SOW_NOAA_HA_Dive_Boat_Jet_Replacement.docx

DOCX document 45 KB Posted

Attached to
Alamarin 288 Waterjet Replacement - Hi'ialakai
Solicitation number
NMAN7200-18-00586
Issued by

View the file

Other files

File Type Posted
JOFOC_HA_UTB_Jet_Replacement_for_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship Hi’ialakai

Dive Boat Jet Replacement

FY 2018

STATEMENT OF WORK

December 20, 2017

NOAA FY18 Hi’ialakai Dive Boat Jet Replacement

DEC 2017

Scope

1.1. General

1) Replace the Alamarin 288 water jet on 29’ aluminum MetalShark Marine Relentless Dive Boat, HIN GAJRBO11E313, with Cummins QSB6.7 480hp@3000rpm engine with ZF 1:1 Gear ratio. This includes all related incidental work not limited to complete mounting and installation hardware, making all related plumbing connections, removing corrosion, start-up, testing, and final adjustments to produce a turn-key result acceptable to the Contracting Officers Representative (COR).

2) Period of performance:

Award – JAN 15, 2018

3) Vessel is located on a trailer at:

R&H Machinery 91-200 Kauhi St Kapolei, HI 96707

Inspection Offeror to inspect the vessels to fully and accurately assess condition and estimate the work required prior to bidding. Drawings and other technical information provided by the government shall be for reference only and may not represent the final as-built condition of the vessel or its systems. Correspondingly, reference information shall be independently verified during inspection by the offeror if needed for estimation or completion of work. Reservations in condition assessment due to access or other restrictions shall be provided in writing with the offeror’s proposal and quote.

References

All work shall be done in accordance with the following references:

1.2. US Code of Federal Regulation, Subchapter T, Small Passenger Vessels (under 100 gross tons)

1.3. American Bureau of Shipping, Guidance for Building and Classing High Speed Craft, 2012

1.4. American Bureau of Shipping “Rules for Materials and Welding – Aluminum and FRP

1.5. US Coast Guard, Marine Safety Center, MTN 01-08

1.6. American Boat and Yacht Council (ABYC) Standards and Technical Information Reports for Small Craft.

1.7. NOAA Small Boat Standards and Procedures Manual, 4th Edition, www.sbp.noaa.gov/policy/manual.html

1.8. NOAA Standard Specification S0100, Implementation and Conduct of Check Points

1.9. NOAA Standard Specification AMC-000-3C General Requirements for Small Contract Ship Repairs Repair Items

All Boats Item 01: Replace Alamarin 288 Jet

1. Remove engine and drive shaft

2. Remove Alamarin 288 water jet assembly per manufacturer’s instructions.

3. Repair any corrosion or wear that would impact proper installation or operation of jet.

4. Install new Alamarin 288 water jet assembly per manufacturer’s instructions. This includes:

15” stainless steel impeller Hydraulic cylinder and pump for reverse bucket DIN 150 Drive Flange Tube reverse bucket Spare belt for hydraulic pump Grease filler for rear bearing Raw Water Outlet Automated Lubrication Unit Grass Rake

5. Reinstall engine and drive shaft.

6. Test unit to ensure proper operation satisfactory to NOAA.

A. Quality Assurance

A.1 Follow requirements of NOAA Standard Specification AMC-000-3C for inspections, testing, and installation requirements.

A.2 All new welds should be ground smooth, cleaned, and if on a watertight boundary tested for water-tight integrity.

A.3 All coating systems and material disturbed in the process of these modifications should be restored to pre-work condition.

A.4 All spaces should be professionally cleaned and inspected before being returned to NOAA.

A.5 Conduct a hose test per AMC-000-3C on all hatches and windows to ensure water tight integrity and function of drainage system

A.6 Perform all indicated checkpoint requirements and obtain COR approval before proceeding beyond the checkpoint on the associated work item.

A.7 Vendor is responsible for providing necessary hardware and supplies for each work item.

image1.wmf image2.wmf

File details come from the government source that posted it.