Section 08630 -- Metal Framed Skylight
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATION OF BUILDING #3 WR#HQC 90298
NIH, BETHESDA, MARYLAND WFT#09033.NIH.A
METAL-FRAMED SKYLIGHTS 08630 - 1
ADDENDUM NO. 1 APRIL 06, 2010
SECTION 08630 - METAL-FRAMED SKYLIGHTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes skylights with metal framing.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. LEED Submittals:
1. Product Data for Credit EQ 4.1: For sealants used inside of the weatherproofing system, including printed statement of VOC content.
C. Shop Drawings: For metal-framed skylights. Include plans, elevations, sections, details, and attachments to other work.
D. Samples: For each type of exposed finish.
E. Delegated-Design Submittal: For metal-framed skylights indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
F. Product test reports.
G. Field quality-control reports.
H. Warranties: Sample of special warranties.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of metal-framed skylights required for this Project.
B. Structural-Sealant Glazing: Comply with recommendations in ASTM C 1401, "Guide for
Structural Sealant Glazing," for joint design and quality-control procedures.
C. Preinstallation Conference: Conduct conference at Project site.
METAL-FRAMED SKYLIGHTS 08630 - 2
1.4 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal-framed skylights that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Five years from date of Substantial Completion.
B. Special Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering.
1. Warranty Period: 20 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. LinEl Signature.
2. Naturalite Skylight Systems; Vistawall Group.
3. O'Keeffe's Inc.
4. Schuco USA, LP.
5. Super Sky Products, Inc.
6. United Skys, Inc.
2.2 PERFORMANCE REQUIREMENTS
A. General: Metal-framed skylights shall withstand the effects of the following without failure due to defective manufacture, fabrication, installation, or other defects in construction:
1. Structural loads.
2. Thermal movements.
3. Movements of supporting structure.
4. Dimensional tolerances of support system and other adjacent construction.
5. Failure includes, but is not limited to, the following:
a. Deflection exceeding specified limits.
b. Thermal stresses transferring to building structure.
c. Framing members transferring stresses, including those caused by thermal and structural movements to glazing.
d. Glazing-to-glazing contact.
e. Noise or vibration created by wind and by thermal and structural movements.
f. Loosening or weakening of fasteners, attachments, and other components.
g. Sealant failure.
METAL-FRAMED SKYLIGHTS 08630 - 3
B. Delegated Design: Design metal-framed skylights, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
C. Structural Loads:
1. Wind Loads: As indicated on Drawings.
2. Seismic Loads: As indicated on Drawings.
D. Deflection of Framing Members: At design wind pressure, as follows:
1. Deflection Normal to Glazing Plane: Limited to 1/175 of clear span for spans up to 13 feet 6 inches (4.1 m) and to 1/240 of clear span plus 1/4 inch (6.35 mm) for spans more than 13 feet 6 inches (4.1 m) or an amount that restricts edge deflection of individual glazing lites to 3/4 inch (19.1 mm), whichever is less.
2. Deflection Parallel to Glazing Plane: Limited to L/360 of clear span or 1/8 inch (3.2 mm), whichever is smaller.
E. Lateral Bracing of Framing Members: Compression flanges of flexural members are laterally braced by cross members with minimum depth equal to 50 percent of flexural member that is braced. Glazing does not provide lateral support.
F. Structural-Test Performance: Provide metal-framed skylights tested according to ASTM E 330, as follows:
1. When tested at positive and negative wind-load design pressures, assemblies do not evidence deflection exceeding specified limits.
2. When tested at 150 percent of positive and negative wind-load design pressures, assemblies, including anchorage, do not evidence material failures, structural distress, and permanent deformation of main framing members exceeding 0.2 percent of span.
3. Test Durations: As required by design wind velocity, but not less than 10 seconds.
G. Air Infiltration: Provide metal-framed skylights with maximum air leakage through fixed glazing and framing areas of 0.06 cfm/sq. ft. (0.03 L/s per sq. m) of fixed wall area when tested according to ASTM E 283 at a minimum static-air-pressure difference of 6.24 lbf/sq. ft. (300
Pa).
H. Water Penetration under Static Pressure: Provide metal-framed skylights that do not evidence water penetration through fixed glazing and framing areas when tested according to
ASTM E 331 at a minimum static-air-pressure difference of 20 percent of positive wind-load design pressure, but not less than 6.24 lbf/sq. ft. (300 Pa).
I. Thermal Movements: Provide metal-framed skylights that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures.
Base engineering calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
METAL-FRAMED SKYLIGHTS 08630 - 4
J. Condensation Resistance: Provide metal-framed skylights with fixed glazing and framing areas having condensation-resistance factor (CRF) of not less than 53 when tested according to
AAMA 1503.
2.3 FRAMING SYSTEMS
A. Aluminum: Alloy and temper recommended in writing by manufacturer for type of use and finish indicated.
1. Sheet and Plate: ASTM B 209 (ASTM B 209M).
2. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221 (ASTM B 221M).
3. Extruded Structural Pipe and Tubes: ASTM B 429/B 429M.
4. Structural Profiles: ASTM B 308/B 308M.
B. Pressure Caps: Manufacturer's standard aluminum components that mechanically retain glazing.
1. Include snap-on aluminum trim that conceals fasteners.
C. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with nonstaining, nonferrous shims for aligning skylight components.
D. Fasteners and Accessories: Manufacturer's standard, corrosion-resistant, nonstaining, nonbleeding fasteners and accessories compatible with adjacent materials.
1. At pressure caps, use ASTM A 193/A 193M stainless-steel screws.
2. Use self-locking devices where fasteners are subject to loosening or turning out from thermal and structural movements, wind loads, or vibration.
3. Reinforce members as required to receive fastener threads.
4. Use exposed fasteners with countersunk Phillips screw heads.
E. Concrete and Masonry Inserts: Hot-dip galvanized cast-iron, malleable-iron, or steel inserts complying with ASTM A 123/A 123M or ASTM A 153/A 153M requirements.
F. Anchor Bolts: ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6), galvanized steel.
G. Concealed Flashing: Manufacturer's standard, corrosion-resistant, nonstaining, nonbleeding flashing compatible with adjacent materials.
H. Exposed Flashing and Closures: Manufacturer's standard aluminum components not less than
0.060 inch (1.524 mm) thick.
I. Framing Gaskets: Manufacturer's standard.
J. Framing Sealants: As recommended in writing by manufacturer.
1. Provide sealants for use inside of the weatherproofing system that have a VOC content of
250 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
K. Corrosion-Resistant Coating: Cold-applied asphalt mastic.
METAL-FRAMED SKYLIGHTS 08630 - 5
2.4 GLAZING
A. Glazing: As specified in Division 8 Section "Glazing."
B. Spacers, Setting Blocks, and Gaskets: Manufacturer's standard elastomeric types.
C. Bond-Breaker Tape: Manufacturer's standard.
D. Glazing Sealants: As recommended in writing by manufacturer.
1. Provide sealants for use inside of the weatherproofing system that have a VOC content as indicated when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
2. Structural Sealant: ASTM C 1184, neutral-curing silicone formulation compatible with system components with which it comes in contact, specifically formulated and tested for use as structural sealant, and approved by structural-sealant manufacturer for use in metal-framed skylights indicated.
a. VOC Content: 100 g/L or less.
b. Color: Black.
3. Weatherseal Sealant: ASTM C 920 for Type S, Grade NS, Class 25, Uses NT, G, A, and
O; neutral-curing silicone formulation compatible with structural sealant and other components with which it comes in contact; and recommended in writing by structural-and weatherseal-sealant and metal-framed skylight manufacturers for this use.
a. VOC Content: 250 g/L or less.
b. Color: Matching structural sealant.
2.5 FABRICATION
A. Fabricate aluminum components before finishing.
B. Fabricate aluminum components that, when assembled, have the following characteristics:
1. Profiles that are sharp, straight, and free of defects or deformations.
2. Accurately fitted joints with ends coped or mitered.
3. Internal guttering systems or other means to drain water passing joints, condensation occurring within framing members, and moisture migrating within skylight to exterior.
4. Physical and thermal isolation of glazing from framing members.
5. Accommodations for thermal and mechanical movements of glazing and framing to maintain required glazing edge clearances.
C. Fabricate aluminum sill closures with weep holes and for installation as continuous component.
D. Reinforce aluminum components as required to receive fastener threads.
E. Factory-Glazed, Metal-Framed Skylights:
1. Factory install glazing to comply with requirements in Division 8 Section "Glazing."
METAL-FRAMED SKYLIGHTS 08630 - 6
2. Prepare surfaces that will contact structural sealant according to structural-sealant manufacturer's written instructions to ensure compatibility and adhesion. Preparation includes, but is not limited to, cleaning and priming surfaces.
F. After fabrication, clearly mark components to identify their locations in Project according to
Shop Drawings.
2.6 ALUMINUM FINISHES
A. High-Performance Organic Finish: Two-coat fluoropolymer finish complying with
AAMA 2605 and containing not less than 70 percent PVDF resin by weight in color coat.
1. Color and Gloss: As selected by Architect from manufacturer's full range.
2.7 SOURCE QUALITY CONTROL
A. Structural-Sealant Glazing: Perform quality-control procedures complying with ASTM C 1401 recommendations including, but not limited to, material qualification procedures, sealant testing, and fabrication reviews and checks.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General:
1. Comply with manufacturer's written instructions.
2. Do not install damaged components.
3. Fit joints between aluminum components to produce hairline joints free of burrs and distortion.
4. Rigidly secure nonmovement joints.
5. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding movement of moving joints.
6. Seal joints watertight unless otherwise indicated.
B. Metal Protection: Where aluminum will contact dissimilar materials, protect against galvanic action by painting contact surfaces with protective coating or by installing nonconductive spacers as recommended in writing by manufacturer for this purpose.
C. Install continuous aluminum sill closure with weatherproof expansion joints and locked and sealed corners. Locate weep holes at rafters.
D. Install components to drain water passing joints, condensation occurring within framing members, and moisture migrating within skylight to exterior.
E. Install components plumb and true in alignment with established lines and elevations.
METAL-FRAMED SKYLIGHTS 08630 - 7
F. Install glazing as specified in Division 8 Section "Glazing."
1. Structural-Sealant Glazing:
a. Prepare surfaces that will contact structural sealant according to structural-sealant manufacturer's written instructions to ensure compatibility and adhesion.
Preparation includes, but is not limited to, cleaning and priming surfaces.
b. Install weatherseal sealant according to Division 7 Section "Joint Sealants" and according to weatherseal-sealant manufacturer's written instructions to produce weatherproof joints. Install joint filler behind weatherseal sealant as recommended in writing by weatherseal-sealant manufacturer.
G. Erection Tolerances: Install metal-framed skylights to comply with the following maximum tolerances:
1. Alignment: Limit offset from true alignment to 1/32 inch (0.8 mm) where surfaces abut in line, edge to edge, at corners, or where a reveal or protruding element separates aligned surfaces by less than 3 inches (76 mm); otherwise, limit offset to 1/8 inch (3.2 mm).
2. Location and Plane: Limit variation from true location and plane to 1/8 inch in 12 feet
(3.2 mm in 3.7 m) but no greater than 1/2 inch (13 mm) over total length.
3.2 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
1. Water-Spray Test: Before installation of interior finishes has begun, skylights shall be tested according to AAMA 501.2 and shall not evidence water penetration.
B. Repair or remove work where test results and inspections indicate that it does not comply with specified requirements.
C. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
D. Prepare test and inspection reports.
END OF SECTION 08630