This Invitation for Bids (IFB No. 2027-FE01) is issued by New Heights Charter School of Brockton, a Massachusetts-based educational institution, for a Front Entry Enhancement Project rebid following a prior procurement where submitted bids exceeded the available construction budget. The project involves furnishing all labor, materials, equipment, permits, inspections, bonds, insurance, and incidental services necessary to complete a comprehensive front entrance enhancement at the school's campus located at 1690 Main Street, Brockton, Massachusetts. The scope includes decorative brick entrance walls and pillars with natural granite caps, reinforced concrete entrance walks and plaza, commercial black powder-coated aluminum ornamental fencing and gates, a complete automatic irrigation system, full sod and topsoil restoration, specimen trees with a reduced planting palette, strategic low-voltage landscape lighting, owner-furnished Peace Pole installation, and complete site restoration and closeout. The mandatory pre-bid site visit is scheduled for Monday, November 30, 2026 at 10:00 a.m. ET, with the deadline for written questions also on November 30, 2026 at 3:00 p.m. ET. Sealed bids are due Wednesday, December 2, 2026 at 10:00 a.m. ET, with public bid opening immediately following at 10:15 a.m. ET. Notice of Award is targeted for Friday, December 4, 2026, and contract execution is targeted no later than Friday, January 8, 2027. Construction is anticipated to commence Monday, April 19, 2027, with Substantial Completion required by Friday, May 28, 2027 and Final Completion by Friday, June 4, 2027. The contract will be firm fixed-price with lump-sum pricing for the complete turnkey scope.

The board-approved construction budget is approximately $195,000, representing the maximum available funding, and the School reserves the right to reject all bids if pricing exceeds this amount. Award will be made to the lowest responsive and responsible bidder meeting all mandatory requirements in accordance with applicable Massachusetts public procurement and construction requirements. The project is subject to Massachusetts prevailing-wage requirements, with current wage rates incorporated via Department of Labor Standards Wage Request No. 20261109140834, issued November 10, 2026. Contractors must provide a 100% Performance Bond and 100% Payment Bond, maintain minimum Commercial General Liability insurance of $1,000,000 per occurrence/$2,000,000 aggregate, Automobile Liability of $1,000,000 combined single limit, and statutory Workers' Compensation coverage. Mandatory bid submission requirements include signed cover letter, Mandatory Compliance Checklist, Bid Price Form, Construction Schedule Certification, detailed Schedule of Values, technical approach, Contractor Qualifications and References (at least three comparable projects within five years), Proposed Major Subcontractors, evidence of licenses, insurance documentation, bid deposit/bond documentation, Required Certifications, warranty information, Bidder Acknowledgment, and the 2026-2027 School Calendar. No set-aside provisions are specified in this solicitation. The value-engineered rebid scope retains key architectural and functional features while reducing costs through material substitutions, including commercial concrete curbing instead of quarried granite, finished concrete plaza instead of interlocking pavers, and commercial aluminum fencing instead of heavy ornamental iron, while maintaining automatic irrigation, decorative masonry with granite caps, sod restoration, and Peace Pole installation as mandatory requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB No. 2027-FE01 | Front Entry Enhancement Project

New Heights Charter School of Brockton | 1690 Main Street, Brockton, MA 02301

INVITATION FOR BIDS

IFB No. 2027-FE01

FRONT ENTRY ENHANCEMENT PROJECT

REVISED TURNKEY SCOPE

Board-Approved Construction Budget: $195,000

Bid Due: Wednesday, December 2, 2026 at 10:00 a.m. ET

Issued by: New Heights Charter School of Brockton

1690 Main Street, Brockton, Massachusetts 02301

Procurement Officer: Dr. Delroy Dennis, MCPPO | Director of Operations

IMPORTANT PROCUREMENT NOTICE

New Heights Charter School of Brockton (NHCSB) is rebidding the Front Entry Enhancement Project following a prior procurement in which submitted pricing exceeded the School's available construction budget. This solicitation incorporates a revised, value-engineered scope intended to preserve the principal architectural, functional, landscape, and visual features of the original design while achieving greater cost efficiency.

The successful Contractor shall provide a complete turnkey project for the lump-sum bid submitted.

Bidders shall not condition their bid upon future deletion of required work, substitution of unspecified materials, or post-award renegotiation of the advertised scope.

BUDGET AND SCOPE NOTICE

The School's estimated available construction budget is approximately $195,000. The stated budget does not authorize bidders to omit mandatory work. Each bidder must submit a firm price for the complete advertised scope. NHCSB reserves the right to reject all bids if pricing exceeds available funding.

Decorative brick entrance walls and pillars with natural granite wall caps.

Reinforced concrete entrance walks and entrance plaza.

Commercial black powder-coated aluminum ornamental fencing and gates.

Complete automatic irrigation system.

Full sod and topsoil restoration.

Specimen trees and a reduced but intentional planting palette of shrubs, ornamental grasses, and perennials.

Strategic low-voltage landscape lighting at primary focal areas.

Owner-furnished Peace Pole installation.

Complete site restoration, cleanup, warranties, as-built documentation, and closeout.

Key Item Posting Information IFB Number 2027-FE01

Procurement Front Entry Enhancement Project - Revised Turnkey Scope

Project Location 1690 Main Street, Brockton, MA 02301

Estimated Construction Budget $195,000 (Board-approved maximum available construction budget)

Award Method Lowest responsive and responsible bidder meeting all mandatory requirements

Bid Type Firm Fixed-Price Turnkey

Prevailing Wage Required - DLS Wage Request No. 20261109140834, issued November 10, 2026

Mandatory Site Visit Yes Bid Submission Electronic submission through COMMBUYS

Point of Contact Dr. Delroy Dennis, MCPPO | ddennis@nhcsb.org | (508) 857-5721 ext. 1361

TABLE OF CONTENTS

1. Notice to Bidders

2. Procurement Schedule

3. Project Background and Objectives

4. Revised Turnkey Scope

5. Mandatory Technical Specifications

6. Value-Engineered Material Standards

7. Landscape, Irrigation and Lighting Requirements

8. Site Visit and Existing Conditions

9. Schedule and Completion Requirements

10. Prevailing Wage, Bonds and Insurance

11. Bid Submission Requirements

12. Responsiveness and Responsibility

13. Bid Opening, Evaluation and Award

14. Contract Terms

15. Project Administration, Changes and Closeout

16. Attachments and Appendices

Appendix A - Mandatory Compliance Checklist

Appendix B - Bid Price Form

Appendix C - Construction Schedule Certification

Appendix D - Contractor Qualifications & References

Appendix E - Proposed Major Subcontractors

Appendix F - Required Certifications

Appendix G - Draft Contract Agreement

Appendix H - Revised Mandatory Landscape Plant Schedule

Appendix I - Current Department of Labor Standards Prevailing Wage Schedule

Appendix J - School Logo Artwork

Appendix K - Bidder Acknowledgment Appendix L - 2026-2027 NHCSB School Calendar

1. NOTICE TO BIDDERS

New Heights Charter School of Brockton (the "Awarding Authority") invites sealed bids from qualified and experienced site-construction contractors for the Front Entry Enhancement Project - Revised Turnkey Scope at its campus located at 1690 Main Street, Brockton, Massachusetts 02301.

The Work under this Contract consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, inspections, testing, temporary facilities, protection, coordination, closeout services, and all incidental work necessary to provide a complete and operational front entrance enhancement in accordance with the Contract Documents.

This solicitation contains clear mandatory requirements. The Contract will be awarded in accordance with applicable Massachusetts public procurement and public construction requirements to the lowest responsive and responsible bidder satisfying the material requirements of this IFB.

Submission of a bid constitutes the bidder's representation that it has:

Reviewed the complete Contract Documents and all issued Addenda.

Inspected the Project site and understands existing conditions affecting the Work.

Included the entire required turnkey scope in its lump-sum price.

Included all prevailing-wage obligations, permits, bonds, insurance, supervision, overhead, profit, testing, cleanup, warranties, and incidental items.

Committed to the required construction schedule and Substantial Completion date stated in the final procurement schedule.

Not omitted any required element unless expressly excluded by the Awarding Authority in writing.

2. PROCUREMENT SCHEDULE

The dates below shall be finalized in the COMMBUYS posting. If a date in COMMBUYS differs from a draft date shown elsewhere in the Contract Documents, the latest written Addendum or official COMMBUYS posting shall govern.

Milestone Date / Time

IFB Posted on COMMBUYS and NHCSB Website Wednesday, November 18, 2026 at 10:00 a.m. ET

Mandatory Pre-Bid Site Visit Monday, November 30, 2026 at 10:00 a.m. ET

Deadline for Written Questions Monday, November 30, 2026 at 3:00 p.m. ET

Responses / Addendum Tuesday, December 1, 2026 by 12:00 p.m. ET

Bids Due Wednesday, December 2, 2026 at 10:00 a.m. ET

Public Bid Opening Wednesday, December 2, 2026 at 10:15 a.m. ET

Responsiveness / Responsibility Review December 2-3, 2026

Notice of Award Target: Friday, December 4, 2026

Contract Execution Target: no later than Friday, January 8, 2027

Notice to Proceed Monday, April 19, 2027 - first day of April Break;

written NTP required before on-site work

Required Substantial Completion Friday, May 28, 2027 - material requirement

Final Completion / Closeout Friday, June 4, 2027

Priority Heavy-Construction Window April 19-23, 2027 (NHCSB April Break) - demolition, excavation, grading, trenching, concrete removal, Milestone Date / Time and foundation work prioritized

SCHEDULE CONTROL

The final Substantial Completion date will be a material requirement of the solicitation. Bidders must certify their ability to meet that date in Appendix C. A bid proposing a materially later completion date may be deemed nonresponsive.

3. PROJECT BACKGROUND AND OBJECTIVES

The existing front entrance serves as the primary gateway to the NHCSB campus for students, staff, families, visitors, and community partners. The School seeks to improve the entrance through coordinated masonry, pedestrian improvements, landscaping, irrigation, ornamental fencing, lighting, and site restoration.

The project was previously advertised under IFB #2026-FE01. Following receipt of bids exceeding available funding, NHCSB elected to revise and rebid the project using a value-engineered scope. The intent of this rebid is to reduce cost while preserving the principal design features, durability, safety, functionality, and visual identity of the original project.

4. REVISED TURNKEY SCOPE

4.1 Mobilization, Layout and Site Protection

Mobilization of labor, equipment, supervision, and materials.

Construction layout and field verification.

Temporary construction fencing, pedestrian barricades, and warning signage.

Protection of existing buildings, utilities, pavement, landscaping, and improvements designated to remain.

Traffic and pedestrian control appropriate to an occupied educational campus.

Temporary facilities and daily housekeeping.

4.2 Demolition and Disposal

Removal and lawful disposal of designated asphalt, pavement, concrete walkway, curbing, turf, landscape materials, and other improvements indicated for removal.

Protection of existing improvements designated to remain.

Lawful off-site disposal of construction debris and rubble.

4.3 Earthwork and Foundations

Excavation, grading, backfill, fill placement, compaction, and subgrade preparation.

Dense graded crushed-stone base where required.

Reinforced concrete footings and foundations for masonry walls, pillars, fencing, gates, and other required improvements.

Fine grading and restoration of disturbed areas.

4.4 Concrete and Hardscape

Reinforced concrete sidewalks and accessible pedestrian connections.

Commercial cast-in-place or precast concrete curbing at the main entrance in lieu of quarried granite curbing.

Four-inch reinforced finished concrete entrance plaza in lieu of interlocking unit pavers.

Concrete pads, transitions, edge conditions, and other concrete work required for a complete installation.

All concrete shall meet applicable design, strength, finish, reinforcement, accessibility, and durability requirements stated in the Technical Specifications.

4.5 Masonry - Preserved Architectural Scope

Decorative face-brick entrance walls.

Decorative brick entrance pillars.

Natural granite wall and pillar caps.

Concrete masonry units, reinforcing steel, ties, flashing, waterproofing, expansion joints, and related components.

All masonry dimensions and appearance shall follow the revised Contract Documents and design intent.

4.6 Ornamental Fencing and Gates

Commercial-grade black powder-coated aluminum fencing, approximately three feet high unless otherwise shown.

Decorative entry gates with commercial-grade hardware, anchorage, and accessories.

Fencing profile shall be appropriate for a prominent school entrance and shall not be substituted with chain link or residential-grade material.

4.7 Automatic Irrigation - Mandatory

Complete automatic irrigation system serving the revised landscape and turf areas.

Controller, valves, piping, heads, fittings, sleeves, testing, startup, adjustments, and winterization/operating instructions as applicable.

Hand watering by School staff is not an acceptable substitute for the required automatic irrigation system.

4.8 Landscape Installation - Reduced, Not Deleted

Specimen trees identified in the Revised Landscape Plant Schedule.

Selected foundation shrubs and ornamental shrubs.

Selected ornamental grasses and perennial plantings concentrated at key entrance, masonry, sign, and

Peace Pole focal areas.

Screened loam/topsoil, mulch, soil amendments, finish grading, and complete sod restoration.

Plant quantities and species shall conform to Appendix H. Substitutions require prior written approval.

4.9 Strategic Landscape Lighting - Mandatory

Low-voltage landscape lighting at primary entrance masonry/pillars, sign/entry focal areas, and selected Peace Pole or landscape focal areas shown in the revised lighting plan.

Fixtures, wiring, transformers, controls, mounting, testing, and commissioning.

The reduced lighting package is intended to preserve nighttime safety and presentation while controlling cost.

4.10 Peace Pole Installation

Install the Owner-furnished Peace Pole, including excavation, concrete foundation, anchorage, alignment, final grading, and restoration.

4.11 Testing, Closeout and Warranty

Required inspections and testing.

Manufacturer warranties and minimum one-year contractor workmanship warranty.

As-built drawings and final approved submittal record.

Irrigation operating instructions and landscape maintenance recommendations.

Final certified payroll reports.

Final cleanup, power washing where appropriate, punch-list completion, and Final Acceptance.

5. MANDATORY TECHNICAL SPECIFICATIONS

The following requirements are material pass/fail requirements unless the Awarding Authority expressly states otherwise. Failure to satisfy a mandatory requirement may result in rejection as nonresponsive.

Complete turnkey scope included with no undisclosed exclusions.

Firm fixed lump-sum base bid.

Required completion date accepted without qualification.

Masonry walls, entrance pillars, and natural granite caps included.

Reinforced concrete plaza, sidewalks, and commercial concrete curbing included.

Commercial black aluminum ornamental fencing and gates included.

Complete automatic irrigation included.

Revised specimen trees, shrubs, grasses, perennials, mulch, topsoil, and sod included exactly as scheduled.

Strategic low-voltage landscape lighting included.

Peace Pole installation included.

Prevailing-wage compliance included.

Required permits and inspections included.

Required bonds and insurance included.

Final cleanup, warranties, as-builts, maintenance documentation, and closeout included.

6. VALUE-ENGINEERED MATERIAL STANDARDS

The value-engineering decisions incorporated into this IFB have already been made by the Awarding Authority. Bidders shall price the scope exactly as advertised. No bidder may substitute additional scope reductions, material downgrades, or work deletions unless expressly authorized by written Addendum before bid opening.

Original Design Element Revised Mandatory Requirement Quarried granite entrance curbing Commercial cast-in-place or precast concrete curbing Interlocking unit-paver entrance plaza Four-inch reinforced finished concrete entrance plaza

Custom heavy ornamental iron fencing Commercial black powder-coated aluminum ornamental fencing

Full original landscape palette Revised reduced landscape palette per Appendix I Full landscape-lighting package Strategic focal-area landscape lighting Automatic irrigation RETAINED - complete automatic system required Decorative masonry and natural granite caps RETAINED Sod/topsoil restoration RETAINED Peace Pole installation RETAINED

7. LANDSCAPE, IRRIGATION AND LIGHTING REQUIREMENTS

Appendix H shall provide the exact revised plant quantities, sizes, and species to be priced by all bidders.

The revised schedule shall supersede the prior full planting schedule. The intent is to preserve a finished and visually intentional entrance, not to eliminate ornamental landscaping.

Landscape quantities shall be based only on the revised plant schedule issued with this IFB or by Addendum.

All plant material shall be nursery-quality, healthy, properly sized, and installed in accordance with recognized horticultural standards.

Automatic irrigation shall provide coverage appropriate to the revised landscape and sod areas.

Landscape lighting shall be limited to the strategic locations shown in the revised plans/specifications.

Bidders shall include establishment, startup, adjustment, and maintenance instructions required by the

Contract Documents.

8. SITE VISIT AND EXISTING CONDITIONS

A mandatory pre-bid site visit shall be conducted. Attendance by an authorized representative of each prospective bidder is required. The purpose is to verify dimensions, access, grades, utilities, drainage, demolition limits, staging, existing conditions, and other factors affecting the Work.

FIELD VERIFICATION

Bidders are responsible for verifying quantities, dimensions, access, grades, and existing site conditions before bidding. Failure to adequately investigate visible or reasonably observable conditions shall not constitute grounds for increasing the Contract Price after award.

Questions raised orally during the site visit are not binding. Any interpretation, clarification, correction, or modification to the Contract Documents will be issued only by written Addendum through COMMBUYS.

9. SCHEDULE AND COMPLETION REQUIREMENTS

Time is of the essence. The Contractor shall plan procurement, mobilization, staffing, and sequencing to achieve Substantial Completion no later than Friday, May 28, 2027, and Final Completion/Closeout no later than Friday, June 4, 2027. On-site construction is anticipated to commence Monday, April 19, 2027, at the beginning of NHCSB April Break (April 19-23, 2027), following written Notice to Proceed and suitable site/weather conditions.

The required Substantial Completion date of Friday, May 28, 2027 is a material requirement of this IFB.

The Contractor shall prioritize the most disruptive activities during April Break, including demolition, excavation, grading, trenching, concrete removal, footing/foundation work, and other heavy site operations. Work continuing after students return shall be phased to maintain a secure construction zone, safe pedestrian access, and uninterrupted school operations.

The bidder must submit Appendix C - Construction Schedule Certification.

The baseline construction schedule shall specifically identify the April 19-23, 2027 heavy-construction phase and the contractor's pedestrian, staff, visitor, and emergency-access plan for all work performed after April Break.

A detailed baseline construction schedule shall be submitted within five calendar days after Notice of Award or as otherwise directed.

The schedule shall identify mobilization, demolition, earthwork, foundations, concrete, masonry, fencing, irrigation, landscape installation, lighting, inspections, punch-list work, and final completion.

No material procurement, mobilization, or construction may begin before full contract execution and written Notice to Proceed.

Any requested time extension must be submitted in writing and approved by the Awarding Authority before the applicable milestone is missed.

10. PREVAILING WAGE, BONDS AND INSURANCE

10.1 Prevailing Wage

This Project is subject to applicable Massachusetts prevailing-wage requirements. A current Department of Labor Standards wage schedule shall be incorporated into the final posted IFB. The Contractor and all subcontractors shall pay applicable wage rates, submit certified payrolls and statements of compliance, maintain required payroll records, and comply with all posting and recordkeeping obligations.

10.2 Bonds

Bid deposit/bid bond: as required by applicable law and the final solicitation instructions.

Performance Bond: 100% of the Contract Price.

Payment Bond: 100% of the Contract Price.

10.3 Insurance

Coverage Minimum Commercial General Liability $1,000,000 each occurrence / $2,000,000 aggregate Automobile Liability $1,000,000 combined single limit Workers' Compensation Statutory Employers' Liability $500,000 or greater if required by contract review Umbrella / Excess $2,000,000

New Heights Charter School of Brockton shall be named as an Additional Insured where applicable.

Certificates and required endorsements shall be provided prior to contract execution. No Work shall commence until insurance has been reviewed and approved.

11. BID SUBMISSION REQUIREMENTS

Each bidder shall submit a complete bid package electronically through COMMBUYS in the manner stated in the official posting. The package shall include, at minimum:

1. Signed cover letter.

2. Appendix A - Mandatory Compliance Checklist.

3. Appendix B - Bid Price Form.

4. Appendix C - Construction Schedule Certification.

5. Detailed Schedule of Values.

6. Technical approach describing sequencing, staffing, subcontractor coordination, site protection, and execution of the complete scope.

7. Appendix D - Contractor Qualifications & References, including at least three comparable projects completed within the past five years.

8. Appendix E - Proposed Major Subcontractors.

9. Evidence of licenses and registrations required by law.

10. Insurance evidence.

11. Required bid deposit/bond documentation.

12. Appendix F - Required Certifications.

13. Warranty information.

14. Appendix K - Bidder Acknowledgment.

15. Appendix L - 2026-2027 NHCSB School Calendar.

16. Any other documentation specifically required by this IFB or Addenda.

12. RESPONSIVENESS AND RESPONSIBILITY

12.1 Responsiveness

A responsive bid complies with every material requirement of this IFB, including the complete turnkey scope, mandatory forms, certifications, price, construction schedule, and absence of material exceptions or conditions.

12.2 Responsibility

Adequate experience with commercial site construction, masonry, hardscape, irrigation, fencing, and landscape work of similar size and complexity.

At least five years of relevant experience or other qualification expressly accepted by the Awarding

Authority.

At least three comparable completed projects within the past five years.

Adequate staffing, supervision, equipment, subcontractor capability, and financial capacity.

Satisfactory references and performance history.

Ability to comply with prevailing wage, certified payroll, safety, permits, bonds, insurance, and schedule requirements.

Legally authorized to conduct business in the Commonwealth and not subject to any disqualifying debarment or suspension.

13. BID OPENING, EVALUATION AND AWARD

13.1 Public Bid Opening

Bids will be publicly opened at the date and time stated in the final Procurement Schedule and COMMBUYS posting. Bidder names and total bid prices will be announced and recorded.

13.2 Evaluation

NHCSB will review each bid for responsiveness and each bidder for responsibility. Mandatory requirements are pass/fail. NHCSB will not use post-opening subjective scoring to convert the IFB into a best-value procurement.

13.3 Award

Among bidders determined responsive and responsible, award shall be made in accordance with applicable Massachusetts procurement requirements to the lowest eligible bidder.

13.4 Clarifications and Rights Reserved

Request clarification of a bid without permitting a material change to price, scope, or schedule.

Verify references, qualifications, licenses, insurance, financial capacity, and subcontractor information.

Waive minor informalities where legally permitted.

Reject any or all bids when permitted and in the School's best interest.

Cancel or reissue the procurement.

Reject bids that are incomplete, conditional, materially unbalanced, nonresponsive, or submitted by a bidder determined not responsible.

14. CONTRACT TERMS

Term Requirement

Contract Price Firm fixed lump-sum price for complete performance of the revised turnkey scope.

Payment Progress payments based on accepted work and

Term Requirement approved payment applications.

Retainage As required by applicable law and the executed contract.

Changes Written Change Order approved by NHCSB before changed work is performed.

Prevailing Wage Full compliance, certified payroll, and statements of compliance required.

Warranty Minimum one-year workmanship warranty plus manufacturer warranties.

Permits Contractor to obtain and pay for permits, inspections, licenses, and approvals unless expressly stated otherwise.

Termination For default, failure to perform, or convenience as permitted by the final contract and applicable law.

Governing Law Commonwealth of Massachusetts.

15. PROJECT ADMINISTRATION, CHANGES AND CLOSEOUT

15.1 Pre-Construction Submittals

Baseline construction schedule.

Schedule of Values.

Shop drawings and product data.

Material and plant submittals.

Certificates of Insurance and required endorsements.

Performance and Payment Bonds.

Permit documentation.

Safety Plan and Traffic/Pedestrian Control Plan.

Irrigation and lighting submittals.

15.2 Changes

No change to the Work shall be made without prior written approval through an executed Change Order.

Work performed without authorization shall be at the Contractor's sole risk and expense and shall not entitle the Contractor to additional compensation or time.

15.3 Closeout

Final inspections and approvals.

Punch-list completion.

Manufacturer and contractor warranties.

As-built drawings.

Irrigation operating and winterization instructions.

Landscape maintenance recommendations.

Final certified payrolls and compliance documentation.

Final cleanup and restoration.

Final Acceptance by the Awarding Authority.

16. ATTACHMENTS AND APPENDICES

Appendix / Attachment Document

A Mandatory Compliance Checklist

B Bid Price Form

C Construction Schedule Certification

D Contractor Qualifications & References

E Proposed Major Subcontractors

F Required Certifications

G Draft Contract Agreement

H Revised Mandatory Landscape Plant Schedule

I Current Department of Labor Standards Prevailing Wage Schedule

J School Logo Artwork

K Bidder Acknowledgment

APPENDIX A - MANDATORY COMPLIANCE CHECKLIST

Mandatory Requirement Yes / No Bid Reference Complete turnkey revised scope included Firm fixed lump-sum price Required completion date accepted Masonry walls and entrance pillars included Natural granite wall/pillar caps included Reinforced concrete entrance plaza included Commercial concrete curbing included Black aluminum ornamental fencing/gates included Complete automatic irrigation included Revised specimen trees included Revised shrubs/perennials/grasses included Topsoil, mulch and sod restoration included Strategic landscape lighting included Peace Pole installation included Prevailing-wage compliance included Required bonds included Permits and inspections included Closeout and warranty requirements included

APPENDIX B - BID PRICE FORM

The undersigned Bidder agrees to furnish all labor, supervision, materials, equipment, tools, transportation, permits, inspections, testing, bonds, insurance, prevailing-wage compliance, closeout, and all other services necessary to complete the Front Entry Enhancement Project - Revised Turnkey Scope in accordance with the Contract Documents.

Description Amount

TOTAL TURNKEY BASE BID $____________________________

TOTAL BID IN WORDS: ______________________________________________________________________________

The Bidder certifies that the Total Base Bid includes the complete scope described by IFB #2027-FE01 and all Contract Documents. No required work, material, system, planting, irrigation, lighting, fencing, masonry, hardscape, permit, bond, insurance, prevailing-wage obligation, or incidental work necessary for a complete project has been excluded unless expressly identified by NHCSB in the Contract Documents.

Bidder Information Legal Company Name Business Address Authorized Representative Title Email Phone Signature Date

APPENDIX C - CONSTRUCTION SCHEDULE CERTIFICATION

Required Substantial Completion Date: Friday, May 28, 2027

The Bidder certifies that it has reviewed the required construction schedule and has sufficient personnel, equipment, subcontractors, material availability, procurement lead times, and supervision to achieve the required Substantial Completion date. The Bidder understands that the required completion date is a material requirement of the solicitation.

Certification Legal Company Name Authorized Representative Title Signature Date

APPENDIX D - CONTRACTOR QUALIFICATIONS & REFERENCES

Provide company qualifications and at least three comparable projects completed within the past five years.

Reference 1

Field Response Project / Client

Field Response Location Project Scope Contract Value Completion Date Client Contact Phone / Email

Reference 2

Field Response Project / Client Location Project Scope Contract Value Completion Date Client Contact Phone / Email

Reference 3

Field Response Project / Client Location Project Scope Contract Value Completion Date Client Contact Phone / Email

APPENDIX E - PROPOSED MAJOR SUBCONTRACTORS

Trade / Scope Subcontractor License / Registration Contact

APPENDIX F - REQUIRED CERTIFICATIONS

Independent Price Determination / Non-Collusion

The bidder certifies under penalties of perjury that its bid and prices were arrived at independently, in good faith, and without collusion or agreement intended to restrict competition.

Company Authorized Representative Signature Date

Massachusetts Tax Compliance

The bidder certifies under penalties of perjury that it is in compliance with applicable Massachusetts tax laws and authorizes verification where permitted.

Company Authorized Representative Signature Date

Debarment / Eligibility

The bidder certifies that neither it nor its principals is presently debarred, suspended, or otherwise ineligible to contract, except as disclosed in writing.

Company Authorized Representative Signature Date

Prevailing Wage Compliance

The bidder acknowledges the prevailing-wage requirements applicable to the Project and agrees to comply with wage, certified payroll, statement-of-compliance, posting, and recordkeeping obligations.

Company Authorized Representative Signature Date

Complete Scope Certification

The bidder certifies that its price includes the complete revised turnkey scope without undisclosed exclusions or future price adjustments.

Company Authorized Representative Signature Date

APPENDIX G - DRAFT CONTRACT AGREEMENT

This Draft Contract Agreement is provided for procurement purposes. The final agreement may be revised following legal and administrative review, provided revisions do not alter the material basis of award.

1. Parties

Agreement between New Heights Charter School of Brockton, 1690 Main Street, Brockton, MA 02301 (Awarding Authority) and the awarded Contractor.

2. Project

Front Entry Enhancement Project - Revised Turnkey Scope, IFB #2027-FE01.

3. Contract Documents

Executed Agreement, IFB, Technical Specifications, all Attachments/Appendices, Addenda, accepted Bid, prevailing-wage schedule, bonds, insurance, approved schedule, approved submittals, Notice to Proceed, and approved Change Orders.

4. Contract Price

The Contract Price shall be the accepted firm fixed lump-sum bid and shall include all labor, supervision, materials, equipment, permits, testing, bonds, insurance, overhead, profit, cleanup, warranties, and incidental items necessary to complete the Work.

5. Contract Time

Work shall commence only upon written Notice to Proceed. Substantial and Final Completion shall occur by the dates stated in the executed agreement and approved baseline schedule. Time is of the essence.

6. Payment

Payment applications shall be supported by Schedule of Values, certified payroll, statements of compliance, approved Change Orders, and other documentation required by the Awarding Authority.

7. Changes

No changed or extra work may proceed without prior written Change Order approval.

8. Prevailing Wage

Contractor and subcontractors shall comply with all applicable prevailing-wage obligations.

9. Bonds and Insurance

Required bonds and insurance shall be furnished and approved before Work begins.

10. Warranty and Closeout

Minimum one-year workmanship warranty plus manufacturer warranties; final payment subject to Final Acceptance and complete closeout.

11. Termination and Governing Law

Termination rights and remedies shall be as stated in the final agreement and applicable Massachusetts law. The agreement shall be governed by Massachusetts law.

AWARDING AUTHORITY CONTRACTOR

New Heights Charter School of Brockton Company: __________________________ By: ______________________________ By: ______________________________ Name/Title: _______________________ Name/Title: _______________________ Date: ____________________________ Date: ____________________________

APPENDIX H - REVISED MANDATORY LANDSCAPE PLANT SCHEDULE

The following reduced planting schedule is mandatory and replaces the original full planting schedule for bid pricing. Equivalent substitutions require prior written approval by Addendum before bid opening. All plant material shall be nursery-grown, healthy, first quality, and installed in accordance with accepted horticultural practice.

Qty Botanical / Type Common Name / Description Minimum Size

5 Carpinus betulus 'Fastigiata'

Fastigiate Hornbeam 3 in. cal.

2 Malus jefspire Purple Spire Columnar Crabapple

3 in. cal.

12 Buxus 'Green Gem' Green Gem Boxwood 18-24 in.

6 Hydrangea paniculata Bobo

Bobo Hardy Hydrangea 7 gal.

6 Hydrangea paniculata

'SMNHPSB'

Tiny Quick Fire Hydrangea

3 gal.

8 Ilex glabra 'Shamrock' Shamrock Inkberry Holly

2-2.5 ft.

8 Juniperus horizontalis Icee Blue

Icee Blue Juniper 5 gal.

12 Nepeta x faassenii 'Jr.

Walker's Low'

Catmint 1 gal.

8 Pennisetum alopecuroides 'Dwarf Hamelin'

Dwarf Fountain Grass 3 gal.

12 Hemerocallis 'Stella d’Oro'

Stella d’Oro Daylily 1 gal.

6 Rosa 'ChewNiceBell' Oso Easy Italian Ice Rose

5 gal.

6 Salvia nemorosa 'Mainacht'

May Night Meadow Sage

1 gal.

12 Liriope muscari 'Monroe White'

Monroe White Lilyturf 1 gal.

Landscape bed limits, spacing, and final placement shall follow the reference design intent and field coordination with the Awarding Authority. Topsoil, mulch, sod restoration, automatic irrigation, and strategic landscape lighting remain part of the mandatory base scope.

APPENDIX I - CURRENT PREVAILING WAGE SCHEDULE

Official Massachusetts Department of Labor Standards Prevailing Wage Schedule - Wage Request No.

20261109140834, issued November 10, 2026, for IFB #2027-FE01 at 1690 Main Street, Brockton, MA 02301.

The schedule is incorporated in its entirety and applies to this Project.

APPENDIX J - SCHOOL LOGO ARTWORK

APPENDIX K - BIDDER ACKNOWLEDGMENT

The undersigned acknowledges receipt of IFB #2027-FE01 and all Addenda, confirms authority to bind the bidder, and certifies that the bid is complete and accurate, includes the full revised turnkey scope, and commits to the required project schedule.

Field Bidder Response Legal Company Name Business Address

FEIN

Authorized Representative Title Email Phone Signature Date Addenda Acknowledged

TURNKEY SCOPE CERTIFICATION

The bidder certifies that its bid includes the complete revised turnkey scope without unauthorized exclusions, deletions, substitutions, or future price adjustments.

SCHEDULE CERTIFICATION

The bidder certifies that, if awarded, it can execute the contract, provide required bonds and insurance, mobilize upon written Notice to Proceed, and achieve Substantial Completion by the required date stated in the final solicitation.

APPENDIX L - 2026-2027 NHCSB SCHOOL CALENDAR

Construction scheduling shall be coordinated with the attached school calendar. Heavy and disruptive work is prioritized for April Break, April 19-23, 2027.

IMPORTANT PROCUREMENT NOTICE
TABLE OF CONTENTS
1. NOTICE TO BIDDERS
2. PROCUREMENT SCHEDULE
3. PROJECT BACKGROUND AND OBJECTIVES
4. REVISED TURNKEY SCOPE
4.1 Mobilization, Layout and Site Protection
4.2 Demolition and Disposal
4.3 Earthwork and Foundations
4.4 Concrete and Hardscape
4.5 Masonry - Preserved Architectural Scope
4.6 Ornamental Fencing and Gates
4.7 Automatic Irrigation - Mandatory
4.8 Landscape Installation - Reduced, Not Deleted
4.9 Strategic Landscape Lighting - Mandatory
4.10 Peace Pole Installation
4.11 Testing, Closeout and Warranty
5. MANDATORY TECHNICAL SPECIFICATIONS
6. VALUE-ENGINEERED MATERIAL STANDARDS
7. LANDSCAPE, IRRIGATION AND LIGHTING REQUIREMENTS
8. SITE VISIT AND EXISTING CONDITIONS
9. SCHEDULE AND COMPLETION REQUIREMENTS
10. PREVAILING WAGE, BONDS AND INSURANCE
10.1 Prevailing Wage
10.2 Bonds
10.3 Insurance
11. BID SUBMISSION REQUIREMENTS
12. RESPONSIVENESS AND RESPONSIBILITY
12.1 Responsiveness
12.2 Responsibility
13. BID OPENING, EVALUATION AND AWARD
13.1 Public Bid Opening
13.2 Evaluation
13.3 Award
13.4 Clarifications and Rights Reserved
14. CONTRACT TERMS
15. PROJECT ADMINISTRATION, CHANGES AND CLOSEOUT
15.1 Pre-Construction Submittals
15.2 Changes
15.3 Closeout
16. ATTACHMENTS AND APPENDICES
APPENDIX A - MANDATORY COMPLIANCE CHECKLIST
APPENDIX B - BID PRICE FORM
APPENDIX C - CONSTRUCTION SCHEDULE CERTIFICATION
APPENDIX D - CONTRACTOR QUALIFICATIONS & REFERENCES
Reference 1
Reference 2
Reference 3
APPENDIX E - PROPOSED MAJOR SUBCONTRACTORS
APPENDIX F - REQUIRED CERTIFICATIONS
Independent Price Determination / Non-Collusion
Massachusetts Tax Compliance
Debarment / Eligibility
Prevailing Wage Compliance
Complete Scope Certification
APPENDIX G - DRAFT CONTRACT AGREEMENT
1. Parties
2. Project
3. Contract Documents
4. Contract Price
5. Contract Time
6. Payment
7. Changes
8. Prevailing Wage
9. Bonds and Insurance
10. Warranty and Closeout
11. Termination and Governing Law
APPENDIX H - REVISED MANDATORY LANDSCAPE PLANT SCHEDULE
APPENDIX I - CURRENT PREVAILING WAGE SCHEDULE
APPENDIX J - SCHOOL LOGO ARTWORK
APPENDIX K - BIDDER ACKNOWLEDGMENT