NOAA General Technical Requirements (GTR) Rev -.pdf

PDF 318 KB Posted

Attached to
MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS Federal contract opportunity
Solicitation number
1305M226Q0100REF
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document is the NOAA General Technical Requirements (GTR) revision guide that establishes technical standards and procedures for federal maritime construction and maintenance contracts, specifically applicable to NOAA vessel modifications and repairs.

The GTR comprises 16 sections covering comprehensive technical requirements for vessel work including regulatory compliance, inspection and testing protocols, material specifications, and construction standards. Key requirements address inspection access for equipment maintenance and repair; structural tightness testing using air, water, or visual methods; electrical systems testing per IEEE standards including insulation resistance and motor load verification; auxiliary systems testing such as fresh water, fire-fighting equipment, distilling plants, and steering systems; HVAC system balancing and operational verification per ASHRAE standards; and painting specifications requiring lead-free coatings with documented dry film thickness measurements. Additional sections mandate specifications for contractor-furnished materials suitable for marine service, joiner work using noncombustible materials, thermal and acoustic insulation installations, and piping design with flexible joints, proper hangers, and accessibility provisions. The document establishes an order of precedence for contract requirements with regulatory requirements superseding work items, contract drawings, guidance drawings, and GTR specifications in descending priority. All testing must be conducted in the presence of the Contracting Officer's Representative and applicable regulatory body representatives including the American Bureau of Shipping (ABS), U.S. Coast Guard (USCG), and International Maritime Organization (IMO), with preliminary testing required before official tests and calibrated instruments required within six months of testing dates.

View the file

Other files for this federal contract opportunity

Other files attached to MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS, newest first.
File Type Posted
TJ-573-01 Cranes Deck and Boom O M.pdf PDF
TJ_FY2027 DD_Fire System Inventory_Fixed Semi-Cylinders.pdf PDF
NOAA Standard Specification MOC-167-1 Refurbishment of Water Tight Closures.pdf PDF
NOAA Standard Specification MOC-100-1A_Abs Load Line Survey.pdf PDF
NOAA Standard Specification AMC-505-1B_Valve Overhaul and Tests.pdf PDF
48026A-GI INDUSTRIAL-NOAA T JEFFERSON-POTBD_UTT.pdf PDF
1102-35 - Safe Use of Rigging Equipment (public).docx DOCX document
NF 57-07-12 - DryDock-UWILD Inspection Checklist (public).pdf PDF
Steyr Motors Marine Engines Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
TJ-311-03 EDG Alternator.pdf PDF
Capstan_SA-1128 Manual for SA1014.pdf PDF
436-6634707 Machinery Alarm and Monitoring System Dk Pln - redline.pdf PDF
528-6634786E Plumbing and Deck Drains Arrangement and Details_130709483.pdf PDF
512-6634856_HVAC Arr and Details FCSLE Deck Fr 19-50.pdf PDF
TJ-079-03E Trim and Stability Booklet_101947795.pdf PDF
525-6634754E Fills Vents and Soundings Arrngmnt and Details.pdf PDF
TJ-528-009A - Grey Water and Sewage Modifications.pdf PDF
612-6634889D Lifelines Handrails and Stanchions.pdf PDF
TJ-611-6634891F DECK FITTINGS ARRANGEMENT and DETAILS.pdf PDF
163-6634821_Seachest Details.pdf PDF
243-6634740_Propeller Shafting Arrangement and Details.pdf PDF
TJ-582-002A New Transom Mooring Chock Inst.pdf PDF
636-6634911 Acoustic Tile Installation Arr.pdf PDF
601-6634921 Joiner Arrangement Main Deck.pdf PDF
320-6634691 Cable Wtrtight Penetrations - redline.pdf PDF
TJ_985_985-6634639_RevP_Sht1 THRU 3_ABS_FIRE CONTROL PLAN.pdf PDF
259-6634767 Diesel Engine Exhaust Arrangement.pdf PDF
514-3275003-12_91762335.pdf PDF
512-6634850F HVAC ARRNGMNT ENGRM_124644191.pdf PDF
TJ-583-022A Platform and Grating Mods.pdf PDF
101-6634867 Structural Module 8.pdf PDF
512-3275003-7 HVAC MODS 01 LVL AND ABV REV B.pdf PDF
801-6634641_Table of Offsets.pdf PDF
101-6634866_Structural Module Assembly No 7.pdf PDF
TJ-529-001A Cross Flooding Piping Installation.pdf PDF
TJ-562-001A Rudder Arrangment and Details_102457373.pdf PDF
562-6634741D Rudder Arrangement and Details.pdf PDF
073-6634629_Resilient and Dim Mounting List.pdf PDF
101-6634864 Structural Module 5.pdf PDF
259-6634766 Engine Exhaust System.pdf PDF
TJ-437-004 TLI Electrical Modifications.pdf PDF
TJ_FY2027 DD_Fire System Inventorya.pdf PDF
TJ_FY2027 DD_Fire System Inventory_Portables.pdf PDF
NOAA Standard Specification AMC-240-1 Propulsion Shafts and Propellers.pdf PDF
NOAA Standard Specification MOC-000-1G_General_Requirements for Ship Repair Work on NOAA_Ships.pdf PDF
NOAA Standard Specification 000-2D Temporary-Services-Contractor-Facility.pdf PDF
NOAA Standard Specification AMC-233-1A Overhaul of Diesel Engines.pdf PDF
NOAA Standard Specification AMC-583-1B General Requirements for Life Raft Inspections.pdf PDF
NOAA Standard Specification AMC-635-2 Thermal Insulation for Compartments.pdf PDF
Show all 50

MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEENERA

U

Nation

AL TE

United St nal Ocea

N

ECHNI

(G

25 M tates Dep nic and A

NOAA

ICAL R

GTR)

March 20 partment

Atmosph

REQU

t of Com heric Adm

UIREM

mmerce ministrat

MENTS

tion

S

GENERAL TECHNICAL REQUIREMENTS

GENERAL TECHNICAL REQUIREMENTS (GTR) INDEX

Revision - NOAA GTR SHEET 2 OF 97

1 Regulatory Bodies and Order of Precedence

2 Access for Inspection, Operation, Maintenance, and Repair

3 Tests, Trials, Inspections, and Certificates

4 Brand Name or Equal

5 Drawings, Drawing Review, and Drawing Approval Requirements

6 Contractor Furnished Material and Workmanship

7 General Painting

8 Joiner Work

9 Insulation And Lagging

10 Piping

11 Manufacturer’s Representatives

12 Structure And Foundations

13 Interior Deck Coverings

14 Heating, Ventilation And Air Conditioning (HVAC)

15 Electrical And Electronic Systems

16 Identifying Markings

GTR No. 1

REGULATORY BODIES AND ORDER OF PRECEDENCE

Revision - NOAA GTR GTR 1 SHEET 1 OF 2

1.0 ABSTRACT

This Item identifies regulatory body requirements and order of precedence requirements.

2.0 REFERENCES: None

3.0 REGULATORY BODIES

Whether or not specifically required in a work item or GTR, all of the applicable laws of the United States and the requirements of the various regulatory bodies in force at the time of contract award shall apply to the work performed under the contract, including but not limited to those listed below:

3.1 American Bureau of Shipping (ABS), Rules for Building and Classing Steel Vessels Under 90 Meters (295 Feet) in Length and Guide for Certification of Lifting Appliances.

3.2 United States Coast Guard (USCG), Code of Federal Regulations, Title 46 - Shipping (46 CFR), Code of Federal Regulations, Title 33 - Navigation and Navigable Waters (33 CFR), Code of Federal Regulations, Title 29 – Labor, Title 35 - Panama Canal (35 CFR), and Navigation and Vessel Inspection Circulars.

3.3 International Maritime Organization (IMO): Including all resolutions and amendments as adopted for the International Convention for the Safety of Life at Sea (SOLAS), the International Convention for the Prevention of Pollution from Ships (MARPOL), and the International Convention for the Prevention of Collisions at Sea (COLREGS).

3.4 United States Public Health Service (USPHS), Publication No. 393, "Handbook on Sanitation of Vessel Construction".

3.5 Federal Communications Commission (FCC).

3.6 U.S. Department of Labor, "Safety and Health Regulations for Longshoring” and “Occupational Safety and Health Act (OSHA)”.

3.7 Panama Canal Authority (ACP).

3.8 Suez Maritime Canal Universal Company Rules of Navigation.

4.0 ORDER OF PRECEDENCE

4.1 The following order of precedence in descending order shall apply:

GTR No. 1

REGULATORY BODIES AND ORDER OF PRECEDENCE

Revision - NOAA GTR GTR 1 SHEET 2 OF 2

4.1.1 Regulatory requirements.

4.1.2 Work item requirements.

4.1.3 Contract Drawing.

4.1.4 Contract Guidance Drawings.

4.1.5 GTR.

4.2 Order of Precedence within Work Package

4.2.1 Within the scope of the Work Package, each work item will be accomplished in accordance with all NOAA General Technical Requirements (GTR), whether stated or not in the individual work items. When a work item has special requirements that differ from the GTR, the requirements of the work item will govern. Where there are no requirements invoked, the GTR will govern. It shall be the responsibility of the Contractor to identify and perform all work in accordance with the relevant GTR.

4.2.2 Anything shown in the drawings but not described in the work package, or described in the work package but not shown in drawings, will be as if shown and described in both cases. In case of a difference or a conflict between drawings or the work package, the work package will govern. Omissions from the drawings or from the work package of details or work that is customarily performed shall not relieve the Contractor of his obligations to perform such detail work. All costs arising from work package deficiencies will be resolved in accordance with the change clause in the Terms and Conditions.

4.2.3 Where requirements of the Contract, Contract Drawings, Contract Guidance Drawings, or the Work Package are in excess of regulatory body requirements, the Contract, Contract Drawings, Contract Guidance Drawings, or the Work Package shall prevail.

GTR No. 2

ACCESS FOR INSPECTION, OPERATION, MAINTENANCE, AND REPAIR

Revision - NOAA GTR GTR 2 SHEET 1 OF 2

This Item establishes the general requirements for inspection, maintenance, operation, removal, installation, and repair access to Government furnished and Contractor furnished equipment, machinery, and associated foundations.

2.0 REFERENCES

2.1 American Society for Testing and Materials (ASTM), F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities.

3.0 LAYOUT

3.1 Machinery, equipment, and associated foundations shall be installed to permit ready access to all parts for inspection, maintenance, operation, removal, installation, and repair without disturbing other structures or ship's components. Piping runs, cable runs, ventilation ducts, controls, valves, and wireways shall not be installed in areas rendered inaccessible by the location of fittings or by other obstructions. When layouts call for the installation of permanent ladders, doors, catwalks, manholes, scuttles, and bolted plates, they shall be installed for ease of removal and reinstallation. Battens and gratings in holds, storerooms, and other spaces and protective casings around pipes shall be readily removable.

3.2 Equipment and accompanying local operating panels and gageboards shall be installed to conform with manufacturer’s requirements for clear access to equipment for ease of maintenance, repair, inspection, and operation. This includes but is not limited to providing clearance for opening and closing of operating panels, motor controller boxes, drawers, and doors.

3.3 Outfitting arrangements shall be designed to allow full opening and closing of all drawers and doors.

3.4 Equipment shall be installed to ensure personnel safety and protection of equipment in accordance with Reference 2.1.

3.5 Installation and modification arrangements shall not degrade the capabilities, operability, human engineering considerations, safety, alignment, maintainability, electromagnetic capability, and intended use of new or existing equipment.

GTR No. 2

ACCESS FOR INSPECTION, OPERATION, MAINTENANCE, AND REPAIR

Revision - NOAA GTR GTR 2 SHEET 2 OF 2

4.0 MANHOLES AND ACCESS OPENINGS

4.1 Access openings and manholes shall not be restricted by interferences including but not limited to cable runs, pipes, valves, heating coils, girders, longitudinals, web frames, or major bulkhead stiffeners. When access openings or manholes require ladders, rungs, and/or grabrails for accessibility, they shall be installed in line with the openings. All trunks and casings shall be large enough to facilitate unobstructed servicing of piping, manifolds, and other items.

4.2 Where access to components such as piping cleanout connections, wiring, ducts, vents, piping, air conditioning controls, filters, heaters, valves, and ducting access plates are needed due to maintenance/inspection requirements, the access shall comply with Reference 2.1, be hinged and fitted with quick acting catches, and be clearly labeled to identify the concealed equipment.

4.3 Duct access openings shall have bolted cover plates and shall comply with Reference

2.1. Cover plates shall be of the same thickness and material as the duct, transition, or trunk to which it is attached. A gasket shall be installed between the cover plate and the duct, transition piece, or trunk. Access openings shall be as large as possible but not more than 600 by 600 mm (24 by 24 in) and not less than 200 mm (8 in) by 230 mm (9 in). Access openings in transition sections shall be rectangular, circular, or trapezoidal. Access openings shall be installed in the bottom of the duct unless the top side of the duct is more accessible.

5.0 PROVISIONS FOR REMOVALS

New equipment shall be installed in locations to facilitate removal of components in accordance with the manufacturer’s requirements. Provisions for removals may consist of areas of decks, bulkheads, etc. which have been soft patched and arranged so that when a section is removed, the remaining structure will be self-supporting.

GTR No. 3

TESTS, INSPECTIONS, TRIALS, AND CERTIFICATES

Revision - NOAA GTR GTR 3 SHEET 1 OF 18

This Item describes the general requirements associated with performing tests, inspections, trials, and obtaining certificates to demonstrate total compliance with the Work Package requirements as well as specific testing requirements and procedures for each type of work being performed (HVAC, electrical, piping, etc.).

2.0 REFERENCES

2.1 Society of Naval Architects and Marine Engineers (SNAME), Technical and Research Bulletin 3-39, Guide for Shop and Installation Tests.

2.2 Institute for Electrical and Electronic Engineers (IEEE) Standard 45, Recommended Practice for Electric Installations on Shipboard.

2.3 MIL-STD-1605 (Series), Procedures for Conducting a Shipboard Electromagnetic Interference (EMI) Survey.

2.4 Institute for Electrical and Electronic Engineers (IEEE) Standard 149-1979, Standard Test Procedures For Antennas.

2.5 Institute for Electrical and Electronic Engineers (IEEE) Standard 43-2000, Recommended Practice For Testing Insulation Resistance Of Rotating Machinery.

2.6 Institute for Electrical and Electronic Engineers (IEEE) Standard 112-2004, Standard Test Procedure For Polyphase Induction Motors And Generators.

2.7 Institute for Electrical and Electronic Engineers (IEEE) Standard 120-1989, Master Test Guide For Electrical Measurements In Power Circuits.

2.8 ASHRAE Standard 151P, Practices for Measurement, Testing, Adjusting and Balancing of Shipboard HVAC and Refrigeration Systems.

2.9 U.S. Public Health and Human Services, Standards of Sanitation and Ratproofing for the Construction Vessels.

3.0 DEFINITIONS

3.1 Completion Test - A completion test verifies that all aspects of the work item have been completed. For compartments, it means all equipment, piping, electrical, deck coverings, Revision - NOAA GTR GTR 3 SHEET 2 OF 18 overheads, etc. is installed and tested and proves the compartment is complete and ready for service. For tanks, it means all cleaning, flushing, installations, and testing has been completed, all temporary services are removed and the tank is ready for service. A completion test may include a series of functional, operational, and structural tightness tests.

3.2 Functional Test - A functional test verifies that equipment, material, components, and gear meet their intended purpose and that all work has been performed satisfactorily to the specific instructions of the work item and the manufacturer’s instructions. For instance, functional tests shall be used to verify the proper installation and operation of components and gear such as doors, scuttles, cabinets, etc. Functional tests include weld visual inspection and Non-Destructive Testing (NDT), including, but not limited to: dye penetration, radiographic, etc.

3.3 Operational Test - An operational test verifies that:

All work has been performed satisfactorily and to the specific instructions and requirements of the work item, manufacturer, and regulatory bodies.

The equipment, material, machinery, or system including all flows, levels, temperatures, loads, and alarms complies with manufacturer’s parameters.

The equipment, material, machinery, or system performs its intended purpose.

3.4 Tightness Test - A tightness test verifies that all structural work including any structural attachments which would affect the tightness of the structure, is complete and ready for service. This may be accomplished using air or water depending on the specific instructions in the work item, regulatory body requirements and the intended service.

4.0 GENERAL

4.1 Tests and inspections are required on all systems, equipment, machinery, surfaces, items, and components that are installed, repaired, overhauled, relocated, or modified. Tests, trials and inspections shall be conducted as indicated in the individual items of this Work Package and in the presence of the COR. All applicable Regulatory Bodies and required Technical Representation shall attend each test, trial and inspection.

4.2 Preliminary tests are required to be conducted on all units before calling for an official test. To support preliminary testing the contractor shall have in place an effective Quality Assurance Program approved for use by the Senior Shipyard Official and available for review by the Government prior to the initiation of productive work.

4.2.1 Inspection personnel shall be qualified to perform the duties assigned and authorized to make an accept/reject determination for the Contractor. The Contractor shall verify that all tests, inspections and work conform to contract requirements prior to presentation to the

Revision - NOAA GTR GTR 3 SHEET 3 OF 18 representative(s) from NOAA for acceptance. In the event that specific criteria are not provided in the Work Item, the contractor shall verify that the tests, inspections or work meet Regulatory Body Requirements (ABS, USCG, etc.) prior to presentation to the COR (Contracting Officer’s Representative) for acceptance.

4.3 A test, trial, or inspection is successful if it meets the requirements of the test procedure and if it is completed to the satisfaction of the COR, Original Equipment Manufacturer (OEM) technical representatives, and regulatory bodies.

4.4 Ensure that all industrial work which may impact the test, trial, or inspection outcome is completed before its conduct. The Contractor is responsible for notifying all applicable regulatory bodies of scheduled testing and retaining of required technical representatives at contractor expense for verification of test results. Failure to obtain regulatory body representatives to witness testing, trial, or inspection shall require rescheduling the test, trial, or inspection at Contractor’s expense.

4.5 Provide materials, power, equipment, instrumentation, and personnel to perform each test, trial, and inspection, and to record data. Materials, equipment and services include but are not limited to manlifts, lighting, ventilation, and instrumentation to conduct each inspection.

Operation of (existing/installed) shipboard equipment shall only be accomplished by ship’s force.

4.6 Notify the COR at least 4 hours but not more than 24 hours before the test, trial, or inspection to be witnessed. When work to be witnessed is scheduled to occur after the normal day shift working hours, on a weekend or holiday, or off-site testing is required, the COR shall be notified at least 24 hours in advance but not less than 4 hours prior to the end of the last normal day shift.

5.0 INSTRUMENTS AND GAGES USED FOR DATA RECORDING

Contractor furnished measuring instruments shall be calibrated within 6 months of the date of the test. Calibrated equipment shall be identified with a label stating date of most recent calibration and calibrating agency. Ship installed gages and test instruments shall not be used to obtain test, trial, and inspection data unless approved by the COR prior to conduct of the test.

6.0 LEAK TESTING OF SYSTEMS CONTAINING REFRIGERANTS OR HALON

Refrigerant containing chloro-flouro carbons (CFC) shall not be used as a leak test gas.

One of the following leak test gases shall be used:

Revision - NOAA GTR GTR 3 SHEET 4 OF 18

A mixture of trace quantity of non-CFC refrigerant and dry air or nitrogen. In this case, leak test gas shall be recovered and reused and not released into the atmosphere.

A non-ozone depleting alternative gas.

An EPA SNAP (Significant New Alternatives Policy) approved alternative refrigerant.

7.0 PAINTING TEST AND INSPECTION REQUIREMENTS

7.1 The Contractor and the COR shall conduct a joint inspection of areas to be prepared and painted before surface preparation begins to ensure that protective measures are implemented.

7.2 The Contractor shall perform inspections after completion of each stage of surface preparation, each coat, and each stripe coat, to verify surface condition, Dry Film Thickness (DFT) and space cleanliness, and before securing space. At least 5 DFT readings shall be taken per 100 square feet.

7.3 The Contractor shall stop the inspection if surface preparation, coating, or final inspection fails to meet acceptance criteria of the inspection. The cause of the failure shall be identified. After failure correction, the complete inspection shall be reconducted. The Contractor shall remedy failed areas at no additional cost to the Government.

7.4 The Contractor shall conduct a final inspection of space, surfaces, and tanks to ensure that spaces are clean.

8.0 STRUCTURAL TIGHTNESS AND COMPLETION TESTS

New, repaired, and modified ship's tanks, cofferdams, void spaces, and structures designated as oiltight, watertight, airtight, or fumetight shall be tested to ensure tightness. New weather decks and interior steel decks, coamings, and deck connections of steel bulkheads, in way of toilets, washrooms, and other wet spaces shall be tested to ensure tightness before installing deck or bulkhead covering.

8.1 Test Requirements

8.1.1 Air Tests

a. Air tests (either an air hose test or an air pressure test), hydrostatic tests, or vacuum box tests shall be used to test the tightness of oiltight, watertight, or airtight compartments.

Revision - NOAA GTR GTR 3 SHEET 5 OF 18

b. If air testing (air hose or air pressure) is used, structural integrity and tightness shall be considered satisfactory if no bubbles develop in the leak indicator solution.

c. When conducting air pressure tests, Contractor’s air pressure test fixture shall be comprised of a pressure gage with a range suitable for the required test pressure, a quick acting manual relief valve at least 25 mm (1 in) in diameter, and an automatic relief valve at least 25 mm (1 in) in diameter set to relieve pressure at 7 kPa (1 psi) over the required test pressure.

Manometers are acceptable in lieu of a pressure gage.

d. Where an air hose test is used, the nozzle shall be 300 mm (12 inches) from the tested item and the stream directed against all compartment boundaries, plate connections, closures, fittings, and boundary penetrations in the manner most likely to reveal leaks. The nozzle diameter shall be at least 10 mm (.375 in), and the pressure at the nozzle at least 620 kPa (90 psi). A soap solution shall be applied on the opposite side of the structure and the structure inspected to detect leakage.

8.1.2 Water Tests

a. If hydrostatic tests are conducted, other tightness tests are not necessary providing tests are conducted after work affecting structural integrity has been completed.

b. Where water hose testing is used, the nozzle shall be within 3 meters (10

ft) of the structure under test, and the stream shall be directed against structure portions in a manner most likely to reveal leaks. The nozzle diameter shall be at least 13 mm (0.5 in) and the pressure at the nozzle shall be at least 210 kPa (30 psi). Compartment boundaries, plate connections, closures, fittings, and boundary penetrations shall be tested. The opposite side of the structure shall be inspected to detect leakage.

c. If water hose testing is used, structural integrity and tightness shall be considered satisfactory if no visible leakage develops.

d. Airports, fixed lights, and fixed, hinged, or otherwise movable weather windows shall be hose tested with at least 207 kPa (30 psi) water pressure.

8.1.3 Visual Test

Visual examinations of fumetight structures shall be made by lighting one side of the structure and darkening the other side. Inspection shall be made from the dark side and shall be considered satisfactory if no light penetrates into the dark side.

8.1.4 Functional and Tightness for Doors, Hatches, and Manholes

Revision - NOAA GTR GTR 3 SHEET 6 OF 18

Doors and scuttles shall be functionally tested by opening and closing them by their operating gear to demonstrate operability to the COR in accordance with Reference 2.1.

They shall also be chalk tested and air box tested to prove tightness.

9.0 TESTS FOR HULL FITTINGS AND APPURTENANCES

9.1 Liferails and Stanchions

At least one liferail end stanchion and one other liferail stanchion on each platform or deck shall be tested by a 136 kg (300 lb.) horizontal load, outboard at the stanchion's top, and perpendicular to the railings. The load shall be held for 10 minutes. 20 % of top liferail sections on each platform or deck (one of which shall be an end section), as selected by the COR, shall be tested by applying a 136 kg (300 lb.) load horizontally outboard and perpendicular to the rail at the rail’s midpoint. The load shall be held for 10 minutes. Permanent deformation or damage shall not be visible after load release from the liferails and stanchions.

9.2 Padeyes

Padeyes shall be given a static test of twice the design working load for a period of 10 minutes without damage or permanent distortion occurring to the fitting. The weight of power hoists shall be considered as part of the design working load for test purposes.

10.0 ELECTRICAL AND ELECTRONICS

10.1 General

Shop and installation tests shall be performed on electrical, electronic, navigation, and interior communication equipment that is new or removed from the ship for modification, overhaul, or repair in accordance with References 2.2 through 2.7. Operational tests on equipment that is modified, overhauled, or repaired onboard the ship shall be performed in accordance with References 2.2 through 2.7.

10.2 Insulation Resistance Tests

10.2.1 End to end continuity and electrical insulation resistance tests on new, modified, overhauled, or repaired system cables shall be performed in accordance with Reference 2.2.

10.2.2 The COR shall be immediately notified if insulation values of equipment or cable are less than 1 Megohm.

Revision - NOAA GTR GTR 3 SHEET 7 OF 18

10.3 Enclosure Ground Tests

Electrical and electronic equipment enclosures shall be tested for continuity and resistance of the grounding path. The resistance of the grounding path between the equipment enclosure and a ship structural member shall not exceed 0.1 ohm.

10.4 Propulsion And Auxiliary Generator Tests

New, modified, overhauled, or repaired generators shall be tested in accordance with Reference 2.1.

10.5 Switchboard/Switchgear Tests

New, modified, overhauled, or repaired switchboards, switchgear, and automatic and manual bus transfer equipment shall be tested in accordance with Reference 2.2.

10.6 Power Distribution

Each new, modified, overhauled, or repaired circuit shall be operationally tested. The voltage dip shall be recorded using an oscilloscope to demonstrate that a temporary voltage dip during motor starting or speed change does not interrupt service to other equipment.

10.7 Motors And Controls

10.7.1 New, modified, overhauled, and repaired motors and associated controllers shall be tested in accordance with Reference 2.2.

10.7.2 Individual line amperes shall not differ from the nameplate average value by more than +10 %. The motor nameplate full load ampere value shall be compared with the value indicated on the motor controller overload heater coils to ensure that the heater coil is of the correct rating to provide motor protection.

10.8 Lighting

New, modified, overhauled, and repaired ship's service and emergency lighting circuits shall be tested in accordance with Reference 2.2.

Revision - NOAA GTR GTR 3 SHEET 8 OF 18

10.9 Batteries And Chargers

10.9.1 The Contractor shall test new storage batteries and their associated battery charging units in accordance with manufacturer’s recommendations. Voltage and specific gravity values for each cell for the fully discharged and fully charged conditions shall comply with manufacturer's specified values for each condition.

10.9.2 Portable batteries and associated chargers shall be tested in accordance with manufacturer’s recommendations.

10.10 Antennas

New, repaired, overhauled, or modified HF and VHF antennas shall be tested in accordance with References 2.3 and 2.4.

Revision - NOAA GTR GTR 3 SHEET 9 OF 18

11.0 AUXILIARY SYSTEMS TESTS REQUIREMENTS

Operational tests on contractor and government furnished auxiliary systems, machinery, or components and installation tests on auxiliary systems, machinery, or components that are repaired, overhauled, or modified shall be performed in accordance with Reference 2.1.11.1.

11.1 Fresh Water Systems

11.1.1 The fresh water system, including compression tanks, shall be hydrostatically tested to 150 percent of working pressure.

11.1.2 Potable water systems shall be tested by filling from shore and also by transferring water from one tank to an overboard connection using the ship's pumps. To demonstrate that the specified water delivery (pressure and quantity) is met, the water supply to groups of fixtures at the most remote forward, after, and topside location shall be checked. The capacity of the pump or pumps used to supply the group of fixtures shall meet the flow requirements for these fixtures.

11.1.3 The Contractor shall disinfect the potable water tank in accordance with Reference 2.9. After the Contractor has disinfected the potable water tank, the Contractor shall conduct the tests required by Reference 2.9 and submit results to the COR. If tests results do not comply with the limits established in Reference 2.9, the Contractor shall repeat the tank flushing, superchlorinating, and testing. The operation of the disinfection system shall be demonstrated after potable tank disinfection and again before the sea trials. Minimum residual concentration readiness shall be determined by taking water samples from each installed sampling connection.

11.1.4 The hot potable water system shall be tested to demonstrate the ability of the system to deliver hot water at a minimum of 49 °C (120 °F) at the most remote plumbing fixtures of each heater loop within 10 seconds.

11.1.5 The chilled water system shall be tested to insure that, with all valves in the open position, the measured water flow (gpm) at each plant is within 90-110 % of the connected load.

11.2 High and Low Pressure Evaporators, Distillers, Auxiliary Steam Generators, and Miscellaneous Heat Exchange Equipment

The Contractor shall test evaporators, auxiliary steam generating equipment, and heat exchangers, in accordance with Reference 2.1.

Revision - NOAA GTR GTR 3 SHEET 10 OF 18

11.3 Firemain, Flushing, Sprinkling, Washdown and Salt Water Service Systems

After installation or repair and prior to sea trials, the firemain, flushing, sprinkling, washdown and salt water service systems shall be hydrostatically tested at 150 percent of maximum working pressure as required for USCG certification.

11.4 Fire Fighting Equipment

11.4.1 Carbon Dioxide Systems

a. Prior to connection the cylinders, a pressure test shall be applied. Only carbon dioxide or other inert gas shall be used for the test. The piping from the cylinders to the stop valves in the manifold shall be subjected to a pressure of 1,000 psi with no additional gas being introduced to the system. The pressure drop shall not exceed 150 psi per minute for a 2 minute period. The individual branch lines to the various spaces protected shall be subject to the same test except that a pressure of 600 psi shall be used. The distribution piping shall be capped within the space protected at the first joint ahead of the nozzles.

b. Remote control for release of carbon dioxide equipment shall be operated.

c. Operation of the discharge delay and alarm shall be checked. Discharge of gas into spaces that may be occupied shall be delayed for a sufficient period to allow escape from any portion of the space. The alarm shall be audible throughout the space with the machinery operating.

d. Operating levers, selector valves, etc. shall be properly identified.

e. Pressure switches for automatic shut-down of ventilation shall be operated.

f. All carbon dioxide cylinders shall be checked for weight. Cylinder weight shall be within 10 percent of the stamped weight.

11.4.2 Halon 1301 Systems

a. Prior to connecting the cylinders, a pressure test shall be applied. Only carbon dioxide or other inert gas shall be used for the test. The piping from the cylinders to the stop valves in the manifold shall be subjected to a pressure of 1-1/2 times the design pressure of the system (900 psi for nominal 360 psi systems and 2800 psi for nominal 600 psi systems).

With no additional gas being introduced to the system, pressure drop shall not exceed 150 psi per

Revision - NOAA GTR GTR 3 SHEET 11 OF 18 minute for a 2 minute period. The individual branch lines to the various spaces protected shall be subject to the same test. The distribution piping shall be capped within the space protected at the first joint ahead of the nozzles.

b. Remote release mechanisms shall be checked to insure that cables and pulleys are free to move and that the mechanism operates properly.

c. The discharge alarm must be checked and operated with dry air or nitrogen. The alarm shall be audible throughout the space with machinery operating.

d. Pressure switches for automatic shut-down of ventilation and equipment shall be operated.

e. The weight and pressure of each cylinder shall be checked. Cylinder charge shall be 5 percent or less. Cylinder pressure shall not vary more than 10 percent from normal pressure (adjusted for temperature).

11.4.3 Aqueous Potassium Carbonate System (APC)

The nitrogen pressurization piping of the galley APC system shall be gas pressure tested for tightness and strength to 135 percent of design pressure.

APC switches shall be operated by a reduction of line pressure to verify cut-off of fryer element power. Verification of unobstructed flow through piping and nozzles shall be performed using compressed air at 85 to 100 psi. Activation of the APC system by remote manual means shall be demonstrated.

11.4.4 Portable Fire Fighting Equipment

The installation, charge, tagging, and placement of portable fire extinguishers shall be verified.

11.4.5 Aqueous Film Forming Foam (AFFF) System

The system piping for AFFF stations shall be hydrostatically tested for strength and tightness. Compressed air at 85 to 100 psi shall be used to demonstrate unobstructed flow through piping and sprinkling nozzles. Outlets may be temporarily capped if necessary to allow testing of one or two outlets at a time. All AFFF concentrate tanks shall be tested for strength and tightness by a hydrostatic pressure of 10 psi. All installed AFFF systems shall be operationally tested for AFFF making ability. Duration of the test shall be 1 minute, after which an AFFF sample shall be taken. The AFFF (seawater) solution produced shall be

Revision - NOAA GTR GTR 3 SHEET 12 OF 18 checked by the refractometer method for 4 percent minimum concentration. AFFF hose reel units shall be test-operated with the AFFF station set up in the AFFF recirculation mode.

Seawater shall be discharged overboard. During the test, the local and remote controls shall be operated.

a. High Capacity AFFF Systems

The systems, exclusive of the AFFF sprinkler groups, shall be tested hydrostatically as specified for the firemain. In addition, the systems shall be given an operational test during which all remote actuation controls shall be selectively operated and flow observed at the respective service outlets. Flow test of AFFF sprinkler groups shall be conducted by removing the cap from the group control valve, installing the test fitting, connecting a 2-1/2-inch hose to the test fitting, and positioning the other end at the discharge location. During the above operational tests, AFFF stations shall be aligned to recirculate AFFF concentrate to the AFFF concentrate tank. All lines containing seawater shall be drained after testing.

b. Machinery Space AFF Systems

The systems, exclusive of AFFF sprinkler groups, shall be tested hydrostatically as specified for the firemain. The systems shall be given an operational test during which all manual control valves and nitrogen cylinder actuating valves shall be selectively operated. The AFFF concentrate shall be recirculated and the PKP cylinders shall be isolated during the test. Flow shall be observed from a hose reel and from a 1-1/2 inch hose attached to the group control valve test fitting. All lines containing seawater shall be drained after testing.

c. AFFF Monitor System

The AFFF monitor installation shall be given an operational test with the AFFF system lined up to recirculate back to the tank. Operation of the “Sea-Water”, “AFFF”, and “OFF” controls shall be demonstrated.

11.5 Bilge System

The bilge system shall be hydrostatically tested at 150 percent of working pressure.

11.6 Fuel Oil Filling, Venting, Stowage and Transfer Systems

11.6.1 Hydrostatic tests shall be conducted after cleaning. Fuel piping shall be hydrostatically tested after installation with clean fresh water or the service fluid to 150 percent

Revision - NOAA GTR GTR 3 SHEET 13 OF 18 of the design pressure or 50 psi, whichever is greater. Pumps in fuel stripping, transfer and service systems shall be isolated during hydrostatic tests of the system piping.

11.6.2 An operational test of the filling and transfer system shall be performed to demonstrate compliance of in-port fueling with service fluid rates.

11.6.3 Power operated system and tank valves shall be operated. Operation of the valves shall be confirmed by actual observation of each valve. Correct operation of valve position indicators shall be observed during this test.

11.7 Compressed Air System

11.7.1 Shop tests on a standard production air compressors are not required except for the usual tests performed by the manufacturer for production line units.

11.7.2 Air compressors shall be tested with the diving equipment after all necessary piping and accumulator tanks have been installed and pressure tested. Tests shall be conducted for one hour to demonstrate satisfactory operation of the compressor and its automatic controls and safety devices.

11.7.3 Compressed air piping shall be tested hydrostatically at 150 percent of maximum allowable working pressure.

11.8 Auxiliary Steam, Exhaust Steam and Steam Drains

After installation, the auxiliary steam, exhaust steam and steam drain systems shall be tested hydrostatically at 150 percent of maximum allowable working pressure. The exhaust steam shall be tested at the maximum pressure under full load conditions using the working fluid.

11.9 Distilling Plant

The distilling plant should be operated with sea water feed to demonstrate the specified capacities. The ability of the distilling plant to produce the maximum quantity and required distillate for period of not less than six (6) hours should be demonstrated in its normal underway mode of operation. Record operating data from the ship’s instrumentation at 30 minute intervals for not less than six (6) hours.

11.9.1 Piping systems operating at pressures above atmospheric shall be hydrostatically tested at 150 percent of maximum allowable working pressure. Piping systems operating at atmospheric or sub-atmospheric pressure shall be tested for leakage using air at 10 psi.

Revision - NOAA GTR GTR 3 SHEET 14 OF 18

11.9.2 Shipboard performance tests of 24 hour duration shall be conducted dockside and during sea trials while underway to demonstrate production of rated capacity and specified salinity. However, where the distilling units are exact duplicates of design which has passed the above tests, the duration of the dockside performance tests may be reduced to 8 hours.

11.9.3 Automatic operation of the three-way solenoid-operated valves shall be demonstrated.

11.10 Steering System

11.10.1 Shop Tests

a. The steering gear shall be completely assembled (including remote control provisions, rudder tiller and connecting links, if feasible) in a manner simulating the shipboard installation. It shall be operated at no load from hard over to hard over for at least one-half hour to demonstrate satisfactory mechanical an/or hydraulic operation and that the dimensional, control and lubrication aspects of the design are satisfactory. A check should be made for proper rate of travel, helm response, follow-up action, storage motion, hydraulic fluid and pump temperatures and, where feasible, mechanical rudder and helm indicator accuracy.

Temporary piping or flexible hose may be used for ship tests.

b. Where feasible, the hydraulic, electric or pneumatic steering control components should be assembled to demonstrate satisfactory operation as a complete system.

11.10.2 Installation Tests

a. The following preliminary checks shall be conducted:

1) Measure insulation resistance of motors and electrical steering control system including cable to remote control stations.

2) Demonstrate proper operation of relief valves.

3) Where applicable, demonstrate proper operation and setting of horsepower limiter (pressure compensator).

4) Where applicable, test replenishing system relief valves.

5) Check setting of control limit stops and copper and steel hard-over stops for proper rudder motion limits.

Revision - NOAA GTR GTR 3 SHEET 15 OF 18

6) Demonstrate satisfactory operation of differential control unit for full storage motion and correct follow-up action.

b. The following operating checks shall be conducted:

1) Operate steering gear at no load for one-half hour on each power unit, moving rudder hard-over to hard-over at least five times for each steering station. Check setting of control limit stops, number of handwheel turns hard-over to hard-over and rate of rudder travel.

2) Check alignment of ship’s rudder and position of rudder angle indicators on ram unit and at each steering station (where applicable).

3) Demonstrate operation of steering gear on either set of two opposed cylinders if required by design.

4) Operate steering gear from either power unit and check the rapidity of shifting from one power unit to the other. Where specified, demonstrate operation of steering gear on both power units.

5) Demonstrate operation of electrical low voltage release feature.

6) If separate servo-pump motors are utilized, demonstrate that servo-motors start before main motors and that interlocks are operating properly.

7) Demonstrate operation of overload audible and visible alarms and indicator lights.

11.11 Pumps

11.11.1 Each pump shall be operated at the normal service conditions while handling, where practicable, its normal working fluid.

11.11.2 The pumping equipment shall be operated with all governors and control apparatus in place and operating.

11.11.3 Pump tests may be conducted in conjunction with piping system tests.

Revision - NOAA GTR GTR 3 SHEET 16 OF 18

11.11.4 All pumps shall be given a continuous test for a period of at least one hour, or longer if required, for the test of the source of motive power. Not less than three sets of readings at approximately equal time intervals shall be taken on all instruments and shall be recorded on data sheets.

11.11.5 All pumps shall be operated as near to the rated suction pressure, discharge pressure and capacity as practicable; for units such as main and auxiliary feed pumps and main condensate pumps, capacities obtained when the main machinery is operating under dock trial conditions will be satisfactory.

11.11.6 In addition to the continuous operating test, other tests shall be conducted on the pump and associated equipment as follows:

a. The ability of the unit to take its suction through each suction connection and to discharge through each discharge connection shall be demonstrated.

b. The ability of the unit to operate in parallel shall be demonstrated where parallel operation is required. This may take place during sea trials.

c. The operation of automatic level switches and automatic pressure switches shall be demonstrated.

d. For pumps fitted with automatic priming systems, the operation of each priming system shall be demonstrated.

e. Where pumps are specified and designed to deliver various capacities at different operating conditions or speeds, they shall be operated at the specified heads and speeds.

f. The correct settings and/or operation of the relief valves, governor valves, and recirculating valves shall be demonstrated. Where not practicable to test relief valves in the ship, they may be tested in the shop.

11.12 Navigation Equipment

All navigation equipment should be proven operational during dock trials and any calibration or adjustments necessary shall be performed during initial phases of the sea trials.

Revision - NOAA GTR GTR 3 SHEET 17 OF 18

12.0 HVAC TESTING

12.1 General

The Contractor shall perform operational tests on new, repaired, overhauled, or modified HVAC systems, equipment, or components in accordance with Reference 2.1. The tests must demonstrate compliance with Work Package and contract requirements.

12.2 Test Requirements

12.2.1 General

All HVAC systems shall be balanced and operationally tested in accordance with the requirements of Reference 2.8.

12.2.2 Installation Tests

Installation tests shall be performed after complete installation and prior to sea trials, at a time when testing conditions are such that accurate, realistic data can be obtained. All readings shall be recorded at half-hour periods and coordinated with recorded data from the installed system instruments and test instruments.

a. Equipment Tests

Prior to testing the HVAC system as a complete system, fans, motors, coils, filters, compressors, pumps, all control devices and dampers, etc., shall be checked for satisfactory operation, adjusted for full load operating conditions; such components shall not be readjusted during tests. All related companion heating, ventilation and common trunk systems, whether intakes or discharges, shall be in simultaneous operation and all doors closed while these tests are in progress.

b. System Tests

The entire air conditioning plant shall be operated for at least 6 hours with the entire connected load at approximately the maximum design operating conditions, to verify the ability of the system to develop design load at specified temperature and pressure. All controls, regulating, modulating and expansion valves, thermostats, dampers, etc. shall be checked for proper operation.

Revision - NOAA GTR GTR 3 SHEET 18 OF 18

c. Ventilation Volumetric Tests

Determine that all instruments used to conduct ventilation and system tests have been calibrated within the preceding six months.

1) The average velocity of the air passing through each supply and exhaust terminal and through the entire system shall be determined and compared with design conditions. Barometer and psychrometer readings shall be taken at the system intake and discharge.

2) All data taken shall be corrected for standard air and compared with design criteria for adequacy. The following air delivery rates are considered satisfactory unless otherwise specified.

Each system shall be capable of handling 100 to 110 % of designed air volume.

Air supply, recirculating and exhaust terminals shall be balanced to deliver 95 to 110 % of the designed volume.

d. Noise Level Test

1) Noise level readings shall be taken in control stations with all vent systems in operation. Readings shall be taken on American Standards Association “A” or “B” weighted network, as applicable, at a time when the ambient level without the vent systems in operation is ten decibels less than those mentioned above.

2) Primary reading (ambient noise level with vent systems secured) - At least two readings shall be taken in each place; the average reading shall be recorded for sound level with space unmanned and all equipment, including vent systems, secured.

3) Final reading (with vent systems in operation) - The average of two or more readings shall be taken at different locations, three feet from each terminal, close to but not within the airstream.

4) Sound level readings and space vent system and terminal numbers shall be recorded on the test form.

GTR No. 4

BRAND NAME OR EQUAL

Revision - NOAA GTR GTR 4 SHEET 1 OF 1

This Item establishes procedures and standards for determining equivalence of Contractor Furnished Material (CFM).

2.0 REFERENCES: None

3.0 COMMERCIAL BRAND NAMES OR EQUIVALENT EQUIPMENT

When CFM is required and specified by brand name in the contract or work item, equivalent material may be proposed. The salient physical, functional, and other characteristics which "equal" products meet shall include but are not limited to:

3.1 Compliance of proposed item, equipment, component, or material with regulatory body requirements and other design standards.

3.2 Data that demonstrates that the proposed item, equipment, component, or material meets or exceeds the specified performance requirements.

3.3 Compliance of proposed CFM with the scope of the Work Item. Costs of proposed CFM exceeding those resulting from using the specified CFM shall be the sole responsibility of the Contractor.

3.4 Data that demonstrates that the proposed item, equipment, component, or material has functionally equivalent:

a. Dimensions.

b. Weight.

c. Power, HVAC, cooling water, and other required services.

d. Suitability for marine service.

e. Material.

f. Maintenance features and requirements.

g. Vendor furnished training.

h. Life cycle cost and maintenance cost.

i. Structureborne and airborne noise characteristics.

j. Warranty provisions.

k. Maintenance manpower requirements.

l. Worldwide support and service infrastructure.

m. Spare parts availability.

n. Estimated spare parts costs for one year's use.

o. Compatibility with interrelated systems and arrangements.

GTR No. 5

DRAWINGS, DRAWING REVIEW, AND DRAWING APPROVAL REQUIREMENTS

Revision - NOAA GTR GTR 5 SHEET 1 OF 3

This Item establishes drawing preparation, review, and approval requirements.

2.0 REFERENCES

2.1 American Society of Mechanical Engineers (ASME), Y14.24M, Types and Applications of Engineering Drawings.

3.0 DRAWINGS

3.1 Ship's Drawings

After contract award, NOAA will provide the Contractor a copy of any ship's drawing applicable to the contract and currently in the NOAA library in either conventional or digital format, as available, within fourteen days after receipt of request.

3.2 Updating Drawings

3.2.1 When updating NOAA drawings, the NOAA Master drawing will be provided upon request in either conventional or digital format and transmitted via a guaranteed, insured, and traceable delivery method.

3.2.2 Return all drawings provided by the Government to the Contracting Officer via a guaranteed, insured, traceable delivery method within 15 days after request by the COR. If not requested earlier, return shall be made at the time of redelivery of the ship to the Government.

3.2.3 Loaned drawings shall not be altered or modified in any manner other than as specifically tasked in the contract.

3.3 Contract Guidance Drawings

3.3.1 The Contract Guidance Drawings are for guidance only. They disclose the basic technical information and performance requirements necessary for a Contractor to complete the detailed design required to develop and produce a working drawing.

3.3.2 The Contract Guidance Drawings are not intended to restrict the Contractor to the procedures and details shown therein. Equivalent details and procedures which may make use of more readily available material or permit the use of Contractor's standards or procedures of equal merit are acceptable. The Contractor shall submit to the COR for approval his alternate

Revision - NOAA GTR GTR 5 SHEET 2 OF 3 method, materials, or procedures along with documentation to substantiate the claim of merit.

Approval of the drawings, methods, materials, or procedures and supporting documentation will indicate only that the general method of construction and detailing is satisfactory and will not relieve the Contractor of the responsibility for any error. The Contractor shall assume the risk and cost to remove unapproved substitutions for materials, methods, or procedures.

3.3.3 The original Contract Guidance Drawings shall not be altered by the Contractor in any manner. Where a Contract Guidance Plan is used as the basis for a new drawing, the copy shall be identified as a new drawing with a new file name.

3.4 Contract Drawings

A Contract Drawing is a NOAA drawing which delineates mandatory design features of the ship. No departure from details of a Contract Drawing shall be made without specific approval of the COR.

3.5 Working Drawings

3.5.1 Working drawings shall be prepared as required by the Contractor to facilitate completion of work, or as otherwise required by NOAA. Working drawings shall be prepared in CAD format, scaled to Size F (.71 meter X 1.01 meter (28 in x 40 in)). The level of detail (as defined in Reference 2.1) for working drawings shall be as follows:

a. Mechanical schematic (diagrammatic) diagram.

b. Arrangement drawings.

c. Detail drawings - monodetail and multidetail (composite).

d. Assembly drawings.

e. Installation drawings.

f. Modifying drawings - altered item, selected item, and modification.

g. Layout drawings.

h. Electrical/Electronic diagrams.

i. Other Schedules/Lists required to support installations and modifications.

Revision - NOAA GTR GTR 5 SHEET 3 OF 3

3.5.2 The final revision of the working drawings are "as-built" drawings and reflect the condition of all areas covered by the Work Package upon ship redelivery.

3.6 Selected Record Plans

3.6.1 Selected Record Plans represent the entire system, arrangement, layout “as is’ taking into consideration any work or modifications which the Contractor effected to that system, arrangement, or layout under the Work Package.

3.6.2 Selected Record Plans will be prepared in CAD format.

4.0 DRAWING FORMAT

4.1 Drawings shall have a NOAA title block and borders as approved by NOAA. A Contractor's title block shall be included on the bottom of the first sheet to the left of and adjacent to the NOAA title block.

4.2 The initial approval authority for all drawings shall be the COR.

4.3 All drawings shall be prepared in AutoCAD 2010 or later. All drawings shall be submitted in AutoCAD 2010 and Adobe Acrobat (pdf).

GTR No.

This is the start of the file's text. The full file is on GovTribe.