Contract Opportunity Award Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
ARCHIVE
DAYS AFTER THE AWARD DATE
RECOVERY ACT FUNDS
NAICS CODE
SET-ASIDE
CONTRACTING OFFICE
ADDRESS
DESCRIPTION
See Attachment
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
AWARD NUMBER
AWARD AMOUNT
LINE ITEM NUMBER
AWARD DATE (MM-DD-YYYY)
AWARDEE NAME
CONTRACTOR'S DUNS NUMBER
AWARDEE ADDRESS LINE 1
AWARDEE ADDRESS LINE 2
AWARDEE ADDRESS LINE 3
AWARDEE ADDRESS LINE 4
AWARDEE CITY
AWARDEE STATE
AWARDEE ZIP CODE
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
AWARD INFORMATION
ADDITIONAL INFORMATION
GENERAL INFORMATION
* = Required Field Contract Opportunity Award Notice FY20 IRP-LCR 8 Sites Siemens to Cisco (VA-20-00059233) and Justification Posting 78744 36C10A20Q0186 N 541519 Department of Veterans Affairs Technology Acquisition Center - Austin 1701 Directors Blvd, Suite 600 Austin TX 78744 Contracting Officer Kari Cozzens kari.cozzens@va.gov 512-981-4479
NNG15SD34B_36C10A20F0251
$6,699,768.13 08-07-2020
MINBURN TECHNOLOGY GROUP, LLC
965431815
10113 MINBURN ST
GREAT FALLS
VA
22066 See attached document: C01 JA Redacted.
Cisco Voice System Upgrade
The Contractor shall provide VS platform replacement utilizing a phased installation approach. As part of the VS platform replacement, the Contractor shall supply all hardware, perform installation, pre-cutover, cutover, and acceptance activities. The Contractor shall also provide hardware installation technical support to VA UCIS Contractor activities performed include the following:
a. Perform Site survey to complete pre-cutover documentation
b. Mount equipment in equipment racks
c. Cable equipment for power and connectivity to network and Main Distribution Frame (MDF)
d. Cut-over Analog lines from old Private Branch Exchange to new VS equipment
e. Cut-Over existing LEC Circuits (PRI’s. SIP Trunks, etc.) from old Private Branch Exchange to new VS equipment
f. Replace phones where necessary
g. Pick up old phones during the replacement and bring back to staging area