| Division | Task | Labor | Material | Sub Contractor Name | % Self Performed | Total |
| 1 | General Requirements | |||||
| 2 | Site Construction | |||||
| 3 | Concrete | |||||
| 4 | Masonry | |||||
| 5 | Metal | |||||
| 6 | Wood and Plastics | |||||
| 7 | Thermal and Moisture Protection | |||||
| 8 | Doors and Windows | |||||
| 9 | Finishes | |||||
| 10 | Specialties | |||||
| 11 | Equiptment | |||||
| 12 | Furnishings | |||||
| 13 | Special Constructions | |||||
| 14 | Conveying System | |||||
| 15 | Mechanical | |||||
| 16 | Electrical | |||||
| 1 -- SUBTOTAL | ||||||
| GC LABOR OVERHEAD | ||||||
| GC G&A | ||||||
| GC PROFIT | ||||||
| 2 -- SUBTOTAL | ||||||
| GC SUB TOTAL (Sum 1+2) | ||||||
| PERFORMANCE/PAYMENT BONDS | ||||||
| SUB TOTAL CONTRACT PRICE (Sum 1+2 and BOND) | ||||||
| OWNER CONTINGENCY | $2,000,000 | |||||
| 3 -- SUBTOTAL | ||||||
| TOTAL CONTRACT PRICE (Sum 1+2+3 and BOND) | ||||||
| Provide back-up pricing information to support each CSI Division |
&CTABLE B - 1 -- SCHEDULE OF CHARGES FOR THE BASIC AWARD PERIOD