Specifications for FY 2019 Small Boat Repair NOAA Ship RAINIER

Item 16330: Anode Replacement NOAA FY19 Fairweather Small Boat Repairs

08NOV2018

NOAA Ship Fairweather

Small Boat Repairs

FY 2019

STATEMENT OF WORK

November 8, 2018

1. BACKGROUND: NOAA’s research and survey ships comprise the largest fleet of federal research ships in the Nation. Ranging from large oceanographic research vessels capable of exploring the world’s deepest ocean, to smaller ships responsible for charting the shallow bays and inlets of the United States, the fleet supports a wide range of marine activities including fisheries research, nautical charting, and ocean and climate studies. In addition to its ships, the NOAA Small Boat Program manages a fleet of more than 400 small boats that perform various data collection missions for NOAA throughout the United States and its territories including hydrographic surveys, fishing, diving, scientific instrument deployment/recovery, water and air quality monitoring, law enforcement and marine mammal surveys. Vessels vary in size from a simple 10-ft. kayak to a complex 85-ft. research vessel. The majority of small boats fall within the range of 16-26 feet in length and operate in near-shore environments, but extended missions in deep water environments are common among the larger vessels.

The NOAA small boats included in this Statement of Work (SOW) are carried aboard the NOAA Ship Fairweather (S 220), commissioned in 1967, as survey assets. The ship is homeported in Ketchikan, Alaska and her primary mission is conducting hydrographic surveys in support of nautical charting.

2. INTENT

2.1 This specification contains the general requirements for work performed by the Small Boats Repair Contractor (Contractor) for the NOAA Ship Fairweather’s small boats. These general requirements apply to all work items contained in this contract including care of the boats, sea trials, and services provided to the boats during the contract

2.2 Contractor must demonstrate significant past performance completing work within the scope of this contract on vessels of similar size and complexity, with particular regard to marine aluminum welding and ABYC electrical standards.

2.3 Work under this contract will be performed at the Contractor’s facility. NOAA will transport the boats to/from the NOAA pier at Sand Point Lake Washington, Seattle, WA to/from a Contractor’s facility within 12NM. Transportation beyond 12NM would be the responsibility of the contractor and at the contractor’s expense. Upon completion, NOAA will conduct acceptance testing at the Contractor’s facility.

2.4 The period of performance for this contract is from time of award to February 18th, 2019.

2.5 There are 5 small boats covered under this Scope of Work with the following particulars:

2.4.1 FA-2805 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2009, 7 LT (15500 #) Displacement, Hull Number 2805, Aluminum Hull, Cummins 500HP engine

2.4.2 FA-2806 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2009, 7 LT (15500 #) Displacement, Hull Number 2806, Aluminum Hull, Cummins 500HP engine

2.4.3 FA-2807 – 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2009, 7 LT (15500 #) Displacement, Hull Number 2807, Aluminum Hull, Cummins 500HP engine

2.4.4 FA-2808 - 30 foot All American Marine 30 HSL Hydrographic Survey Launch, manufactured in 2009, 7 LT (15500 #) Displacement, Hull Number 2808, Aluminum Hull, Cummins 500HP engine

2.4.5 FA-2302 – 23 foot Silver Ships Ambar 700, manufactured in 2004, 3.5LT (6931 #) Displacement, Hull ID Number VSI70017G404, Aluminum RHIB with hybrid air/foam collar, Cummins 315 HP engine.

3. REFERENCES

3.1 US Code of Federal Regulations, 46 CFR, Subchapter T, Small Passenger Vessel (under 100 GRT)

3.2 American Bureau of Shipping (ABS), Guidance for Building and Classing High Speed Craft, 2018

3.3 ABS Rules for Materials and Welding - Aluminum and FRP

3.4 US Coast Guard (USCG), Marine Safety Center, MTN 01-08

3.5 American Boat and Yacht Council (ABYC) Standards and Technical Information Reports for Small Craft

3.6 NOAA Small Boat Standards and Procedures Manual, 4th Edition

3.7 NOAA Standard Specification S0100, Implementation and Conduct of Checkpoints

3.8 NOAA Standard Specification AMC-000-3C General Requirements for Small Contract Ship Repairs

3.9 IEEE Std 1580-2010, IEEE Recommended Practice for Marine Cable for Use on Shipboard and Fixed or Floating Facilities

3.10 International Organization for Standardization (ISO) 6954:2000- Mechanical Vibration- Guidelines for the measurement, reporting, and evaluation of vibration with regard to habitability on passenger and merchant ships.

3.11 American Welding Society (AWS) D1.2 Structural Welding Code- Aluminum

4. DEFINITIONS Wherever used in this specification and in all other work items in this contract, the following definitions of terms apply:

4.1 COR. Contracting Officer Representative. Government Employee. Generally, the contractor’s point of contact for all contract and work related issues. The COR is the direct representative of the Contracting Officer. No other government employees other than the COR and KO (see below) have the ability to direct Contractor work.

4.2 Inspect. Visually evaluate the specified surface, item, part, or component for evidence of contamination, damage, excessive wear, scoring, and any other condition which could interfere with the proper operation or functioning of the surface, item, part or component.

4.3 Install. Place the specified item in position for service and make all connections needed to ensure proper use, service, appearance, and operation. Except as may otherwise be specified, this shall include the following:

4.3.1. Provide new or modify existing foundations. Securely mount equipment and components using new fasteners. Align connected equipment and components to meet manufacturer’s specifications.

4.3.2. Make all electrical connections. Provide new electrical cable runs between controllers and motors of new equipment. Existing cables may be reused in other applications, except where the existing cables are too short to make connections. Continuous cable shall be used unless exception is approved by COR.

4.3.3. Modify piping (within 5 feet of installation location) to suit the new equipment, including the rerouting of existing piping and adding of new piping as needed to properly connect equipment and components.

4.4 KO. Contracting Officer

4.5 HSL. Hydrographic Survey Launch, a specific design of survey vessel owned by NOAA and deployed from NOAA research vessels on domestic and international voyages.

4.6 Piping. A system of pipe, tube, elbows, tees, valves, couplings, and other pipe fittings. Unless otherwise specified in the detailed item description, all piping systems and components shall comply with material and installation requirements of reference 3.1.

4.7 Rebuild. Disassemble, clean, inspect, submit condition found report, repair (including renewal of all parts needed such as o-rings, gaskets, and other consumable parts), reassemble, test, and calibrate the specified part, component, system, or machine to restore it to a condition of reliability equivalent to a new part, component, system, or machine. Components and parts shall meet the manufacturer's applicable rebuild specifications.

4.8 Reinstall. Return the same item which was previously removed to its previous configuration and location.

4.9 Renew. Provide and install a new item for an existing item previously removed or to be removed. The new item must be the identical same part number or component ID as the removed item, or manufacturer specified superseding item if the removed item is obsolete.

4.10 Replace. Provide and install a new different item for an existing item previously removed or to be removed. The new item must be comparable in material, performance and configuration to the item removed.

4.11 Checkpoint. Instances that have the verbiage “***CHECKPOINT***” in the SOW require the contractor to verify, or inspect, the work performed with the COR. Any section that does not include “***CHECKPOINT***” does not preclude the contractor from obtaining COR approval, or verification, before proceeding with work.

5. REQUIREMENTS

5.1 Condition Found Reports

5.1.1. A Condition Found Report (CFR) shall be prepared and submitted by the Contractor to the COR on all of the following occasions:

5.1.1.1. Whenever specifically required by this or other documents.

5.1.1.2. Whenever the Contractor determines or notes that additional work or material or other deviation is necessary in order to produce a reliable or complete repair.

5.1.1.3. Whenever defect or deficiencies are noted in Government-furnished Property, or on government equipment or components.

5.1.1.4. Whenever measurements, tests or inspections are required by these specifications, manufacturer standard procedures, or procurement documents, the results and findings shall be documented on a CFR.

5.1.2. Condition Found Reports shall contain, as a minimum, the following:

5.1.2.1. Name of the boat and Hull Number.

5.1.2.2. Contract number and related work item number.

5.1.2.3. Detailed description of conditions observed, including a record of all measurements taken and other supporting data.

5.1.2.4. Recommendations of additional work and materials deemed to be needed, if any, including the contractors proposed cost for time and material incidental to the recommendation.

5.1.2.5. Estimate of the impact on the completion of the contract, if any.

5.1.3. Submit Condition Found Reports to the COR within twenty-four hours after completing the measurements, inspections, or tests, or after the need for additional work or material is noted. Additional work shall not proceed without approval from the KO.

5.1.4. For work involving disassembling and inspection of equipment, machinery or systems and for work involving opening and inspection of tanks, the work must be completed and Condition Found Report submitted during the first 25-percent of the work performance period.

5.2 Responsibility.

5.2.1. Coordination of the work schedules will be the responsibility of the Contractor to avoid any delays or disruptions in order to meet the performance period. The Contractor will provide all facilities, labor, materials, tools, and services required to complete the work UNLESS exceptions are noted in the specified tasks below.

5.2.2. Upon receipt of the vessel the contractor will accept full responsibility for the safety of the vessel, including but not limited to fire protection, security patrols, water-tight integrity, and protection from adverse environmental conditions, etc. This responsibility will terminate only after all work defined herein (or added during the work period) is complete, accepted by NOAA, and NOAA personnel receive the vessel. Contractor is advised that the vessel’s integrated fire protection system may be disabled for all or part of the contract period for service, this does not relieve the contractor from responsibility for the safety of the vessels.

5.2.3. NOAA employees and contractors may be working on board the vessel during the contract performance period on a not to interfere basis. During this period it will be required that these personnel have access to the vessel during normal working hours. This may include access for outside contractors returning fire protection equipment serviced under an unrelated contract.

5.2.4. If the vessel is hauled from the water, the Contractor will ensure that all machinery and equipment used for that purpose is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessel, and operated by trained, competent personnel. COR (or a representative) shall be present for haul-out and launch of vessel(s) and shall approve the planned placement of lifting straps. Special care must be taken to protect sensitive and highly valuable hull mounted equipment during haul-out and launch. The keel shall be blocked in accordance with industry best practices, a minimum of three keel blocks no less than 8 inches in length and at least 4 jack stands shall be used to support and stabilize the vessel.

5.2.5. The government reserves the right to award some or all tasks defined herein, and to add tasks during the work period so long as period of performance revisions, if any, are mutually agreed.

5.2.6. The contractor is required to maintain any and all applicable regulatory certificates and comply with any and all required inspections for and during the performance of the contract.

5.3 Progress Meetings.

5.3.1. Weekly progress meetings shall be held at a time and place mutually agreeable to the COR and the Contractor. As a minimum, the meetings shall be attended by the COR and a Contractor's management official having authority to make binding commitments. Other interested parties may attend the meetings as appropriate.

5.3.2. Prior to the end of the work day preceding the progress meeting, the Contractor shall submit to the COR a preliminary progress report containing the following information:

5.3.2.1. Percentage completion of each contract item, including all additional work items authorized by the Contracting Officer.

5.3.2.2. Notation of any problems which could impact timely completion, including material delivery delays

5.3.3. Meeting minutes will be recorded by Contractor and provided to COR in a CFR.

5.4 Personnel Information.

5.4.1. Provide to the COR a list of the Contractor's supervisors, including shop supervisors, and a list of telephone numbers where the supervisors can be reached during non-working hours in event of an emergency.

5.4.2. Provide to the COR a list of all Contractor’s and Subcontractor’s workers that will be performing work on Government equipment. Include in the list relevant certifications and certification expiry dates.

5.5 Protective Coverings.

5.5.1. Prior to starting work, protect the decks, working surfaces and hull in areas in which contract work is to be performed and spaces through which workers will traverse with a temporarily fitted heavy vinyl, plywood or particle board. Securely tape all edges and joints of the protective covering. Maintain the protective covering in place during the entire contract period, renewing sections which are damaged during the contract period.

5.5.2. Protect all compartments, machinery, equipment, deck coverings, furnishings, insulation, glass, cables, piping systems, coatings, structures, and other vessel components from damage and from entry of dust, dirt, grit, sand, and other foreign particles.

5.5.3. All damage and contamination resulting from failure to provide adequate protection shall be repaired and cleaned by the Contractor at the Contractor’s expense to re- establish the condition which existed at the start of the work.

5.5.4. After completion of all other work, remove and dispose of all protective coverings along with any adhesive residue used to hold coverings in place.

5.6 Local Policies and Directives. While Contractor personnel, including those of subcontractors, are working on the boats or on other government facilities, they shall comply with all policies and directives issued by the Master, Commanding Officer, or Director of the ship or facility.

5.7 Safety Requirements.

5.7.1. Fire Watch Standers.

5.7.1.1. Hot work is permitted only when fire watch standers are provided by the Contractor and the work site has been approved by a certified Marine Chemist or Competent Person as required. A fire watch stander is required whenever welding, flame cutting or other hot work is performed where combustible materials are present within 35 feet; or where wall or deck openings within a 35-feet radius expose combustible materials in adjacent areas; or when combustible materials are adjacent to the opposite side of metal partitions exposed to hot work, and could be ignited by conduction or radiation. In the latter case, a fire watch stander is required on both sides of the partition.

5.7.1.2. Each fire watch stander shall be outfitted by the Contractor with a fire extinguisher of a suitable size and type, and appropriate personal protective equipment.

5.7.1.3. Prior to leaving the work site, the fire watch stander shall verify with the worker performing the hot work that no further hot work will be performed. Fire watch standers shall remain at the hot work location for a minimum of 30 minutes after cessation of hot work and ensure the work site is cool to the touch prior to leaving.

5.7.1.4. Insulation, sheathing, or other materials which limit access to either side of a partition or structure on which hot work is being performed shall be considered to be an interference, and shall be removed and restored by the Contractor.

5.8 Interferences and Restorations.

5.8.1. Remove all interferences and obstructions necessary to complete the required work. This shall include the disassembly and removal of machinery, piping, ducts, cable, wiring, insulation, structures, and anything else which interferes with the proper accomplishment of work. Except as otherwise specified, this does not include relocations made necessary by new installations which physically prevent an interference from being returned to its existing location.

5.8.2. Whenever an interference to be removed involves a structural strength member, temporary supports shall be provided to compensate for the strength loss. If the vessel is waterborne, whenever watertight integrity is violated by a removed interference, provide a temporary means of maintaining watertight integrity, except when work is actually being performed or the space is otherwise manned.

5.8.3. Restore all interferences to their existing configuration and condition. Install new gaskets and fasteners. In place of material which is rendered unsuitable for reinstallation during removal or storage, provide and install new materials which are equal in composition, strength, design, type, and size as existed prior to removal. All insulation removed or damaged shall be renewed with new insulation.

5.8.4. Align and conduct strength, tightness, and operational tests to ensure that the reinstalled interferences safely perform their normal functions.

5.8.5. The Contractor shall be responsible for identifying all interferences involved in accomplishing required work. Interferences are not normally identified in the detail specifications of the work item.

5.9 Watertight Integrity. The Contractor shall maintain or restore the watertight integrity of the boat's watertight bulkheads, decks, and hull by installing stuffing tubes, welded bulkhead and deck penetrations, multi-cable transits, couplings, and kickpipes as appropriate. All materials and installation details shall be same as the nearest similar existing penetrations.

5.10 Removals. Whenever removal of equipment or machinery is specified, but reinstallation is not specified, the Contractor shall remove all related electrical cables, brackets, foundations, and piping. Removal of cables shall be to the nearest circuit breaker or terminal not needed for operation of other equipment or machinery. Removal of piping shall include all related piping not used by other systems or equipment. Install pipe caps as needed to maintain remaining piping tight. Foundations or supports shall be cut close to the deck, bulkhead, or other support and ground smooth.

5.11 Brackets and Supports. All pipe, cables, ducts, furniture, equipment, and machinery installed by the Contractor shall be bracketed, supported, and secured so as to carry the weight of the material, prevent excessive vibration, and withstand inertia forces resulting from rolling and pitching of the boat. For general structural elements and supports excessive vibration is considered in excess of 30 mm/s for single frequency peak component and in excess of 12 mm/s for overall frequency weighted root mean square value when measured in accordance with reference 3.10.

5.12 Gaskets, Packing, and Seals. Whenever the Contractor performs work which disturbs existing gaskets, packing, or seals, new gaskets, packing, and seals of same material as existing shall be installed unless otherwise specified.

5.13 Welding and Allied Processes.

5.13.1. All welding, brazing, and allied processes shall be in accordance with the requirements and recommendations of references 3.2, 3.3., and 3.11.

5.13.2. Prior to any welding or allied process being performed on the boats, the Contractor shall provide documentation of welder qualification in accordance with reference 3.3 and 3.11, or alternative qualification as approved by the COR.

5.13.3. All welding on the boats shall follow a written Weld Procedure Specification, as developed in accordance with reference 3.3 and 3.11. The Contractor shall supply the COR copies of all relevant Weld Procedure Specifications.

5.13.4. All welding, brazing and allied processes shall be conducted on the hull shall be conducted on the boats while they are out of the water.

5.13.5. When welding on equipment, machinery, pressure vessels, or piping, the return ground cable to the welding equipment shall be connected in the immediate vicinity (as close as practical) of the work to ensure that current does not flow through bearings, pipe hangers or other areas where arcing or high resistance paths exist.

5.14 Painting.

5.14.1. Prior to applying any paint or coatings, the Contractor shall verify that all surfaces have been properly prepared and that weather conditions are suitable for painting. Painting shall not commence until the COR, or representative, has observed the Contractor verify temperature and humidity conditions are within the paint manufacturer's requirements. Contractor shall submit a CFR documenting the conditions at the time of paint application.

5.14.2. Paint shall be applied only when the following conditions exist and can be maintained until the paint has cured:

5.14.2.1. Apply paint only to dry surfaces and when there is no chance of precipitation until after the paint has cured. The temperature of the surface to be painted shall be at least 5 degrees Fahrenheit above the dew point. The dew point shall be measured prior to painting by taking the dry-bulb temperature of the surface and the wet-bulb temperature at the jobsite.

5.14.2.2. The air temperature and surface temperature must both be a minimum of 45 degrees Fahrenheit at all times, unless a lower temperature is specifically authorized by the paint manufacturer’s printed instructions.

5.14.2.3. Painting is permitted only when the humidity is less than 80 percent unless otherwise specified in the paint manufacturer’s written instructions. In the event the Contractor desires or must proceed with painting when the existing weather conditions do not meet the above specified conditions, the Contractor shall erect a cover over the surfaces to be painted and shall heat the surfaces and the surrounding air to establish the required conditions. The conditions shall be maintained until the paint has fully cured in accordance with the paint manufacturers’ application instructions.

5.14.3. Restore all existing coating systems which are damaged during performance of work. The new coating system shall be same as existing.

5.14.4. Surface preparation and paint application shall be in accordance with applicable NOAA specifications and comply with the paint manufacturers' printed recommendations and instructions for all aspects of surface preparation, and handling, mixing, and application of paint materials.

5.14.5. Paint schedule: Paint systems used on the vessel shall consist of a primer coat followed by a minimum of two top coats unless otherwise specified either in the detailed specification or by the manufacturer of the paint. It is the responsibility of the Contractor to ensure that paint used is compatible with existing paint on the boat

5.15 Electrical. All requirements and recommendations of references 3.2, 3.4 and 3.5 shall be followed in the selection and installation of electrical cables, equipment, and machinery in accordance with 46 CFR Part 111. New electrical cable shall meet the standards of reference 3.9. Cables shall be installed neatly and shall be aligned with one another. Cable paths shall avoid sharp bends and chafe points, and cables shall be secured at approximately 18 inch intervals. Where cables penetrate watertight boundaries, the penetrations shall be sealed with mechanical stuffing tubes or compression block fittings. New cables shall be labeled with the name of the circuit number or system, and labels shall be of robust material and robustly attached to the cable. Cable connections shall be made with mechanical crimp ring terminal fittings utilizing heat shrink tubing, or with compression terminal strip blocks. AC power cabling shall be routed with at least six inches of separation from signal or communication cables.

5.16 Weight and Stability: Contractor shall provide certified weight of each vessel in a CFR before commencing work and after all work is complete.

5.17 Departure Trials and Testing.

5.17.1. Upon completion of work all systems that were worked on shall be tested per manufacturer’s recommendation and to demonstrate satisfactory system performance in normal operating conditions.

5.17.2. The Contractor will, prior to departure, provide a thorough clean-up of all work areas to be approved by the COR. The clean-up shall restore all work areas and associated passageways and access pathways to the same condition of cleanliness and serviceability as they were in upon the boats arrival. Clean up shall include, but not be limited to activities such as sweeping, vacuuming, wiping, washing, degreasing, waxing, painting and repairing/replacing as necessary to return the boat to the arrival condition of cleanliness and serviceability.

5.17.3. The contractor shall submit to the COR a schedule for testing all equipment the contractor has worked on one week before departure. The contractor must submit a list of the personnel who will ride the boat during departure for testing work.

5.17.4. The contractor shall provide at least one supervisor for departure testing to coordinate testing, adjustment and repair of discrepancies.

5.17.5. All equipment will be operated by government personnel.

5.17.6. All testing will be conducted during normal working hours.

5.17.7. No contractor work will be allowed during trials except as approved by the COR.

5.17.8. Departure trial discrepancies must be corrected before the completion of the contract.

5.17.9. At the COR’s discretion, departure trials may be replaced with dock trials.

5.18 Tests and Inspections.

5.18.1. Prior to contractor accepting each vessel, a walkthrough shall be conducted jointly with the contractor and NOAA representative demonstrating proper operation of all systems. Satisfactory performance (or discrepancies) shall be documented in a CFR. Upon completion of all contractor work the vessel shall be cleaned in all work areas and returned to the condition which it arrived as documented jointly by the COR and contractor.

5.18.2. At least twenty-four hours (and during normal working hours), in advance of conducting each required test and inspection, notify the COR in order to allow the COR the opportunity to witness, or to arrange for another NOAA representative to witness the tests and inspections. For non ABS related testing/inspection, the COR must be present unless the COR has authorized testing/inspection to proceed without his presence.

5.18.3. All tests and inspections shall be witnessed by the Contractor's supervisor responsible for the work. A Condition Found Report (See 4.1) shall be prepared to document the results of all tests and inspections.

5.18.4. To the extent possible, all tests and inspections shall be scheduled during the normal weekday work shift. Tests and inspections may be scheduled for other times only when necessary to avoid a delay in the contract completion. When necessary to schedule a test or inspection after the normal day shift or on a weekend, the COR shall be notified of the test or inspection at least four hours before the end of the last preceding regular work shift.

5.18.5. The Contractor shall perform an operational test of all newly installed, overhauled, and repaired equipment to demonstrate proper operation. Vessel equipment will be operated by the NOAA Personnel.

5.19 Disposal of Fluids. Whenever work requires that equipment, machinery, piping, or tanks be drained of fluids, the Contractor shall be responsible for draining and proper disposal of the fluid in accordance with local, state, and federal regulations. If the Contractor drains the fluid into the boat's bilges, the Contractor shall pump all fluid from the applicable bilges into tanks and properly dispose of the fluid, including the fluid that existed prior to and the fluid that accumulates between the time the equipment, machinery, piping or tanks were drained and the time the bilges have been pumped dry by the Contractor. The cost of this should be included in the specific work items. A written record shall be provided to the COR at the completion of the contract, documenting quantity and type of fluids disposed of and receiving authority (ie company that took possession of the fluids).

5.20 Disassembly and Inspections. Whenever equipment, machinery, systems, or other system components are required to be disassembled, opened or overhauled, the contractor shall complete all disassembling and inspections during the first 25-percent of the work performance period. All tanks required to be opened shall also be opened and gas-freed during the first 25-percent of the work performance period. No time extension of the work performance period will be granted for delays caused by the contractor's failure to comply with this 25-percent time requirement. The 25-percent time requirement is calculated by multiplying the total number of work days proposed in the Contractors schedule by 0.25 and rounding up to the next whole number then adding that number of days to the scheduled start date not counting weekends or holidays not worked.

5.21 Period of Performance:

Work under this contract shall be completed between time of award and 21FEB2018

6. GOVERNMENT FURNISHED MATERIAL

As specified in specific tasks.

7. NOTES

The requirements and provisions of this specification are additions to or amplification of the requirements and provisions set forth in other specifications, solicitation, or procurement documents. In the event a conflict should occur, the requirements of the other documents take precedence over those contained here.

1. BASE WORK ITEMS: To be accomplished on all vessels included in contract

I. Haul, clean, block, store, and launch Remove the vessel from the water. Pressure-wash the entire hull from sheer line to keel removing all dirt, grime, and marine growth. If the vessel is a catamaran, clean all surfaces within the tunnel. Similarly, clean all fittings below waterline, including propulsor components, struts, stern tubes, rudders, foils, fins, through-hulls, etc. If the vessel is fitted with waterjet propulsors, clean the interior of the jets. Do not damage any existing anti-fouling paint unless further tasks in this SOW require its removal. Do not pressure wash or clean transducer emitting surfaces, NOAA employees will clean transducer emitting surfaces while vessel is removed from the water. Clean all surfaces of all anodes with a wire brush unless they are to be replaced, and wire brush all new and existing anodes again within 24 hours of the vessel’s return to the water.

Block the vessel in a level altitude with the keel (or keels) 36” minimum off the ground. Inspect the hull, coatings, and all attachments and report any damage or discrepancies to the COR in writing. Provide electrical power to the vessel suitable for its shore power system.

Upon completion of all work done on the hard, launch the vessel, inspect all compartments for leaks, and secure it dockside. If dockside testing or underway trials are required after launch, provide prior notification to the COTR so NOAA personnel can attend.

II. Renew hull anodes The contractor shall renew all anodes on the underbody and appendages in kind if they are eroded more than 20%. Clean the mounting bolts with a wire brush to ensure electrical continuity with the hull. Renew nylon locking fasteners for all new anodes. New anodes shall be of the same type, size, and configuration as the existing anodes.

III. Inspect all seacocks The contractor shall open, actuate, and visually inspect all seacocks in the hull bottom and topsides. CFR shall be submitted to the COR detailing the location and condition of seacocks and any recommended repairs.

IV. Clean all bilges and apply Boeshield below the waterline The contractor shall have the following hull spaces cleaned after all other work on the vessel is completed:

· Forepeak (main cabin), from deck to keel

· Engine compartment from deck to keel

· Port and Starboard lazarettes, from deck to keel Cleaning will be done by hand with soap and water, contractor shall use only soap/solvents approved for use on aluminum. All salt, dust, dirt, debris, and oils will be removed, and all compartments will be vacuumed and dried. Note: Simple Green is not an approved product to clean aluminum.

After cleaning is completed, the contractor shall apply Boeshield T-9 protective coating to the bilges center and next highest pocket on either side of the following spaces:

· Port and Starboard lazarettes The coating will be applied to the interior of the hull plate and all structural members welded to it from the keel up to the next highest bilge pocket from the keel. Follow manufacturer’s instructions during the application.

Specific Work Items

Hydrographic Survey Launches (HSLs) 2805, 2806, 2807, and 2808:

1. [Base work items above]

2. Bottom Paint

2.1. Background: These vessels hull exterior has never been painted. Due to fouling, NOAA has decided to apply antifouling bottom paint to 6 inches above the waterline.

2.2. Tasks: After the vessel has been cleaned and all hull repairs are complete, the contractor shall apply 2 coats (approximately 2.7 gallons) of ePaint EP-PRIME 1000 Epoxy Primer (white) and 3 coats (approximately 3 gallons) of ePaint SN-1 Antifouling Paint (grey) including the rudders, waterline, and foils.

2.3. General Information: Manufacturer’s procedures will be used to apply the paint, if thinning is required to adjust viscosity of a coating, only ePaint thinners may be used per manufacturer’s recommendations.

2.4. Government Furnished Equipment: None

2.5. Performance Requirements: Contractor is to comply with painting requirements specified in section 5.14 of this document.

3. Guard Rails – Images 1, 2, and 8

3.1. Background: These are simple aluminum round stock hand rails welded to the hull on the port and starboard quarters for safety. They get damaged during normal operations and during launch/recovery of the vessel.

3.2. Tasks: Renew port and starboard guard rails on HSL 2805, 2807, and 2808. Renew starboard guard rail on 2806. Rails shall be renewed completely to the weather deck.

3.3. General information: These guard rails also receive the ‘pot haulers’ and have a simple tapped opening to insert a set screw to secure the ‘pot haulers’ from rotating. This feature will need to be replicated when renewing each guard rail. The damaged existing guard rails are still installed for reference.

3.4. Government furnished equipment: Existing t-handle set screws to secure ‘pot haulers’ may be reused.

3.5. Performance Requirements: Contract certified marine welder shall be experienced with aluminum welding and adhere to all standards identified in above references. Functional test of ‘pot haulers’ and visual inspection of guard rails.

4. Propellers

4.1. Background: The HSL props are subject to normal wear and tear, the intent of this task is to prolong their life and maintain optimal performance.

4.2. Tasks: Remove, recondition, and reinstall each propeller. Reconditioning should remove any dents, bends, or dings to achieve balance and optimal surface profile.

4.3. General information: Any damage beyond what is deemed ‘normal wear and tear’ should be reported to the COR by CFR.

4.4. Government furnished equipment: None.

4.5. Performance Requirements: Visual and functional retest.

5. Black Water System – Image 3

5.1. Background: The macerator pumps were recently installed and black water system is in good working order, this is a preventative maintenance item.

5.2. Tasks: Drain, flush, and disinfect the black water tank and all associated piping. Ensure that all valves, fittings, and piping are free of deposits. Upon completion, gravity charge the black water system and tank with freshwater to demonstrate that no leaks are present, then remove and properly dispose of test water. Renew the macerator pump impeller on each HSL.

5.3. General information: Impeller part number is JAB 6303-0003-P.

5.4. Government furnished equipment: None.

5.5. Performance Requirements: Test run pump to demonstrate proper performance with clean water. Pump shall not exhibit any unusual noise or vibration.

6. Sea Strainer

6.1. Background: This is a modification requested by operators to improve functionality.

6.2. Tasks: Install freshwater washout connection in piping between sea cock and inlet of sea strainer

6.3. General information: Sea strainer inlet is 3” bronze pipe. Remove inlet fitting and replace with or add T-connection with 1 inch pipe thread at top leading to 90 degree ball valve and terminating at 1 inch female cam lock fitting. Include matching cam plug. Material shall be bronze throughout. Drawing illustrating this modification is attached as appendix B and suggested materiel list as appendix C.

6.4. Government furnished equipment: None.

6.5. Performance Requirements: Visual and functional retest without leakage when the vessel is returned to the water.

7. Generator (HSL 2807)

7.1. Background: Operators report that the Cummins-Onan generator gauge console and remote start functionality are not completely installed electrically.

7.2. Tasks: Investigate the status of wiring, submit a CFR to the COR. Option to complete electrical installation of existing remote gauges and remote start.

7.3. General information: This will likely involve procuring parts (wiring harness) from Cummins to connect at the generator. Model MDKBH (Spec A-E)

7.4. Government furnished equipment: None.

7.5. Performance Requirements: Start generator remotely and locally, observe proper function of all gauges and instruments. Electrical work shall be conducted by ABYC certified marine electrician and all wiring installation shall be in accordance with ABYC standards and references listed in this document.

8. Hatch Hardware (HSL 2805)

8.1. Background: Existing hardware is still installed but has been damaged by normal wear and tear.

8.2. Tasks: Renew hatch hardware for HSL 2805 starboard lazerette

8.3. General information: Through bolt has been bent and does not allow operation of the twist lock hatch closure device. Potential safety and water ingress concern.

8.4. Government furnished equipment: None.

8.5. Performance Requirements: Demonstrate proper operation of hatch closure device.

9. Cummins/Onan OEM Maintenance/Repairs

9.1. Background: Each HSL has an on board Cummins Onan diesel generator and Cummins inboard diesel engine. An OEM (Cummins) technician has conducted a detailed assessment of each, including the engine of FA 2302, and generated a comprehensive work list and estimate.

9.2. Tasks: Contract and collaborate with local Cummins Service Center for Cummins Technician to accomplish work as quoted in Appendix A (included in supporting documentation).

9.3. General information: Local Cummins Service Center utilized is in Sumner, WA and the main point of contact is Rick Ackerman, Marine Service Supervisor, (253)204-1036

9.4. Government furnished equipment: None

9.5. Performance Requirements: Test in accordance with Cummins Technician recommendations. Cummins Technician shall be present during retest prior to acceptance.

Silverships Ambar 700 (FA-2302):

10. Paint

10.1. Background: This vessel is regularly deployed and recovered from the ship and the paint is showing heavy wear.

10.2. Tasks: After the vessel has been cleaned and all hull repairs are complete, the contractor shall touch up the cabin and bottom paint as needed, including the rudders and waterline.

10.3. General information: Manufacturer’s procedures will be used in all cases. Color to match existing coatings. Contractor is to have a certified paint inspector or OEM representative oversee the application process and notify the COR between applications for inspection. The contractor will ensure that all the environmental conditions are within the manufacturer’s specified parameters during all work.

10.4. Government furnished equipment: Ship will provide the orange paint previously used on the hull and cabin

10.5. Performance Requirements: Contractor is to comply with painting requirements specified in section 5.14 of this document.

11. Collar – Image 7

11.1. Background: The air/foam hybrid collar is repeatedly crushed when stowed in the ship’s davit, over the years it has broken down and has now exceeded its service life.

11.2. Tasks: Renew air/foam hybrid collar

11.3. General Information: Contractor is to collaborate with OEM (Wing Inflatables) to source, procure, and replace the existing air/foam hybrid collar. The existing collar will likely be difficult to remove and the replacement collar will be difficult to install. The replacement collar will have outboard lifelines, UV resistant coating, be orange in color, 1x8 inch black rubstrake and include a basic repair kit. OEM estimate for the collar is $14,218 and the lead time is currently 6 weeks with a $500 shipping estimate.

11.4. Government furnished equipment: None

11.5. Performance Requirements: Contractor is to inspect the hull and submit a CFR with findings following the removal of the existing collar, with particular emphasis on any corrosion found. Visual and functional test following installation of the new collar.

12. Wiper Motor assembly and blade – Image 4

12.1. Background: The wiper motor has failed the blade has deteriorated due to normal wear and tear

12.2. Tasks: Renew or replace the wiper motor and wiper blade assembly.

12.3. General information: Inspect wiring and submit CFR to COR if corrosion or high resistance are found, if wiring is in usable condition it is acceptable to reuse wiring. The wiper motor is inside the center console and not readily accessible; removal of an electrical panel as interference will likely be necessary.

12.4. Government furnished equipment: None.

12.5. Performance Requirements: Functional test of wiper assembly and visual leak test with water hose.

13. Canvas and mounts – Image 5 and 6

13.1. Background: The cabin canvas weather barrier has been damaged by normal wear and tear. Mounting snaps on cabin frame are corroded and the mounting surfaces require repair prior to reuse.

13.2. Tasks: Renew canvas and mounting snaps

13.3. General information: Source, procure, and assemble heavy duty UV and weather resistant material with paneling comparable to existing design. Remove existing snap fittings from aluminum cabin framing, renew and prep the aluminum surfaces, and install new snaps to match new canvas.

13.4. Government furnished equipment: Ship will provide orange paint to match existing pain on cabin.

13.5. Performance Requirements: It is not acceptable to shear off the snap screws and leave stainless steel screw shafts in the aluminum, the entire screws shall be removed, new aluminum material welded over and ground down to a smooth surface. Welding and welding personnel shall be in accordance with the Specification Requirements section 5.14. Functional and visual test will be conducted. COR shall approve selected canvas product prior to procurement.

14. Sound Insulation

14.1. Background: The sound levels on this vessel and in the cabin have been found to exceed 115 dB(A) during operation. NOAA desires to reduce these levels to 85dB(A) or lower for operator safety and comfort. Existing sound insulation material in engine compartment is past its useful life.

14.2. Tasks: Replace existing sound insulation material in engine compartment with a superior product (if available). Install sound insulation material (Dynamat or similar) on the engine side of the main cabin bulkheads to dampen overall sound levels in the cabin. Submit CFR with recommendations to modify engine sound mounts or exhaust to reduce noise levels to the target range.

14.3. General information: Access inside the center console is limited and difficult. Submit any recommendations the contractor has to further reduce the sound levels aboard this boat to the COR in a CFR.

14.4. Government furnished equipment: Sound meter with operator upon request

14.5. Performance Requirements: New material installed in accordance with manufacturer’s instructions and condition report submitted to COR upon completion. COR shall approve selected sound insulating material prior to procurement.

15. Transmission

15.1. Background: Operators have reported “sluggish” performance of the vessel prompting investigation to verify proper matching of the drive train. After consulting with OEM representatives for the jets it was determined that the existing engine and jet impeller should be ideally matched at close to a 1:1 ratio whereas the current Twin Disc MG-5011SC is geared to ratio of 1.733

15.2. Tasks:

15.2.1. Evaluate the existing propulsion system components to verify suspected cause of poor performance and recommend most cost effective and least intrusive solution.

15.2.2. ***CHECKPOINT***

Submit CFR to COR with recommendations to replace the existing transmission to improve performance.

15.2.3. Option to procure new transmission and replace vessels transmission with approval from COR

15.3. General Information: Preliminary investigation has yielded that a ZF 280-1 with a 1.056:1 ratio would be a suitable solution for the existing engine and jet without further modification. Request contractor consider this option and include in the submitted evaluation.

Current drive components include:

· Cummins 6BTA5.9-M315HP@2800RPM Serial # 60260768

· Twin Disc MG-5011SC 1.733 ratio – Image 9 Serial # 20407239

· Hamilton Jet HJ274, Serial # 3117, Impeller 107078, Nozzle 06025

15.4. Government furnished equipment: None

15.5. Performance Requirements: If new transmission is installed, test in accordance with manufacturers recommendations to include at a minimum a visual inspection and operational test at full planing speed.

Image 1

Image 2

Image 3

Image 4

Image 5

Image 6

Image 7

Image 8

Image 9 image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.png image12.jpeg image1.png image2.png image3.jpeg

File details come from the government source that posted it.