Article H.14
13 KB Posted
- Solicitation number
- NIHOF2010210
About this file
Article H.14 (Revised)
Text of this file
RFP Number : NIHOF2010210
- 1 -
RFP TABLE OF CONTENTS
ARTICLE H.14. Project Record Documents
RFP Number : NIHOF2010210
- 2 -
ARTICLE H.14. Project Record Documents
a) The Contractor shall set aside at the site one set of Contract Drawings to be used as Project Record Drawings.
b) The Contractor shall record on the Project Record Drawings all changes to accurately show as-built conditions.
c) Use colored pencils for notes, sketches, cross references to drawings, details, etc. Pasted-on data, sketches, etc., shall be accepted provided they do not cover any of the drawing data, manufacturers' names, model numbers, size, rating, etc., of equipment.
d) The COTR shall review and concur with all data placed on the drawings. The completed Project Record Drawings shall be given to the Contracting Officer prior to requesting Final Acceptance.
TABLE OF CONTENTS
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .