1938554_Statement_of_Work.pdf
PDF 72 KB Posted
- Attached to
- BD Equipment Maintenance Federal contract opportunity
- Solicitation number
- NIAID-RFQ19-1938554
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAR_52_212_5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Equipment Maintenance
A. Background Information
The Laboratory of Systems Biology (LSB) investigates basic aspects of innate and adaptive immune function, with an emphasis on how the body, and more specifically, different cell types within the body discriminate between self and non-self. This discrimination is the crucial mechanism by which the body patrols itself and is able to respond appropriately upon infection by a microorganism. Using computational biological approaches coupled with more traditional biological experimentation, the LSB strives to build models of how the individual cells comprising the immune system play their part in differentially responding to the varied immunological stimuli presented to them by the myriad of known pathogens. These models allow us to make informed predictions as to how the body will respond when challenged by, for example, a novel vaccine.
In order to study this it is imperative to know which cell types are present in a given experimental sample and the LSR Fortessa and accompanying Facs Flow Supply System allow us to discriminate between these cell types by analyzing markers on the cell surfaces which are indicative-of-and-unique-to specific cell types. This acquisition is to continue the maintenance agreement to keep this equipment functioning properly.
The Laboratory of Systems Biology (LSB) currently owns the LSR Fortessa and Facs Flow Supply System. In order to maintain the integrity of on-going research it is imperative that this equipment be maintained in fully operational status. This maintenance agreement will protect the investment of the laboratory in both the equipment and the research in progress.
List of equipment requiring service is as follows:
The period of performance for this requirement will be as follows:
Base Year: January 21, 2019 through January 20, 2020 Option Year 1: January 21, 2020 through January 20, 2021 Option Year 2: January 21, 2021 through January 20, 2022
Option Year 3: January 21, 2022 through January 20, 2023 Option Year 4: January 21, 2023 through January 20, 2024
B. Contractor Requirements – On-Site – Shall provide the following service
Service Contract-LSRFortessa with one Computer Workstation (excluding lasers and printers):
Two (2) Preventive Maintenance (PM) Inspections to be performed during a 12-month period Two (2) PM Kits will be provided Software revisions that are released during the contract term
# Description Material Number Serial Number Quantity
1 Svc Cont LSRFortessa SORP (No Lasers) 647177 H64717700055 1
2 Svc Cont SAPPHIRE 488‐200 Blue Lsr 339489 NO‐SERIAL‐7447 1
3 Svc Cont Cube 637‐150 Red Lsr 653542 NO‐SERIAL‐7448 1
4 Svc Cont SAPPHIRE 561‐150 Yellow Lsr 648702 NO‐SERIAL‐7449 1
5 Svc Cont COMP 405‐100 Violet Lsr 643914 NO‐SERIAL‐7450 1
6 Svc Cont LIGHTWAVE XYCTE 355‐60 UV Lsr 345312 NO‐SERIAL‐7451 1
7 Svc Cont FACS Flow Supply System 349277 N3332 1
Manufacturer is Becton, Dickinson, and Company
Unlimited service visits during the term of this contract, Monday through Friday, excluding Federal holidays
Every reasonable effort will be made to respond to a request for emergency on-site service (Monday through Friday, excluding holidays) within 48 hours.
Unlimited telephone support for instruments, reagents, and applications will be provided at no additional charge
Includes labor, travel expenses, and parts (excluding consumables).
C. Government Responsibilities
The Government will supply no materials.
D. Inspection and Acceptance Requirements
All work will be inspected and approved by a Government approving official at the completion of the job.
All work shall be completed in accordance with industry standards.
File details come from the government source that posted it.