This is a request for proposal for the operation of a clinical research facility. The National Institute of Allergy and Infectious Diseases is seeking proposals to conduct clinical trials of vaccines and antivirals in adult and pediatric populations. Studies will investigate the safety, immunogenicity, and efficacy of vaccines against viruses such as influenza, respiratory syncytial virus, human parainfluenza viruses, human metapneumovirus, flaviviruses, and viral agents of gastroenteritis. Proposals are due by November 12, 2018. The contract will be an indefinite delivery, indefinite quantity contract with a minimum value of $10 and maximum of $73 million over the period from TBD through TBD. The contractor will perform work defined in task orders issued by NIAID, covering activities such as clinical trials of candidate vaccines and pathogenesis or challenge studies.

RFP Final with Attachments

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 -

SOLICITATION

SECTION A - SOLICITATION/CONTRACT FORM

1. Requisition or other Purchase Authority: TBD

2. Request for Proposal (RFP) Number:

NIHAO201800107

3. Issue Date:

9/12/2018

4. Set Aside:

[X] No

[ ] Yes See Part IV Section L

5. Title : Operation of a Facility for the Study of Infectious Agents, Vaccines and Antimicrobials in Adult and Pediatric Human Subjects

6. ISSUED BY:

Office of Acquisitions

National Institutes of Health National Institute of Allergy and Infectious Diseases 5601 Fishers Lane Rockville, MD 20892

7. SUBMIT OFFERS TO:

See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.

8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 3:00 p.m. local time on 11/12/2018. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.

9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, "PACKAGING AND DELIVERY OF THE PROPOSAL." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the address provided for the OFFICE OF ACQUISITIONS.

IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (c)(3) of FAR Clause 52.215-1, Instructions to Offerors--Competitive Acquisition," LOCATED IN SECTION L.1. OF THIS SOLICITATION.

10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov

11. FOR INFORMATION CALL: Alice Sobsey

PHONE: 240-669-5118

e-MAIL: alice.sobsey@nih.gov

COLLECT CALLS WILL NOT BE ACCEPTED.

Dixie Harper Contracting Officer Office of Acquisitions http://www.sam.gov

RFP Number : NIHAO201800107

- 2 -

RFP TABLE OF CONTENTS

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SECTION D - PACKAGING, MARKING AND SHIPPING

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES OR PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART II - CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

SOLICITATION ATTACHMENTS

TECHNICAL PROPOSAL ATTACHMENTS

BUSINESS PROPOSAL ATTACHMENTS

INFORMATIONAL ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. GENERAL INFORMATION

a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION

b. REQUEST FOR INFORMATION OR SOLICITATION FOR PLANNING PURPOSES

c. NAICS CODE AND SIZE STANDARD

d. TYPE OF CONTRACT AND NUMBER OF AWARDS

e. TASK ORDERS UNDER MULTIPLE AWARD INDEFINITE DELIVERY CONTRACTS

f. COMMITMENT OF PUBLIC FUNDS

g. PROMOTING EFFICIENT SPENDING

h. COMMUNICATIONS PRIOR TO CONTRACT AWARD

i. RELEASE OF INFORMATION

j. PREPARATION COSTS

k. SERVICE OF PROTEST

l. LATE PROPOSALS AND REVISIONS

2. INSTRUCTIONS TO OFFERORS

a. GENERAL INSTRUCTIONS

1. Contract Type and General Clauses

2. Authorized Official and Submission of Proposal

3. Proposal Summary and Data Record (NIH-2043)

4. Separation of Technical and Business Proposals

5. Alternate Proposals

6. Evaluation of Proposals

7. Potential Award Without Discussions

8. Use of the Metric System of Measurement

- 3 -

9. Standards for Privacy of Individually Identifiable Health Information

10. Non-discrimination for Conscience, HHSAR Clause 352.270-9

11. Privacy Act - Treatment of Proposal Information

12. Selection of Offerors

13. Institutional Responsibility Regarding Investigator Conflicts of Interest

14. ROTC Access and Federal Military Recruiting on Campus

15. Past Performance Information

16. Solicitation Provisions Incorporated by Reference

b. TECHNICAL PROPOSAL INSTRUCTIONS

1. Technical Discussions

2. Other Considerations

3. Technical Evaluation

4. Human Subjects

Notice to Offerors of Requirements, Protection of Human Subjects, HHSAR 270-4(a)

Instructions to Offerors Regarding Protection of Human Subjects

Required Education in the Protection of Human Research Participants

Inclusion of Women and Minorities in Research Involving Human Subjects

Inclusion of Children in Research Involving Human Subjects

Research Involving Human Fetal Tissue

Human Stem Cell Research

Data and Safety Monitoring in Clinical Trials

Registration and Results Reporting for Applicable Clinical Trials in ClinicalTrials.gov

5. Obtaining and Disseminating Biomedical Research Resources

c. BUSINESS PROPOSAL INSTRUCTIONS

1. Basic Cost/Price Information

2. Proposal Cover Sheet

3. Information Other than Cost or Pricing Data

4. Cost and Pricing Data

5. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data

6. Salary Rate Limitation

7. Small Business Subcontracting Plan

8. Mentor Protege Program, HHSAR 352.219-70

9. HUBZone Small Business Concerns

10. Total Compensation Plan

11. Other Administrative Data

12. Qualifications of the Offeror

13. Subcontractors

14. Proposer's Annual Financial Report

15. Travel Costs/Travel Policy

SECTION M - EVALUATION FACTORS FOR AWARD

- 4 -

PART I - THE SCHEDULE

THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.

ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE

CONTRACT AWARD.

THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS

INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE

TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES

The Laboratory of Infectious Diseases (LID) and the Laboratory of Viral Diseases (LVD) of NIAID require clinical trials to investigate the safety, immunogenicity, and protective efficacy of vaccines against pneumoviruses, paramyxoviruses (primarily human parainfluenza viruses (HPIVs)), influenza viruses, flaviviruses, alphaviruses, and bunyaviruses, including newly emerging viruses such as Zika virus, noroviruses, rotavirus, and virally-vectored vaccines. Vaccine studies will include adult and pediatric subjects. Clinical trials in adults may also be required for pathogenesis research and to develop viral human challenge models for the testing of antivirals and vaccines.

ARTICLE B.2. PRICES/COSTS

a. This is an Indefinite Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $10 (minimum) nor more than a total of $73,000,000 (maximum) for successful performance of this contract.

b. The costs set forth in this ARTICLE will cover the contract period TBD through TBD.

c. The Government will issue Task Orders based on the work described in the Statement of Work (SOW), Attachment 1 of this contract.

d. Ordering procedures are described in The TASK ORDER PROCEDURE Article in SECTION G of this contract.

ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS

a. Items Unallowable Unless Otherwise Provided

Notwithstanding the clauses, ALLOWABLE COST AND PAYMENT, incorporated in this contract, unless authorized in writing by the Contracting Officer, the costs of the following items or activities shall be unallowable as direct costs:

1. Conferences and Meetings

- 5 -

2. Food for Meals, Light Refreshments, and Beverages

3. Promotional Items [includes: clothing and commemorative items such as pens, mugs/cups, folders/folios, lanyards, and conference bags that are sometimes provided to visitors, employees, grantees, or conference attendees.]

4. Acquisition, by purchase or lease, of any interest in real property;

5. Special rearrangement or alteration of facilities;

6. Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value.

(General purpose equipment is defined as any items of personal property which are usable for purposes other than research, such as office equipment and furnishings, pocket calculators, etc.);

7. Travel to attend general scientific meetings;

8. Foreign travel;

9. Patient care costs;

10. Accountable Government Property (defined as non-expendable personal property with an acquisition cost of $1,000 or more) and "sensitive items" (defined as items of personal property (supplies and equipment that are highly desirable and easily converted to personal use), regardless of acquisition value.

11. Printing Costs (as defined in the Government Printing and Binding Regulations).

ARTICLE B.4. ADVANCE UNDERSTANDINGS

Other provisions of this contract notwithstanding, approval of the following items within the limits set forth is hereby granted without further authorization from the Contracting Officer.

a. Overtime

Overtime (premium) pay for 0 hours not to exceed a total of $0 annually.

b. Establishment of Indirect Cost Rate

Indirect costs are funded at the current negotiated rate costs; however, the Contractor shall not bill or be reimbursed for indirect costs until such time as an indirect cost proposal has been submitted to the cognizant office responsible for negotiating the indirect cost rates, unless a temporary billing rate(s) has been included herein. Unless otherwise specified below, the indirect cost rate proposal shall be submitted no later than three (3) months after the date of contract award.

c. Invoices - Cost and Personnel Reporting, and Variances from the Negotiated Budget

1. The Contractor agrees to provide a detailed breakdown on invoices of the following cost categories:

a. Direct Labor - List individuals by name, title/position, hourly/annual rate, level of effort, and amount claimed.

b. Fringe Benefits - Cite rate and amount

c. Overhead - Cite rate and amount

d. Materials & Supplies - Include detailed breakdown when total amount is over $1,000.

e. Travel - Identify travelers, dates, destination, purpose of trip, and amount. Cite COA, if appropriate. List separately, domestic travel, general scientific meeting travel, and foreign travel.

f. Consultant Fees - Identify individuals and amounts.

g. Subcontracts - Attach subcontractor invoice(s).

h. Equipment - Cite authorization and amount.

i. G&A - Cite rate and amount.

j. Total Cost

- 6 -

k. Fixed Fee

l. Total CPFF

Monthly invoices must include the cumulative total expenses to date, adjusted (as applicable) to show any amounts suspended by the Government.

2. The Contractor agrees to immediately notify the Contracting Officer in writing if there is an anticipated overrun (any amount) or unexpended balance (greater than 10 percent) of the amount allotted to the contract, and the reasons for the variance. Also refer to the requirements of the Limitation of Funds and Limitation of Cost Clauses in the contract.

d. Non-Personal Services and Inherently Government Functions

1. Pursuant to FAR 37.1, no personal services shall be performed under this contract. All work requirements shall flow only from the Contracting Officer's Representative (COR) to the Contractor's Project Manager. No Contractor employee will be directly supervised by the Government. All individual employee assignments, and daily work direction, shall be given by the applicable employee supervisor. If the Contractor believes any Government action or communication has been given that would create a personal services relationship between the Government and any Contractor employee, the Contractor shall promptly notify the Contracting Officer of this communication or action.

2. Pursuant to FAR 7.5, the Contractor shall not perform any inherently Governmental actions under this contract.

No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative. No Contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work. In all communications with other Government contractors in connection with this contract, the Contractor employee shall state that they have no authority to in any way change the contract and that if the other contractor believes this communication to be a direction to change their contract, they should notify the Contracting Officer for that contract and not carry out the direction until a clarification has been issued by the Contracting Officer.

3. The Contractor shall insure that all of its employees working on this contract are informed of the substance of this article. Nothing in this article shall limit the Government's rights in any way under the other provisions of the contract, including those related to the Government's right to inspect and accept the services to be performed under this contract. The substance of this article shall be included in all subcontracts at any tier.

e. Confidential Treatment of Sensitive Information

The Contractor shall guarantee strict confidentiality of the information/data that it is provided by the Government during the performance of the contract. The Government has determined that the information/data that the Contractor will be provided during the performance of the contract is of a sensitive nature. Disclosure of the information/data, in whole or in part, by the Contractor can only be made after the Contractor receives prior written approval from the Contracting Officer. Whenever the Contractor is uncertain with regard to the proper handling of information/data under the contract, the Contractor shall obtain a written determination from the Contracting Officer.

f. Contract Number Designation On all correspondence submitted under this contract, the Contractor agrees to clearly identify the contract number that appears on the face page of the contract as follows:

Contract No. HHSN2722019000XXI

- 7 -

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

ARTICLE C.1. STATEMENT OF WORK

a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated 6/4/2018, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).

ARTICLE C.2. REPORTING REQUIREMENTS

All reports required herein shall be submitted in electronic format.

All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."

a. Technical Progress Reports

1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award. [Note: Beginning May 25, 2008, the Contractor shall include the applicable PubMed Central or NIH Manuscript Submission reference number when citing publications that arise from its NIH funded research.]

For proposal preparation purposes only, it is estimated that in addition to the required electronic version(s) 0 hard copies of these reports will be required as follows:

[ ] Monthly [ ] Quarterly [X] Semi-Annually [X] Annually [X] Annually (with a requirement for a Draft Annual Report) [X] Final - Upon final completion of the contract [X] Final - Upon final completion of the contract (with a requirement for a Draft Final Report)

2. Summary of Salient Results

The Contractor will be required to prepare and submit, with the final report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract. This report will be required on or before the expiration date of the contract.

b. Other Reports/Deliverables

1. Source Code and Object Code http://www.hhs.gov/web/508/index.html

- 8 -

Unless otherwise specified herein, the Contractor shall deliver to the Government, upon the expiration date of the contract, all source code and object code developed, modified, and/or enhanced under this contract.

2. Multiple Principal Investigators Leadership Plan The Contractor shall submit a revised/updated Leadership Plan in the event of a change in any of the Principal Investigators named in the Key Personnel Article in SECTION G of this contract. The revised plan is subject to review and approval by the Contracting Officer.

3. REPORTING REQUIREMENTS FOR USE WITH THE ELECTRONIC REPORT DELIVERABLE

SUBMISSION (eRDS) SITE

All reports required herein shall be submitted in electronic format. All electronic contract deliverables shall be submitted via the NIAID electronic Report Deliverable Submission (eRDS) Site, available at the following website: https://erds.niaid.nih.gov/. All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at http://www.hhs.gov/web/508/index.html under "Making Files Accessible."

ARTICLE C.3. INVENTION REPORTING REQUIREMENT

All reports and documentation required by FAR Clause 52.227-11, Patent Rights-Ownership by the Contractor including, but not limited to, the invention disclosure report, the confirmatory license, and the Government support certification, shall be directed to the Division of Extramural Inventions and Technology Resources (DEITR), OPERA, OER, NIH, 6705 Rockledge Drive, Suite 310, MSC 7980, Bethesda, Maryland 20892-7980 (Telephone: 301-435-1986). In addition, one copy of an annual utilization report, and a copy of the final invention statement, shall be submitted to the Contracting Officer. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted to the Contracting Officer on the expiration date of the contract.

The first annual utilization report shall be due on or before 9/8/2020. Thereafter, reports shall be due on or before the 1st Calendar day following the reporting period. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted on the expiration date of the contract. All reports shall be sent to the following address:

Contracting Officer National Institutes of Health National Institute of Allergy and Infectious Diseases Office of Acquisitions 5601 Fishers Lane Bethesda, Maryland 20892-9822

If no invention is disclosed or no activity has occurred on a previously disclosed invention during the applicable reporting period, a negative report shall be submitted to the Contracting Officer at the address listed above.

To assist contractors in complying with invention reporting requirements of the clause, the NIH has developed "Interagency Edison," an electronic invention reporting system. Use of Interagency Edison is required as it streamlines the reporting process and greatly reduces paperwork. Access to the system is through a secure interactive Web site to ensure that all information submitted is protected. Interagency Edison and information relating to the capabilities of the system can be obtained from the Web ( http://www.iedison.gov), or by contacting the Extramural Inventions and Technology Resources Branch, OPERA, NIH.

http://www.iedison.gov

- 9 -

SECTION D - PACKAGING, MARKING AND SHIPPING

All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.

ARTICLE D.1. PACKAGING

ARTICLE D.2. MARKING

ARTICLE D.3. SHIPPING

- 10 -

SECTION E - INSPECTION AND ACCEPTANCE

a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.

b. For the purpose of this SECTION, TBD is the authorized representative of the Contracting Officer.

c. Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.

d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.

FAR Clause 52.246-7, Inspection of Research and Development - Fixed Price (August 1996).

FAR Clause 52.246-8, Inspection of Research and Development - Cost-Reimbursement (May 2001).

Alternate I (April 1984) is not applicable to this contract.

FAR Clause 52.246-9, Inspection of Research and Development (Short Form) (April 1984).

- 11 -

SECTION F - DELIVERIES OR PERFORMANCE

ARTICLE F.1. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY

1998)

This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:

52.242-15, Stop Work Order (August 1989)

Alternate I (April 1984) is applicable to this contract.

https://www.acquisition.gov/?q=browsefar

- 12 -

SECTION G - CONTRACT ADMINISTRATION DATA

ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)

The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:

TBD

The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the Statement of Work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.

The alternate COR is responsible for carrying out the duties of the COR only in the event that the COR can no longer perform his/her duties as assigned.

The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract

The Government may unilaterally change its COR designation.

ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)

The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.

(End of Clause)

The following individual(s) is/are considered to be essential to the work being performed hereunder:

Name Title

TBD

ARTICLE G.3. METHOD OF ORDERING

a. Orders issued under this contract may be placed as follows:

[ ] in writing

- 13 -

[ ] via telephone

[ ] via facsimile (fax)

[X] via electronic mail (e-mail)

[ ] Oral [Oral Orders will be confirmed in writing within days of issuance.

[ ] Other Specify:

b. The Contracting Officer is authorized to issue orders and provide written confirmation of oral orders, if applicable, under the contract.

c. Fair Opportunity

1. In accordance with FAR 16.505(b)(1)(i), each awardee will be given a fair opportunity to be considered for each order issued over $3,500 unless the following exception(s) apply:

i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.

iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

iv. It is necessary to place an order to satisfy a minimum guarantee.

2. All awardees will be given a fair opportunity to be considered in accordance with the FAR as follows:

i. For orders exceeding $3,500 up to the simplified acquisition threshold, in accordance with FAR 16.505(b)(1)(ii);

ii. For orders exceeding the simplified acquisition threshold up to $5.5 Million, in accordance with 16.505(b)(1)(iii); and,

iii. For orders exceeding $5.5 Million, in accordance with FAR 16.505(b)(1)(iv).

ARTICLE G.4. TASK ORDER PROCEDURE

This contract provides for the issuance of Task Orders on a negotiated basis as follows:

a. General

Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.

No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.

b. Requesting Task Order Proposals.

- 14 -

The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.

Generally, the Task Order Request for Proposal (TORFP) will include but is not limited to the following:

1. Statement of Work;

2. Reporting Requirements and Deliverables;

3. Proposal Due Date and Location to Deliver Proposals;

4. Period of Performance of Task Order;

5. Anticipated type of Task Order;

6. Technical Proposal Instructions;

7. Business proposal Instructions

8. Evaluation Factors for Award

All contract clauses contained this contract shall be incorporated in the TORFP and the resultant task order.

If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.

Contractors are not required to propose on all TORFPs. Those eligible Contractors that decide not to submit a proposal shall advise the Contracting Officer, in writing, of their intention not to submit a proposal on or before the closing date and time established in the TORFP. An election not to propose on a given TORFP will not negatively affect or prohibit a Contractor from competing on future TORFPs. However, it may affect the Contractor's eligibility for continuations or extensions of the resultant Task Order.

c. Competitive Ordering Process.

1. All Contractors within a technical area will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of this contract unless otherwise specified in the proposed task order.

2. Contractors will be provided an adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part 16. Each TORFP will indicate the criteria for the evaluation of proposals. The responses shall demonstrate capability for each criterion to be evaluated.

Generally, the Contractor will be asked to demonstrate the following as appropriate:

• Understanding of the requirements;

• Experience and capability on similar tasks;

• Technical approach, methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies.

• Procedures for assuring quality of work, products, and deliverables;

• Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);

• Staffing plan with skill levels and level of effort for each individual proposed. Generally, resumes will be required for proposed personnel (if not previously submitted);

• References to evaluate past performance; and

- 15 -

• Cost/Price to perform the task order.

d. Evaluation and Award of Task Order Proposals

The Government will evaluate the Task Order proposals against the requirements of the TORFP.

Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, technical factors will be significantly more important than cost or price However, each TORFP will specify how the award decision will be made.

Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor whose proposal is most advantageous to the government

The Contracting Officer will notify the Contractor(s) of the selection decision in writing.

e. Fair Opportunity

1. In accordance with FAR 16.505(b)(1)(i), each awardee will be given a fair opportunity to be considered for each order issued over $3,500 unless the following exception(s) apply:

i. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.

iii. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

iv. It is necessary to place an order to satisfy a minimum guarantee.

2. All awardees will be given a fair opportunity to be considered in accordance with the FAR as follows:

i. For orders exceeding $3,500 up to the simplified acquisition threshold, in accordance with FAR 16.505(b)(1)(ii);

ii. For orders exceeding the simplified acquisition threshold up to $5.5 Million, in accordance with 16.505(b)(1)(iii); and,

iii. For orders exceeding $5.5 Million, in accordance with FAR 16.505(b)(1)(iv).

ARTICLE G.5. INVOICE SUBMISSION/CONTRACT FINANCING REQUEST AND CONTRACT

FINANCIAL REPORT

a. Invoice Submission/Contract Financing Request and Contract Financial Reporting, NIH(RC)-4for NIH Cost- Reimbursement Type Contracts are attached and made part of this contract. The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.

1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.

a. The original invoice shall be submitted to the following designated billing office:

- 16 -

National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500

b. One copy of the invoice shall be submitted to the following approving official:

Alice Sobsey Contract Specialist

NIAID/NIH/HHS

5601 Fishers Lane Room 3B29

MSC 9822

Rockville, MD 20892- 9822

E-mail: alice.sobsey@nih.gov

The Contractor shall submit an electronic copy of the payment request to the approving official instead of a paper copy. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.

[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]

Central Point of Distribution: OAInvoices@mail.nih.gov

The Contractor shall submit an electronic copy of the payment request to the Central Point of Distribution mailbox. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.

[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]

2. In addition to the requirements specified in FAR 32.905 for a proper invoice, the Contractor shall include the following information on the face page of all payment requests:

a. Name of the Office of Acquisitions. The Office of Acquisitions for this contract is National Institute of Allergy and Infectious Diseases.

b. Federal Taxpayer Identification Number (TIN). If the Contractor does not have a valid TIN, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.

c. DUNS or DUNS+4 Number. The DUNS number must identify the Contractor's name and address exactly as stated in the contract and as registered in the Central Contractor Registration (CCR) database. If the Contractor does not have a valid DUNS number, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.

d. Invoice Matching Option. This contract requires a two-way match.

- 17 -

e. Unique Invoice Number. Each payment request must be identified by a unique invoice number, which can only be used one time regardless of the number of contracts or orders held by an organization.

f. The Contract Title is: LID

g. PRISM/NBS Line Item Number and associated PRISM/NBS Line Item Period of Performance

b. Inquiries regarding payment of invoices shall be directed to the designated billing office, (301) 496-6452.

c. The Contractor shall include the following certification on every invoice for reimbursable costs incurred with Fiscal Year funds subject to HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of this contract.

For billing purposes, certified invoices are required for the billing period during which the applicable Fiscal Year funds were initially charged through the final billing period utilizing the applicable Fiscal Year funds:

"I hereby certify that the salaries charged in this invoice are in compliance with HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of the above referenced contract."

ARTICLE G.6. INDIRECT COST RATES

In accordance with Federal Acquisition Regulation (FAR) (48 CFR Chapter 1) Clause 52.216-7 (d)(2), Allowable Cost and Payment incorporated by reference in this contract in PART II, SECTION I, the cognizant Contracting Officer representative responsible for negotiating provisional and/or final indirect cost rates is identified as follows:

Director, Division of Financial Advisory Services Office of Acquisition Management and Policy National Institutes of Health

6011 EXECUTIVE BLVD, ROOM 549C, MSC-7663

BETHESDA MD 20892-7663

These rates are hereby incorporated without further action of the Contracting Officer.

ARTICLE G.7. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE

a. Contractor Performance Evaluations

Interim and Final evaluations of Contractor performance will be prepared on this contract in accordance with FAR Subpart 42.15. The Final performance evaluation will be prepared at the time of completion of work. In addition to the Final evaluation, Interim evaluation(s) will be prepared Annually as follows on December 31 each year.

Interim and Final evaluations will be provided to the Contractor as soon as practicable after completion of the evaluation. The Contractor will be permitted thirty days to review the document and to submit additional information or a rebutting statement. If agreement cannot be reached between the parties, the matter will be referred to an individual one level above the Contracting Officer, whose decision will be final.

Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.

b. Electronic Access to Contractor Performance Evaluations

Contractors may access evaluations through a secure Web site for review and comment at the following address:

- 18 -http://www.cpars.gov http://www.cpars.gov

- 19 -

SECTION H - SPECIAL CONTRACT REQUIREMENTS

ARTICLE H.1. HUMAN SUBJECTS

It is hereby understood and agreed that research involving human subjects shall not be conducted under this contract, and that no material developed, modified, or delivered by or to the Government under this contract, or any subsequent modification of such material, will be used by the Contractor or made available by the Contractor for use by anyone other than the Government, for experimental or therapeutic use involving humans without the prior written approval of the Contracting Officer.

ARTICLE H.2. HUMAN SUBJECTS

Research involving human subjects shall not be conducted under this contract until the protocol developed in Phase I has been approved by NIAID, written notice of such approval has been provided by the Contracting Officer, and the Contractor has provided to the Contracting Officer a properly completed "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263 (formerly Optional Form 310) certifying IRB review and approval of the protocol. The human subject certification can be met by submission of the Contractor's self designated form, provided that it contains the information required by the "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263 (formerly Optional Form 310).

When research involving Human Subjects will take place at collaborating sites or other performance sites, the Contractor shall obtain, and keep on file, a properly completed "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263 (formerly Optional Form 310) certifying IRB review and approval of the research.

ARTICLE H.3. REQUIRED EDUCATION IN THE PROTECTION OF HUMAN RESEARCH

PARTICIPANTS

NIH policy requires education on the protection of human subject participants for all investigators receiving NIH contract awards for research involving human subjects. For a complete description of the NIH Policy announcement on required education in the protection of human subject participants, the Contractor should access the NIH Guide for Grants and Contracts Announcement dated June 5, 2000 at the following website:

http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-039.html.

The information below is a summary of the NIH Policy Announcement:

The Contractor shall maintain the following information: (1) a list of the names and titles of the principal investigator and any other individuals working under the contract who are responsible for the design and/or conduct of the research; (2) the title of the education program(s) in the protection of human subjects that has been completed for each named personnel and; (3) a one sentence description of the educational program(s) listed in (2) above. This requirement extends to investigators and all individuals responsible for the design and/or conduct of the research who are working as subcontractors or consultants under the contract.

Prior to any substitution of the Principal Investigator or any other individuals responsible for the design and/or conduct of the research under the contract, the Contractor shall provide the following written information to the Contracting Officer: the title of the education program and a one sentence description of the program that has been completed by the replacement.

ARTICLE H.4. DATA AND SAFETY MONITORING IN CLINICAL TRIALS

The Contractor is directed to the full text of the NIH Policy regarding Data and Safety Monitoring and Reporting of Adverse Events, which may be found at the following web sites:

http://grants.nih.gov/grants/guide/notice-files/not98-084.html http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-039.html http://grants.nih.gov/grants/guide/notice-files/not98-084.html

- 20 -http://grants.nih.gov/grants/guide/notice-files/not99-107.html http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-038.html

The Contractor must comply with the NIH Policy cited in these NIH Announcements and any other data and safety monitoring requirements found elsewhere in this contract.

Data and Safety Monitoring shall be performed in accordance with the approved Data and Safety Monitoring Plan.

The Data and Safety Monitoring Board shall be established and approved prior to beginning the conduct of the clinical trial.

ARTICLE H.5. REGISTRATION AND RESULTS REPORTING FOR APPLICABLE CLINICAL

TRIALS IN CLINICALTRIALS.GOV

The Food and Drug Administration Amendments Act of 2007 (FDAAA) at: http://frwebgate.access.gpo.gov/cgi-bin/ getdoc.cgi?dbname=110_cong_public_laws&docid=f:publ085.110.pdf, Title VIII, expands the National Institutes of Health's (NIH's) clinical trials registry and results database known as ClinicalTrials.gov and imposes new requirements that apply to specified "applicable clinical trials," including those supported in whole or in part by NIH funds. FDAAA requires:

• the registration of certain "applicable clinical trials" (see Definitions at: http://grants.nih.gov/ClinicalTrials_fdaaa/ definitions.htm) in ClinicalTrials.gov no later than 21 days after the first subject is enrolled; and

• the reporting of summary results information (including adverse events) no later than 1 year after the completion date (See Definitions at link above) for registered applicable clinical trials involving drugs that are approved under section 505 of the Food, Drug and Cosmetic Act (FDCA) or licensed under section 351 of the PHS Act, biologics, or of devices that are cleared under section 510k of FDCA.

In addition, the Contractor shall notify the Contracting Officer's Representative (COR), with the trial registration number (NCT number), once the registration is accomplished. This notification may be included in the Technical Progress Report covering the period in which registration occurred, or as a stand alone notification.

The Contractor is the Sponsor, therefore the "Responsible Party" for the purposes of compliance with FDAAA which includes registration (and results reporting, if required) of applicable clinical trial(s) performed under this contract in the Government database, ClinicalTrials.gov ( http://www.ClinicalTrials.gov).

Additional information is available at: http://prsinfo.clinicaltrials.gov .

ARTICLE H.6. HUMAN MATERIALS

The acquisition and supply of all human specimen material (including fetal material) used under this contract shall be obtained by the Contractor in full compliance with applicable State and Local laws and the provisions of the Uniform Anatomical Gift Act in the United States, and no undue inducements, monetary or otherwise, will be offered to any person to influence their donation of human material.

ARTICLE H.7. HUMAN MATERIALS (ASSURANCE OF OHRP COMPLIANCE)

The acquisition and supply of all human specimen material (including fetal material) used under this contract shall be obtained by the Contractor in full compliance with applicable State and Local laws and the provisions of the Uniform Anatomical Gift Act in the United States, and no undue inducements, monetary or otherwise, will be offered to any person to influence their donation of human material.

The Contractor shall provide written documentation that all human materials obtained as a result of research involving human subjects conducted under this contract, by collaborating sites, or by subcontractors identified under this contract, were obtained with prior approval by the Office for Human Research Protections (OHRP) of an Assurance to comply with the requirements of 45 CFR 46 to protect human research subjects. This restriction applies to all http://grants.nih.gov/grants/guide/notice-files/not99-107.html http://grants.nih.gov/grants/guide/notice-files/NOT-OD-00-038.html http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_public_laws&docid=f:publ085.110.pdf http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_public_laws&docid=f:publ085.110.pdf http://grants.nih.gov/ClinicalTrials_fdaaa/definitions.htm http://grants.nih.gov/ClinicalTrials_fdaaa/definitions.htm http://www.ClinicalTrials.gov http://prsinfo.clinicaltrials.gov

- 21 -collaborating sites without OHRP-approved Assurances, whether domestic or foreign, and compliance must be ensured by the Contractor.

Provision by the Contractor to the Contracting Officer of a properly completed "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263(formerly Optional Form 310), certifying IRB review and approval of the protocol from which the human materials were obtained constitutes the written documentation required. The human subject certification can be met by submission of a self-designated form, provided that it contains the information required by the "Protection of Human Subjects Assurance Identification/IRB Certification/Declaration of Exemption", Form OMB No. 0990-0263(formerly Optional Form 310).

ARTICLE H.8. RESEARCH INVOLVING HUMAN FETAL TISSUE

All research involving human fetal tissue shall be in conducted in accordance with the Public Health Service Act, 42 U.S.C. 289g-1 and 289g-2. Implementing regulations and guidance for conducting research on human fetal tissue may be found at 45 CFR 46, Subpart B and http://grants1.nih.gov/grants/guide/notice-files/not93-235.html and any subsequent revisions to this NIH Guide to Grants and Contracts ("Guide") Notice.

The Contractor shall make available, for audit by the Secretary, HHS, the physician statements and informed consents…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .