QUESTIONS & ANSWERS
SOLICITATION #NIHOF2010210
As of: 03/26/2010
REPLY
BY
QUESTIONS RESPONSES TO QUESTIONS
1. Sheet A3.03 Note #3 requests that you reference the Project Specifications for skylights manufacturers, details, etc. No specification has been provided for information regarding skylights. Please advise.
1. Refer to new Specification SECTION 08630 METAL - FRAMED SKYLIGHT attached
2. Detail 4/A5.20 indicates the stair from the North Lobby down to the first floor level comprises of 9 equal treads. In reviewing detail 2/A5.21, there appears to be 10 equal treads. Please advise.
2. The top tread is at the entrance lobby elevation. As a result 9 equal tread is correct.
3. Ceramic Tile details on Sheet A5.50 provide details regarding the wall elevation tile pattern, but do not include any details associated with the floor tile pattern. Please provide a pattern for the floor tiling and base.
3. Refer to detail 1/A5.25
4. Please review and provide interior elevations, schedule of finishes for both elevator cabs, as none have been identified by the Contract Documents.
4. Refer to Specification Section 14210 - ELECTRIC TRACTION ELEVATOR, 2.6 CAR ENCLOSURES, D. Car Materials and Finishes: Add the following General: Provide wall hung panels as manufactured by SnapCab, model model "Traditional" finished with choice of Standard Laminate finishes:
5. Detail 2/S3.04 indicates details the elevation for the elevator machine room. Please review and advise where this steel slab is being constructed, please provide a connection detail for the new masonry to the existing to remain roof structure. If the steel slab is being placed above the elevator shaft, does this elevation allow for sufficient overrun space?, and if so, what is the access to the elevator hoisting equipment and control panels.
5. Plan 2/S3.04 is partial plan of the existing machine room between lines F & G and lines 3 and 4. This area is not inteneded to be a machine room as part of the renovation work.
The elevation tag shown is to the existing slab that is located above the 5th floor level. No new slab is to be constructed at this location, above the 5th floor level.
6. If the contractor is to receive electronic CAD files prepared by the A/E and be required to create & maintain complete & full construction BIM Model…will the CAD files be provided in 2-D or 3-D? Or...will the provided files already be in a 3-D BIM Model format?
This will have a huge impact on the initial cost to set up the BIM Model for this project.
6. Requirement shall be removed (BIM)
7. Will electronic CAD files be provided by each of the design disciplines, i.e. Civil, Structural, Architectural, and MPE? Will the software be compatible / consistent to integrate to the BIM Model software or should we expect to utilize NAVIS for the integration?
7. Requirement shall be removed (BIM)
CO
8. In the RFP / Part IV Representations And Instructions
- Section K - Representations, Certifications and Other Statements of Offerors: there are parts that should be completed by the Contracting Officer.
When will this be completed, and will it be sent out as an addendum?
8. See Section L for the Business Size and NAICS Code.
Additionally, see Paragraph 1.(b)(2) which indicates that FAR Clause 52.204-7 applies. You must therefore go to Paragraph 1.(d) page 4 of the Section K document, which directs that you go to the hyperlink to the ORCA site and complete the Online Representation and Certification Application.
9. Other than the Pre Proposal Conference scheduled for March 24th I do not see any meetings scheduled for a walk through of the facility.
Due to the number of subcontractors involved I would hope to have at least two opportunities made available.
9. See response to RFI #8 above.
10. Spec Section 01270 -- Unit Price Item # 9 asks for pricing for "additional shoring and bracing" with a unit of measurement per LINEAR METER. Specification Section 02300 does not address this"unit price" or provide a height. Since this unit of measurement is normally provided as a per square unit measure instead of linear…do you have a unit height to correspond with the linear meter length so the
10. Linear meter is correct. The shoring requirement for the work is to be included in the base bid. Unit price item #9 is intended to address the possibility that the shoring (included as par to the base bid) may need to extend deeper that expected.
contractor can properly quantify the item? Or should this item be provided per square meter?
11. Spec Sections 03300 & 03720 -- Unit Price Item # 12 Concrete Repair refers to providing unit prices for additions and deductions for each of the repair quantities identified in the Concrete Repair notes on sheet S4.11 and per Division 03. The three REPAIR NOTES specific to concrete repairs are detailed on:
4/S4.11, 5/S4.11 & 7/S4.11. The additional concrete repair references in Divison 03300 Part 3 - Execution, Section 3.15 that refer to Concrete Surface Repairs for the following: A. Defective Concrete, B. Patching Mortar, C. Repairing Formed Surfaces, D. Repairing Unformed Surfaces, & E. structural repairs of concrete. Should the contractor assume the three details shown on sheet S4.11 are the only requested Unit Prices for this item?
11. The concrete repairs associated with Division 03300 are to address pouring and forming defects that may occur in newly poured concrete.
12. Spec Section 17723 - The Electrical drawings on sheet E0.02 refer to Specification Section 17723, regarding the Mass Evacuation System. Has this specification section been released yet? Where can I get a copy?
12. The specification section for the Mass Evacuation System is 16723.
13. The RFP - Section F - Deliveries of Performance, Article F.3 Time of Delivery, (a) states the delivery of the services described in Section C within 540 days.
The Solicitation, Offer, and Award Form 1442 issued on March 11, 2010 indicates a completion within 502 days. Please provide correct project period/duration for this solicitation / work.
13. The performance period is actually 365 working days which is 511 calendar days (365/(5/7)
14. Spec Section 01222 - I can find no reference to Cost Breakdown Item # CB27 on the plans. Please identify the work and location of the work in the contract document.
14. CB#27 refers to cleaning of existing trench drains at entrance to service area. Refer to drawing C1.03 and trench drain at SW corner of building and note "EX TRENCH DRAIN TO
REMAIN, CONTRACTOR IS TO CLEAN AND ENSURE IN
PROPER WORKING ORDER". Refer also to drawing A0.00 and to specification section 01700 "EXECUTION
REQUIREMENTS".
15. Spec Section 01222 - The Cost Breakdown Items stop at Item # CB33. On drawing sheets A2.01 & A3.01 a Cost Breakdown designation CB34 appears on each drawing with a different description at each location. How shall the contractor proceed with the two distinct CB items? Are they supposed to be included with the other breakdown items?
15. Refer to sheet Bid set (January 8, 2010) sheet A0.00 for list of cost breakdown items. Specification section 01222- COST
BREAKDOWN ITEMS, PART 3 - EXECUTION, 3.1 LIST OF
LINE ITEM BREAKDOWN PRICES, Add the following :
GG Line Item No. CB34 - Additional excavation of subsoil and sheeting and shoring if applicable.
Provide as indicated and specified
16. Divisions 8 & 13 -- Line Item No. CB28 within the proposed alternates for the Project identified within the formal RFP, as well as on sheet A8.05 of the Contract Documents, identifies that there should be a blast resistant laminated glass. Please review and advise the specifications and criteria that should be utilzied.
16. Refer to Bid set (January 8, 2010) sheet A0.00 for list of cost breakdown items. Section 01222- COST BREAKDOWN
ITEMS, PART 3 - EXECUTION, 3.1 LIST OF LINE ITEM
BREAKDOWN PRICES, BB line Item No. 28 delete "Blast Resistant Laminated Glass" and replace with the following the following: - Provide Exterior Windows with laminated glass.
1. Provide as indicated and specified
17. Article B. 3 Prices -- The statement at the bottom of Table B-1 -- Schedule Of Charges For The Basic Award Period instructs the contractor to provide back-up pricing information to support each CSI Division.
Are you asking for the individual Subcontractor bid quotations for each trade we submit? When is the "back-up" documentation due? Given the MEP trades "last minute" pricing due to supply houses not releasing material quotations, it is not expected we will know which subcontractor we will use, or have a completed subcontractor proposal in time to turn in our proposal. Can we have 48 to 72 hours to review subcontractor scopes and quotes prior to this disclosure?
17. We will accept back up calculations showing how you arrive at the B.3 pricing (unit pricing and quantities). Prior to award, the selected offeror must provide the subcontractor written quotes to support the calculations.
18. Article B.3 Prices -- Table B-1 -- Schedule Of Charges For The Basic Award Period is different from Attachment 6 - Pricing Schedule. Which Pricing Schedule do you wish the contractor to submit for this proposal?
18. Please disregard Attachment #6 – Provide your individual pricing calculations to support you B.3 pricing. See #17 above.
19. Article B.3 Pricing - Are we expected to include the
Owner Contingency at $2,000,000 in the Pricing Schedule we turn in?
19. You may; however, this amount may go up or down based on the selected offeror’s award price.
20. Spec Section 02620 -- Structural Drawing S3.01 indicates that the existing subdrainage lines shall be cleaned, serviced and utilized for the renovated building. Drawing Note #2 on sheet DP2.01 states that all plumbing utilities within the building shall be removed in their entirety and replaced with new piping. Please advise which note shall take precedence.
20. The existing sub-slab drainage system is to remain and is not part of the plumbing utilities of the building although, there is a note on the plumbing and structural drawings to tie the existing sub-slab drainage system into the storm water system as part of the work.
21. Please review and confirm that it shall be the General Contractors responsibility to design, furnish and install a permanent ground water system for the sub-basement level. Please advise if there is a current system in place, and if the Engineer of record has sized the new building systems to receive additional water from the dewatering system. Also, if there is a current system in place, will you provide all of the calculations and information downstream of the proposed work? If it is a CG responsibility to design are we precluded from using the Engineer of record as the designer? Since the Engineer of record already has the baseline studies and records it should be significantly less expensive and faster to produce the design.
21. According to the existing structural drawings, there is a sub-slab drainage system below the basement level slab and the layout of this system is shown on 1/S3.01. This layout is copied from the existing structural drawings. The existing structural drawings do not indicate a sub-slab drainage system in the sub-basement level. The new sub-slab drainage system shown in the new portion of the sub-basement is to be designed by the Contractor as noted on the drawings. Using the Engineer of record could be perceived as a conflict of interest.
22. The Contract Documents indicate that there is an Opaque Film to be applied to several of the window
22. Refer to new Specification SECTION 08871 PRIVACY FILM attached openings. Please review and advise what type of film, thickness and manufacturer should be utilized.
23. Article H.6. Wage Rates -- Can you confirm that the Wage Rate Decision to be implemented for this project is, in fact, the General Wage Decision (Montgomery County, MD) No. MD080056, Modification No. 22, dated 02/05/2010?
23. Note that there is a new Davis Bacon Wage Determination for Montgomery County, Maryland. The Wage Determination number is MD100056, dated 03/12/2010 and may be accessed at http://www.wdol.gov/wdol/scafiles/davisbacon/MD56.dvb
24. Our firm “An 8(a) firm” is Teaming with “Large Firm”, under written teaming agreement to submit proposal for NIH Bldg 3, and would like to use “Large Firms Resources, Past Performance & Relevant Experience” in our Technical Proposal, We have the following Questions:
1. WILL NIH ACCEPT LARGE FIRMS EXPERIENCE AS
“OFFERORS RELEVENT EPERIENCE?”
2. WILL NIH ACCEPT LARGE FIRMS PAST
PERFORMANCE AS “OFFERORS PAST
PERFORMACNE?”
3. IS HASCON CONSTRUCTION MANAGEMENT FOR
FEE EXPERIENCE ACCEPTABLE AS “OF
OFERORS RELEVENT EPERIENCE?”
4. Will NIH “Accept combined team of 8(a) Firm and Large Firm as Key Personnel” as “OFFERORS KEY
PERSONNEL”?
24. The solicitation doesn’t restrict a firm from teaming with another form (large or small); however, please see FAR Clause 52.219-14 (Limitations on Subcontracting). This clause was erroneously left out of Article I.3 of the Solicitation and will be added via an amendment. FAR Clause 52.219-14 requires that the prime contractor performs at least 15 percent of the work with his own staff.
25. We are submitting the following questions for the pre-proposal conference for the above-referenced solicitation:
1. Has the LEED charette been completed? If so, what will be required of the construction contractor?
25. 1. The LEED charette has been completed. The LEED Scorecard as of 2-23-2010, which indicates decisions made, will be distributed. For LEED requirements refer to specification sections 01352 "LEED REQUIREMENTS", 01440 "CONSTRUCTION INDOOR AIR QUALITY", 01524 "
CONSTRUCTION WASTE MANAGEMENT" and 01810
"GENERAL COMMISSIONING REQUIREMENTS".
Contractor is responsible for LEED requirements in all spec sections such as VOC limits, and items in LEED Scorecard http://www.wdol.gov/wdol/scafiles/davisbacon/MD56.dvb�
2. Past Performance: Please clarify the past performance requirements. The requirements as stated on pages 74 and 77 do not match.
Page 74, Item 10: “A list of the last 3 contracts completed during the past 7 years and or currently being performed…”
Page 77, Item a: “A list of the last contracts completed during the past Seven (7) years and THE LAST THREE CONTRACTS AWARDED currently being performed…” identified as "C".
2. Delete Paragraph 10, page 74. It is a duplicate of the Past Performance Information on page 77. In the 2nd sentence in Paragraph “a.” under Past Performance, change the first part of the sentence to read “A list of all contracts completed during the past Seven (7) years….
26. Drawing A4.03- Please confirm that projection screens will go in rooms 4E04 and 5E04. They are shown graphically, but they are not noted with section 5/A4.12.
26. Please provide projection screens in room 4E04, and 5E04 in accordance with detail indicated on construction documents.
27. Will there be a cap on the number of days for the liquidated damages stated in item 52.211-12, Item (a), on page 19 of the RFP?
27. There is no Cap. Liquidated damaged will be assessed beginning the day after the performance period ends. See #13 above for performance period and will depend on the contract performance period.
28. 01310-6 (1.9A) Is the Environmental Safety Officer / Industrial Hygienist required as a full time employee throughout the duration of the project or only when needed?
28.
29. 01500-3 (D2) Is the Integrated Pest Management
Quality Control Supervisor required as a fulltime employee throughout the duration of the project or only as needed?
29.
30. Specification section 15900 - Building Automation and 30.
Temperature Controls calls for Siemens to be the only acceptable controls vendor. As one of two approved controls companies on the NIH Bethesda campus, and in the spirit of competition, Johnson Controls requests to be added as an acceptable controls vendor for this project.
31. Solicitation- Page 69- Please confirm that RFIs can be sent in until noon on 4/9/10.
31. Solicitation questions can only be sent thru March 29, 2010 at 12 noon. Note that Section L, Paragraph 1.e. (page 68) has been changed to read:
……..”In addition you may sent written questions after the 3/22/2010 thru noon 03/29/2010. Answers to all question will be consolidated and posted as an amendment to this solicitation. The 03/29/2010 cut-off will allow time for any addendum to the drawings/specifications.” ……
32. Please confirm that the schedule to be submitted with the bid need not be on Primavera P6, but can be on any software.
32.
33. Solicitation- Page 18- Article F.1- “The period of performance of this contract shall be from 4/27/10 through 10/19/11.” Please confirm that the dates shown supersede all other references to project duration.
33. The period of performance shall be 511 calendar days after Award/Notice to Proceed. The April 27th date is an estimated award date.
34. Please provide a list of the current bid documents including the dates.
34.
35. Specification section 02111- All H Drawings- Please confirm whether or not the soffit and/or fascia at the roof overhang and dormers shown on drawings A8.03 and A8.04 have lead-based paint on them.
35.
36. Solicitation- Page 6- The note at the bottom of the table reads..”Provide back-up pricing information to support each CSI division.” Please provide a
36. Show your calculations (i.e., other works sheets to show how you arrived at proposed price for each division -- show description of what is required.
unit prices, quantities; RS Means). You must provide supporting subcontractor quotes to support subcontractor pricing prior to contract award.
37. Solicitation – Page 30- Will AIS be required? If so, is there a specific software program we should use?
37.
38. Should we include any roof work in our bid? If so, please provide roof specs.
38.
39. C5.01- Section 5- Please provide spec for the stone, geo fabric and edging material. Please provide depth and width of stone strip.
39.
40. Please provide a specification for site restoration, i.e., Can disturbed areas of grass be re-seeded or will it be required to be sodded?
40.
41. We have submitted several RFIs and wanted to confirm that we have submitted them properly. Please let me know if we should re-submit them in a different format.
41. See the list of RFI. We are working on the responses and will update this list shortly.
42. I was hoping that you would be able to provide me with a list of interested bidders, planholders or Pre-Bid attendees so that we can submit our pricing for signage. Thanks so much in advance for your assistance.
42. A copy of t he Pre-proposal sign-in sheet is attached to Amendment #000001. You can also view the list of interested party list under this solicitation number at the FBO site.
43. Plan Sheet: A8.05 -- Specification Section: 08550
a. In the Pre-Conference yesterday it was mentioned that the windows will need to have a blast rating, but none are shown on the drawings or specs. If a blast rating is required will it fall under UFC-4-010-01. Can an all aluminum window be used in lieu of the
43.
aluminum clad?
b. On the window schedule notes some windows are scheduled to receive opaque film can acid etched or obscure glass be used in lieu of the opaque?
c. Can we rely on the window quantity noted on the schedule on sheet A8.05 or must we got individual floor plans?
d. Is the design intent to have a double hung window that is in operable or can a fixed window to simulate a double hung be used instead?
44. pre bid was not mandatory right, and three page of the standard form is all you need to be submitted right?
44. No, attendance to the pre-proposal conference is not a prerequisite to submitting a proposal. You must follow the solicitation instructions in submitting your proposal.
45. Please provide the contact information and procedure to gain access into Building # 3. Thanks!
45. The Project Officer contact information is as follows:
Mr. Dexroy Chism 301.402.7958 Dexroy.chism@nih.gov
46. Is there a limit to the area of the limit of disturbance
46. The limit of disturbance (LOD) shall be limited to 4500 sf and will be defined using orange blaze safety fence
47. Is stabilization required at the construction entrance?
47. Provide stabilized construction entrance(s) shall be constructed at every gate in the safety fence.
48. Is it the contractors responsibility to clean the roadway?
48. Any dirt tracked onto the roadway will be cleaned immediately – dry brushed. Use of water to wash the road is prohibited.
49. Does NIH require the fire standpipes to remain active during construction?
49. Yes, per NFPA 241. Standpipes will need to be in place prior to construction (before the storage of combustible material). The standpipes in the stairwells need to be installed and connected to the FDC's while the permanent water supplied is being installed. Once the permanent supply is ready, the standpipes will need to be connected mailto:Dexroy.chism@nih.gov� to it.
50. What LEED points will the project pursue 50. Please refer to the LEED score sheet
51. What Codes / Standards apply? 51. Please refer to www.orf.od.nov.gov
| RESPONSES TO QUESTIONS |
| QUESTIONS |
| REPLY BY |
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .