Attachment_8_Q3_08_19_14.pdf
PDF 16 KB Posted
- Attached to
- DC-8 Fuel Tank Leak Repair
- Solicitation number
- NND1688866Q
About this file
Q-3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_DC-8_Fuel_Leak_Photos.pptx | PPTX presentation | |
| Attachment_5_DCP-O-001.pdf | ||
| Attachment_1_NND1677766Q.pdf | ||
| Attachment_9_Q10_08_19_14.pdf | ||
| Attachment_3_2016.02.02_SOW.doc | DOC document | |
| Attachment_7_Q1_08_19_14.pdf | ||
| Attachment_2_NND1677766Q_Terms_ _Conditions.docx | DOCX document | |
| Attachment_6_DCP-S-067.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NASA Armstrong Flight Research Center
PROCUREMENT QUALITY REQUIREMENTS
Q-3
A. SOURCE INSPECTION AND/OR TEST IS REQUIRED BY NASA
QUALITY REPRESENTATIVE
1. Articles and materials ordered by this contract are subject to NASA Quality inspection or test at the Contractor facility prior to delivery. Contact your NASA Buyer for the name and phone number of your NASA Quality Assurance Representative (QAR). The NASA QAR will provide a list of the mandatory inspection points (MIP) or test requirements for this contract. Do not start work on this order until the mandatory inspection points are established and understood. Verification of material or properties may be the first MIP.
The Contractor shall notify NASA QAR at least 2 days prior to completion of work requiring NASA inspection or test. A seven work day notification is required prior to the completion on the work requiring NASA QA inspection when the facility is out of the commuting area of NASA DFRC. The NASA mandatory inspection points were established at contract award. The advance notice is to permit the NASA QAR adequate scheduling of required contractual inspection and/or testing at the Contractor facility or other site as applicable.
At the time of such source inspection and/or test by NASA QAR, the Contractor shall provide the NASA representative with verifiable quality evidence to assure that the items meet the requirements of the contract.
2. The source inspection and/or test provided herein shall not constitute final acceptance of the items unless it is specifically stated in contract documents that final acceptance by NASA QAR will be performed at the Contractor facility.
3. Each shipment against this contract shall include objective evidence that NASA QAR has completed source inspection or test prior to shipment from the contractor’s facility or site as applicable.
4. Please contact one of these individuals to schedule a visit of a NASA Quality Assurance Representative.
Approved 1 July 2014
PQA