Amended_RFP-NIH-OD-2015057__-_Amendment_2.pdf
PDF 762 KB Posted
- Attached to
- NIH WIDE BUSINESS AND PROFESSIONAL SUPPORT SERVICES Federal contract opportunity
- Solicitation number
- NIHOD2015057
About this file
The Amended Request for Proposals (RFP) is attached.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__3_RFP-NIH-OD-2015057.pdf | ||
| Amendment_3_Attachment_12_Fully_Loaded_Hourly_Rate_Pricing_Table.xlsx | XLSX spreadsheet | |
| Amendment_2_Q_and_A_5.28.15.pdf | ||
| Amendment_2_SectionKRepsandCerts.pdf | ||
| Amendment_2_NIHBPSS_LABOR_CATEGORY_DESCRIPTIONS.pdf | ||
| Amendment_2_Attachment_12_Fully_Loaded_Hourly_Rate_Pricing_Table.xlsx | XLSX spreadsheet | |
| NIHBPSSLABORCATEGORYDESCRIPTIONS.pdf | ||
| SectionKRepsandCerts.pdf | ||
| Attachment12FullyLoadedHourlyRatePricingTable.xlsx | XLSX spreadsheet | |
| Questions_and_Answers_5.13.15_Cut_Off.pdf | ||
| Amended_RFP-NIH-OD-2015057__-_Amendment_1.pdf | ||
| NIH_Wide_Business_and_Professional_Support_Services_RFP-NIH-OD-2015057.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP-NIH-OD-2015057
Amendment 2 (05/28/15)
RFP-NIH-OD-2015057
“NIH WIDE BUSINESS AND PROFESSIONAL SUPPORT SERVICES”
Amendment #2
Amendment Issue Date: May 28, 2015
Proposal Due Date/Time:
June 15, 2015 at 3:00 P.M.ET., local time
[UnChanged]
Issued By:
Eric Steinberg
Contracting Officer
HHS/NIH/OLAO
6011 Executive Blvd.
Rockville, MD 20892
Points of Contact:
PRIMARY:
Chase.Lucas@nih.gov
Chase A. Lucas, Contract Specialist
Phone: 301-435-3922
SECONDARY:
Eric.Steinberg@nih.gov
Eric Steinberg, Contracting Officer
Phone: 301-402-3349
Offerors must acknowledge receipt of this Amendment on each copy of the proposal submitted. Failure to receive your acknowledgment of this Amendment may result in the rejection of your proposal.
1. SECTION C.2. Reporting Requirements- item a.1.Technical progress reports is modified.
2. SECTION J- LIST OF ATTACHMENTS is revised in its entirety.
- Broken hyperlinks were removed from Section J and the associated attachment was uploaded onto fbo.gov.
3. SECTION L, item 1.a.2. is revised to correct the small business size standard.
4. SECTION L, Instructions to Offerors, item 2.b. TECHNICAL PROPOSAL INSTRUCTIONS and item 2.c BUSINESS PROPOSAL INSTRUCTIONS is revised in its entirety.
5. SECTION M, EVALUATION FACTORS FOR AWARD is revised in its entirety.
6. ATTACHMENT 1 Packaging and Delivery of the Proposal is revised in its entirety.
mailto:Chase.Lucas@nih.gov mailto:Eric.Steinberg@nih.gov
- 1 -
SOLICITATION
SECTION A - SOLICITATION
1. Requisition or other Purchase Authority:
2. Request for Proposal (RFP) Number:
RFP-NIH-OD-2015057
3. Issue Date:
May 5, 2015
4. Set Aside:
[X] No
[ ] Yes See Part IV Section L
5. Title : NIH-Wide Business and Professional Support Services
6. ISSUED BY:
Office of the Director Office of Logistics and Acquistion Operations (OLAO) National Institutes of Health 6011 Executive Blvd. Bethesda, MD 20892-7663
7. SUBMIT OFFERS TO:
See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.
Note: This solicitation has a required total page limitation of not to exceed 35 pages (unless otherwise specified) for the technical proposal.
8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 3:00pm ET local time on June 15, 2015. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.
9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, "PACKAGING AND DELIVERY
OF THE PROPOSAL." IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR
HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (f) of FAR Clause 52.212-1 Instructions to Offerors--Commercial Items (April 2014)," LOCATED IN SECTION L.1. OF THIS
SOLICITATION.
10. Offeror must be registered in the Central Contractor Registry (CCR) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov
11. FOR INFORMATION CALL: Mr. Chase A. Lucas
PHONE: 301-435-3922
E-MAIL: chase.lucas@nih.gov No collect calls or facsimile transmissions will be accepted.
Amendment 1 Issue Date: May 22, 2015
Amendment 2 Issue Date: May 28, 2015 Eric Steinberg Contracting Officer Office of the Director Office of Logistics and Acquistion Operations
(OLAO)
http://www.sam.gov
RFP Number : RFPNIHOD2015057
- 2 -
RFP TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
BUSINESS PROPOSAL ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. NAICS CODE AND SIZE STANDARD
b. TYPE OF CONTRACT AND NUMBER OF AWARDS
c. TASK ORDERS UNDER MULTIPLE AWARD INDEFINITE DELIVERY CONTRACTS
d. COMMITMENT OF PUBLIC FUNDS
e. PROMOTING EFFICIENT SPENDING
f. COMMUNICATIONS PRIOR TO CONTRACT AWARD
g. RELEASE OF INFORMATION
h. PREPARATION COSTS
i. SERVICE OF PROTEST
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Proposal Summary and Data Record (NIH-2043)
4. Evaluation of Proposals
5. Potential Award Without Discussions
6. Use of the Metric System of Measurement
7. Privacy Act - Treatment of Proposal Information
8. Selection of Offerors
9. Past Performance Information
10. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Discussions
- 3 -
2. Other Considerations
3. Technical Evaluation
c. BUSINESS PROPOSAL INSTRUCTIONS
1. Basic Cost/Price Information
2. Proposal Cover Sheet
3. Salary Rate Limitation
4. Small Business Subcontracting Plan
5. Mentor Protege Program, HHSAR 352.219-70
6. HUBZone Small Business Concerns
7. Other Administrative Data
8. Subcontractors
9. Proposer's Annual Financial Report
10. Travel Costs/Travel Policy
SECTION M - EVALUATION FACTORS FOR AWARD
1. GENERAL
2. TECHNICAL
4. PAST PERFORMANCE
- 4 -
PART I - THE SCHEDULE
THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.
ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE
CONTRACT AWARD.
THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS
INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE
TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
The contract (s) to be awarded under the Request for Proposal (RFP) will provide NIH wide business operations support services, (1) Financial Analysis, Business Solutions, and Acquisition Life-cycle Support, (2) Business Process Improvement and Organizational Assessment (3) Communication and Training (4) Program Planning and Management Services (5) Supply Chain Management (6) Asset Management (7) Policy Development, Implementation, and Administration (8) System Integration Work for the NIH.
ARTICLE B.2. PRICES/COSTS
a. This is a Multiple Award Indefinite Quantity contract (s) as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $250 (minimum) nor more than a total of $30,750,000 (maximum) for successful performance of this contract(s).
b. The costs set forth in this ARTICLE will cover the contract period September 01, 2015 through August 31, 2016.
c. The Government will compete and award Task Orders based on the work described in SECTION C of this contract.
d. Ordering procedures are described in The TASK ORDER PROCEDURE Article in SECTION G of the contract.
e. The Contractor shall provide rates for all labor categories listed in Attachment 12 of SECTION J for the base year and option periods. Note: It is required that option periods shall include annual 2% escalations. Required positions will be determined for each Task Order.The loaded rates are ceiling price rates and contractors may, at their discretion, elect to propose lower rates when responding to a request for a task order proposal. If offeror proposes a consultant or subcontractor for a labor category, and that consultant or subcontractor does not require a fully loaded rate, for the purposes of evaluation please provide a fully loaded labor rate.
- 5 -
ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS
This article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.
ARTICLE B.4. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award.
- 6 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. DESCRIPTION-STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated January 2015, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein are applicable to Task Orders and shall be submitted in electronic format.
All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."
a. Technical Progress Reports
1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award.
For proposal preparation purposes only, it is estimated that in addition to the required electronic version(s) 0 hard copies of these reports, some or all of the following reports maybe required at the Task Order level.
[X] Weekly [X] Monthly [X] Quarterly [X] Semi-Annually [X] Annually [X] Annually (with a requirement for a Draft Annual Report) [X] Final - Upon final completion of the contract [X] Final - Upon final completion of the contract (with a requirement for a Draft Final Report)
2. Summary of Salient Results
The Contractor will be required to prepare and submit, with the final report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract. This report will be required on or before the expiration date of the contract.
1. Information Security and Physical Access Reporting Requirements
The Contractor shall submit the following reports as required by the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract. Note: Each report listed below includes a reference to the appropriate subparagraph of this article.
http://www.hhs.gov/web/508/index.html
- 7 -
a. Roster of Employees Requiring Suitability Investigations
The Contractor shall submit a roster, by name, position, e-mail address, phone number and responsibility, of all staff (including subcontractor staff) working under the contract who will develop, have the ability to access, or host and/or maintain a Federal information system(s). The roster shall be submitted to the Contracting Officer's Representative (COR), with a copy to the Contracting Officer, within 14 calendar days of the effective date of the contract. (Reference subparagraph A.e. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
b. IT Security Plan (IT-SP)
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the contractor shall submit the IT-SP within thirty
(30) days after contract award. The IT-SP shall be consistent with, and further detail the approach to, IT security contained in the Contractor's bid or proposal that resulted in the award of this contract. The IT-SP shall describe the processes and procedures that the Contractor will follow to ensure appropriate security of IT resources that are developed, processed, or used under this contract. If the IT-SP only applies to a portion of the contract, the Contractor shall specify those parts of the contract to which the IT-SP applies.
The Contractor shall review and update the IT-SP in accordance with NIST SP 800-53A, Guide for Assessing the Security Controls in Federal Information Systems and Organizations, on an annual basis.
(Reference subparagraph D.c.1. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
c. IT Risk Assessment (IT-RA)
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the contractor shall submit the IT-RA within thirty
(30) days after contract award. The IT-RA shall be consistent, in form and content, with NIST SP 800-30, Risk Management Guide for Information Technology Systems, and any additions or augmentations described in the HHS-OCIO Information Systems Security and Privacy Policy.
The Contractor shall update the IT-RA on an annual basis.
(Reference subparagraph D.c.2. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
d. FIPS 199 Assessment
In accordance with HHSAR Clause 352.239-72, Security Requirements For Federal Information Technology Resources, the Contractor shall submit a FIPS 199 Assessment within thirty (30) days after contract award. The FIPS 199 Assessment shall be consistent with the cited NIST standard.
(Reference subparagraph D.c.3. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECITON H of this contract.
e. Reporting of New and Departing Employees
- 8 -
The Contractor shall notify the Contracting Officer's Representative (COR) and Contracting Officer within five working days of staffing changes for positions that require suitability determinations as follows:
a. New Employees who have or will have access to HHS Information systems or data: Provide the name, position title, e-mail address, and phone number of the new employee. Provide the name, position title and suitability level held by the former incumbent. If the employee is filling a new position, provide a description of the position and the Government will determine the appropriate security level.
b. Departing Employees: 1) Provide the name, position title, and security clearance level held by or pending for the individual; and 2) Perform and document the actions identified in the "Employee Separation Checklist", attached in Section J, ATTACHMENTS of this contract, when a Contractor/Subcontractor employee terminates work under this contract. All documentation shall be made available to the COR and/or Contracting Officer upon request.
(Reference subparagraph E.2.a-c. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
f. Contractor - Employee Non-Disclosure Agreement(s) The contractor shall complete and submit a signed and witnessed "Commitment to Protect Non-Public Information
- Contractor Agreement" form for each contractor and subcontractor employee who may have access to non-public Department information under this contract. This form is located at: https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Nondisclosure.pdf.
(Reference subparagraph E.3.d. of the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)
2. Section 508 Annual Report
The contractor shall submit an annual Section 508 report in accordance with the schedule set forth in the ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY Article in SECTION H of this contract. The Section 508 Report Template and Instructions for completing the report are available at: http://www.hhs.gov/web/508/contracting/technology/vendors.html under "Vendor Information and Documents."
http://www.hhs.gov/web/508/contracting/technology/vendors.html
- 9 -
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
- 10 -
SECTION E - INSPECTION AND ACCEPTANCE
a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
b. For the purpose of this SECTION, Jeff Klein is the authorized representative of the Contracting Officer.
c. Inspection and acceptance will be performed at:
CONUS (TBD at the Task Order Level)
FAR Clause 52.246-6, Inspection Time-and Material and Labor Hour (May 2001).
Alternate I (April 1984) is not applicable to this contract.
- 11 -
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
a. The period of performance of this contract shall be from September 1, 2015 through August 31, 2016.
b. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:
Option Option Period Option 1 12 Months after the effective start date of Option 1 Option 2 12 Months after the effective start date of Option 2
ARTICLE F.2. DELIVERIES
Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule.
The following table provides a complete listing of the required deliverables by task and are applicable to each Task Order. The table includes, Task No., End Result/Deliverable, Quantity and Schedule/Milestone. The tool for creating it, Acceptance Criteria, and Intended Use, as applicable, will be stated in each individual task order.
a. The items specified below as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified below:
b.
Task End Result/Deliverable Quantity Schedule/Milestone
2.4 Risks identified in monthly meetings, issues discussed in the meeting, the decisions rendered and the action items for each meeting member to address.
1 Secure Electronic Copy
Within 5 working days after each meeting.
2.8 The Contractor shall develop and maintain
components of task project schedules for tracking the task/sub-tasks specifically identified by the COR.
1 Secure Electronic Copy
Within 10 days of the start of a new task or sub-task.
2.8 The Contractor shall update the project
schedule with percentage of work completed, schedule date changes, or other schedule changes as requested by the COR.
1 Secure Electronic Copy
Monthly
2.9 Monthly Status reports. 1 Secure
Electronic Copy
By the 10th working day of each month following the first full month of task order performance
2.10 Annual Progress Report 1 Secure
Electronic Copy
Yearly
Other Deliverable (as defined in individual Task Orders)
As required & specified in Government requests
2.5 Attend relevant planning meetings, teleconferences, conferences, and forums
As directed by the COR/TO COR
2.6 Prepare agenda, minutes, briefing, speeches, papers, letters, manuals, job aids, or other documents
As defined in individual Task Orders
- 12 -
Task End Result/Deliverable Quantity Schedule/Milestone
2.7 Design, develop, and deploy dashboards
and related tools As defined in individual Task Orders
2.11 Perform cataloging tasks As defined in individual Task Orders
c. The above items shall be addressed and delivered to:
Recipient Address Contract Officer Representative (COR) Office of Strategic Sourcing and Data Analysis
6011 Executive Blvd Room 541F Rockville, MD 20852
Contracting Officer
Office of Strageic Sourcing and Data Analysis
6011 Executive Bld
Rockville, MD 20852
ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far .
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is applicable to this contract.
http://www.acquisition.gov/far
- 13 -
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
Jeffrey S. Klein
FAC-COR III
Office of Strategic Sourcing and Data Analysis 6011 Executive Blvd Room 541F Rockville, MD 20852 Email: KleinJ@odepsm2.od.nih.gov
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, HHSAR 352.242-70 (January 2006) (At least 1 Key Personnel is required for all Task Areas)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to diverting any of the specified individuals to other programs or contracts (or as soon as possible, if an individual must be replaced, for example, as a result of leaving the employ of the Contractor), the Contractor shall notify the Contracting Officer and shall submit comprehensive justification for the diversion or replacement request (including proposed substitutions for key personnel) to permit evaluation by the Government of the impact on performance under this contract. The Contractor shall not divert or otherwise replace any key personnel without the written consent of the Contracting Officer. The Government may modify the contract to add or delete key personnel at the request of the Contractor or Government.
(End of Clause)
The following individual(s) is/are considered to be essential to the work being performed hereunder:
Technical Task Area Name Title
1 TBD TBD
2 TBD TBD
3 TBD TBD
4 TBD TBD
5 TBD TBD
6 TBD TBD
7 TBD TBD
- 14 -
Technical Task Area Name Title
8 TBD TBD
ARTICLE G.3. TASK ORDER PROCEDURE
This contract provides for the issuance of Task Orders on a negotiated basis as follows:
a. General
Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.
No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
b. Requesting Task Order Proposals.
The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.
Generally, the Task Order Request for Proposal (TORFP) will include but is not limited to the following:
1. Statement of Work;
2. Reporting Requirements and Deliverables;
3. Proposal Due Date and Location to Deliver Proposals;
4. Period of Performance of Task Order;
5. Anticipated type of Task Order;
6. Technical Proposal Instructions;
7. Business proposal Instructions
8. Evaluation Factors for Award
All contract clauses contained in this contract shall be incorporated in the TORFP and the resultant task order. If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.
Contractors are not required to propose on all TORFPs. Those eligible Contractors that decide not to submit a proposal shall advise the Contracting Officer, in writing, of their intention not to submit a proposal on or before the closing date and time established in the TORFP. An election not to propose on a given TORFP will not negatively affect or prohibit a Contractor from competing on future TORFPs. However, it may affect the Contractor's eligibility for continuations or extensions of the resultant Task Order.
c. Competitive Ordering Process.
1. All Contractors within a technical area will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of this contract unless otherwise specified in the proposed task order.
- 15 -
2. Contractors will be provided adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part 16. Each TORFP will indicate the criteria for the evaluation of proposals. The responses shall demonstrate capability for each criterion to be evaluated.
Generally, the Contractor will be asked to demonstrate the following as appropriate:
• Understanding of the requirements;
• Experience and capability on similar tasks;
• Technical approach, methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies.
• Procedures for assuring quality of work, products, and deliverables;
• Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);
• Staffing plan with skill levels and level of effort for each individual proposed. Generally, resumes will be required for proposed personnel (if not previously submitted);
• References to evaluate past performance; and
• Cost/Price to perform the task order.
d. Evaluation and Award of Task Order Proposals
The Government will evaluate the Task Order proposals against the requirements of the TORFP.
Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, technical factors will be significantly more important than cost or price However, each TORFP will specify how the award decision will be made.
Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor whose proposal is most advantageous to the government
The Contracting Officer will notify the Contractor(s) of the selection decision in writing.
e. Fair Opportunity
1. In accordance with FAR 16.505(b)(1)(i), each awardee will be given a fair opportunity to be considered for each order issued over $3,000 unless the following exception(s) apply:
i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.
iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
iv. It is necessary to place an order to satisfy a minimum guarantee.
v. For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.
- 16 -
vi. In accordance with section 1331 of Public Law 111-240 (15 U.S.C. 644(r)), contracting officers may, at their discretion, set aside orders for any of the small business concerns identified in 19.000(a)(3).
When setting aside orders for small business concerns, the specific small business program eligibility requirements identified in part 19 apply.
2. All awardees will be given a fair opportunity to be considered in accordance with the FAR as follows:
i. For orders exceeding $3,000 up to the simplified acquisition threshold, in accordance with FAR 16.505(b)(1)(ii);
ii. For orders exceeding the simplified acquisition threshold up to $5 Million, in accordance with 16.505(b)(1)(iii); and,
iii. For orders exceeding $5 Million, in accordance with FAR 16.505(b)(1)(iv).
ARTICLE G.4. INVOICE SUBMISSION
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
a. The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
b. One copy of the invoice shall be submitted to the following approving official:
Contracting Officer TBD at Task Order Level
Room
MSC
E-mail:TBD at Task Order Level
The Contractor shall submit an electronic copy of the payment request to the approving official instead of a paper copy. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
Central Point of Distribution:
The Contractor shall submit an electronic copy of the payment request to the Central Point of Distribution mailbox. The payment request shall be transmitted as an attachment via e-mail to
- 17 -the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
a. Inquiries regarding payment of invoices shall be directed to the designated billing office, (301) 496-6452.
ARTICLE G.5. GOVERNMENT PROPERTY
If this RFP will result in the acquisition or use of Government Property provided by the contracting agency or if the Contracting Officer authorizes in the preaward negotiation process, the acquisition of property (other than real property), this ARTICLE will include applicable provisions and incorporate the HHS Publication, entitled, "HHS Contracting Guide for Contract of Government Property," which can be found at: http://oamp.od.nih.gov/sites/default/ files/appendix_q_hhs_contracting_guide.pdf.
ARTICLE G.6. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
a. Contractor Performance Evaluations
Interim and Final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The Final performance evaluation will be prepared at the time of completion of work. In addition to the Final evaluation, Interim evaluation(s) will be prepared Annually.
Interim and Final evaluations will be provided to the Contractor as soon as practicable after completion of the evaluation. The Contractor will be permitted thirty days to review the document and to submit additional information or a rebutting statement. If agreement cannot be reached between the parties, the matter will be referred to an individual one level above the Contracting Officer, whose decision will be final.
Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
b. Electronic Access to Contractor Performance Evaluations
Contractors may access evaluations through a secure Web site for review and comment at the following address:
http://www.cpars.gov http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf http://oamp.od.nih.gov/sites/default/files/appendix_q_hhs_contracting_guide.pdf http://www.cpars.gov
- 18 -
SECTION H - SPECIAL CONTRACT REQUIREMENTS
ARTICLE H.1. NEEDLE DISTRIBUTION
The Contractor shall not use contract funds to carry out any program of distributing sterile needles or syringes for the hypodermic injection of any illegal drug.
ARTICLE H.2. ACKNOWLEDGEMENT OF FEDERAL FUNDING
The Contractor shall clearly state, when issuing statements, press releases, requests for proposals, bid solicitations and other documents describing projects or programs funded in whole or in part with Federal money: (1) the percentage of the total costs of the program or project which will be financed with Federal money; (2) the dollar amount of Federal funds for the project or program; and (3) the percentage and dollar amount of the total costs of the project or program that will be financed by nongovernmental sources.
ARTICLE H.3. DISSEMINATION OF FALSE OR DELIBERATELY MISLEADING INFORMATION
The Contractor shall not use contract funds to disseminate information that is deliberately false or misleading.
ARTICLE H.4. PRIVACY ACT, HHSAR 352.224-70 (January 2006)
This contract requires the Contractor to perform one or more of the following: (a) Design; (b) develop; or (c) operate a Federal agency system of records to accomplish an agency function in accordance with the Privacy Act of 1974 (Act) (5 U.S.C. 552a(m)(1)) and applicable agency regulations. The term "system of records" means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual. Violations of the Act by the Contractor and/or its employees may result in the imposition of criminal penalties (5 U.S.C. 552a(i)). The Contractor shall ensure that each of its employees knows the prescribed rules of conduct and that each employee is aware that he/she is subject to criminal penalties for violation of the Act to the same extent as Department of Health and Human Services employees. These provisions also apply to all subcontracts the Contractor awards under this contract which require the design, development or operation of the designated system(s) of records [5 U.S.C. 552a(m)(1)]. The contract work statement: (a) identifies the system(s) of records and the design, development, or operation work the Contractor is to perform; and (b) specifies the disposition to be made of such records upon completion of contract performance.
(End of clause)
45 CFR Part 5b contains additional information which includes the rules of conduct and other Privacy Act requirements and can be found at: http://www.access.gpo.gov/nara/cfr/waisidx_06/45cfr5b_06.html.
The Privacy Act System of Records applicable to this project is Number 09-25-0036. This document is incorporated into this contract as an Attachment in SECTION J of this contract. This document is also available at: http:// oma.od.nih.gov/public/MS/privacy/PAfiles/read02systems.htm.
ARTICLE H.5. OPTION PROVISION (Applicable to Task Orders)
Unless the Government exercises its option pursuant to the Option Clause set forth in SECTION I., the contract willconsist only of the Base Period of the Statement of Work as defined in Sections C and F of the contract. Pursuant to FAR Clause 52.217-8, Option to Extend Services, FAR Clause 52.217-9, Option to Extend the Term of the Contract set forth in SECTION I. of this contract, the Government may, by unilateral contract modification, require the Contractor to perform additional options set forth in the Statement of Work and also defined in Sections C and F of the contract. If the Government exercises this option,notice must be given at least 60 days prior to the expiration date of http://www.access.gpo.gov/nara/cfr/waisidx_06/45cfr5b_06.html http://oma.od.nih.gov/public/MS/privacy/PAfiles/read02systems.htm http://oma.od.nih.gov/public/MS/privacy/PAfiles/read02systems.htm
- 19 -this contract, and the price of the contract will beincreased as set forth in the OPTION PRICES Article in SECTION B of this contract.
ARTICLE H.6. INFORMATION AND PHYSICAL ACCESS SECURITY
A. HHS-Controlled Facilities and Information Systems Security
a. To perform the work specified herein, Contractor personnel are expected to have routine (1) physical access to an HHS-controlled facility; (2) physical access to an HHS-controlled information system; (3) access to sensitive HHS data or information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
b. To gain routine physical access to an HHS-controlled information system, and/or access to sensitive data or information, the Contractor and its employees shall comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; Office of Management and Budget Memorandum (M-05-24); and Federal Information Processing Standards Publication (FIPS PUB) Number 201; and with the personal identity verification and investigations procedures contained in the following documents:
1. HHS-OCIO Information Systems Security and Privacy Policy ( http://www.hhs.gov/ocio/policy/ #Security)
2. HHS HSPD-12 Policy Document, v. 2.0 ( http://www.whitehouse.gov/sites/default/files/omb/assets/ omb/memoranda/fy2005/m05-24.pdf)
3. Information regarding background checks/badges ( http://idbadge.nih.gov/background/index.asp)
c. Position Sensitivity Levels:
This contract will entail the following position sensitivity levels:
[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).
[X] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).
[ ] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).
d. The personnel investigation procedures for Contractor personnel require that the Contractor prepare and submit background check/investigation forms based on the type of investigation required. The minimum Government investigation for a non-sensitive position is a National Agency Check and Inquiries (NACI) with fingerprinting. More restricted positions - i.e., those above non-sensitive, require more extensive documentation and investigation.
The Contractor shall submit a roster, by name, position, e-mail address, phone number and responsibility, of all staff (including subcontractor staff) working under the contract who will develop, have the ability to access and/or maintain a Federal Information System(s). The roster shall be submitted to the Contracting Officer's Representative (COR), with a copy to the Contracting Officer, within 14 calendar days after the effective date of the contract. The Contracting Officer shall notify the Contractor of the appropriate level of suitability investigations to be performed. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at: https://ocio.nih.gov/aboutus/publicinfosecurity/ acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.
http://www.hhs.gov/ocio/policy/#Security http://www.hhs.gov/ocio/policy/#Security http://www.whitehouse.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-24.pdf http://idbadge.nih.gov/background/index.asp https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx
- 20 -
Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.
All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract.
Contractors may begin work after the fingerprint check has been completed.
e. Investigations are expensive and may delay performance, regardless of the outcome of the investigation.
Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.
f. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).
g. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
h. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.
i. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.
B. Standard for Security Configurations, HHSAR 352.239-70, (January 2010)
a. The Contractor shall configure its computers that contain HHS data with the applicable Federal Desktop Core Configuration (FDCC) (see http://nvd.nist.gov/fdcc/index.cfm) and ensure that its computers have and maintain the latest operating system patch level and anti-virus software level.
Note: FDCC is applicable to all computing systems using Windows XPTM and Windows VistaTM, including desktops and laptops - regardless of function - but not including servers.
b. The Contractor shall apply approved security configurations to information technology (IT) that is used to process information on behalf of HHS.
c. The Contractor shall ensure IT applications operated on behalf of HHS are fully functional and operate correctly on systems configured in accordance with the above configuration requirements. The Contractor shall use Security Content Automation Protocol (SCAP)-validated tools with FDCC Scanner capability to ensure its products operate correctly with FDCC configurations and do not alter FDCC settings - see http:// scap.nist.gov/validation. The Contractor shall test applicable product versions with all relevant and current http://nvd.nist.gov/fdcc/index.cfm http://scap.nist.gov/validation http://scap.nist.gov/validation
- 21 -updates and patches installed. The Contractor shall ensure currently supported versions of information technology products met the latest FDCC major version and subsequent major versions.
d. The Contractor shall ensure IT applications designed for end users run in the standard user context without requiring elevated administrative privileges.
e. The Contractor shall ensure hardware and software installation, operation, maintenance, update, and patching will not alter the configuration settings or requirements specified above.
f. The Contractor shall (1) include Federal Information Processing Standard (FIPS) 201-compliant ( http:// csrc.nist.gov/publications/fips/fips201-1/FIPS-201-1-chng1.pdf), Homeland Security Presidential Directive 12 (HSPD-12) card readers with the purchase of servers, desktops, and laptops; and (2) comply with FAR Subpart 4.13, Personal Identity Verification.
g. The Contractor shall ensure that its subcontractors (at all tiers) which perform work under this contract comply with the requirements contained in this clause.
C. Standard for Encryption language, HHSAR 352.239-71, (January 2010)
a. The Contractor shall use Federal Information processing Standard (FIPS) 140-2-compliant encryption (Security) Requirements for Cryptographic Module, as amended) to protect all instances of HHS sensitive information during storage and transmission. (Note: The Government has determined that HHS information under this contract is considered "sensitive" in accordance with FIPS 199, Standards for Security Categorization of Federal Information and Information Systems, dated February 2004).
b. The Contractor shall verify that the selected encryption product has been validated under the Cryptographic Module Validation Program (see http://csrc.nist.gov/groups/STM/cmvp/) to confirm compliance with FIPS 140-2 (as amended). The Contractor shall provide a written copy of the validation documentation to the Contracting Officer and the Contracting Officer's Technical Representative.
c. The Contractor shall use the Key Management Key (see FIPS 201, Chapter 4, as amended) on the HHS personal identification verification (PIV) card; or alternatively, the Contractor shall establish and use a key recovery mechanism to ensure the ability for authorized personnel to decrypt and recover all encrypted information (see http://csrc.nist.gov/drivers/documents/ombencryption-guidance.pdf). The Contractor shall notify the Contracting Officer and the Contracting Officer's Technical Representative of personnel authorized to decrypt and recover all encrypted information.
d. The Contractor shall securely generate and manage encryption keys to prevent unauthorized decryption of information in accordance with FIPS 140-2 (as amended).
e. The Contractor shall ensure that this standard is incorporated into the Contractor's property management/ control system or establish a separate procedure to account for all…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .