RFP Number : NIHOF2010210
- 1 -
RFP TABLE OF CONTENTS
ARTICLE B.3. PRICES
- 2 -
ARTICLE B.3. PRICES
a. The total fixed price of this contract is $ .
b.Upon delivery and acceptance of the services described in SECTION C of this contract and identified in the schedule of charges below, the Government shall pay to the Contractor the unit price(s) set forth below:
TABLE B-1 -- SCHEDULE OF CHARGES FOR THE BASIC AWARD PERIOD
Division Task Labor Material Sub Contractor Name
% Self Performed Total
1 General Requirements
2 Site Construction
3 Concrete
4 Masonry
5 Metal
6 Wood and Plastics
7 Thermal and
Moisture Protection
8 Doors and Windows
9 Finishes
10 Specialties
11 Equipment
12 Furnishings
13 Special Constructions
14 Conveying System
15 Mechanical
16 Electrical
1 -- SUBTOTAL
GC LABOR OVERHEAD
GC G&A
GC PROFIT
- 3 -
Division Task Labor Material Sub Contractor Name
% Self Performed Total
2 -- SUBTOTAL
GC SUB TOTAL (Sum 1+2)
PERFORMANCE/
PAYMENT BONDS
SUB TOTAL CONTRACT
PRICE (Sum 1+2 and BOND)
OWNER CONTINGENCY $2,000,000
3 -- SUBTOTAL
TOTAL CONTRACT PRICE
(Sum 1+2+3 and BOND)
Provide back-up pricing information to support each CSI Division
- 4 -
c. Optional Priced Items: The Government may separately exercise each optional priced items below. If the Government chooses to exercise each items it may do so within 511 calendar days of award. Offerors shall take the option period into consideration when pricing each item.
TABLE B-2 -- OPTIONAL PRICE BREAKDOWN
(See Specification Section 01222 -- Cost Breakdown )
ITEM Labor Material Total A Line Item No. CB1:
Add Security Gate on Access Road
B Line Item No. CB2:
Hazardous Material Abatement
C Line Item No. CB3:
Replace Open Office Flat Roof and Framing
D Line Item No.
CB4: Provide Mass Evacuation System
E Line Item No. CB5:
New Manholes for Water Drainage Away from Building
F Line Item No. CB6:
Lightning Protection System
G Line Item No. CB7:
Upgrade Mechanical Controls
H Line Item No. CB8:
Network Transformers
I Line Item No. CB9:
Network Protectors
J Line Item No. CB10:
No-Load Break Switch
K Line Item No. CB11:
Switchgear Lineup
L Line Item No. CB12:
Spare Circuit Breaker
M Line Item No. CB13:
Emergency Quick Connect for Temp Roll-up Generator
N Line Item No.
CB14: Grounding Risers
O Line Item No. CB15:
Domestic Water Filter, Valves, and Related Piping
P Line Item No. CB16:
Additional Water
- 5 -
ITEM Labor Material Total Heater, Valves, and Related Piping
Q Line Item No. CB17:
Thermostatic Mix Valve and Associated Valves and Piping
R Line Item No. CB18:
Fire Pump and Room
S Line Item No.
CB19: Additional Underpinning
T Line Item No. CB20:
Bike Racks and Showers
U Line Item No. CB21:
Regrade Roof ad Mechanical Expansion
V Line Item No. CB22:
Security, Building Hardening
W Line Item No. CB23:
Security, Additional Reinforcing
X Line Item No. CB24:
Road Repairs
Y Line Item No. CB25:
Security, Electronic:
Z Line Item No. CB26:
Security, Cameras
AA Line Item No. CB27:
Repairs at Southwes Corner of Building
BB Line Item No. CB28:
Provide Exterior Windows with Laminated Glass
CC Line Item No. CB29:
Slotted Metal Framing
DD Line Item No. CB30:
Knox Box
EE Line Item No. CB31:
Concrete Pads
FF Line Item No. CB32:
Fire Stopping
GG Line Item No. CB33:
Fireproofing
HH Line Item No. CB34:
Additional Excavation (see Drawing Sheet #A0.00)
II Line Item No. CB35:
Commissioning
- 6 -
TABLE B-3 -- ALTERNATES
(See Specification Section 01230 -- Alternates)
ITEM LABOR MATERIAL TOTAL
A Alternate No.
1: Decommission, Remove and Dispose of all Nitrogen in Storage Tank
B Alternate No. 2:
Sanitary Lateral Replacement
C Alternate No. 3:
Storm Sewer Lateral
D Alternate No. 4:
Incoming Water Service Line
E Alternate No. 5: Chill Mater Service Line
F Alternate No. 6a:
Steam, Condensate, and High Press Lines -- Manhole & Building
G Alternate No. 6b:
Steam, Condensate, and High Pressure Lines -- Manhole & Building
TABLE OF CONTENTS