resources.
Does the proposal identify anticipated benefits, potential users, indicators of success, and methods of disseminating results? Is an effective method proposed for dissemination of project results? Are the various target audiences, such as the fishing community or the general public, identified? Will the outreach methods acknowledge NOAA Fisheries support of the project?
B. Review and Selection Process
Screening, review, and selection procedures will take place in 3 steps: initial screening;
panel review; and final selection by the Selecting Official (the NOAA/NMFS Regional Administrator).
1. Initial Screening - An initial administrative review is conducted on each application to determine compliance with application requirements and completeness of application materials. Applications determined to be ineligible, incomplete or non-responsive will be eliminated from further review. When applications are received they will be screened to ensure that they were received by the deadline date (see Section IV. C. Submission Dates and Times); the applicant is eligible to apply; the proposed project addresses one of the
Federal Funding Opportunity Page 14 of 22 funding priorities; and includes a project summary, project description, budget, and supporting documentation as outlined in Section IV.B. Content and Form of Application. We do not have to screen applications before the submission deadline in order to identify deficiencies that would cause your application to be rejected so that you would have an opportunity to correct them. However, should we do so and provide you information about deficiencies, or should you independently decide it is desirable to do so, you may correct any deficiencies in your application before the deadline.
After the deadline, the application must remain as submitted; no changes can be made to it.
If your application does not conform to the requirements listed above, and the deadline for submission has passed, the application will be rejected without further consideration.
2. Panel Review - After the initial screening, each application will be reviewed by three or more appropriate federal, private or public sector experts (e.g. industry, academia, or governmental experts) with subject matter expertise. The reviewers will meet and evaluate each proposal individually based on its own merit against the evaluation criteria described in Section V. A. Evaluation Criteria. All applications, regardless of priority, will be reviewed in this manner. Prior to the meeting or webinar, each reviewer will independently evaluate each project and provide an individual score prior to the panel meeting or webinar. During the panel meeting or webinar, reviewers may revise their scores and comments. Reviewers will submit their final proposal scores to the MET manager by the end of the panel meeting or Webinar. After the panel scores are submitted, a compilation of all proposals in rank order is developed based on the average score from the reviewer scores. No consensus advice will be developed at the meeting, nor given to NOAA. These reviewers will be required to certify that they do not have a conflict of interest concerning the application(s) they are reviewing.
NOAA will protect the identity of each reviewer to the maximum extent permitted by law.
3. Selection. After applications have undergone the panel review, the Selecting Official will make the final decision regarding which applications will be funded based upon the numerical rankings and evaluations of the applications.
C. Selection Factors
The NOAA PIRO Regional Administrator, as the Selecting Official, will review the funding recommendation and comments of the reviewers to determine which applications will be recommended to the NOAA Grants Officer. The Selecting Official shall recommend proposals to the Grants Officer for funding in the rank order unless the proposal is justified to be selected out of rank order based on one or more of the following factors listed in no order of significance:
1. Availability of funds;
Federal Funding Opportunity Page 15 of 22
2. Balance/distribution of funds;
a. By research area;
b. By project type;
c. By type of Applicant;
d. By type of partners;
e. Geographic distribution;
3. Duplication of other projects funded or considered for funding by NOAA/federal agencies;
4. Program priorities as noted in Section I A. and B.
5. Applicant's prior award performance in conducting a previous award, such as the applicant’s use of funds, achievement of project objectives, and compliance with grant conditions. The Selecting Official may also consider whether the applicant failed to submit a timely performance report or submitted a report of unacceptable quality:
6. Partnerships with/Participation of targeted groups; and
7. Adequacy of information necessary for NOAA staff to make a National Environmental Policy Act (NEPA) determination and draft necessary documentation before recommendations for funding are made to the NOAA Grants Officer.
D. Anticipated Announcement and Award Dates
The competitive selection process and subsequent notification of applications being considered for funding are expected to be complete by July 2019. The earliest start date for projects will be October 1, 2019, dependent upon availability of Federal funding, acceptable completion of all NOAA/applicant negotiations including NEPA analysis and permit requirements, and the provision of other supporting documentation as requested.
VI. Award Administration Information
A. Award Notices
Upon completion of the review and selection process, successful applicants will receive notification from a NMFS Regional representative that the application has been recommended for funding selection to the NOAA Grants Management Division. This notification is not an authorization to begin performance of the project, and it is not a guarantee of funding. Official notification of funding, signed by the NOAA Grants Officer, is the authorizing document that allows the project to begin. This notification will be issued to the Authorizing Representative of the project either electronically through use of Grants Online or in hard copy. Projects should not be initiated in expectation of Federal funding until the Applicant’s Authorized Representative has received official notice of the award from the NOAA Grants Officer and has reviewed and accepted the terms of the award.
Federal Funding Opportunity Page 16 of 22
Unsuccessful applicants will be notified their proposal was not recommended for funding or was not reviewed because it did not meet the minimum requirements described in IV.B (Content and Form of Applications). Unsuccessful paper applications will not be returned to the applicant. Successful applicants may be asked to modify objectives, work plans, or budgets prior to final approval of an award. The exact amount of funds to be awarded, the final scope of activities, the project duration, and specific NOAA cooperative involvement with the activities of each project will be determined in pre-award negotiations among the applicant, the NOAA Grants Office, and NOAA program staff.
Award documents provided by the Grants Officer may contain special award conditions limiting the use of funds for activities that have outstanding environmental compliance requirements. These special award conditions may also include other compliance requirements for the award, as applicable, and will be applied on a case-by-case basis.
Applicants are strongly encouraged to review award documents carefully before accepting a Federal award so they are fully aware of the relevant Standard Terms and Conditions as well as any Special Award Conditions that have been placed on the award.
B. Administrative and National Policy Requirements
1. Department of Commerce Pre-Award Notification Requirements The Department of Commerce Pre-Award Notification Requirements for Grants and Cooperative Agreements contained in the Federal Register notice of December 30, 2014 (79 FR 78390) are applicable to this solicitation and may be accessed online at https://www.gpo.gov/fdsys/pkg/FR-2014-12-30/pdf/2014-30297.pdf
2. Administrative Requirements - Successful applicants that accept a NOAA award under this solicitation will be bound by the Department of Commerce and NOAA standard terms and conditions. This document will be provided in the award package in Grants Online, NOAA’s financial assistance management system. In addition, award documents provided by the NOAA grants office though the Grants Online award package may contain program-specific special award conditions.
3. NEPA Requirements - As required by the National Environmental Policy Act (NEPA), NOAA must analyze the potential environmental impacts, of applications that request Federal funding. Detailed information on NOAA compliance with NEPA can be found at the following NOAA NEPA website: http://www.nepa.noaa.gov/, including our NOAA Administrative Order 216-6 for NEPA and the Council on Environmental Quality implementation regulations. Consequently, as part of an applicant's package, and under their description of their program activities, applicants are required to provide detailed
Federal Funding Opportunity Page 17 of 22 information on the activities to be conducted, locations, sites, species and habitat to be affected, possible construction activities, and any environmental concerns that may exist (e.g., the use and disposal of hazardous or toxic chemicals, introduction of non-indigenous species, impacts to endangered and threatened species, aquaculture projects, and impacts to coral reef systems). Program applications should, to the best extent, provide what they know about their projects at the time of submitting their grant application.
In addition to providing specific information that will serve as the basis for any required impact analyses, applicants may also be requested to assist NOAA in drafting of an environmental assessment, if NOAA determines an assessment is required. Applicants will also be required to cooperate with NOAA in identifying and implementing feasible measures to reduce or avoid any identified adverse environmental impacts of their proposal. The failure to do so shall be grounds for not selecting an application. Funds will not be released until NOAA completes the requisite NEPA analysis and documentation. Funds may be withheld by the Grants Officer under a special award condition requiring the recipient to submit additional environmental compliance information sufficient to enable NOAA to make an assessment on any impacts that a project may have on the environment. It is the applicant’s responsibility to obtain all necessary federal, state, and local government permits and approval for the proposed work to be conducted. Applicants are expected to design their proposed activities to minimize the potential for adverse impacts to the environment. If applicable, documentation of requests for, or approval of required environmental permits should be included in the application package. Applications will be reviewed to ensure that they contain sufficient information to allow NOAA staff to conduct a NEPA analysis so that appropriate NEPA documentation, required as part of the application package, can be submitted to the NOAA Grants Management Division along with the recommendation for funding for selected applications. Applicants whose proposed projects may have an environmental impact must furnish information requested to assist proposal reviewers in assessing the potential environmental consequences of supporting the project.
4. Limitation of Liability - Funding for programs listed in this notice is contingent upon the availability of Fiscal Year 2019 appropriations. Applicants are hereby given notice that the amount of funds has not yet been determined for the program described in this notice, and applicants are advised that the competition described herein may be subject to cancellation due to unavailability of funding or revision of agency priorities. In no event will NOAA or the Department of Commerce be responsible for proposal preparation costs.
Publication of this announcement does not oblige NOAA to award funding for any specific projects or obligate any available funds. You should not initiate your project in expectation of Federal funding until you receive a grant award document signed by an authorized NOAA official. If you incur any costs prior to receiving an award agreement signed by an authorized
Federal Funding Opportunity Page 18 of 22
NOAA official, you do so solely at your own risk of these costs not being included under the award. Recipients and sub-recipients are subject to all Federal laws and agency policies, regulations and procedures applicable to Federal financial assistance awards.
5. Paperwork Reduction Act - This collection of information contains requirements subject to the Paperwork Reduction Act. The use of Standard Forms 424, 424A, 424B, and SFLLL and CD-346 has been approved by the Office of Management and Budget (OMB) under control numbers 0348-0040, 0348-0044, 0348-0043, 0348-0046 and 0605-0001.
Notwithstanding any other provision of law, no person is required to respond to, nor shall any person be subject to a penalty for failure to comply with, a collection of information subject to the requirements of the PRA unless that collection of information displays a currently valid OMB control number.
6. Administrative Procedure Act/Regulatory Flexibility Act - Prior notice and an opportunity for public comment are not required by the Administrative procedure Act or any other law for rules concerning public property, loans, grants, benefits, and contracts (5 U.S.C. 553(a)(2)). Because notice and opportunity for comments are not required pursuant to 5 U.S.C. 553 or any other law, the analytical requirements of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) are inapplicable. Therefore, a regulatory flexibility analysis has not been prepared. It has been determined that this notice does not contain policies with Federalism implications as that term is defined in Executive Order 13132.
7. Executive Order 12866 - It has been determined that this notice is not significant for purposes of Executive Order 12866.
8. Unpaid or Delinquent Tax Liability – In accordance with Section 523 of Division B and Sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) or a future public law, an authorized representative of the selected applicant(s) will be required to provide certain pre-award representations regarding federal felony and federal criminal tax convictions, unpaid federal tax assessments, and delinquent federal tax returns.
This is the start of the file's text. The full file is on GovTribe.