Appendix_9_-_FOMS_Specifications.pdf
PDF 6 MB Posted
- Attached to
- Facilities Operations and Maintenance Services Federal contract opportunity
- Solicitation number
- NNG16572637R-1
About this file
Appendix 9
View the file
Other files for this federal contract opportunity
Show all 50
Facilities Operations and Maintenance Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix 9 GSFC Specifications (November, 2015)
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 31 00 PROJECT COORDINATION
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 43 ENVIRONMENTAL PROCEDURES
01 41 00 SPECIAL INSPECTIONS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 10 CONTRACTOR QUALITY CONTROL I
01 45 20 CONTRACTOR QUALITY CONTROL II
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 65 00 PRODUCT DELIVERY AND GOMAR TAGS
01 73 00 SELECTIVE DEMOLITION
01 78 00 TASK ORDER CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 86 12 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS
01 91 13 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 82 14 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 23 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 72 00 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID SURFACE FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50 PREPARATION FOR RE-ROOFING
07 11 13 BITUMINOUS DAMPPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 RIGID FOAM BOARD INSULATION
PROJECT TABLE OF CONTENTS Page 1
GSFC Specifications (November, 2015)
07 21 16 BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23 RESINOUS FLOORING
09 68 13 TILE CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALLCOVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNS
10 21 13 TOILET COMPARTMENTS
10 22 19 DEMOUNTABLE PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS AND CABINETS
DIVISION 11 - EQUIPMENT
11 13 10 DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 93 13 BICYCLE RACKS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 00 FIRE-SUPPRESSION SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
PROJECT TABLE OF CONTENTS Page 2
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF HVAC SYSTEMS
23 09 13 CONTROL VALVES, SELF-CONTAINED
23 09 23 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 09 43 PNEUMATIC CONTROL SYSTEMS FOR HVAC
23 09 53 SPACE TEMPERATURE CONTROL SYSTEMS
23 21 13 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 13 STEAM TRAPS
23 22 23 STEAM CONDENSATE PUMPS
23 22 25 STEAM VALVES
23 22 26 STEAM SYSTEM AND TERMINAL UNITS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 00 TERMINAL HEATING AND COOLING UNITS
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 71 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23 LIGHTING CONTROL DEVICES
26 11 16 SECONDARY UNIT SUBSTATIONS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16 PANELBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 52 00 EMERGENCY LIGHTING
26 53 00 EXIT SIGNS
26 56 00 EXTERIOR LIGHTING
26 56 13 LIGHTING POLES
26 60 13 LOW-VOLTAGE MOTORS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 73 AIR ASPIRATING SMOKE DETECTION SYSTEMS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 23 19 DEWATERING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
PROJECT TABLE OF CONTENTS Page 3
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 60 01 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 61 00 UNDERGROUND CHILLED WATER DISTRIBUTION
33 63 13 UNDERGROUND STEAM DISTRIBUTION SYSTEM
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
GSFC Construction Specifications (November, 2015)
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00
SUMMARY OF WORK
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
1.3 RELATED SECTIONS
1.4 REFERENCES
1.5 SUBMITTALS
1.6 WORK RESTRICTIONS DUE TO GOVERNMENT OPERATIONS
1.7 WORK IN SECURE AREAS
1.8 OCCUPANCY OF PREMISES
1.9 NORMAL DUTY HOURS
1.10 CONTRACTOR MOBILIZATION
1.10.1 Contractor Contact List
1.11 CONTRACTOR PERSONNEL BADGING
1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
1.13 ON-SITE PERMITS
1.13.1 Excavation Permit
1.13.2 Hot Work Permit
1.13.3 Confined Space Entry Permit
1.13.4 Utility Outage Request
1.14 SALVAGED MATERIAL AND EQUIPMENT
1.15 CONSTRUCTION AND DEMOLITION (C&D) WASTE
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 10 00 Page 1
SECTION 01 10 00
SUMMARY OF WORK
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
Not used.
1.3 RELATED SECTIONS
Related Sections include the following:
1. Division 01 Section "Governmental Safety and Environmental Requirements."
1.4 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
GODDARD SPACE FLIGHT CENTER (GSFC)
GPR 1600.1A (2014) Goddard Space Flight Center (GSFC) Protective Services Program Requirements
GPR 1700.6B (2012) Confined Space Program Requirements
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Division 01 Section "Submittal Procedures":
SD-01 Preconstruction Submittals
Mobilization Plan ; G
Contractor Contact List ; G
Excavation Permit ; G
Hot Work Permit ; G
SECTION 01 10 00 Page 2
Confined Space Entry Permit ; G
Utility Outage Plan ; G
Utility Outage Request ; G
C&D Waste Management Plan ; G
SD-11 Closeout Submittals
Delivery Report ; G
C&D Waste Report ; G
1.6 WORK RESTRICTIONS DUE TO GOVERNMENT OPERATIONS
Some construction activities involving work in Buildings 1, 3, 5, 7, 10, 13, 14, 15, 23, 24, 25, 28, 29, 31 and 32; work pertaining to utilities and manholes serving those facilities; and work requiring an excavation permit will be periodically prohibited due to Government Operations.
Work prohibitions will be for an average of 8 periods per year, of between 7 and 21 working days each, but not exceeding 120 working days per year.
The Contractor may request a Freeze Exemption Request (FER) to the work prohibition provided that the Contractor clearly demonstrates that the work has no chance of affecting critical mission operations. Evaluation of the FER and final determination will be made by the Contracting Officer.
Government Operations occurring on weekends, holidays, and other days outside the range of normal duty hours shall not be included in the time periods indicated above.
The Contractor shall clearly indicate restrictions due to Government Operations in the proposed work schedule, and shall provide sufficient detail in the work schedule to indicate exactly which work tasks will be affected by the work restrictions. The Contractor shall revise and submit updated progress schedules to reflect periodic changes in the Government Operations Schedule.
An initial Government Operations Schedule shall be provided for each task order at the Preconstruction Conference. An updated status report of Government Operations shall be provided by the 15th of each month, or when necessary to convey critical changes to the Government Operations schedule.
Work restrictions due to Government Operations are highly volatile and may change with little or no notice due to factors which affect critical mission activities. The Contractor shall closely coordinate schedules with the Government in order to minimize the impact of these work restrictions to the timely and successful prosecution of the work.
1.7 WORK IN SECURE AREAS
Some work may require access to secure areas. The Contractor will be notified when work in secure areas will be required by specific task orders.
Access to the secure areas of the Building 3/13/14 complex requires a Government-issued temporary badge, and accompaniment by a Government escort at all times.
SECTION 01 10 00 Page 3
1.8 OCCUPANCY OF PREMISES
The work areas will be located in normally occupied buildings.
1.9 NORMAL DUTY HOURS
Normal duty hours for work shall be from 7:00 a.m. to 3:30 p.m., Monday through Friday, except as noted.
Normal duty hours for work shall be from 7:00 a.m. to 3:00 p.m. in Buildings 24, 24A, 24B, 24C, and 31.
Normal duty hours for deliveries shall be from 7:00 a.m. to 3:00 p.m. to Building 35 through the gate accessed off Soil Conservation Road.
Work shall be performed only during normal duty hours, except as otherwise required or authorized by the Government, or where such timeliness of performance is necessary to safeguard life or property.
Requests for deviation from normal working hours shall be submitted in writing to the Government not less than 3 working days in advance of the proposed work period.
1.10 CONTRACTOR MOBILIZATION
Prior to starting work on each individual task order, the Contractor shall submit to the Government a mobilization plan indicating the locations of office and storage trailers, staging areas, means of access to work areas, and use of approaches, corridors, and stairways. The Contractor shall also request a Preconstruction Conference through the Government's on-site Quality Assurance Group. The meeting agenda shall consist of a review of the Contractor's mobilization plan , work sequencing, means of access to work areas, storage space of Contractor materials and equipment including trailers (if required), staging areas, utility outages required, applicable safety measures, and use of the building's approaches, corridors, elevators and stairways. Review and approval for the above shall include the Contracting office, building's Facilities Operations Manager (FOM) and Building Manager.
1.10.1 Contractor Contact List
The Contractor shall submit a listing of contact personnel to be used in the event of an emergency. List shall minimally include addresses and telephone numbers. The list shall be regularly updated to reflect changes in employment status.
1.11 CONTRACTOR PERSONNEL BADGING
The Contractor shall adhere to the GSFC security requirements specified in
GPR 1600.1A .
Entrance onto the GSFC campus requires a GSFC-issued picture badge, GSFC-issued temporary badge, or accompaniment by a GSFC-issued picture badged escort. The Contractor shall provide an escort to accompany subcontractors working in secure areas. Only contractor personnel in possession of a GSFC-issued picture badge may serve as an escort.
The Contractor shall obtain personnel badges following the requirements
SECTION 01 10 00 Page 4 listed on the GSFC protective services website located at URL http://protectiveservicesdivision.gsfc.nasa.gov/persec/badging.
1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Unless otherwise noted in the task order documents, the Contractor shall accept delivery of Government-furnished material and equipment at the GSFC's shipping and receiving facility, Building 35. The Contractor, at no additional cost to the Government, shall provide all handling, rigging, and transportation necessary to transport the Government-furnished materials and equipment from the receiving location to the point of incorporation into the Work.
The Contractor shall visually inspect Government-Furnished Property in the presence of the Government or their designated representative during and immediately after taking delivery from the Government. Crated materials and equipment shall be uncrated for inspection and shall be re-crated until incorporation into the Work.
The Contractor shall submit a delivery report documenting each item of Government-Furnished Property received, including accessories, indicating quantity and condition. Report dents, scratches, cracks, surface rust and burns, frays and crimps in cables, obvious missing parts, and any quantities short of those specified. Report shall include the signature of the Government or their designated representative present at delivery and inspection with exceptions noted.
1.13 ON-SITE PERMITS
The Contractor shall secure permits for excavation work, for hot work, utility outages, and for entry into confined spaces. All requests shall be made in writing to the Government, using the appropriate form. No work shall be performed until an approved permit has been obtained and posted.
Permits shall be posted in a conspicuous location in the construction area.
Permits are the property of the Government and shall be returned to the Contracting Officer, or designated representative, upon completion of the permitted work.
1.13.1 Excavation Permit
The Contractor shall submit an Excavation Permit not less than 10 working days prior to the proposed work using the Excavation Request/Permit form, available in Building 4. The Contractor shall retain the original copy of the permit request, and a photocopy of the request shall be routed to the Government for review and approval.
Excavation operations shall include surface scarifying, surface grading, driving stakes, setting post holes, trenching, general excavating and any other activity which has the potential to damage underground utilities.
1.13.2 Hot Work Permit
The Contractor shall comply with the Hot Work requirements specified in Division 01 Section "Governmental Safety and Environmental Requirements."
The Contractor shall submit a Hot Work Permit on the day of the proposed work using form GSFC 23-4 Hot Work Permit. The Contractor shall retain the original copy of the permit request, and a photocopy of the request shall be routed to the Government for review and approval.
SECTION 01 10 00 Page 5
Notwithstanding issuance of any permit, the Contractor shall not burn trash or rubbish on the Goddard Space Flight Center.
1.13.3 Confined Space Entry Permit
The Contractor shall adhere to the GSFC confined space entry requirements specified in GPR 1700.6B and as specified in Division 01 Section "Governmental Safety and Environmental Requirements." The Contractor shall submit a Confined Space Entry Permit not less than 3 working days prior to the proposed entry into a confined space, using form GSFC 23-52 Confined Space Entry Evaluation/Permit.
1.13.4 Utility Outage Request
For task orders that involves utility outages, the Contractor shall submit a Utility Outage Plan . The Utility Outage Plan shall list all significant outages that will be necessary to complete the work in the task order.
The Contractor shall utilize the Outage Table on the construction documents as the basis for this plan, including other information which may be provided by the Government. The Contractor shall submit a Utility Outage Request not less than 7 working days prior to the proposed work using the web-based Utility Outage Tracking System (UOTS).
Utility outages shall be arranged for at the convenience of the Government. Unless otherwise noted in the task order documents, utility outages shall be scheduled outside regular working hours or over weekends. In addition to the time required for the Contractor to perform the Work, the utility outage times shall also include the time necessary for the Government to secure and restore the utility including related activities such as drain down and refill times, lock out/tag out, and required testing.
The Work shall be scheduled to minimize the number of required utility outages. When more than one connection to an existing utility is required, all connections to that particular utility shall be scheduled and made during a single utility outage. The Contractor shall provide sufficient work force to accomplish all scheduled work on the affected utility during the approved outage period.
The following types of utility outages will be prohibited during Scheduled Government Operations:
1. Any type requiring an excavation permit or connection to an underground utility.
2. Any type involving work in an electrical/telecommunications manhole or distribution transformer.
3. Work in Buildings 1, 3, 5, 7, 10, 13, 14, 15, 23, 24, 25, 28, 29, 31 and 32.
The Government reserves the right to seek compensatory damages for Outage Requests that are dutifully processed, approved and prepared for, and for which the Contractor fails to execute.
1.14 SALVAGED MATERIAL AND EQUIPMENT
Items designated on the construction documents to be salvaged shall remain
SECTION 01 10 00 Page 6 the property of the Government.
Salvaged property shall be segregated, itemized, and delivered to the Government's designated storage area.
Unless otherwise noted in the task order documents, the Contractor shall deliver salvaged property to the GSFC's shipping and receiving facility, Building 35. The Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition.
Maintain property control records for material or equipment designated as salvage. The Contractor, at no additional cost to the Government, shall provide all handling, rigging, and transportation necessary to transport the Government furnished materials and equipment from the work area to the Government's designated storage area.
The Contractor shall submit a Transportation Report documenting each item of salvaged property, including accessories, indicating quantity and condition. The Government or their designated representative shall visually inspect the salvaged property in the presence of the Contractor upon taking delivery from the Contractor. Report shall include the signature of the Contracting Officer or their designated representative present at time of delivery and inspection with exceptions noted.
1.15 CONSTRUCTION AND DEMOLITION (C&D) WASTE
Federal Executive Order Planning for Federal Sustainability in the Next Decade, released on March 19, 2015, requires that federal agencies divert at least 50 percent of their Construction and Demolition (C&D) waste stream from landfills to recycling centers. C&D waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the Work.
The Contractor shall be required to divert at least 50 percent (by weight) of the C&D waste from going to a landfill. An exemption for a lower diversion rate shall be allowed if it becomes cost prohibitive to transport the waste a long distance to a recycling center. Specifically, recycling centers farther than 50 miles from GSFC will be considered cost prohibitive.
Submit a C&D Waste Management Plan after receiving the first task order.
The plan shall state whether the Contractor plans to segregate C&D waste on-site for delivery to recycling centers and landfills, or transport the co-mingled waste off-site to a segregation facility. The plan shall include the name of the segregation and recycling facilities the Contractor plans to use.
Submit on an annual basis, but no later than November 30, a C&D Waste Report . The report shall indicate the total tonnage of C&D waste that was generated under this Contract, the total tonnage sent to landfills, and the total tonnage of C&D waste diverted to recycling centers. The figures shall be certified (with signature) by the Contractor.
PART 2 PRODUCTS
Not used.
SECTION 01 10 00 Page 7
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 10 00 Page 8
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 31 00
PROJECT COORDINATION
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
1.3 REFERENCES
1.4 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PRE-CONSTRUCTION CONFERENCE
3.2 PROGRESS MEETINGS
3.3 PROGRESS SCHEDULE
3.3.1 Bar Chart
3.3.2 Adverse Weather Delays
3.3.3 Government Operations Delays
3.4 PROJECT SUBMITTAL SCHEDULE
3.5 AS-BUILT DRAWINGS
SECTION 01 31 00 Page 1
SECTION 01 31 00
PROJECT COORDINATION
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
This Section describes the requirements for preconstruction conferences, progress meetings, task order-specific progress schedules, task order-specific submittal schedules, and as-built documentation.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
GSA FAR (2015) Federal Acquisition Regulation
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Division 01 Section "Submittal Procedures":
SD-01 Preconstruction Submittals
Progress Schedule ; G
Project Submittal Schedule ; G
SD-11 Closeout Submittals
As-Built Drawings ; G
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PRE-CONSTRUCTION CONFERENCE
The Contractor shall attend a Preconstruction Conference scheduled by the
SECTION 01 31 00 Page 2
Government for each individual task order. Work shall not begin prior to the meeting. For task orders where subcontractor labor is being employed, subcontractor attendance at the Preconstruction Conference is also required.
The Preconstruction Conference agenda shall minimally include a discussion of the following: project location, personnel contact, safety issues, permits, required outages, requirement for progress meetings, a review of the progress schedule, and a review of the list of proposed task-specific submittals.
3.2 PROGRESS MEETINGS
The Contractor shall attend progress meetings when scheduled by the Government. Attendance is required by appropriate contractor staff and subcontractors as needed to satisfactorily address the meeting's scheduled agenda topics.
The meeting agenda shall include a review of the minutes of the previous meeting, a review of the work progress, field observations, problems, decisions, status of submittal reviews, status of the progress schedule, potential factors of delay, deficiencies, material delivery schedules, safety issues, and other business relating to the work.
Updates to the progress schedule shall be submitted by the 15th of each month, and distributed prior to the following month's progress meeting.
3.3 PROGRESS SCHEDULE
In compliance with GSA FAR, Part 52, Clause 236-15, "Schedule for Construction Contracts," the Contractor shall submit a progress schedule.
3.3.1 Bar Chart
The Contractor shall prepare and submit a bar chart type progress schedule compliant with the following:
1. Within 15 days after notice to proceed, submit 7 copies of the progress schedule to the Government for review and approval. The Contractor shall update the schedule as the work progresses, and resubmit copies of the updated schedule to the Government with each revision.
2. Bar Chart shall minimally include the following:
a) Primary work activities shall be itemized under major headings. Under each heading, subtasks shall be broken out into separate line items sufficient to track the progress of the work.
b) Provide separate line items for training of Government personnel, Operational Readiness Reviews (ORRs), O&M Manuals, and for each system specified in Division 01 Section "Task Order Closeout."
c) Provide a separate major heading for project closeout activities. Examples of subtasks listed under this heading include punch list, clean-up, and submission of the As-Built Drawings.
SECTION 01 31 00 Page 3
3.3.2 Adverse Weather Delays
For weather-dependent activities, the Contractor's progress schedule shall reflect delays in the work attributed to adverse weather. The following allowances shall be made for anticipated adverse weather delays per month:
Monthly Anticipated Adverse Weather Calendar Days
J F M A M J J A S O N D
4 4 4 5 5 2 2 3 2 3 4 4
3.3.3 Government Operations Delays
The Contractor's progress schedule shall reflect delays in the work attributed to anticipated Government Operations as defined by Division 01 Section "Summary of Work."
3.4 PROJECT SUBMITTAL SCHEDULE
The Contractor shall review the specifications and construction documents to verify that the Submittal Schedule is complete.
The Contractor shall review the Contract and add to the Schedule any other submittal required under the Contract but not listed in the specifications or construction documents.
Within 30 days after notice to proceed, the Contractor shall have reviewed the Preliminary Project Submittal Schedule with all necessary subcontractors, and shall mark-up with suggested deletions, revisions, and additions, anticipated submission date, and submit to the Government fo approval a proposed Project Submittal Schedule.
Upon approval, the Government shall provide to the Contractor an Approved Project Submittal Schedule.
Approval of the Schedule by the Government does not relieve the Contractor of supplying submittals required by the contract documents but were omitted from the Schedule.
3.5 AS-BUILT DRAWINGS
Refer to Division 01 Section "Task Order Closeout" for requirements relating to as-built drawings.
SECTION 01 31 00 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
1.3.2 Approving Authority
1.3.3 Work
1.4 SUBMITTALS
1.5 SUBMITTAL REVIEWING ENTITIES
1.5.1 Government (G)
1.5.2 Architect-Engineer (AE)
1.6 PREPARATION
1.6.1 Transmittal Form
1.6.2 Format for SD-02 Shop Drawings
1.6.3 Format of SD-03 Product Data and SD-08 Manufacturer's
Instructions
1.6.4 Format of SD-04 Samples
1.6.5 Format of SD-05 Design Data and SD-07 Certificates
1.6.6 Format of SD-06 Test Reports and SD-09 Manufacturer's Field
Reports
1.6.7 Format of SD-10 Operation and Maintenance Data (O&M)
1.6.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout
Submittals
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
1.7.2 Number of Copies of SD-03 Product Data and SD-08
Manufacturer's Instructions
1.7.3 Number of Samples SD-04 Samples
1.7.4 Number of Copies SD-05 Design Data and SD-07 Certificates
1.7.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's
Field Reports
1.7.6 Number of Copies of SD-10 Operation and Maintenance Data
1.7.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11
Closeout Submittals
1.8 VARIATIONS
1.8.1 Considering Variations
1.8.2 Proposing Variations
1.8.3 Warranting that Variations are Compatible
1.8.4 Review Schedule is Modified
1.9 SUBMITTAL REGISTER
1.10 GOVERNMENT REVIEW
1.10.1 Review Notations
1.11 SCHEDULING
1.12 REJECTED SUBMITTALS
1.13 APPROVED SUBMITTALS
1.14 APPROVED SAMPLES
SECTION 01 33 00 Page 1
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
11/15
PART 1 GENERAL
1.1 RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
The Government may request submittals in addition to those specified herein when deemed necessary to substantiate compliance with specific project requirements.
Units of weights and measures used on all submittals are to be the same as those used in the construction documents.
Each submittal shall be complete and include sufficient detail to allow ready determination of compliance with Contract requirements.
The Contractor's Quality Control (CQC) System Manager and the Designer of Record, if applicable, shall review all submittals prior to forwarding to the Government for the Government's action. Submittals reviewed by the Contractor and Designer of Record shall be stamped, signed, dated, and indicate the action taken. Proposed deviations from the Contract requirements are to be clearly identified.
Submittals requiring Government approval shall be made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in compliance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to issuance of Contract notice to proceed.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
SECTION 01 33 00 Page 3
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal Register
Schedule of prices or Earned Value Report
Health and Safety plan
Work plan
Quality Control (QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the Contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
SECTION 01 33 00 Page 4
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of Contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
SECTION 01 33 00 Page 5
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
1.3.2 Approving Authority
Office or designated person authorized to approve submittal.
1.3.3 Work
As used in this Section, on- and off-site construction required by the construction documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in compliance with this Section:
SD-01 Preconstruction Submittals
Submittal Register ; G
1.5 SUBMITTAL REVIEWING ENTITIES
1.5.1 Government (G)
Government review and approval is required for extensions of design, SECTION 01 33 00 Page 6 critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government. Government approval is required for all deviations from the Contract.
1.5.2 Architect-Engineer (AE)
Architect-Engineer (AE) review and recommendation to the Government on disposition is required for extensions of design, critical materials, any deviations from the solicitation, the accepted proposal, or the completed design, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government. The Contractor shall provide the number of copies designated herein. The Government will review Architect-Engineer-approved submittals for compliance with the Contract.
1.6 PREPARATION
1.6.1 Transmittal Form
Transmittal forms shall utilize GSFC form FMD-304 Material Approval Submittal Transmittal identifying the Contractor, his address, and telephone number, Contract number, and date of submission. Each individual submittal shall be marked on the transmittal form, and shall be identified by submittal schedule reference number (i.e., NASA NUMBER); Subcontractor and supplier, their addresses and telephone numbers; submittal name;
contract specification and drawing reference; compliance with applicable referenced specifications; and similar information to distinguish it from other submittals.
1.6.2 Format for SD-02 Shop Drawings
Shop drawings are not to be less than 8 1/2 by 11 inches nor more than 30 by 42 inches , except for full size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless other form is required. Drawings are to be suitable for reproduction and be of a quality to produce clear, distinct lines and letters with dark lines on a white background.
Bind shop drawings in sets, and include the following on each drawing:
a. The project name, which shall be the general title of the construction documents.
b. Name of Contractor.
c. Name of Subcontractor.
d. Date of the drawings and revisions.
e. Name of the item, material, or equipment detailed thereon.
f. Number of the submittal (e.g., first submittal, etc.) in a uniform location adjacent to the title block.
Shop drawings shall be numbered in a logical sequence; the Contractor may use their own numbering system. Each drawing shall include the number of the submittal in a uniform location adjacent to the title block. Place the Government's Contract number in the margin, immediately below the
SECTION 01 33 00 Page 7 title block, for each drawing.
Reserve a blank space, no smaller than 3 by 5 inches on the right hand side of each sheet for the Government's disposition stamp.
Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the construction documents. Identify materials and products for work shown.
1.6.3 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions
Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.
Indicate, by prominent notation, each product which is being submitted;
indicate specification section number and paragraph number to which it pertains.
Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.
Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, submit as specified for SD-07 Certificates.
Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Government. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
Collect required data submittals for each specific material, product, unit of work, or system into a single submittal and marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of construction effort.
Submit manufacturer's instructions prior to installation.
1.6.4 Format of SD-04 Samples
Samples shall be physically identical to the proposed material or product to be incorporated into the Work, fully fabricated and finished in the specified manner, and full scale. Where variations in color, finish, pattern, or texture are inherent in the material or product represented by the sample, multiple units of the sample, showing the near-limits of the
SECTION 01 33 00 Page 8 variations and the "average" of the whole range (not less than 3 units), shall be submitted. Each unit shall be marked to describe its relation to the range of the variation. Where samples are specified for selection of color, finish, pattern, or texture, the full set of available choices shall be submitted for the material or product specified. Sizes and quantities of samples shall represent their respective standard unit.
a. The project name, which shall be the general title of the construction documents.
b. Name of Contractor.
c. Name of Subcontractor.
d. The name of the item, material, or equipment detailed thereon.
e. Name of producer and brand.
f. Specification Section to which samples apply.
g. Submittal Register reference number.
h. Samples of finish materials shall have additional markings that will identify them under the finish schedules.
1.6.5 Format of SD-05 Design Data and SD-07 Certificates
Provide design data and certificates on 8 1/2 by 11 inches paper. Provide a bound volume for submittals containing numerous pages.
1.6.6 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Provide reports on 8 1/2 by 11 inches paper in a complete bound volume.
Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.
1.6.7 Format of SD-10 Operation and Maintenance Data (O&M)
Comply with Division 01 Section "Operation and Maintenance Data" for format requirements.
1.6.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
Submit 5 copies of submittals of shop drawings.
SECTION 01 33 00 Page 9
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.7.3 Number of Samples SD-04 Samples
Submit 3 samples showing that accurately illustrate the range of variation what can be anticipated in the finished project. One approved sample will be retained by the Government, and two samples will be returned to the Contractor.
1.7.4 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.7.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity requirements specified for shop drawings.
1.7.6 Number of Copies of SD-10 Operation and Maintenance Data
Submit 3 copies of O&M Data to the Government for review and approval.
1.7.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
Submit 3 sets of administrative submittals.
1.8 VARIATIONS
Variations from Contract requirements require both Designer of Record (DOR) and Government approval pursuant to Contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.8.1 Considering Variations
Discussion with Government prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from Contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.8.2 Proposing Variations
When proposing variation, deliver written request to the Government, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required
SECTION 01 33 00 Page 10 for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.8.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this Contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.8.4 Review Schedule is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.9 SUBMITTAL REGISTER
Prepare and maintain a submittal register, as the work progresses. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Submittal Register shall include columns with the following data:
a. Column listing the specification section in which the submittal is required.
b. Column listing the Submittal Description and type (e.g., SD-02 Shop Drawings).
c. Column listing principal paragraph where the material or product is specified.
1.10 GOVERNMENT REVIEW
1.10.1 Review Notations
The Government will review submittals and provide pertinent notation generally within 15 working days after receipt of submission. On complex or lengthy submittals requiring extensive review efforts by the Government, and on occasions when numerous submittals are made within a 15 day period, the aforementioned 15-day review period may be exceeded by the Government.
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "APPROVED" authorize the Contractor to proceed with the work covered.
b. Submittals marked "APPROVED AS NOTED - NO RESUBMIT" authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "APPROVED AS NOTED - RESUBMIT" require the Contractor to make the necessary corrections and revisions and to re-submit them for approval in the same routine as before.
d. Submittals marked "REJECTED - RESUBMIT" indicate noncompliance with
SECTION 01 33 00 Page 11 the Contract requirements and shall be re-submitted with appropriate changes.
e. Submittals marked "REVIEW NOT REQUIRED - NO ACTION TAKEN" indicate the Government is not required to approve the submitted work or operation. Such determination by the Government shall not relieve Contractor of his responsibility to perform the work in a safe and workmanlike manner and to obtain all required permits and approvals.
1.11 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the construction documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the construction documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required .
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.12 REJECTED SUBMITTALS
The Contractor shall make corrections required by the Government's review.
If the Contractor considers any correction or notation on the returned submittals to constitute a change to the Contract requirements, notice as required…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .