Questions and Answers

View the file

Other files

File Type Posted
Questions_and_Answers_2.pdf PDF
NNK16567219R_Amendment_01.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers NNK16567219R

1. Section L.12(b)

Question: Page 75 states “using not smaller than 12 point type for all proposal text.” Is it permissible for us to submit a limited number of elements of the proposal using Times

New Roman font 10? Those elements would be: (1) Focus boxes; (2) Past Performance figure data, and (3) any figure using less than one third of a single sheet of text.

Answer: No. The 12 point font type for all proposal text remains unchanged.

2. SF 33 and Section L.16 E (2)

Question: Page 1 states “…this offer is accepted within 180 calendar days…” Page 96 states “…shall provide for a minimum offer acceptance period of 270 calendar days…”

Please clarify whether it is 180 days or 270 days.

Answer: Amendment 01 revises the RFP SF33, page 1, Block 12, minimum offer acceptance period from 180 calendar days to 270 calendar days.

3. Section L.16 C and Attachment L-07, Basic Cost Template (BCT)

Question: Page 92, Section L.16 (C), Volume III, Cost Factor, Section 3, Other

Information (f), the RFP states "Flex-Hours: The Offeror shall propose the following flex-hours using Attachment L-07 Basic Cost Template (BCT), Flex-Hours worksheet.

The Offeror shall use their labor classifications and map into the Government’s Labor

Categories. The pricing of the flex hours below will determine the flex-hour labor cost used for proposal evaluation and fee determination purposes. The actual skills required during contract execution may vary."

But, the FLEX Hours in the table given in (f) in the above noted Section L - FLEX Hours table do not match the Hours on The FLEX-Hours worksheet of Att. L-07 BCT for

Option 1, Year 3 and for Option 2, Year 4. Please clarify which is correct.

Answer: Amendment 01 to the RFP revises Attachment L-07, Basic Cost Template

“Flex Hours” tab, to match the flex-hours identified in the RFP Table L.16 (C), Volume

III- Cost Factor, Section 3, Other Information (f), which contains the correct skill mix to be proposed for the flex-hours. Offerors may use “Attachment L-07 Basic Cost Template

(BCT) Rev 1” provided in Amendment 01 OR may make the revisions provided in

Enclosure 1, Basic Cost Template Changes- Flex Hour Tab, in the original Attachment

L-07 Basic Cost Template “Flex Hours” tab.

4. Section M.4, Past Performance

Question: “Only contracts which are being performed or completed in the past 3 years will be considered recent.” Due to the potential unfair competitive advantage to the

Questions and Answers NNK16567219R incumbent, will the government consider 5 years of relevant past performance versus 3 years?

Answer: The Government has not identified any unfair competitive advantage based upon the RFP past performance factor’s stated definition of recent contracts. Contracts which have been performed or completed in the past 3 years are deemed sufficient to allow all offerors to establish a record of relevant performance.

5. Section L.16B(c), Past Performance

Question: “The Offeror may submit additional information at its discretion (within page limits) if it considers such information necessary to establish a record of relevant performance.” Section M.4 Factor 2: Past Performance reads, in part, “The Offeror and proposed Major Subcontractors (as defined in L.16.B) recent and relevant performance of work similar in size, content, and complexity to the requirements of this solicitation will be evaluated.” Will the government evaluate additional past performance information of minor subcontractors submitted per L.16.B (c) that do not meet the definition in L.16.B?

Answer: No. In accordance with Section M.4, Past Performance, only Offerors and

Major Subcontractor’s recent and relevant performance of work similar in size, content, and complexity to the requirements of this solicitation will be evaluated.

6. Section L.16 B (c), Past Performance

Question: “The Offeror may submit additional information at its discretion (within page limits) if it considers such information necessary to establish a record of relevant performance.” Is other past performance information submitted per L.16 B (c) limited to performance completed within the last three (3) years?

Answer: Amendment 01 revises the RFP to delete L.16 B (c).

7. Section L.16B, Past Performance

Question: Does the safety performance information need to be submitted only for the

Prime or is the safety performance information required for each citation for both Prime and Major Subcontractor?

Answer: Only the Offeror’s safety performance information over the last 3 years is required to be submitted per Volume II: Past Performance (d).

Enclosure 1: Basic Cost Template Changes- Flex Hours Tab

The changes in “from/to” format are shown in red text in the picture below:

To update the Attachment L-07 Basic Cost Template, the following changes are required to be made to the “Flex hours” tab:

Cells AB8 & AC8 remove“7,840” and replace with “3,245”

Cells AB9 & AC9 remove “6,720” and replace with “4,056”

Cells AB10 & AC10 remove “19,040” and replace with “12,981”

Cells AB11 & AC11 remove “16,240” and replace with “11,764”

Cells AB12 & AC12 remove “2,240” and replace with “1,623”

Cells AB13 & AC13 remove “1,120” and replace with “811”

Cells AB14 & AC14 remove “2,240” and replace with “4,736”

Cells AB15 & AC15 remove “12,320” and replace with “26,048”

Cells AB16 & AC16 remove “2,240” and replace with “4,736”

Column Y Z AA AB AC AD Y Z AA AB AC AD

ROW

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5 ROW

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5

8 SMA Engineer 1 1,680 3,360 7,840 7,840 2,735 8 SMA Engineer 1 1,680 3,360 3,245 3,245 2,735

9 SMA Engineer 2 1,440 2,880 6,720 6,720 3,419 9 SMA Engineer 2 1,440 2,880 4,056 4,056 3,419

10 SMA Engineer 3 4,080 8,160 19,040 19,040 10,940 10 SMA Engineer 3 4,080 8,160 12,981 12,981 10,940

11 SMA Engineer 4 3,480 6,960 16,240 16,240 9,914 11 SMA Engineer 4 3,480 6,960 11,764 11,764 9,914

12 SMA Engineer 5 480 960 2,240 2,240 1,368 12 SMA Engineer 5 480 960 1,623 1,623 1,368

13 Analyst 240 480 1,120 1,120 684 13 Analyst 240 480 811 811 684

14 Specialist - 1 480 960 2,240 2,240 1,368 14 Specialist - 1 480 960 4,736 4,736 1,368

15 Specialist - 2 2,640 5,280 12,320 12,320 8,204 15 Specialist - 2 2,640 5,280 26,048 26,048 8,204

16 Specialist - 3 480 960 2,240 2,240 1,368 16 Specialist - 3 480 960 4,736 4,736 1,368

17 15,000 30,000 70,000 70,000 40,000 17 15,000 30,000 70,000 70,000 40,000

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5

21 CCP 8.0% 8.0% 11.8% 11.8% 8.5% 21 CCP 8.0% 8.0% 11.8% 11.8% 8.5%

22 GSDO 56.0% 56.0% 35.3% 35.3% 53.0% 22 GSDO 56.0% 56.0% 35.3% 35.3% 53.0%

23 ISS 0.8% 0.8% 1.2% 1.2% 0.9% 23 ISS 0.8% 0.8% 1.2% 1.2% 0.9%

24 LSP 17.6% 17.6% 25.9% 25.9% 18.8% 24 LSP 17.6% 17.6% 25.9% 25.9% 18.8%

25 AMO 16.0% 16.0% 23.5% 23.5% 17.1% 25 AMO 16.0% 16.0% 23.5% 23.5% 17.1%

26 PMO 1.6% 1.6% 2.4% 2.4% 1.7% 26 PMO 1.6% 1.6% 2.4% 2.4% 1.7%

27 Total 1.00 1.00 1.00 1.00 1.00 27 Total 1.00 1.00 1.00 1.00 1.00

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5

Base

Year 1

Base

Year 2

Option #1

Year 3

Option #2

Year 4

Option #3

Year 5

33 CCP 9,400 9,400 9,400 9,440 9,480 33 CCP 9,400 9,400 9,440 9,480 9,440

34 GSDO 65,800 65,800 28,200 28,320 58,776 34 GSDO 65,800 65,800 28,320 28,440 58,528

35 ISS 940 940 940 944 948 35 ISS 940 940 944 948 944

36 LSP 20,680 20,680 20,680 20,768 20,856 36 LSP 20,680 20,680 20,768 20,856 20,768

37 AMO 18,800 18,800 18,800 18,880 18,960 37 AMO 18,800 18,800 18,880 18,960 18,880

38 PMO 1,880 1,880 1,880 1,888 1,896 38 PMO 1,880 1,880 1,888 1,896 1,888

39 Total 117,500 117,500 79,900 80,240 110,916 39 Total 117,500 117,500 80,240 80,580 110,448

Attachment L-07 Original Basic Cost Templete (BCT) Attachment L-07, Rev 1 Basic Cost Template (BCT)

Program Data is Informational Only

Flex Hour by Government Labor Category

Programmatic Totals

Program Data is Informational Only

Program Totals

Program Data is Informational Only

Flex Hour by Government Labor Category

Programmatic Totals

Program Data is Informational Only

Program Totals

Enclosure 1: Basic Cost Template Changes- Flex Hours Tab

Cells AB33 remove “9,400” and replace with “9,440”

Cell AB34 remove “28,200” and replace with “28,320”

Cell AB35 remove “940” and replace with “944”

Cell AB36 remove “20,680” and replace with “20,768”

Cell AB37 remove “18,800 and replace with “18,880”

Cell AB38 remove “1,880” and replace with “1,888”

Cell AC33 remove “9,440” and replace with “9,480”

Cell AC34 remove “28,320” and replace with “28,440”

Cell AC35 remove “944” and replace with “948”

Cell AC36 remove “20,768” and replace with “20,856”

Cell AC37 remove “18,880” and replace with “18,960”

Cell AC38 remove “1,888” and replace with “1,896”

Cell AD33 remove “9,480” and replace with “9,440”

Cell AD34 remove “58,776” and replace with “58,528”

Cell AD35 remove “948” and replace with “944”

Cell AD36 remove “20,856” and replace with “20,768”

Cell AD37 remove “18,960” and replace with “18,880”

Cell AD38 remove “1,896” and replace with “1,888”