Addendum_01_to_the_Performance_Work_Statement.pdf
PDF 17 KB Posted
- Attached to
- NIH/ORF-RML IDIQ Task Order Contract Federal contract opportunity
- Solicitation number
- NIHOF2017155
About this file
Addendum 01 to the Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_01_to_NIHOF2017155_dated_3_May_2017.pdf | ||
| Construction_IDIQ_Amendment_01_Dated__3_May_2017.pdf | ||
| RFP_NIHOF2017155.pdf | ||
| DBA_Wage_Determination_MT61_01-27-2017.pdf | ||
| sf33.pdf | ||
| Construction_IDIQ_SOW__3_Apr_2017.docx | DOCX document | |
| Schedule_B_Costs,_Prices,_Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 May, 2017
Solicitation No. NIHOF217155 SOW ADDENDUM NO. 1
RML Construction IDIQ
Solicitation #NIHOF217155:
ADDENUM #1 Scope of Work
Rocky Mountain Laboratories Hamilton, Montana
PROJECT: RML CCRF/Chiller Modifications
ADDENDUM TO THE SCOPE OF WORK
SOW Items:
Item A.1 Contractor shall indicate specific experience regarding the following:
As part of the Construction IDIQ, task orders may include low voltage/data cabling in support of network or special systems connectivity. Cabling tasks may include:
• Material acquisition, shipment, staging and installation of copper and fiber optic cables. The cables may be pulled, terminated, and tested following industry standards and shall be labeled per campus standards. The low voltage installer(s) shall hold current Leviton Authorized Network Certification and BICSI certifications.
Data cabling and components shall include a lifetime warranty. Cable test results shall be provided to the owner in electronic format.
• Cable tray cable support devices and systems.
• Racks, cabinets and patch panels for new hardware.
• Inside Plant (ISP) riser and horizontal pathways.
• Inter-building cable runs and pathways.
• Documented detailed cable run specifications and drawings shall be provided to the
Owner.
• Data cabling installation planning, design and material identification shall be coordinated with the Owner to confirm adherence and compatibility with campus infrastructure standards.
END OF ADDENDUM NO. 1
File details come from the government source that posted it. Updated .