NMMC Exhibit Upgrades M00264-21-Q-0211 RFQ.pdf

PDF 1 MB Posted

Attached to
M00264-21-Q-0211: National Museum of the Marine Corps (NMMC) Exhibit Upgrades
Solicitation number
M00264-21-Q-0211
Issued by

View the file

Other files

File Type Posted
NMMC Gallery Repairs_Attachment 2_DoNotTouch Final.docx DOCX document
NMMC Gallery Repairs_Attachment 1_Timeline.docx DOCX document
RFQ Attachment 4 Question Answer Doc.xlsx XLSX spreadsheet
Copy of Attachment 3 Pricing Template Final.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

M0026421Q0211 24-Aug-2021

b. TELEPHONE NUMBER

(703) 432-1918

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 09 Sep 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

M002649. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

HUGHES, JOY K.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

M3040021SUHC017

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MCINCR - RCO

2010 HENDERSON RD

HUGHES, JOY

QUANTICO VA 22134

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE M30400 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

M30400 NMMC

17001 INTERSTATE DRIVE, STE 130

DUMFRIES VA 22026

ERIK RADOWSKI

TEL: 703-784-4450 FAX:

(703) 784-1929FAX:

TEL: (703) 432-1918

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

337212

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF51

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

M0026421Q0211

Section SF 1449 - CONTINUATION SHEET

FAR 52.212-1 ADDENDUM

This is a FAR Part 12- Acquisition of Commercial Items, procurement that uses FAR Subpart 13 Simplified

Procedures

I. Submission Information

Each Quoter is required to submit a quote that is sufficiently detailed and complete to fully demonstrate an understanding of, and compliance with, all of the requirements of the solicitation. Quotes are solicited on an “all or none” basis. Quoters shall not submit multiple quotes representing alternative terms and conditions for satisfying the requirements of this solicitation. Failure to submit a quote for all requirements of the Performance Work Statement

(PWS) and not in concert with FAR 52.212-1 Addendum shall be the cause for rejection of the quote. Non-compliance with any of the provisions herein may lead the Government to determine that a quote is non-compliant and may result in removal from the evaluation. The Government reserves the right to select a response that provides benefit to the government that exceeds the minimum, but is not required to do so.

Quotes must be prepared in accordance with these instructions. Failure to do so may result in the Quoter’s submission being determined unacceptable and ineligible for award. Each Quoter’s submission shall be screened by the Contracting Officer or designee upon receipt to ensure completeness and compliance with the instructions contained in the Request for Quote (RFQ). Elimination of a Quote is at the sole discretion of the Contracting

Officer.

II. Submission of Questions and Quotes

Questions

All comments and questions must be submitted using Attachment 4, “Question & Answer” spreadsheet for ease of

Government review and to minimize response times. Offerors shall use the form in its original file format and not convert the form to a version in Word, Adobe Acrobat (.pdf), or other file format. To ensure the Government understands the context of the question, and therefore responds accordingly, Offerors shall ensure the referenced document name, section number, page number, and paragraph number are provided as applicable.

All questions must be received by 30 August at 11 AM Eastern Standard Time (EST). All questions submitted for this solicitation must be submitted electronically to joy.hughes@usmc.mil

Quotes

Quotes must be received by the Contracting Office no later than 9 September 2021 at 11:00 AM Eastern

Standard Time (EST). Quotes must be sent electronically via electronic mail and shall be submitted to the following email address by the aforementioned date and time specified: joy.hughes@usmc.mil.

If you run into any issues of not being able to submit via email, please utilize DoD SAFE Site: https://safe.apps.mil/ and must be submitted before the due date/time. Please note that link sites do change, so please review in advance to ensure you have the most updated link.

Note: Due to the firewall at Marine Corps Base Quantico, please be advised that it is the Quoter’s responsibility to ensure all electronic submittals are received by the Contracting Office in the timeframe given above. Late quotes will not be accepted.

Additionally, due to the current COVID-19 environment, hard copies of quotes will NOT be accepted.

mailto:joy.hughes@usmc.mil mailto:joy.hughes@usmc.mil https://safe.apps.mil/

III. Quote Format

In order to maximize efficiency and minimize the time for quote evaluation, it is required that the Quoter submit its quote in accordance with the format and content specified throughout and below:

- Pages are to be typewritten;

- Single-spaced typed lines;

- No smaller than 10 point type; Graphs, tables, charts, and diagrams shall be no smaller that 10 point type;

- 1/2 inch margins (all sides);

- Printable to an 8.5 x 11 inch paper;

- Spreadsheet files shall include all formulas. All rows, columns, cells and worksheets shall be visible.

Formulae shall be rounded to two decimal places (i.e. $12.34);

- Page limitations specified below shall not be exceeded. Title/cover pages, tables of content, appendices, references, glossaries, etc., as well as graphs, tables, charts, diagrams, and etc., are included in the page count. All material in excess of the specified page limits will neither be read nor evaluated;

- Page numbering: Pages shall be numbered consecutively within each volume showing volume and page.

For example, page 9 of Volume I would be numbered I-9 and page 10 of Volume II would be numbered II-

10;

- Each page must include the solicitation number, and the Quoter’s name;

- Each page of the Quote should be affixed the following footer: “Source Selection Information: See FAR

2.101 and 3.104”; and

- Hyperlinks are not permitted.

IV. Quote Content

The Quote must demonstrate an understanding of and an ability to meet all of the requirements set forth in the

RFQ’s PWS. The Quoter shall provide sufficient detail to substantiate the validity of all statements. The Quoter shall demonstrate that the quote is in compliance with the requirements, terms, and conditions of the RFQ.

Comprehensive responses to the requirements of the RFQ are required to enable the Government to evaluate the

Quoter’s understanding of and capability to accomplish the requirements of the PWS. General statements that the

Quoter can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrasing the solicitation’s requirements in whole or in part, will NOT constitute compliance.

Failure to conform to any of the requirements of the solicitation may form the basis for rejection of the quote.

Brochuremanship is not desired, rather clarity, completeness, and conciseness are essential. Since only the quote submitted in response to this solicitation will be evaluated, the Quoter must make certain that its quote is complete with regard to the information provided. Data previously submitted, or presumed to be known, e.g., previous projects performed for the Government, will not be considered in the evaluation unless that information is physically contained in the quote. Information provided must be consistent amongst all volumes.

The Quoter is advised that the Government may selectively verify any information provided in the quote. The

Quoter is cautioned that it is responsible to ensure that material that it desires to have evaluated for a particular section is contained in that specific section.

Quotes shall be presented in three (3) separate volumes (not combined as one Microsoft Word or .pdf document):

Volume I (Administrative)

Volume II (Corporate Experience/Staffing)

Volume III (Cost/Price)

Volume I – Administrative (No page limit for this volume.)

This volume shall address the following:

1. Solicitation and Amendments cover sheet with the appropriate blocks filled in by the Quoter;

2. Quote/Offer Letter. The letter shall be signed by an authorized company official and include the following:

- The Solicitation number;

- Company Information. The name, address, DUNS number, CAGE Code, telephone number, Tax

Identification Number (TIN) and GSA Contract Number of the Quoter;

- Authorized Personnel. Provide the name, title, telephone number, facsimile number, and e-mail address of the company/division point of contact who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government and who can answer questions regarding your

Quote;

- Terms of any express warranty;

- “Remit to” address, if different than mailing address;

- Acknowledgment of Solicitation Amendments (if applicable);

- Agreement with terms. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the RFQ. Quoters are to clearly detail any exceptions taken and the rationale for the exceptions taken to the RFQ. Please note that exceptions taken to the RFQ may render the Quote unacceptable to the Government;

- Documentation of Quoter’s compliance with FAR 52.228-5.

3. Organizational Conflict of Interest (OCI). Offeror shall provide an affirmative statement that no OCIs exist or a detailed plan which mitigates existing or anticipated OCIs;

4. Confirmation of DFARS 252.204-7012 compliance;

5. A completed copy of all solicitation representations and certifications. If the Quoter completed the representations and certifications in the System for Award Management (SAM), it shall include a statement stating its representations and certifications are up to date in SAM. Any representations and certifications that are not available for completion within SAM must be submitted in this volume; and

6. Quote expiration date.

Quoters must review, and complete as necessary, all provisions and clauses contained in this solicitation and include all completions within this volume.

CONFIDENTIAL INFORMATION: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of contract qualifications and quotes/proposals submitted to federal agencies. If a Quoter’s submissions contain information that he/she believes should be withheld from such requestors under FOIA on the grounds that they contain “trade secrets and commercial or financial information” (5 USC 552(b)(4)), the Quoter should mark its submissions in the following manner:

The following notice should be placed on the title page: “Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) _______.”

Volume II – Technical Capability (Page limitation: 20 pages)

THE TECHNICAL QUOTE MUST NOT CONTAIN ANY PRICING DATA.

Factor 1: Corporate Experience

The Quote must provide a narrative which demonstrates the Quoter’s corporate experience with projects similar to that of the PWS. Quoters may include Subcontractor’s corporate experience in addition to their own (if applicable).

The Quoter must demonstrate it has a firm understanding of the PWS requirements, it meets the required minimum corporate experience, and how its corporate experience could benefit the Government in the effort’s complex adaptive sport environment.

Factor 2: Staffing

The Quote must provide a staffing matrix demonstrating the required mix of certified professionals and the required minimum experience.

Volume III – Price (No page limitation for this volume.)

Factor 3: Total Price/Cost

All information relating to pricing/cost data shall be included in Volume III. The price/cost quote shall cover all resources required to complete the requirements of the proposed effort. Quoters are to include a narrative of its pricing methodology / basis of pricing. Quoters are to complete the contract line item number (CLIN) schedule, with prices not exceeding two (2) decimals. In addition to filling out the CLIN schedule, Quoters shall complete and submit the attached Excel Pricing Template, Attachment 3. This template provides a breakdown of pricing to include the proposed hours, proposed labor rates, and travel costs associated with completing this effort.

Data contained in the price/cost quote shall be consistent with data contained in Volume II and the filled-out CLINs.

This volume should contain the Quoter’s most competitive price and terms. You must include total price.

All labor rates and pricing totals shall be inclusive of all overhead, G&A, profit, etc (fully burdened rates). for the firm-fixed-priced CLINs. For comparison purposes, the Government will use the lump sum estimate included on the pricing template.

(End of Provision)

List of RFQ Attachments:

The following will become part of the resultant contract:

Attachment 3: Price Template (as quoted)

The following will not become part of the resultant contract:

Attachment 4: Question & Answer document

FAR 52.212-2 ADDENDUM - EVAL

FAR 52.212-2 ADDENDUM - EVALUATION –COMMERCIAL ITEMS

I. Evaluation of Quotes

The Government intends to make a single award under this solicitation to the responsible Quoter whose quote demonstrates an understanding of and an ability to meet all the requirements set forth in the Performance Work

Statement (PWS). Therefore, quotes proposing less than the entire effort specified herein shall be determined unacceptable and may be removed from consideration for award.

II. Basis of Award

A comparative evaluation of quotes will be performed in accordance with FAR 13.106-2(b)(3). A comparative evaluation entails comparing each technically acceptable quote to another technically acceptable quote to determine which quote provides the best benefit to the Government. The Government is not bound to make award to a quote that exceeds the requirement if it provides no benefit or value to the Government.

It is the intention of the Government to award a single award Firm-Fixed-Price contract resulting from this solicitation with a base period of performance only. The Quote will demonstrate it is in compliance with the requirements, terms, and conditions of the RFQ. Comprehensive responses to the requirements of the RFQ are required to enable the Government to evaluate the Quoter’s understanding of and capability to accomplish the SOW requirements.

III. Evaluation Criteria

The Government will evaluate the Quoter’s quote to determine the extent to which the Quoter has demonstrated its ability to accomplish the tasks listed in the PWS, as outlined in 52.212-1 Addendum, Instructions to Quoters. The following evaluation factors shall be used to evaluate the Quote:

Volume II Technical Capability

Factor 1: Corporate Experience

Quoters will be evaluated on:

- Its corporate experience (and their subcontractors, if applicable) with projects similar to that of the SOW;

- Its understanding of the PWS requirements, as demonstrated by how its corporate experience could benefit the

Government in the effort’s complex adaptive sport environment; and

- Its meeting the required minimum corporate experience;

Quoters whose corporate experience is recent (within the last three (3) years) to the PWS requirements will be evaluated more favorably.

Factor 2: Staffing

Quoters will be evaluated on:

- Its proposed staffing matrix demonstrating the required minimum experience and the required mix of support.

The Government will assign the Quoter’s Technical Capability a rating using the following table:

Technical Capability

Rating Description

Acceptable Quote indicates adequate experience and understanding of the requirements

Unacceptable Quote does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable.

Factor 3: Total Cost/Price

In order to be considered for award, the quoted price must be determined to be fair and reasonable. Note, that while

FAR Part 15 does not apply to this procurement, the price analysis techniques set forth in FAR Subpart 15.4 will be used to determine whether the quoted price is fair and reasonable. The quote will be reviewed for consistency to ensure that all performance, scope, and assumptions quoted in other sections of the quote are captured in the price volume.

The Government will review the pricing table and filled out CLINs for completeness, accuracy, and consistency. A determination will be made as to whether the Quoter properly completed the pricing table. Quotes will be checked for mathematical correctness in all computations and summarizations.

(End of Provision)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Museum Railing Modifications

FFP

FOB: Destination

MILSTRIP: M3040021SUHC017

PURCHASE REQUEST NUMBER: M3040021SUHC017

NET AMT

0002 Job Tree Fabrication

FFP

FOB: Destination

0003 Job Marine Theater Custom Curtains Fabricat

FFP

FOB: Destination

0004 Job Sandbag Removal and Replacement

FFP

FOB: Destination

0005 Job Basket Replacement Fabrication

FFP

FOB: Destination

0006 Job Do Not Touch Sign Fabrication

FFP

FOB: Destination

0007 Job Legacy Walk Graphic Panel Fabrication

FFP

FOB: Destination

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 30-SEP-2021 TO

29-SEP-2022

N/A M30400 NMMC

17001 INTERSTATE DRIVE, STE 130

DUMFRIES VA 22026

ERIK RADOWSKI

703-784-4450

FOB: Destination

M30400

0002 POP 30-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 30-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 30-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 30-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 30-SEP-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 30-SEP-2021 TO

24-SEP-2022

N/A (SAME AS PREVIOUS LOCATION)

PWS

1.0 Background

Open since November 10, 2006, the National Museum of the Marine Corps (NMMC), located at 18900 Jefferson

Davis Hwy, Triangle, VA 22172, is a military history museum dedicated to showcase the material history of the

United States Marine Corps (USMC). Within this document NMMC, Government, and Museum are used interchangeably.

The NMMC consists of eleven (11) extant themed exhibit spaces:

Gallery 1 Leatherneck Gallery

Gallery 2 The High Ground (2nd deck)

Gallery 3 Scuttlebutt Theater

Gallery 4 Making Marines

Gallery 5 Legacy Walk

Gallery 6 The New Republic

Gallery 7 Global Expeditions

Gallery 8 World War I

Gallery 10 World War II

Gallery 11 Korean War

Gallery 12 Vietnam

Each gallery portrays the history of the Marine Corps through a complex integration of artifacts, graphics, audio and video media, theatrical lighting, life cast figures, interactive displays, scenic tableaus, and dioramas.

Within these galleries are various deficiencies to be corrected to facilitate safety and daily operation requirements.

2.0 Scope

The Offeror shall be required to correct various deficiencies in the following areas:

Gallery 1 Leatherneck Gallery

Gallery 5 Legacy Walk

Gallery 6 The New Republic

Gallery 7 Global Expeditions

Gallery 8 World War I

Gallery 10 World War II

Gallery 11 Korean War

Gallery 12 Vietnam

Combat Art Gallery

The Offeror’s responsibilities include: modifications to the museum's railing system throughout four (4) of these galleries to meet Marine Corps Base Quantico safety and operation requirements. Fabrication and installation of three (3) three-dimensional aspen trees in the WWI gallery. Fabrication and installation of two (2) sections of theater curtains in the theater and fabrication of solid sandbags used in fortifications in the WWII gallery. Fabrication of solid cast molds of existing baskets in Gallery 12 Vietnam Quang Nam Village. Furthermore, fabrication of forty-eight (48) “Do Not Touch” signs and mounts in Leatherneck Gallery, Galleries 6,7,8,10,11,12 and Combat Art

Gallery. Lastly fabrication of twenty-nine (29) graphic panels for Gallery 5 Legacy Walk timeline.

The NMMC has achieved and maintained a high level of quality in its exhibits, earning it a gold standard rating with independent museum rating organizations and winning awards for excellence from themed entertainment associations. It is incumbent on the Offeror, and their subcontractors, to maintain or exceed this level of quality and durability in the fabrication, installation, overall look, and quality in the completed exhibitry. Any work failing to meet this standard, as deemed by the Contract Officer's Representative (COR), shall be corrected by the Offeror at their expense. Time spent correcting rejected work shall not be accepted as a reasonable excuse for missing project deadlines. It is also the responsibility of the Offeror, and their subcontractors, to understand and adhere to the requirements of this document. It shall be understood that, for the sake of simplicity and to reduce redundancy, details listed herein are not always repeated on drawings. This is not meant to release the Offeror from meeting these requirements. Any work not meeting the level of quality as specified in this document shall be corrected at the

Offeror’s expense to the satisfaction of the COR.

This contract will be for one base year. For the purpose of coordination with other activities, and invoicing by the

Offeror, the tasks have been identified by contracting year. See Section 3.0 tasks for details.

3.0 Tasks

3.1 Museum Railing Modifications

A. Gallery 7-Global Expansion (3 Cannons Display/Colt M1895). The Offeror is required to modify two

(2) 90-degree corners of the existing museum railing system to a rounded corner to prevent any injury to visitors. One corner is at the 3 cannons display at the entrance of the gallery, and the other is at the Colt

M1895 “Potato Digger” display.

B. Gallery 8- WWI. The Offeror is required to modify eight (8) corners of the existing museum railing system, three

(3) corners at French 75 cannon, one (1) at the Model T Truck, and four (4) 90-degree corners around the Liberty

Truck to a rounded corner to prevent any injury to visitors.

C. Gallery 10-WWII. The Offeror is required to modify two (2) corners at the Pearl Harbor Home Front tableau.

Furthermore, the railing section currently in front of the Iwo Jima Flag needs to be extended across the adjacent wall to prevent further damage to the exhibit by a docent’s chair. This wall section requires repair and a new graphic.

D. Gallery 11- Korea. The Offeror is required to round one (1) 90-degree corner and remove rail/stanchion supports for return to map at teacher’s desk display and interactive. Furthermore, the vendor will extend front rail to meet the adjacent wall and add stanchion supports where needed.

3.2 WWI Gallery Tree Fabrication

A. The Offeror will be required to fabricate and install one (1) three-dimensional Aspen tree with foliage, approximately 8 feet in height by 3-4 inches in diameter that will serve as a corner guard for the existing drywall corner. Furthermore, the vendor will need to fabricate and install two (2) sapling Aspen trees approximately 4-6ft in height by 1.5-2.5 inches in diameter to fill in the corner background area. The tree’s must be equal or greater quality of existing trees and must match in scale and color. Foliage must be rated inherently fire retardant to meet safety codes.

B. Due to their location, corner fabricated tree and foliage shall not obscure overhead gallery lighting, security cameras, or impede visitor traffic in any way.

3.3 WWII Gallery Marine Theater Curtain Fabrication

A. Offeror is required to measure, and fabricate two sections of curtains to match the existing curtains in color and style that are attached directly to the wall at the height of the existing track. The length of the curtains are to be floor length and fit into the existing floor. The existing cornice board can be re-utilized to cover the curtain installation.

B. Approx. Dimensions: Curtain Section 1 (5’w x 10.5’h), Curtain Section 2 (8’w x 10.5’h)

3.4 WWII Gallery: Sandbag Removal and Replacement

A. Wake Island – 1917A1 Browning Machine Gun, Tableau, WWII Gallery. The Offeror is responsible for removing existing sandbags surrounding the 1917A1 Browning Machine Gun and cast figure and replacing them with solid equivalents that maintain the same look as the period and environment they are depicted in. Sandbags must lock into place and be impervious to punctures. Where attachment points are required, they must be attached in pairs to prevent twisting. (See attached photo)

B. Battle of Guadalcanal, 37mm Tableau, WWII Gallery. The Offeror is responsible for removing existing sandbags surrounding the 37mm Battle of Guadalcanal tableau and cast figure and replacing them with solid equivalents that maintain the same look as the period and environment they are depicted in. Sandbags must lock into place and be impervious to punctures. Where attachment points are required, they must be attached in pairs to prevent twisting.

3.5 Vietnam Gallery: Fabricate Basket Replacements

A. The Offeror is responsible for removing all baskets and replacing them with cast, painted molds of the originals in the Quang Nam Village tableau. Any basket with a lid must be created solid with no ability to open. Any open basket must not show visible signs of attachment to ground form. Baskets must be solidly attached to existing ground form.

3.6 Gallery “Do Not Touch” Graphic Sign Fabrication and Installation

Leatherneck Gallery

A. The Offeror is responsible for fabricating two (2) wall mount style “Do Not Touch” signs attached to metal via VHB around the Tarawa Tableau.

B. The Offeror is responsible for fabricating and installing six (6) wall mount style “Do Not Touch” signs attached to metal via VHB tape around the UH-34 Tableau.

Gallery 6 : The New Republic

A. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the Marine Life exhibit.

Gallery 7 : Global Expeditions

A. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff for the 3 connons display.

B. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the Marine Life Tent.

C. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the Colt (Potato Digger) display.

D. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the King Armored Car display.

Gallery 8: World War I

A. The Offeror is responsible for fabricating and installing a rail mounted “Do Not Touch” sign at the Hand to

Hand Fighting display.

B. The Offeror is responsible for fabricating and installing a rail mounted “Do Not Touch” sign at the French

75 cannon display.

C. The Offeror is responsible for fabricating and installing a rail mounted “Do Not Touch” sign at the Model

T truck display.

D. The Offeror is responsible for fabricating and installing a rail mounted “Do Not Touch” sign at the Liberty

Truck display.

Gallery 10 : World War II

A. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the Pearl Harbor Homefront tableau.

B. The Offeror is responsible for fabricating and installing a wall mounted “Do Not Touch” sign attached via

French cleat or standoff at the 1917 Browning Machine Gun tableau.

C. The Offeror is responsible for fabricating and installing a wall mounted "Do Not Touch" sign attached via

French cleat or standoff at the Stuart Light Tank display

D. The Offeror is responsible for fabricating and installing a wall mounted "Do Not Touch" sign attached via

French cleat or standoff at the 37mm tableau.

E. The Offeror is responsible for fabricating and installing a wall mounted "Do Not Touch" sign attached via

French cleat or standoff at the Jeep display.

F. The Offeror is responsible for fabricating and installing two (2) wall mounted Do Not Touch signs attached via French cleat or standoff at the Sherman Tank display.

G. The Offeror is responsible for fabricating and installing two (2) wall mounted "Do Not Touch" signs attached via French cleat or standoff at the Insignia wall at the Iwo Jima Flag.

Gallery 11: Korea

A. The Offeror is responsible for fabricating and installing a rail mounted "Do Not Touch" sign at the

Teacher’s Desk.

B. The Offeror is responsible for fabricating and installing three (3) rail mounted "Do Not Touch" signs at the

Pershing Tank.

C. The Offeror is responsible for fabricating and installing a wall mounted via French cleat or standoff "Do

Not Touch" sign at the Chosin Reservoir Campaign.

Gallery 12 : Vietnam

A. The Offeror is responsible for fabricating and installing a wall mounted via French cleat or standoff "Do

Not Touch" sign at the Quang Nam Village hut tableau.

B. The Offeror is responsible for fabricating and installing two (2) rail mounted "Do Not Touch" signs at the

Ontos display.

C. The Offeror is responsible for fabricating and installing a wall mounted attached to metal via VHB tape

"Do Not Touch" sign in the CH-46 tail section.

D. The Offeror is responsible for fabricating and installing two (2) wall mounted "Do Not Touch" signs via cleat or standoff to the Soviet Howitzer display base.

Combat Art Gallery

A. The Offeror is responsible for fabricating and installing a wall mounted attached via French cleat or standoff "Do Not Touch" sign in the interior entrance wall of the gallery.

3.7 Gallery 5 Legacy Walk Graphic Panel Fabrication

A. The Offeror is responsible for deinstalling/installing and fabricating new graphics for twenty-nine (29) graphic panels along Gallery 5 Legacy Walk Timeline.

4.0 General Requirements

Unless otherwise noted or directed by the COR, for all task orders the following shall apply.

1. Place of Performance: NMMC is located within Prince William County and subject to concurrent jurisdiction with Marine Corps Base (MCB), Quantico, VA 22134.

The NMMC is open to the general public from 9:00 AM until 5:00 PM, 364-days per year, every day except

December 25.

Work that does not degrade the visitors’ experience can be conducted during the hours that the Museum is open.

Work that is loud or degrades the visitors’ experience must be completed before 0900 or after 1700 each day. Loud or potentially experience-degrading work is defined as noise created by any mechanical tool larger than a hand tool(s) that disrupts the visitor experience in the Museum. This will be assessed on a case-by-case basis. Activities such as hammering and drilling will be permitted, but jack hammering or table saws will not be permitted during operating hours. Materials, such as solvents and paint that are potentially off-gassing with unpleasant or harmful vapors, shall not be used in or around Museum visitors. Use of such materials shall be approved by the COR. It is the Offeror’s responsibility to ensure vapors or fumes do not create a negative experience for the visitors.

2. Design & Approval: The selected contractor will be required to conduct a site visit to consult with museum staff prior to beginning any fabrication work. Design samples of intended work must be submitted for approval by museum staff prior to commencement of fabrication. Museum staff shall provide approval of designs or recommendations for modification to designs within ten (10) business days of submission. All work performed must be in line with the high standards set forth by the National Museum of the Marine Corps.

3. Delivery Instructions: All exhibits are to be installed in the NMMC located at:

The National Museum of the Marine Corps

18900 Jefferson Davis Highway, Triangle, VA 22172

ATTN: Matt St.James

All deliverable items shall be packaged and marked according to the Exhibit Fabricator’s best commercial practices to ensure arrival at the specified destination free of damage or deterioration. The Offeror shall comply with all shipping and hauling requirements of the Commonwealth of Virginia, the USMC, and all other associated authorities. All deliveries shall be coordinated with the COR. Any deliveries made without prior coordination run the risk of being refused at the discretion of the COR and at the expense of the Offeror.

4. Travel: Milestone meetings and production meetings will be held at the Museum. This shall require travel to the

NMMC. The Offeror shall conduct a site visit and verify all field conditions, dimensions and materials in the field before commencing work, with the understanding that the government drawings represent design intent and are not to be interpreted as ready-to-build. Deficiencies with the final product caused by a lack of field verification shall be corrected by the Offeror at their expense to the satisfaction of the COR.

5. Working on a Government Installation: The Offeror and his employees shall be subject to all traffic, security, and registration regulations for personnel and vehicles. All Offeror and sub-contracted personnel attending meetings, answering Government telephones, or working on a site where their status is not known to third parties, must identify themselves as such on demand by Government personnel. Unless otherwise directed by the COR, all documents produced or revised by Contractors or developed through Contract participation must be marked as

“Contractor generated documents” or otherwise identified in a manner that discloses the Contractor’s participation.

The Offeror and their subcontractors shall understand they are working at a Government, military installation and shall comply with all posted rules and laws and/or as directed by Government personnel. While on-site, all contracted personnel shall conduct themselves in a professional manner at all times and not create a situation that interferes with Museum operations or with the general public’s visitor experience. Unacceptable or unsafe behavior will be documented by the COR and delivered to the Offeror via email. It shall be the responsibility of the Offeror to correct the behavior or remove the offending personnel per direction of the COR.

6. Deadlines: It shall be the Offeror’s responsibility to meet all schedule milestones and deadlines agreed to by the

COR. It is the responsibility of the Offeror to complete all work, to include any punch list items, in time for the agreed upon deadline. Payment will not be granted for incomplete work.

7. Accident Prevention: The Offeror shall establish an effective accident prevention program and provide a safe environment for all personnel and visitors. Before on-site work begins, the Offeror shall submit to the COR for approval of an accident prevention program. The COR shall review the proposed plan for compliance with OSHA and project requirements. The plan shall, at a minimum, include the following information:

(a) Name of responsible supervisor to carry out the program.

(b) Weekly and monthly safety meetings.

(c) First Aid procedures.

(d) Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, USMC and Heritage Foundation personnel, Offeror's employees and other contractors’ employees. Identify the work included under each phase by reference to specification section or division numbers.

(e) Training, both initial and continuing.

(f) Planning for possible emergency situations. Such planning shall take into consideration the nature of exhibit fabrication and installation, site conditions, and degree of exposure of persons and property.

(g) Certificates: Provide certificates from a mechanic that certifies all mechanical equipment has been inspected and meets OSHA requirements.

(h) Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

(i) Submit a report of safety meetings and of inspections.

(j) Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

8. Accident Reporting: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. The Offeror shall notify the COR immediately in the event of a reportable accident. All other accidents shall be reported within eight (8) hours of incident. The Offeror shall follow up, in writing, with an accident report that includes: Time, date, location of occurrence, names of involved parties and witnesses, description of events and injuries, and a plan of correction to the COR. The Offeror will provide their on-site staff with adequate training to ensure prompt and efficient first aid.

9. Public Safety: The Offeror shall be responsible for erecting barriers to ensure the safe passage of Museum visitors and employees around areas of exhibit work. Where the work under contract occurs in or adjacent to an area of the Museum open to Museum visitors, the Offeror shall provide suitable protection and screening to protect the visitors from any harm or undue inconvenience. Protection shall include barricade panels and locked access of sufficient size and strength to preclude accidental or deliberate entry to the work site by any of the public. Such barriers shall be maintained to present a respectable appearance to the visitors at all times. The Offeror shall provide temporary signs indicating work in process. All signs shall be approved by the COR prior to them being posted. The work, and movement of equipment and materials to and from the site shall be scheduled and conducted in such a manner that the Museum’s visitors and staff are protected from harm or undue inconvenience. The Offeror’s crews shall confirm to current COVID protocols as directed by the state, local, MCB Quantico and NMMC. Until notified by the COR in writing, all crews are to wear masks and anyone displaying symptoms or running a fever shall leave the work site for a minimum of (14) days returning only when the symptoms have subsided.

10. Emergency Instructions: The Offeror shall post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

11. Ingress and Egress: The Offeror shall provide and maintain adequate ingress and egress at all times in accordance with Government safety requirements. No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with egress. The Offeror shall be responsible for all signage, ground guides, and flag-persons.

12. Protective Equipment: The Offeror shall inspect personal protective equipment daily and maintain it in a serviceable condition. Clean, sanitize, and repair personal items before issuing them to another individual. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

13. Hazardous Materials: The Offeror shall ensure that all hazardous materials are stored in approved containers and are handled in a safe manner in accordance with OSHA guidelines. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

14. Onsite Work: The Offeror shall have the appropriate licenses and shall acquire the appropriate approvals required to work in Prince William County, VA. The Offeror shall comply with federal, state, and local regulations, and shall understand that the Museum is subject to concurrent jurisdiction, including Marine Corps Base Quantico, Prince William County, and the Commonwealth of Virginia.

15. Site Restoration: The Offeror is responsible for restoring the work site to its original condition

16. Delivery Dates: The Offeror is responsible for designating or arranging mutually-agreeable delivery dates of

Government furnished equipment and for receiving, unloading and handling Government-furnished equipment at the site.

17. Contract Performance: The Offeror shall fulfill this contract in such a manner that all key personnel will be able to successfully manage all requirements of this PWS. Key personnel are identified as the Project Manager, Project Coordinator, and site Foreman. The Offeror shall provide a single point of contact in the person of a Project

Manager on the job site for all issues.

18. Fire-Retardant Materials: The Offeror shall supply inherently fire-retardant materials for all specimens, including: artificial foliage, fabrics, draperies etc. Certification of all materials to be provided to COR before final invoice.

19. Security Requirements: During on-site installations, the Offeror is responsible for:

-security of equipment and materials left on the Museum campus, including but not limited to the lay down yard/area.

- security breaches perpetrated by all Offeror employees and all subcontractors.

- security and safety during truck delivery, offload, staging, and other potentially dangerous work performed on the

Museum campus.

20. Material Submittals: The Offeror shall follow the following Submittal Process:

Materials, supplies, and equipment procured by the Offeror shall meet the specifications, standards, and manuals listed in these specifications and approved by the COR prior to installation. Submittals are required for approval by the COR. The COR may at any time require test data showing that any materials or supplies procured by the Offeror meet the industrial specifications.

If the quality of an item is not specified, it shall be of acceptable industrial grade and quality, per industry standards, equal to or better than the manufacturer’s original, and will be compatible with existing systems.

Replacement parts shall be new. If new parts are not available, the Offeror may request approval, in writing, from the COR to use rebuilt parts. The use of rebuilt parts prior to written approval of the COR is at the Offeror’s sole risk. All parts, whether new or rebuilt, shall carry the full warranty required by this contract.

The Government acceptance, review, or submittal approval of any portion of the proposal or final design shall not relieve the Offeror from fulfilling his responsibility for any errors or omissions with respect thereto.

21. Government Furnished Equipment (GFE): The Offeror is responsible for protecting GFE from damage, including damage from exposure to the elements, and to repair or replace items damaged as a result of mishandling by the Offeror’s handling or operations. The Offeror shall not accept any GFE without receiving a Transmittal from the COR. The transmittal will be signed by the Offeror and the COR showing receivership of the materials.

Condition of the GFE will be noted on the transmittal at time of signature.

22. Administrative Submittals: The Offeror shall submit the following within 14 days of contract award: (a)

Permits, if required, (b) Insurance Certificates, if required, (c) Preliminary schedule for the work. Submittals shall be reviewed by the COR within ten (10) business days of receipt. Any submittals not meeting the requirements of the contract shall be rejected. The Offeror has ten (10) business days within which to correct and resubmit to the COR for approval. Although the Government understands there are instances requiring a fast approval of a submittal, the

COR will not waive their right to the stated review period due to improper planning on the part of the Offeror. The

Government shall not be liable for project delays in situations where the Offeror failed to allow for the full approval period. Any expenses associated by delays due to this situation shall be the responsibility of the Offeror.

23. Project Schedule: The Offeror shall act as project scheduler and provide a critical path document in both electronic and paper format to the COR on the first Friday of every month. The document shall be created in PC-compatible Microsoft Project or similar software and published in PDF format. The document shall include milestones, all critical path elements, start and end dates for all activities critical to the installation and integration of all exhibit elements. The Project Schedule shall incorporate all scheduling and milestone information from all other contractors that impact and or interface with the Offeror.

24. Coordination: The Offeror shall coordinate exhibit fabrication and installation activities to assure efficient and orderly installation of each part of the work. Coordination must assure safe and timely fabrication, transportation, and installation of all exhibits and associated elements listed in the Solicitation. Coordination shall involve the coordination of all work by all Contractors and Offeror’s sub-contractors. Offeror to provide on-site project coordinator as point of contact during any site work.

Where installation of part of the work is dependent on installation of other components, either before or after its own installation, exhibit fabrication activities shall be scheduled in the sequence required to obtain the best and most efficient results.

The Offeror shall be responsible for coordinating any work that affects the fabrication of any exhibit components, the use of any exhibit components, and the installation of any exhibit components.

Where available space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair. The Offeror shall coordinate installation of all exhibits to facilitate ease of maintenance and repair.

The Offeror shall make adequate provisions to accommodate items scheduled for later installation.

The Offeror shall coordinate scheduling and timing of required administrative procedures with other contracted activities to avoid conflicts and ensure orderly progress of the work.

The Offeror shall hold production meetings with the COR and any other parties needed, to report on progress, resolve issues and coordinate efforts of all Contractors. The meeting location and frequency shall be mutually agreed upon by the COR and the Offeror.

25. Review of Fabrication & Installation Schedule: During production meetings, the Offeror will report where each activity is in relation to the schedule, whether on time, ahead of, or behind schedule. Determine how delays shall be mitigated; secure written commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities shall be completed within the contracted schedule.

Review the present and future needs of each entity present, including the following, if applicable:

(1) Interface requirements

(2) Time

(3) Sequences

(4) Status of submittals

(5) Deliveries

(6) Off-site fabrication problems

(7) Access

(8) Site utilization

(9) Temporary facilities and services

(10) Hours of work

(11) Hazards and risks

(12) Housekeeping

(13) Quality and work standards

(14) Changes, if required

(15) Potential challenges and proposed solutions

26. The Offeror shall notify the COR, via E-mail, upon completion of any and all…