Attachment_II_-_Quality_Assurance_Surveillance_Plan_-_Beckman_Equipment_.pdf
PDF 146 KB Posted
- Solicitation number
- NIHES2015055
About this file
Beckman Equipment Maintenance Services QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1_Attach_II.pdf | ||
| Amendment1_Attach_I.pdf | ||
| Attachment_III_-_Beckman_Equipment_Service_and_Repair_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_I_-_Beckman_Equipment_Listing_2015.pdf | ||
| Beckman_RFP_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT II – QUALITY ASSURANCE SURVEILLANCE PLAN
1 | P a g e
Quality Assurance Surveillance Plan
Preventive Maintenance and Repairs of Government-Owned
Beckman Equipment
I. Objective: To provide a quality surveillance plan for the preventive maintenance and repair of government owned Beckman instruments. This plan provides a basis for the
Contracting Officer Representative (COR) to evaluate the quality of the Contractor’s performance. The oversight provided for in the contract and in this plan will help to ensure that service levels are reached and maintained at the required levels throughout the contract term. Further, this plan provides the COR and Alternate COR (ACOR) with a proactive way to avoid unacceptable or deficient performance, and provides verifiable input for the required annual past performance evaluation.
II. Performance Standards:
A. Quality Level: by monitoring the Contractor, the CORs will determine whether the performance levels set forth in the contract have been attained. Quality standards (i.e.
performance standards) for all tasks are specified in the Performance Work
Statement.
B. Frequency: Prior to contract award, the CORs will evaluate the current levels of performance, according to the standards set forth in this contract. During the performance of this contract, the CORs will take periodic measurements (i.e. conduct surveillance) as specified, and will analyze whether the negotiated frequency of measurement is appropriate for the work being performed. Adjustments may only be made by a modification to the contract.
C. Management Responsiveness: The CORs will determine whether the Contractor has managed the contract effectively and efficiently as specified in the quality standards set forth in the PWS. The CORs will confirm whether the Contractor has satisfactorily met all reporting requirements.
III. Evaluation Methods:
The CORs will conduct performance evaluations based upon the required performance levels set forth in the contract. The following techniques will be used to perform surveillance:
A. Maintenance Performance Report: The CORs will review service reports to ensure that the required preventive maintenance, emergency maintenance, and repair have been provided. Problems, resolutions, etc. shall be noted as stated in the contract.
Results shall be shared with the Contracting Officer.
B. Service Level Monitoring: The Contractor is required to perform preventive maintenance and emergency repairs quickly. Customer feedback will be sought and service request logs shall be reviewed to ensure that reported problems are resolved as quickly and efficiently as possible.
C. Inspections: Health and Safety Branch will conduct 100% inspections of any removals of radioactive materials.
Beckman Maintenance
Performance Based Objectives
2 | P a g e
Desired Outputs
Required Service
Performance
Indicator
Acceptable Quality
Level
Monitoring Method
Equipment in optimum working condition
Preventative Maintenance completion of semiannual inspections
95% Conformance
Random Project Officer Inspection and Customer Concerns
Prompt restoration of critical failed equipment
Providing emergency Repair Maintenance
24 hour response and 48 hour restoration
Timely restoration of failed equipment
Providing Routine repair Service
24 hour response and 72 hour restoration
Timely replacement of failed repair parts
Furnishing of OEM approved replacement Parts
Installation of EOM approved repair parts with minimum delays
Equipment in the desired locations
Relocation and Reinstallation
Complete relocation ans reinstallation within 24 hours of notification
Current Status of equipment condition
Providing Service
Reports
Prompt and accurate
Service Reports
Receipt of correspondence by Project Officer, Alternate Project Officer, and Contracting
Officer
Quality Maintenance
Adherence to the QCP
Exemplary Equipment Performance
Customer Concerns
Evidence of maintenance frequency completion and frequency
Affixing Servicing Stickers when maintenance/repairs have been completed
The application of current Servicing Stickers
100% Conformance
File details come from the government source that posted it. Updated .